Project: -
Client: -
Contractor: -
Consultant: -
Location: -

T D S Item No. and Description T D S Item No. and Description


A. SUB-STRUCTURE 1.8. Cartaway
1. EXCAVATION & EARTH WORKS Total volume of site clearing
1.1. Site clearing 180.00 Ditto item no 1.1
1 20.00
9.00 Total volume Bulk
180.00 m2 net area to item 1.1
162.00 Ditto item no 1.2
1.2. Bulk excavation
1 15.00 Avg. Depth =1.20m Total volume of pit
9.00 105.00 Ditto item no 1.3
1.20
162.00 m3 net volume to item 1.2 Total volume of trench
138.00 Ditto item no 1.4
1.3. Pit Excavation
6 2.50 F-1 (2.5*2*0.5m) Deduction
2.00 64.30 Ditto item no 1.5
2.50 75.00
Deduction
3 2.00 F-2 (2*2*0.5m) 69.00 Ditto item no 1.6
2.00 451.70 m3 net volume to item 1.8
2.50 30.00 1.9. Hard core
105.00 m3 net volume to item 1.3 1 1.50 On axis 1''-1 b/n A-B
4.00 6.00
1.4. Trench Excavation for masonry
3 9.00 on axis 1,2 & 3 b/n A-C 1 5.50 On axis 1-2 b/n A-B
1.00 4.00 22.00
2.00 54.00
1 3.50 On axis 2-3 b/n A-B
1 4.50 on axis 1' b/n B-C 4.00 14.00
1.00
2.00 9.00 1 1.50 On axis 1''-1 b/n B-C
4.00 6.00
1 11.50 on axis A b/n 1'-3'
1.00 1 2.00 On axis 1-1' b/n B-C
2.00 23.00 4.00 8.00

2 13.00 on axis B & C b/n 1-3' 1 3.75 On axis 1-2 b/n B-C
1.00 3.50 13.13
2.00 52.00
138.00 m3 net volume to item 1.4 1 3.50 On axis 2-3 b/n B-C
4.00 14.00
1.5. Fill around foundation
Pit excavation 1 2.70 On axis 3-3' b/n B-C
105.00 Ditto item no 1.3 1.20 3.24
86.37 m2 net area to item 1.9
Deduction
34.50 Ditto item no 2.02.a

6.20 Ditto item no 2.02.b


64.30 m3 net volume item1.5

1.6. Fill around masonry


Ternch excavation
138.00 Ditto item no 1.4

Deduction
69.00 Ditto item no 3.1
69.00 m3 net volume item1.6

1.7. Fill under Hard Core


1 86.37 Ditto item no 1.1
0.15 12.95 Avg H=0.4m
12.95 m3 net volume item1.7

Contractor:‐ _______________
Consultant: ‐ ____________
Client: ‐ __________________
Page 2 of 10

Project: -
Client: -
Contractor: -
Consultant: -
Location: -

T D S Item No. and Description T D S Item No. and Description


2. CONCRETE WORKS 2.2.b) C-25 Concrete in foundation column
2.1. a) Lean Concrete under Footing 1 0.40 C-1 on F1(0.4*0.4m)
6 2.50 F-1 (2.5*2*0.5m) 0.40
2.00 30.00 3.75 0.60

3 2.00 F-2 (2*2.*0.5m) 1 0.40 C-1' on F1(0.4*0.4m)


2.00 12.00 0.40
42.00 m2 net area to item 2.1.a 3.75 0.60
2.1. b) Lean Concrete under Masonry
3 9.00 on axis 1,2 & 3 b/n A-C 1 0.45 C-2 on F1(0.45*0.45m)
0.50 13.50 0.45
3.75 0.76
1 4.50 on axis 1' b/n B-C
0.50 2.25 1 0.45 C-2' on F1(0.45*0.45m)
0.45
1 11.50 on axis A b/n 1'-3' 3.75 0.76
0.50 5.75
2 0.40 C-3 on F2(0.4*0.4m)
2 13.00 on axis B & C b/n 1-3' 0.40
0.50 13.00 3.75 1.20
34.50 m2 net area to item 2.1.b
2.1. c) Lean Concrete under grade beam 1 0.45 C-4 on F2(0.45*0.45m)
1 9.00 on axis 2 b/n A-C 0.45
0.50 4.50 3.75 0.76

1 4.50 on axis 1' b/n B-C 2 0.45 C-5 on F1(0.45*0.45m)


0.50 2.25 0.45
3.75 1.52
1 11.50 on axis B b/n 1'-3 6.20 m3 net volume to item 2.2.b
0.50 5.75 2.2.c) C-25 Concrete in Grade beam
12.50 m2 net area to item 2.1.C 3 8.75 GB1
2.1.d) Floor slab 0.25
1 1.50 On axis 1''-1 b/n A-B 0.40 2.63
4.00 6.00
1 4.50 GB2
1 5.50 On axis 1-2 b/n A-B 0.25
4.00 22.00 0.40 0.45

1 3.50 On axis 2-3 b/n A-B 2 10.00 GB3


4.00 14.00 0.25
0.40 2.00
1 1.50 On axis 1''-1 b/n B-C
4.00 6.00 1 11.20 GB4
0.25
1 2.00 On axis 1-1' b/n B-C 0.40 1.12
4.00 8.00
1 2.70 GB5
1 3.75 On axis 1-2 b/n B-C 0.25
3.50 13.13 0.40 0.27

1 3.50 On axis 2-3 b/n B-C 1 1.30 GB6


4.00 14.00 0.25
0.40 0.13
1 2.70 On axis 3-3' b/n B-C 6.60 m3 net volume to item 2.2.c
1.20 3.24 2.2.d) C-25 Concrete in Ground floor slab
86.37 m2 net area to item 1.9 1 1.43 On axis 1''-1 b/n A-B
2.2.a) C-25 Concrete in footing Pad 4.50 6.44
9 2.50 F-1 (2.5*2*0.5m)
2.00 1 5.75 On axis 1-2 b/n A-B
0.50 22.50 4.13 23.75

