Professional Documents
Culture Documents
Master Divertion July 2023
Master Divertion July 2023
8 8 1105 1105
8 8 1105 1105
DIVERT DUE TO RPM BODY FOR NEEL METAL RODUCT LTID 03M->HR
SCRT,R.SOD 03M->HR SCRT,R.SBODY-M/RPM (BODY-WITH SCALE)
T/SF F/W P/P CONTIN F/COILIN FEW PLACES IN B/SF F/W IN ID 250
MTRL/M RIS(W/S)ON T/B F/W CONTL/ M TI-STREAKS ON T/B F/W
P/P A/IL/M WAVINESS AT B/E CONTL-843MTR
DIVERT DUE TO RPM(B)(WITH SCALE)& LESS WIDTHID-02M->HR
SCRT,R.SOD-02M->HR SCRT,R.SBODY-M/D RPM(B)WITH SCALE ON
T/B F/W P/P A/I CONT IN F/COILL/M TI-STREAKS ON T/B F/W P/P
A/IL/M SEAMLINE ON T/B S/F B.E 10-12MM CONTLESS WIDTH OBS
IN F/COILL/M WAVINESS AT B.E CONTL-703M
DIVERT DUE TO RPM(B)(WITH SCALE),NEEL METALID-02M->HR
SCRT,R.SOD-02M->HR SCRT,R.SBODY-L/M RIS(W/S)ONT/B F/W
DIVERTAT
CONTL/M WAVINESS DUE TOCONTLL/M
D/S LESS WIDTH FOR JSSLON T/B S/F B.E
SEAMLINE
10-12MM CONTL/PITTING ID-03M->HR SCRT,R.S
ON T/B F/W P/P A/I CONTM/D RPM(WITH
SCALE)ON T/BOD-03M->HR SCRT,R.S
F/W P/P A/I FROM 500-ODL-845M
BODY-
L/M RIS(W/S)ON T/B F/W CONT
. L/M TI-STREAKS ON T/B F/W P/P A/I
LESS WIDTH ID TO 270MTR
D/ SLABSCALE ON T/SF F/W 150-230MTR & REST M/ SLAB SCALE ON
T/SF F/W P/P A/I
D/ RPM BODY ON T/SF AT 194 MTR
L-697MTR
OK
OK
OK
CGPL QAD BA QAD CAPL QAD HAPL QAD
DIVERT
DIVERT
DIVERT
DIVERT
OK
DIVERT
OK
DIVERT
DIVERT OK
DIVERT OK
DIVERT
OK
BA MAIN DEFECT CAPL MAIN DEFECT
UNDER WIDTH
SLIVER-C-EDGE SLIVER-C-EDGE
HAPL MAIN DEFECT HPL MAIN DEFECTS
UNDER WIDTH
SLIVER C-EDGE
SLIVER C-EDGE
SLIVER-C-EDGE
HSM
HSM HSM HSM Dis.
HSM MAIN DEFECT Rolling date Campaign Seq. No Ret time Temp.
no
1 4 8 0 12 10 10 Y
0 0 12 0 12 10 10 Y
5 3 10 0 12 10 10 Y
10 27 15 0 12 10 10 Y
10 25 25 10 12 10 10 Y
15 25 35 10 12 10 10 Y
10 30 15 0 24 22 20 Y
3 40 15 0 3 3 2 Y
Customer Casting Date Slab Ind.
1100-4500 21-Jun N
1100-4500 21-Jun N
KRISH IMPEX WC
Grinding
SLAB QA REMARKS Loss(%0 DEFECT SOURCE