Bahria Town Karachi E&P Department: Oil Topup Report

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Bahria Town Karachi E&P Department

(Maintenance Sec on)


Oil Topup Report
B.T .# Descrip on Department
17-96 Grader Infra Phase I Report Date: 15-Mar-23
Work Meter Engine Hydrulic Oil Trans Oil
Sr. 17-98 Hours
Done By Varia on Oil (Aw-68,15W-40 (SAE-30,15W-40) Reason Status
Total Oils 9 Litrs 45 Litrs 45 Litrs
Reason Status
1 10-Jan-23 E 11230 0 Litrs 10 Litrs Transmission Oil Leakge
2 27-Jan-23 E 11321 91 Hrs 3 Litrs 0 Litrs 0 Litrs Engine Oil Consuming
3 6-Feb-23 W/S 11352 31 Hrs 6 Litrs 0 Litrs 0 Litrs Engine Oil Consuming
4 10-Feb-23 E 11385 33 Hrs 5 Litrs 0 Litrs Hydraulic Oil Leakage
5 16-Feb-23 E 11394 9 Hrs 15 Litrs 0 Litrs Hydraulic Pump Ring Leak Ring Changed

6 21-Feb-23 W/S B 11414 20 Hrs 0 Litrs 20 Litrs Transmission Pipe Leak (Used)

7 1-Mar-23 A 11451 37 Hrs 25 Litrs 0 Litrs Hydraulic Pipe Leak Hydraulic Pipe
8 14-Mar-23 A 11533 82 Hrs 0 Litrs 15 Litrs Transmission Oil Leakge
9 0 Litrs 0 Litrs
10 0 Litrs 0 Litrs
11 0 Litrs 0 Litrs
12 0 Litrs 0 Litrs
13 0 Litrs 0 Litrs
14 0 Litrs 0 Litrs
15 0 Litrs 0 Litrs
16 0 Litrs 0 Litrs
17 0 Litrs 0 Litrs
18 0 Litrs 0 Litrs
19 0 Litrs 0 Litrs
20 0 Litrs 0 Litrs
21 0 Litrs 0 Litrs
22 0 Litrs 0 Litrs

You might also like