3 2.50 F-2 (2*2*0.5m) 1 3.93 On axis 2-3 b/n A-B


2.00 4.13 16.23
0.80 12.00
34.50 m3 net volume to item 2.2.a 1 1.43 On axis 1''-1 b/n B-C
4.50 6.44

Contractor:‐ _______________
Consultant: ‐ ____________
Client: ‐ __________________
Page 3 of 10

Project: -
Client: -
Contractor: -
Consultant: -
Location: -

T D S Item No. and Description


1 1.98 On axis 1-1' b/n B-C 2.3. Formwork
4.13 8.18 a) Footing Pad
6 9.00 F-1 (2.5*2*0.5m)
1 3.52 On axis 1-2 b/n B-C 0.50 27.00
3.88 13.64
3 8.00 F-2 (2*2*0.5m)
1 3.93 On axis 2-3 b/n B-C 0.50 12.00
4.13 16.23 39.00 m2 net area to item 2.3.a
b) Foundation Column
1 2.58 On axis 3-3' b/n B-C 1 1.60 C-1 on F1(0.4*0.4m)
1.05 2.71 3.75 6.00
93.61 m2 net area to item 2.2.d
1 1.60 C-1' on F1(0.4*0.4m)
3.75 6.00

1 1.80 C-2 on F1(0.45*0.45m)


3.75 6.75

2 1.80 C-2' on F1(0.45*0.45m)


3.90 14.04

2 1.60 C-3 on F2(0.4*0.4m)


3.65 11.68

1 1.80 C-4 on F2(0.45*0.45m)


3.75 6.75

2 1.80 C-5 on F1(0.45*0.45m)


3.90 14.04
65.26 m2 net area to item 2.3.b
c) Grade Beam
3 17.50 GB1
0.40 21.00

1 8.24 GB2
0.40 3.30

2 19.91 GB3
0.40 15.93

1 22.21 GB4
0.40 8.88

1 5.66 GB5
0.40 2.26

1 2.35 GB6
0.40 0.94
52.31 m2 net area to item 2.3.c

Contractor:‐ _______________
Consultant: ‐ ____________
Client: ‐ __________________
Page 4 of 10

Project: -
Client: -
Contractor: -
Consultant: -
Location: -

T D S Item No. and Description Item No. and Description


3. Stone Masonry Work
3.1. 50cm thick stone masonry wall

3 9.00 on axis 1,2 & 3 b/n A-C


0.50
2.00 27.00

1 4.50 on axis 1' b/n B-C


0.50
2.00 4.50

1 11.50 on axis A b/n 1'-3'


0.50
2.00 11.50

2 13.00 on axis B & C b/n 1-3'


0.50
2.00 26.00
69.00 m3 net volume to item 3.1.

Contractor:‐ _______________
Consultant: ‐ ____________
Client: ‐ __________________
Page 5 of 10

Project: -
Client: -
Contractor: -
Consultant: -
Location: -

T D S Item No. and Description T D S Item No. and Description


B. SUPER STRUCTURE 2 0.30 C-2' (0.3*0.4m)
1.01. C-25 Concrete 0.40
a) Elevation column 3.23 0.78
Ground Floor
1 0.40 C-1 (0.4*0.4m) 2 0.40 C-3 (0.4*0.4m)
0.40 0.40
3.23 0.52 3.23 1.03

1 0.40 C-1' (0.4*0.4m) 1 0.40 C-4 (0.4*0.4m)


0.40 0.40
3.23 0.52 3.23 0.52

1 0.45 C-2 (0.45*0.45m) 2 0.30 C-5 (0.3*0.4m)


0.45 0.40
3.23 0.65 3.23 0.78

2 0.45 C-2' (0.45*0.45m) 3rd Floor


0.45 2 0.30 C-2' (0.3*0.4m)
3.23 1.31 0.40
2.80 0.67
2 0.40 C-3 (0.4*0.4m)
0.40 1 0.40 C-4 (0.4*0.4m)
3.23 1.03 0.40
2.80 0.45
1 0.45 C-4 (0.45*0.45m) 15.96 m3 net volume to item 1.01.a
0.45
3.23 0.65 b.) Floor Beam
1st -2nd Floor
2 0.45 C-5 (0.45*0.45m) 2 9.00 FB1
0.45 0.25
3.23 1.31 0.40 1.80

1st Floor 4 9.00 FB2


1 0.30 C-1 (0.3*0.4m) 0.25
0.40 0.40 3.60
3.23 0.39
2 4.13 FB3
2 0.30 C-1' (0.3*0.4m) 0.25
0.40 0.40 0.83
3.23 0.78
2 11.10 FB4
1 0.30 C-2 (0.3*0.4m) 0.25
0.40 0.40 2.22
3.84 0.46
2 11.95 FB5
2 0.30 C-2' (0.3*0.4m) 0.25
0.40 0.40 2.39
3.23 0.78
2 11.10 FB6
2 0.40 C-3 (0.4*0.4m) 0.25
0.40 0.40 2.22
3.23 1.03
3rd Floor
1 0.40 C-4 (0.4*0.4m) 2 4.70 FB1
0.40 0.25
3.84 0.61 0.40 0.94

2 0.30 C-5 (0.3*0.4m) 1 4.13 FB2


0.40 0.25
3.84 0.92 0.40 0.41

2nd Floor 1 7.70 FB3


1 0.30 C-1 (0.3*0.4m) 0.25
0.40 0.40 0.77
3.23 0.39
1 7.70 FB4
1 0.30 C-2 (0.3*0.4m) 0.25
0.40 0.40 0.77
3.23 0.39

Contractor:‐ _______________
Consultant: ‐ ____________
Client: ‐ __________________
Page 6 of 10

