Contract Overdue Items

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Drawing Register – 21 Nos.

KMEP
No

Status
Service Submission Required Returned
Drawing Ref. TOWER LEVEL Description Rev of
Code Date Date Date
Days
Ref

FM-MX-SD-L28-11065 HTL L28 WS HOTEL LEVEL 28 PLUMBING LAYOUT 3 27/Jul/23 3/Aug/23 53 UR


FM-MX-SD-L22-10924 RTL L22 AC RESIDENTIAL LEVEL 22 & 23 SMOKE CONTROL LAYOUT 1 8/Aug/23 15/Aug/23 41 UR
FM-MX-SD-L4-10960 Podium L04 AC LEVEL 04 GYM & YOGA VENTILATION LAYOUT 2 25/Jul/23 1/Aug/23 55 UR
FM-ID-SD-L4-02705 Podium L04 RCP HOTEL LEVEL 4 - RESTAURENT REFLECTED CEILING PLAN 4 1/Jun/23 8/Jun/23 109 UR
MEP-EX-SD-L17-00055 HTL L17 EL HOTEL LANDSCAPE - LEVEL 17 LIGHTING CONTROL LAYOUT 0 8/Aug/23 15/Aug/23 41 UR
MEP-EX-SD-L17-00054 HTL L17 LC HOTEL LEVEL-17 LANDSCAPE LIGHTING LAYOUT 0 8/Aug/23 15/Aug/23 41 UR
MEP-ID-SD-H18A-00071 HTL L26 RCP HOTEL LEVEL 26 ROYAL SUITE REFLECTED CEILING PLAN 0 19/Aug/23 26/Aug/23 30 UR
MEP-ID-SD-B1-00248 HTL B1 RCP HOTEL BASEMENT LEVEL-01 (B.O.H) MEP CEILING LAYOUT ENLARGED PART PLAN-02 0 18/Aug/23 25/Aug/23 31 UR
MEP-MX-SD-L2-00331 Podium L02 AC LEVEL 02 SECRET GARDEN BAR AC LAYOUT 0 25/Aug/23 1/Sep/23 24 UR
MEP-MX-SD-L2-00332 Podium L02 AC LEVEL 02 SECRET GARDEN BAR VENTILATION LAYOUT 0 25/Aug/23 1/Sep/23 24 UR
MEP-MX-SD-L2-00333 Podium L02 CHW LEVEL 02 SECRET GARDEN BAR CHWP LAYOUT 0 25/Aug/23 1/Sep/23 24 UR
FM-MX-SD-L1-11506 HTL L1 LPG 1ST FLOOR (G+1) PART PLAN-1 GAS LAYOUT 3 24/Jul/23 31/Jul/23 56 UR
MEP-MX-SD-L5-00344 HTL L5 AC 5TH FLOOR (G+5) HEAT / COOL PUMP HVAC LAYOUT 0 31/Aug/23 7/Sep/23 18 UR
MEP-EX-SD-ML-00346 Podium ML EL 4TH FLOOR (G-04) PANTRY POWER LAYOUT 0 4/Sep/23 11/Sep/23 14 UR
MEP-EX-SD-ML-00347 Podium ML EL 4TH FLOOR (G-04) PANTRY LIGHTING & EMERGENCY LIGHTING LAYOUT 0 4/Sep/23 11/Sep/23 14 UR
MEP-MX-SD-L4-00376 Podium L4 EL 4TH Floor (G-04) Part Plan -1 Pantry plumbing layout 0 9/Sep/23 16/Sep/23 9 UR
MEP-EX-SD-B1-00357 Podium B1 EL Basement-01 Bakery /Pastry and Chocolate Room Power Layout 0 11/Sep/23 18/Sep/23 7 UR
MEP-MX-SD-B1-00359 HTL B1 WS Basement-01 Main Kitchen (Hotel) Chocolate Room & Pastry area water Supply Layout 0 11/Sep/23 18/Sep/23 7 UR
Basement-01 Main Kitchen (Hotel) Chocolate Room & Pastry area Low Level Drainage
MEP-MX-SD-B1-00360 HTL B1 DR 0 11/Sep/23 18/Sep/23 7 UR
Layout
MEP-EX-SD-B1-00378 Podium B1 EL Basement-01 Bakery/Pastry and Chocolate Room DB Schedule 0 11/Sep/23 18/Sep/23 7 UR
MEP-EX-SD-B1-00379 Podium B1 EL Basement-01 Bakery/Pastry and Chocolate Room Single line diagram 0 11/Sep/23 18/Sep/23 7 UR

RFI Schedule – 03 Nos.