Project: -
Client: -
Contractor: -
Consultant: -
Location: -

T D S Item No. and Description T D S Item No. and Description


Top tie beam 1 1.98 On axis 1-1'' b/n B-C
1 2.70 RB1 4.13 8.18
0.25
0.40 0.27 2 3.52 On axis 1-2 b/n B-C
3.88 27.28
2 1.30 RB2
0.25 Water tanker
0.40 0.26 2 1.20 EB
4.13 9.90
1 9.00 RB3
0.25 2 1.20
0.40 0.90 1.12 2.69
242.54 m2 net area to item 1.01.c
1 5.50 RB4
0.25 d) Stair case
0.40 0.55 Ground floor
8 1.20 Landing
1 4.70 RB5 1.20
0.25 0.17 1.94
0.40 0.47
4 6.54 Soffit
1 4.70 RB6 1.20
0.25 0.17 5.34
0.40 0.47
68 0.02 Riser
1 4.13 RB7 1.20 1.94 Area = 0.5*(0.17*0.28) = 0.0238m2
0.25
0.40 0.41 4 3.52 LB-1
0.25
1 3.52 RB8 0.40 1.41
0.25 10.62 m3 net volume to item 1.01.d
0.40 0.35

1 3.52 RB9
0.25
0.40 0.35
19.99 m3 net volume to item 1.01.b

c) Floor slab
1st&2nd
2 1.45 On axis 1'-1 b/n A-B
4.13 11.98

2 0.85 On axis 1' b/n A-C


5.00 8.50

2 5.75 On axis 1-2 b/n A-B


4.13 47.50

2 3.93 On axis 2-3 b/n A-B


4.13 32.46

2 1.45 On axis 1'-1 b/n B-C


4.13 11.98

2 1.98 On axis 1-1'' b/n B-C


4.13 16.35

2 3.52 On axis 1-2 b/n B-C


3.88 27.28

2 3.93 On axis 2-3 b/n B-C


4.13 32.46

3rd
1 1.45 On axis 1'-1 b/n B-C
4.13 5.99

Contractor:‐ _______________
Consultant: ‐ ____________
Client: ‐ __________________
Page 7 of 10

Project: -
Client: -
Contractor: -
Consultant: -
Location: -

T D S Item No. and Description T D S Item No. and Description


1.02 Formwork b.) Floor beam
a) Elevation column 1st &2nd Floor
Ground Floor 2 17.25 FB1
1 1.60 C-1 (0.4*0.4m) 0.40 13.80
3.23 5.17
4 16.50 FB2
1 1.60 C-1' (0.4*0.4m) 0.40 26.40
3.23 5.17
2 8.26 FB3
1 1.80 C-2 (0.45*0.45m) 0.40 6.61
3.23 5.81
2 22.95 FB4
2 1.80 C-2' (0.45*0.45m) 0.40 18.36
3.23 11.63
2 23.40 FB5
2 1.60 C-3 (0.4*0.4m) 0.40 18.72
3.23 10.34
2 22.95 FB6
1 1.80 C-4 (0.45*0.45m) 0.40 18.36
3.23 5.81
6 7.80 Under Beam
2 1.80 C-5 (0.45*0.45m) 0.25 11.70
3.23 11.63
1st Floor 6 10.55 Under Beam
1 1.40 C-1 (0.3*0.4m) 0.25 15.82
3.23 4.52
2 11.42 Under Beam
1 1.40 C-1' (0.3*0.4m) 0.25 5.71
3.23 4.52
3rd Floor
1 1.40 C-2 (0.3*0.4m) 2 8.90 FB1
3.23 4.52 0.40 7.12

2 1.40 C-2' (0.3*0.4m) 1 8.26 FB2


3.23 9.04 0.40 3.30

2 1.60 C-3 (0.4*0.4m) 1 14.65 FB3


3.23 10.34 0.40 5.86

1 1.60 C-4 (0.4*0.4m) 1 14.65 FB4


3.23 5.17 0.40 5.86

2 1.40 C-5 (0.3*0.4m) 3 3.90 Under Beam


3.23 9.04 0.25 2.93
2nd floor
1 1.40 C-1 (0.3*0.4m) 2 6.95 Under Beam
3.23 4.52 0.25 3.48

1 1.40 C-2 (0.3*0.4m) Top tie beam


3.23 4.52 1 5.66 RB1
0.40 2.26
2 1.40 C-2' (0.3*0.4m)
3.23 9.04 2 2.35 RB2
0.40 1.88
2 1.40 C-3 (0.3*0.4m)
3.23 9.04 1 17.25 RB3
0.40 6.90
1 1.40 C-4 (0.3*0.4m)
3.23 4.52 1 10.60 RB4
0.40 4.24
2 1.40 C-5 (0.3*0.4m)
3.23 9.04 1 8.90 RB5
3rd floor 0.40 3.56
2 1.40 C-2' (0.3*0.4m)
2.80 7.84 1 8.90 RB6
0.40 3.56
1 1.40 C-4 (0.3*0.4m)
2.80 3.92 1 8.26 RB7
155.17 m2 net area to item 1.02.a 0.40 3.30

Contractor:‐ _______________
Consultant: ‐ ____________
Client: ‐ __________________
Page 8 of 10

Project: -
Client: -
Contractor: -
Consultant: -
Location: -

T D S Item No. and Description T D S Item No. and Description


1 7.54 RB8 d) Stair case
0.40 3.02 Ground floor
8 1.20 Landing
1 7.54 RB9 1.20 11.52
0.40 3.02
4 6.54 Soffit
1 4.68 Under Beam 1.20 31.39
0.25 1.17
8 6.54 Side of Soffit
1 12.85 Under Beam 0.17 8.89
0.25 3.21
68 1.20 Riser
2 3.90 Under Beam 0.17 13.87
0.25 1.95
136 0.02 Side of Riser
2 3.45 Under Beam 3.24 Area = 0.5*(0.17*0.28) = 0.0235m2
0.25 1.73
203.82 m2 net area to item 1.02.b 4 7.04 LB-1
0.40 11.26
c) Floor slab
1st&2nd 4 0.25 Under beam
2 1.45 On axis 1'-1 b/n A-B 3.52 3.52
4.13 11.98 83.70 m2 net area to item 1.02.d

2 0.85 On axis 1' b/n A-C


5.00 8.50

2 5.75 On axis 1-2 b/n A-B


4.13 47.50

2 3.93 On axis 2-3 b/n A-B


4.13 32.46

2 1.45 On axis 1'-1 b/n B-C


4.13 11.98

2 1.98 On axis 1-1'' b/n B-C


4.13 16.35

2 3.52 On axis 1-2 b/n B-C


3.88 27.28

2 3.93 On axis 2-3 b/n B-C


4.13 32.46

3rd
1 1.45 On axis 1'-1 b/n B-C
4.13 5.99

1 1.98 On axis 1-1'' b/n B-C


4.13 8.18

2 3.52 On axis 1-2 b/n B-C


3.88 27.28

Water tanker
2 1.20 EB
4.13 9.90

2 1.20
1.12 2.69
242.54 m2 net area to item 1.02.c

Contractor:‐ _______________
Consultant: ‐ ____________
Client: ‐ __________________
Page 9 of 10

Project: -
Client: -
Contractor: -
Consultant: -
Location: -

T D S Item No. and Description T D S Item No. and Description


2. Block Work 1 4.55 Axis 2' b/n A-C
2.01) 20cm thick 2.83 12.88
Ground floor
1 9.18 Axis A b/n 1-3 -1 0.53 Dedduct Window
2.83 25.98 0.60 -0.32

1 9.85 Axis C b/n 1-3 -1 1.20 Dedduct Door


2.83 27.88 2.83 -3.40

1 5.37 Axis 3 b/n A-C 1 4.65 Axis 1' b/n A-C


2.83 15.20 2.83 13.16

-2 0.90 Dedduct Window -3 0.60 Dedduct Window


1.90 -3.42 1.90 -3.42

-1 0.90 Dedduct Door -2 0.20 Dedduct Window


2.83 -2.55 1.90 -0.76

1 3.08 Axis 3' b/n B-C 3rd floor


2.83 8.72 2 4.05 Axis B&C b/n 1''-2
2.40 19.44
1 8.00 Axis 1 b/n A-C
2.83 22.64 -1 1.30 Dedduct Window
0.85 -1.11
-1 3.25 Dedduct Window Door
2.83 -9.20 2 4.05 Axis 1''&2 b/n B-C
2.40 19.44
-2 1.25 Dedduct Door
2.83 -7.08 -1 1.50 Dedduct Window
0.85 -1.28
1st floor
2 10.70 Axis A&C b/n 1-3 -1 0.90 Dedduct Door
2.83 60.56 2.40 -2.16
279.98 m2 net area to item 2.01.
1 8.10 Axis 3 b/n A-C
2.83 22.92 2.02) 15 cm thick
Ground floor
-2 1.80 Dedduct Window 1 5.43 Axis A b/n 1-3
1.90 -6.84 2.83 15.37

1 8.80 Axis 1' b/n A-C -1 0.90 Dedduct Door


2.83 24.90 2.83 -2.55

-2 0.90 Dedduct Window 1 8.13 AxisC b/n 1-3


1.90 -3.42 2.83 23.01

-1 2.25 Dedduct Window Door -3 0.90 Dedduct Door


2.83 -6.37 2.83 -7.64

-1 1.50 Dedduct Window 3 3.08 Axis 2',2&1'' b/n B-C


1.90 -2.85 2.83 26.15

1 2.40 Axis 1' b/n A-B -1 0.53 Dedduct Window


0.90 2.16 1.90 -1.00

2nd floor 1st floor


1 4.70 Axis A b/n 1-3 1 4.15 Axis A' b/n 1''-3
2.83 13.30 2.83 11.74

1 10.20 Axis A b/n 1-3 -2 0.70 Dedduct Door


2.83 28.87 2.83 -3.96

1 8.10 Axis 3 b/n A-C 1 10.40 Axis B b/n 1-3


2.83 22.92 2.83 29.43

-2 1.80 Dedduct Window -1 0.90 Dedduct Door


1.90 -6.84 2.83 -2.55

Contractor:‐ _______________
Consultant: ‐ ____________
Client: ‐ __________________
Page 10 of 10

Project: -
Client: -
Contractor: -
Consultant: -
Location: -

` T D S Item No. and Description T D S Item No. and Description


1 9.50 Axis1''-3 b/n A-B
2.83 26.89

2 4.10 Axis1''&2 b/n B-C


2.83 23.21

-2 0.90 Dedduct Door


2.83 -5.09

2nd floor
1 2.15 Axis A' b/n 1''-3
2.83 6.08

-1 0.70 Dedduct Door


2.83 -1.98

1 3.50 Axis B b/n 1-3


2.83 9.91

1 4.20 Axis1''-3 b/n A-B


2.83 11.89

-1 0.70 Dedduct Door


2.83 -1.98

2 4.10 Axis1''&2 b/n B-C


2.83 23.21

-2 0.90 Dedduct Door


2.83 -5.09
175.029 m2 net area to item 2.02.

2.03) 10 cm thick
Parapet around ground floor
1 1.35 Axis C b/n 3-3'
1.20 1.62

1 1.85 Area=1/2*3.08*1.2=1.85
1.85

Parapet around second floor


1 4.45 Axis A-B b/n 1'-2
1.20 5.34

1 3.30 Area=1/2*4.35*1.2=3.3
3.30

1 4.55 Axis 2 b/n B-C


1.20 5.46

1 2.58 Area=1/2*4.3*1.2=2.58
2.58
20.148 m2 net area to item 2.03.