No.
Date
KMEP Ref No. Subject Discipline Area/Level Date Sent of Status
Received
Days
MEP-EX-RFI-PW-00269 Template for Warranty Certificate EL PW 18-Jul-23 62 Open
Additional equipment’s & changes in the kitchen equipment loads in basement-1
MEP-EX-RFI-ML-00271 EL ML 19-Aug-23 30 Open
kitchen area
MEP-EX-RFI-B01-00273 RFI for People & Culture Office at basement-01 Revised MEP & FLS requirements EL ML 21-Aug-23 28 Open
WIR Schedule – 11 Nos.
No

Discipli

Status
Level
Submission
Document Ref: Descriptions Returned Date of

ne
Date
Days
Inspection request for the Marking of Drain Provision prior to Coring, (2nos x160mm dia) in Pool Area,
MEP-PX-WR-L4-03073 PL L4 08/04/2023 163 UR
Level 4 Residential Tower. Attached Highlighted drawing as per area & location.
Inspection Request for Installation & Final Fix of Floor Box (AVP-1) @GF, Meeting room, Hotel Tower, as
MEP-EX-WR-GF-03094 ELE G/F 24/07/2023 56 UR
per attached Highlighted drawing.
Inspection Request for Cable Continuity Test of BGM System with SPEAKER RA-FTR-GF-01-01 AMP/OUT
MEP-EX-WR-GF-03492 1,2,3,4 AMP2/OUT 3 & 4 AND HT-FTR-GF--01-01 AMP1/OUT 1,2,3,4 AMP2/OUT 1,2,3,4 @GF, Hotel & ELE GF 10/06/2023 100 UR
Residential Tower, as per attached Report & Drawings.
Inspection Request for De-Snagging of MEP Services in Level 14, Corridor & lobby at Hotel Area, as per
MEP-GE-WR-L14-03628 MEP L14 11/09/2023 7 UR
(attached snag list and comments).
Marking inspection Request for POS Box @L29, Landscape area, Hotel Tower as per attached highlighted
MEP-EX-WR-L29-03731 ELE L29 06/09/2023 12 UR
Drawings.
Inspection Request for Insulation of SS Hot water Piping in Water Meter room at Level 5 to L23 & L31
MEP-PX-WR-ML-03734 PL ML 11/09/2023 7 UR
Residential Tower, as per attached Highlighted drawings.
Inspection Request for Insulation of SS Hot water piping in Water Meter room at Basement 2, Ground Floor,
MEP-PX-WR-ML-03735 PL ML 11/09/2023 7 UR
L2, L4, L8, L11 to L17, L22, L24 to L28 Hotel Tower, as per attached Highlighted drawings.
Inspection Request for DE-Snagging of MEP Services in Level 13(OME-14), Guest Room 1304-11C(OME-1404)
MEP-GE-WR-L13-03736 MEP L13 11/09/2023 7 UR
at Hotel Area, as per attached Documents.
Inspection Request for DE-Snagging of MEP Services in Level 14(OME-15), Guest Room 1404-11C(OME-1504)
MEP-GE-WR-L14-03737 MEP L14 11/09/2023 7 UR
at Hotel Area, as per attached Documents.
Inspection Request for DE-Snagging of MEP Services in Level 14(OME-15), Guest Room 1407-11C(OME-1507)
MEP-GE-WR-L14-03738 MEP L14 11/09/2023 7 UR
at Hotel Area, as per attached Documents.
Inspection Request for DE-Snagging of MEP Services in Level 15(OME-16), Guest Room 1507-11C(OME-1607)
MEP-GE-WR-L15-03739 MEP L15 11/09/2023 7 UR
at Hotel Area, as per attached Documents.

O&M Manual Schedule – 09 Nos.


Code Submittal Returned No. of
KCE/KMEP Ref. Description Manufacturer / Supplier Rev Status
Ref. Date Date days
Operation & Maintenance Manual for Standby Generator
MEP-EX-MA-PW-00002 ELE JENGAN LLC 01 05-Sep-23 13 UR
& Generator Assemblies
Operation & Maintenance Manual for Earthing &
MEP-EX-MA-PW-00006 ELE SMKA ELECTRIC LLC 01 19-Aug-23 30 UR
Lightning Protection System
Operation & Maintenance Manual for Guest Room
MEP-ELV-MA-PW-00002 ELV Creation Gulf 02 16/08/2023 33 UR
Management System (Draft)
Operation & Maintenance Manual for Central Battery
MEP-ELV-MA-PW-00007 ELV ODS 01 22-Aug-23 27 UR
Emergency System
MEP-PX-MA-PW-00001 PL Operation & Maintenance Manual for Sump Pumps AQUAGAS 01 15-May-23 126 UR
Operation & Maintenance Manual for Plumbing Sanitary
MEP-PX-MA-PW-00004 PL SANIPEX LLC 02 31-Jul-23 49 UR
Wares
MEP-PX-MA-PW-00006 PL Operation & Maintenance Manual for Grease Interceptor HEPWORTH PME LLC 00 29-Aug-23 20 UR
MEP-MX-MA-PW-00003 MECH Operation & Maintenance Manual for VAVs PRIME AIR CONDITIONING LLC 00 05-Sep-23 13 UR
MEP-MX-MA-PW-00008 MECH Operation & Maintenance Manual for DX units DAIKIN AIR CONDITIONING LLC 01 7-Aug-23 42 UR

Material Submittal Schedule – 01 Nos.


Code Submittal Returned No. of
KCE/KMEP Ref. Description Rev Status
Ref. Date Date days
MEP-EX-MT-PW-00083 ELE Material Submittal for X-L13 Liner at Ballroom Entrance 00 07-Jul-23 73 UR

You might also like