Contractor:‐ _______________
Consultant: ‐ ____________
Client: ‐ __________________
Project: -
Client: -
Contractor: -
Consultant: -
Location: -

T D S Item No. and Description T D S Item No. and Description


03. Roofing & Water Proofing 04. Carpentry and Jonery
3.01. Derca Roofing 4.01. Semi Solid Woodeen Door
1 51.80 a) 700*2100mm
51.80 3
51.80 m2 net area to item 3.01 3.00 No to item 4.01. a

3.02. Water Proofing b) 900*2100mm


Ground floor 11
1 11.80 around kitchen 11.00 No to item 4.01. b
1.50 17.70
c) 1270*2100mm
1 3.80 1
4.20 15.96 1.00 No to item 4.01. c

1st floor 4.02.Wooden Truss


1 8.40 around bath room 1 around traditional kitchen
1.50 12.60 2 1.35 horizontal member
2.70
1 1.70
2.50 4.25 2 1.20 vertical member
2.55
1 7.65 around bath room 2
1.50 11.48 2 3.36 diagonal member
7.14
1 2.30
2.00 4.60 2 3.08 tie beam
6.55
-1 1.00 Dedduct open space
1.20 -1.20 2 0.99 vertical truss
2.10
2nd floor
1 8.60 around bath room 3 2 2.62 diagonal truss
1.50 12.90 5.57

1 2.30 5 1.35 purlin


2.00 4.60 6.39

1 4.35 around terrace around children bed room 1


6.30 27.41 2 4.35 horizontal member
8.70
1 0.85
5.00 4.25 5 1.20 vertical member
5.55
3rd floor
1 4.65 around terrace 5 5.63 diagonal member
3.68 17.11 26.04

Top of stair 5 5.50 tie beam


1 4.65 around terrace 25.44
4.07 18.93
5 2.16 vertical truss
-1 1.68 Dedduct open lighting space 9.99
1.12 -1.88
148.70 m2 net area to item 3.02 5 5.36 diagonal truss
24.79
3.03. UPVC down pipe
12 3.30 around bath room 7 4.35 purlin
39.60 31.56
39.60 ml to item3.03
around children bed room 2
2 4.65 horizontal member
9.30

5 1.20 vertical member


5.85

T D S Item No. and Description T D S Item No. and Description


5 4.18 diagonal member 6. Plastering and Pointing
20.38 6.01. External HCB
Ground floor
5 1.44 vertical truss 1 9.18 Axis A b/n 1-3
7.02 2.83 25.98

5 3.95 diagonal truss 1 9.85 AxisC b/n 1-3


19.26 2.83 27.88

5 4.00 tie beam 1 5.37 Axis 3 b/n A-C


19.50 2.83 15.20

-2 0.90 Dedduct Window


6 4.65 purlin 1.90 -3.42
26.25
272.615 ml to item 4.02. -1 0.90 Dedduct Door
2.83 -2.55
05. Metal and Almunium Work
5.01. Door, Window and Partition 1 3.08 Axis 3' b/n B-C
1 3.25 WD-1 2.83 8.72
2.83 9.20
1 8.00 Axis 1 b/n A-C
1 0.80 W1 2.83 22.64
1.90 1.52
-1 3.25 Dedduct Window Door
2 0.90 W2 2.83 -9.20
1.90 3.42
-2 1.25 Dedduct Door
2 1.50 W3 2.83 -7.08
1.90 5.70
1st floor
4 1.80 W4 2 10.70 Axis A&C b/n 1-3
1.90 13.68 2.83 60.56

3 0.60 W5 1 8.10 Axis 3 b/n A-C


1.90 3.42 2.83 22.92

2 0.20 W6 -2 1.80 Dedduct Window


1.90 0.76 1.90 -6.84

1 0.30 W7 1 8.80 Axis 1' b/n A-C


0.85 0.26 2.83 24.90

1 1.50 W8 -2 0.90 Dedduct Window


0.85 1.28 1.90 -3.42

10 0.60 W9 -1 2.25 Dedduct Window Door


0.60 3.60 2.83 -6.37

2 0.90 D4 -1 1.50 Dedduct Window


2.83 5.09 1.90 -2.85

2 1.30 D5 1 2.40 Axis 1' b/n A-B


2.83 7.36 0.90 2.16
55.28 m2 net area to item 5.01.
2nd floor
5.02. Handrail 1 4.70 Axis A b/n 1-3
a)Staircase 2.83 13.30
8 2.00
16.00 1 10.20 Axis A b/n 1-3
3.23 32.95
4 1.60
6.40 1 8.10 Axis 3 b/n A-C
22.40 ml to item 5.02.a 3.23 26.16

1 26.18 b)Terrace -2 1.80 Dedduct Window


26.18 1.90 -6.84
26.18 ml to item 5.02.b
1 4.55 Axis 2' b/n A-C
2.83 12.88
T D S Item No. and Description T D S Item No. and Description
-1 0.53 Dedduct Window 6.02.a Internal HCB
0.60 -0.32 Ground floor
2 5.43 Axis A b/n 1-3
-1 1.20 Dedduct Door 3.23 35.08
2.83 -3.40
-2 0.90 Dedduct Door
1 4.65 Axis 1' b/n A-C 2.90 -5.22
2.83 13.16
2 8.13 AxisC b/n 1-3
-3 0.60 Dedduct Window 3.23 52.52
1.90 -3.42
-6 0.90 Dedduct Door
-2 0.20 Dedduct Window 2.90 -15.66
1.90 -0.76
6 3.08 Axis 2',2&1'' b/n B-C
3rd floor 3.23 59.69
2 4.05 Axis B&C b/n 1''-2
2.40 19.44 -2 0.53 Dedduct Window
1.90 -2.00
-1 1.30 Dedduct Window
0.85 -1.11 1st floor
2 4.15 Axis A' b/n 1''-3
2 4.05 Axis 1''&2 b/n B-C 3.23 26.81
2.40 19.44
-4 0.70 Dedduct Door
-1 1.50 Dedduct Window 2.90 -8.12
0.85 -1.28
2 10.40 Axis B b/n 1-3
-1 0.90 Dedduct Door 3.23 67.18
2.40 -2.16
-2 0.90 Dedduct Door
Parapet ground floor 2.90 -5.22
1 1.35 Axis C b/n 3-3'
1.20 1.62 2 9.50 Axis1''-3 b/n A-B
3.23 61.37
1 1.85 Area=1/2*3.08*1.2=1.85
1.85 4 4.10 Axis1''&2 b/n B-C
3.23 52.97
Parapet second floor
1 4.45 Axis A-B b/n 1'-2 -4 0.90 Dedduct Door
1.20 5.34 2.90 -10.44

1 3.30 Area=1/2*4.35*1.2=3.3 2nd floor


3.30 2 2.15 Axis A' b/n 1''-3
3.23 13.89
1 4.55 Axis 2 b/n B-C
1.20 5.46 -2 0.70 Dedduct Door
2.90 -4.06
1 2.58 Area=1/2*4.3*1.2=2.58
2.58 2 3.50 Axis B b/n 1-3
307.443 m2 net area to item 6.01. 3.23 22.61

2 4.20 Axis1''-3 b/n A-B


3.23 27.13

-2 0.70 Dedduct Door


2.90 -4.06

4 4.10 Axis1''&2 b/n B-C


3.23 52.97

-4 0.90 Dedduct Door


2.90 -10.44
407.011 m2 net area to item 6.02a.
T D S Item No. and Description T D S Item No. and Description
b) Beam and Columns 1 2.85
Beam 4.20 11.97
2 130.59 1st & 2nd floor
0.40 104.47 1 0.80
1.78 1.42
1 91.60 3rd floor
0.40 36.64 2nd floor
1 4.23
1 17.24 Top 5.15 21.76
0.40 6.90
-1 6.15 dedduct block work
Column 0.15 -0.92
1 6.45 Ground floor
2.83 18.25 1 1.32
3.52 4.65
1 5.60 1st foor
2.83 15.85 1 2.85
4.20 11.97
1 5.50 2nd floor
2.83 15.57 1 0.80
1.78 1.42
1 2.10 3rd floor
2.83 5.94 1 4.25
203.62 m2 net area to item 6.02.b 3.63 15.43

c) Concret Ceiling 3rd floor


1 9.90 Ground floor 2 1.20 EB
4.20 41.58 4.13 9.90

1 1.32 2 1.20
9.80 12.94 1.12 2.69
90.18 m2 net area to item 6.02.c
1 1.70
2.73 4.64

1 1.20
1.63 1.96

1 2.73
2.13 5.81

1 1.50
8.60 12.90

1 0.85
5.00 4.25

1st floor
1 3.95
4.23 16.71

1 1.20
3.45 4.14

-1 6.15 dedduct block work


0.15 -0.92

1 1.32
3.52 4.65

1 6.10
4.20 25.62

-1 6.15 dedduct block work


0.15 -0.92

1 3.63
4.20 15.25

1 0.90
2.25 2.03
T D S Item No. and Description T D S Item No. and Description
d) To saircase soffit 7. Floor and Wall Finish
8 1.20 Landing 7.01 Ceramic Tile
1.20 11.52 a) 400mm*400mm
Ground floor
4 6.54 Soffit 1 3.80 around kitchen
1.20 31.39 4.20 15.96

8 6.54 Side of Soffit 1 2.20 around traditional kitchen


0.17 8.89 2.88 6.34

68 1.20 Riser 1st floor


0.17 13.87 1 1.70 around bath room 1
2.50 4.25
136 0.02 Side of Riser
3.24 Area = 0.5*(0.17*0.28) = 0.0235m2 1 2.30 around bath room 2
2.00 4.60
4 7.04 LB-1
0.40 11.26 2nd floor
1 2.30 around bath room 3
4 0.25 Under beam 2.00 4.60
3.52 3.52 35.75 m2 net area to item 7.01.a
83.70 m2 net area to item 6.02.d
b) 8mm thick ceramic wall
6.03. Gypsom Plastering Ground floor
1 784.51 1 11.80 around kitchen
784.51 1.50 17.70
784.51 m2 net area to item 6.03
1st floor
1 8.40 around bath room 1
1.50 12.60

1 7.65 around bath room 2


1.50 11.48

2nd floor
1 8.60 around bath room 3
1.50 12.90
54.68 m2 net area to item 7.01.b

c.) 10 cm high ceramic skirting


Ground floor
1 10.10 around kitchen
10.10

2 5.08 around traditional kitchen


10.16

-1 0.90 dedduct door


-0.90

1st floor
2 4.30 around bath room 1
8.60

-1 0.70 dedduct door


-0.70

2 4.30 around bath room 2


8.60

-1 0.70 dedduct door


-0.70

2nd floor
2 4.30 around bath room 3
8.60

-1 0.70 dedduct door


-0.70
43.06 ml to item 7.01.c
T D S Item No. and Description T D S Item No. and Description
7.02.a. Perquet Tiles 7.03.a. Porcelain Tiles
1st & 2nd floor Ground floor
1 4.25 around bed room 1 5.95 around living room
4.20 17.85 4.20 24.99

1 1.55 1 1.32 around corridor


1.85 2.87 9.80 12.94

2 3.00 around bed room 1&4 1 1.70 around maids room


4.20 25.20 2.73 4.64

2 0.80 1 1.20
1.78 2.84 1.63 1.96

2 2.85 around bed room 2&5 1 2.73 around office


4.20 23.94 2.13 5.81

2 0.80 1 1.50 around verenda


1.78 2.84 9.00 13.50

1 3.63 around bed room 3 1st & 2nd floor


4.20 15.25 2 1.20 around corridor
1.95 4.68
1 0.90
2.25 2.03 2 3.67
92.81 m2 net area to item 7.02.a 1.32 9.69
78.21 m2 net area to item 7.03.a
b) 10 cm high hard wood skirting
1st & 2nd floor b) 10 cm porcelain skirting
2 8.45 around bed room Ground floor
16.90 2 10.15 around living room
20.30
2 3.40
6.80 2 11.12 around corridor
22.24
-1 0.90 dedduct door
-0.90 -1 0.90 dedduct door
-0.90
4 7.20 around bed room 1&4
28.80 -1 1.27 dedduct door
-1.27
4 2.58
10.30 2 4.43 around maids room
8.86
-2 0.90 dedduct door
-1.80 2 2.83
5.66
4 7.05 around bed room 2&5
28.20 -1 0.90 dedduct door
-0.90
4 2.58
10.30 2 4.86 around office
9.72
-2 0.90 dedduct door
-1.80 -1 0.90 dedduct door
-0.90
2 7.83 around bed room 3
15.66 2 9.00 around verenda
18.00
2 3.15 80.81 ml to item 7.03.b
6.30

-1 0.90 dedduct door


-0.90
117.86 ml to item 7.02.b
T D S Item No. and Description T D S Item No. and Description
7.04. Cement Screed Floor Finish 1 1.50 W8
a) 50mm thick cement screed 1.50
1 6.85 around parking
4.65 31.85 10 0.60 W9
6.00
1 1.35 around back side 25.75 ml to item 7.06.a
5.92 7.99
b.) Treshold size 250x20mm
1 4.35 around terrace 1 3 0.70 D1
6.30 27.41 2.10

1 0.85 11 0.90 D2
5.00 4.25 9.90

1 4.65 around terrace 2 1 1.27 D3


3.68 17.11 1.27
` 88.61 m2 net area to item 7.04.a
2 0.90 D4
7.05.Granite Stair Tread and Riser 1.80
a) 280x30mm Trade
16 1.20 Ground 2 1.30 D5
19.20 2.60
15.07 ml to item 7.06.b
48 1.20 1st-3rd floor
57.60 c.) Granite Copping size 280x30mm
16 1.20 Ground
16 1.20 19.20
19.20
96.00 ml to item 7.05.a 48 1.20 1st-3rd floor
57.60
b) 170*20mm Riser
19 1.20 Ground 16 1.20
22.80 19.20
96.00 ml to item 7.06.c
57 1.20 1st-3rd floor
68.40
91.20 ml to item 7.05.b

c.) 130mm Granite skirting


16 1.20 Ground
19.20

48 1.20 1st-3rd floor


57.60

16 1.20
19.20
96.00 ml to item 7.05.c

7.06. Granite Windoesill


a) Size 300x30mm
1 3.25 WD-1
3.25

1 0.80 W1
0.80

2 0.90 W2
1.80

2 1.50 W3
3.00

4 1.80 W4
7.20

3 0.60 W5
1.80

2 0.20 W6
0.40
T D S Item No. and Description T D S Item No. and Description
8. Painting b) To-exposed-beam- and columns
8.01.Plastic emulsion paint b) Beam and Columns
a) To internal HCB wall Beam
Ground floor 2 130.59 1st & 2nd floor
2 5.43 Axis A b/n 1-3 0.40 104.47
3.23 35.08
1 91.60 3rd floor
-2 0.90 Dedduct Door 0.40 36.64
2.90 -5.22
1 17.24 Top
2 8.13 AxisC b/n 1-3 0.40 6.90
3.23 52.52
Column
-6 0.90 Dedduct Door 1 6.45 Ground floor
2.90 -15.66 2.83 18.25

6 3.08 Axis 2',2&1'' b/n B-C 1 5.60 1st foor


3.23 59.69 2.83 15.85

-2 0.53 Dedduct Window 1 5.50 2nd floor


1.90 -2.00 2.83 15.57

1st floor 1 2.10 3rd floor


2 4.15 Axis A' b/n 1''-3 2.83 5.94
3.23 26.81 203.62 m2 net area to item 8.01.b

-4 0.70 Dedduct Door c) Concret Ceiling


2.90 -8.12 1 9.90 Ground floor
4.20 41.58
2 10.40 Axis B b/n 1-3
3.23 67.18 1 1.32
9.80 12.94
-2 0.90 Dedduct Door
2.90 -5.22 1 1.70
2.73 4.64
2 9.50 Axis1''-3 b/n A-B
3.23 61.37 1 1.20
1.63 1.96
4 4.10 Axis1''&2 b/n B-C
3.23 52.97 1 2.73
2.13 5.81
-4 0.90 Dedduct Door
2.90 -10.44 1 1.50
8.60 12.90
2nd floor
2 2.15 Axis A' b/n 1''-3 1 0.85
3.23 13.89 5.00 4.25

-2 0.70 Dedduct Door 1st floor


2.90 -4.06 1 3.95
4.23 16.71
2 3.50 Axis B b/n 1-3
3.23 22.61 1 1.20
3.45 4.14
2 4.20 Axis1''-3 b/n A-B
3.23 27.13 -1 6.15 dedduct block work
0.15 -0.92
-2 0.70 Dedduct Door
2.90 -4.06 1 1.32
3.52 4.65
4 4.10 Axis1''&2 b/n B-C
3.23 52.97 1 6.10
4.20 25.62
-4 0.90 Dedduct Door
2.90 -10.44 -1 6.15 dedduct block work
407.011 m2 net area to item 8.01a. 0.15 -0.92

1 3.63
4.20 15.25
T D S Item No. and Description T D S Item No. and Description
1 0.90 -1 3.25 Dedduct Window Door
2.25 2.03 2.83 -9.20

1 2.85 -2 1.25 Dedduct Door


4.20 11.97 2.83 -7.08

1 0.80 1st floor


1.78 1.42 2 10.70 Axis A&C b/n 1-3
2.83 60.56
2nd floor
1 4.23 1 8.10 Axis 3 b/n A-C
5.15 21.76 2.83 22.92

-1 6.15 dedduct block work -2 1.80 Dedduct Window


0.15 -0.92 1.90 -6.84

1 1.32 1 8.80 Axis 1' b/n A-C


3.52 4.65 2.83 24.90

1 2.85 -2 0.90 Dedduct Window


4.20 11.97 1.90 -3.42

1 0.80 -1 2.25 Dedduct Window Door


1.78 1.42 2.83 -6.37

1 4.25 -1 1.50 Dedduct Window


3.63 15.43 1.90 -2.85

3rd floor 1 2.40 Axis 1' b/n A-B


2 1.20 EB 0.90 2.16
4.13 9.90
2nd floor
2 1.20 1 4.70 Axis A b/n 1-3
1.12 2.69 2.83 13.30
230.90 m2 net area to item 8.01.c
1 10.20 Axis A b/n 1-3
d) To saircase soffit 2.83 28.87
4 6.54 Soffit
1.20 31.39 1 8.10 Axis 3 b/n A-C
2.83 22.92
8 6.54 Side of Soffit
0.17 8.89 -2 1.80 Dedduct Window
1.90 -6.84
4 7.04 LB-1
0.40 11.26 1 4.55 Axis 2' b/n A-C
2.83 12.88
4 0.25 bottom of beam
3.52 3.52 -1 0.53 Dedduct Window
55.07 m2 net area to item 8.01.d 0.60 -0.32

8.02.Quartz Painting -1 1.20 Dedduct Door


Ground floor 2.83 -3.40
1 9.18 Axis A b/n 1-3
2.83 25.98 1 4.65 Axis 1' b/n A-C
2.83 13.16
1 9.85 Axis C b/n 1-3
2.83 27.88 -3 0.60 Dedduct Window
1.90 -3.42
1 5.37 Axis 3 b/n A-C
2.83 15.20 -2 0.20 Dedduct Window
1.90 -0.76
-2 0.90 Dedduct Window
1.90 -3.42 3rd floor
2 4.05 Axis B&C b/n 1''-2
-1 0.90 Dedduct Door 2.40 19.44
2.83 -2.55
-1 1.30 Dedduct Window
1 3.08 Axis 3' b/n B-C 0.85 -1.11
2.83 8.72
2 4.05 Axis 1''&2 b/n B-C
1 8.00 Axis 1 b/n A-C 2.40 19.44
2.83 22.64
T D S Item No. and Description T D S Item No. and Description
-1 1.50 Dedduct Window
0.85 -1.28

-1 0.90 Dedduct Door


2.40 -2.16

Parapet second floor


1 4.45 Axis A-B b/n 1'-2
1.20 5.34

1 3.30 Area=1/2*4.35*1.2=3.3
3.30

1 4.55 Axis 2 b/n B-C


1.20 5.46

1 2.58 Area=1/2*4.3*1.2=2.58
2.58
296.655 m2 net area to item 8.02.

9.Glazing Work
1 3.25 WD-1
2.83 9.20

1 0.80 W1
1.90 1.52

2 0.90 W2
1.90 3.42

2 1.50 W3
1.90 5.70

4 1.80 W4
1.90 13.68

3 0.60 W5
1.90 3.42

2 0.20 W6
1.90 0.76

1 0.30 W7
0.85 0.26

1 1.50 W8
0.85 1.28

10 0.60 W9
0.60 3.60

2 0.90 D4
2.83 5.09

2 1.30 D5
2.83 7.36

3 0.70 above wooden D1


0.73 1.53

11 0.90 above wooden D2


0.73 7.23

1 1.27 above wooden D3


0.73 0.93
64.967 m2 net area to item 8.02.
Page 1 of 7
PROJECT: -
CLIENT: -
CONTRACTOR: -
CONSULTANT: -

Dia. Length No. of No. of Bar Length in meter


No Location
(mm) (m) Bar Memb 8 10 12 14 16 20 24
SUB STRUCTURE
Foundation Pad
Type - F-1
X- Direction 14.00 2.700 17.00 6.00 " " " 275.40 " " "
Y- Direction 14.00 3.200 14.00 6.00 " " " 268.80 " " "
" " " " " " "
Type - F-2 " " " " " " "
X- Direction 14.00 2.700 14.00 3.00 " " " 113.40 " " "
Y- Direction 14.00 2.700 14.00 3.00 " " " 113.40 " " "
" " " " " " "
Footing Column " " " " " " "
C-1 on F-1 16.00 4.890 8.00 1.00 " " " " 39.12 " "
St.1 8.00 2.300 28.00 1.00 64.40 " " " " " "
" " " " " " "
C-1' on F-1 16.00 4.890 8.00 1.00 " " " " 39.12 " "
St.1 8.00 2.300 28.00 1.00 64.40 " " " " " "
" " " " " " "
C-2 on F-1 16.00 4.890 8.00 1.00 " " " " 39.12 " "
St.4 8.00 2.500 28.00 1.00 70.00 " " " " " "
" " " " " " "
C-2' on F-1 16.00 4.890 8.00 2.00 " " " " 78.24 " "
St.4 8.00 2.500 28.00 2.00 140.00 " " " " " "
" " " " " " "
C-3 on F-2 16.00 4.890 8.00 2.00 " " " " 78.24 " "
St.1 8.00 2.300 28.00 2.00 128.80 " " " " " "
" " " " " " "
C-4 on F-2 16.00 4.890 8.00 1.00 " " " " 39.12 " "
St.4 8.00 2.500 28.00 1.00 70.00 " " " " " "
" " " " " " "
C-5 on F-1 16.00 4.890 8.00 2.00 " " " " 78.24 " "
St.4 8.00 2.500 28.00 2.00 140.00 " " " " " "
" " " " " " "
Grade Beam " " " " " " "
GB1 14.00 9.600 3.00 3.00 " " " 86.40 " " "
14.00 1.885 5.00 3.00 " " " 28.28 " " "
14.00 2.920 3.00 3.00 " " " 26.28 " " "
14.00 9.600 3.00 3.00 " " " 86.40 " " "
ST 8.00 1.100 41.00 3.00 135.30 " " " " " "
" " " " " " "
GB2 14.00 5.350 3.00 1.00 " " " 16.05 " " "
14.00 1.885 3.00 1.00 " " " 5.66 " " "
14.00 5.350 3.00 1.00 " " " 16.05 " " "
ST 8.00 1.100 27.00 1.00 29.70 " " " " " "
" " " " " " "
GB3 14.00 11.025 3.00 2.00 " " " 66.15 " " "
14.00 2.525 2.00 2.00 " " " 10.10 " " "
14.00 3.460 2.00 2.00 " " " 13.84 " " "
14.00 1.960 2.00 2.00 " " " 7.84 " " "
14.00 11.025 3.00 2.00 " " " 66.15 " " "
ST 8.00 1.100 48.00 2.00 105.60 " " " " " "
" " " " " " "
GB4 14.00 9.085 3.00 1.00 " " " 27.26 " " "
14.00 4.585 3.00 1.00 " " " 13.76 " " "

Contractor:‐ _______________
Consultant: ‐ ______________
Client: ‐ __________________
PROJECT: - Page 2 of 7
CLIENT: -
CONTRACTOR: -
CONSULTANT: -

Dia. Length No. of No. of Bar Length in meter


No Location
(mm) (m) Bar Memb 8 10 12 14 16 20 24
14.00 4.010 2.00 1.00
14.00 3.460 2.00 1.00 " " " 6.92 " " "
14.00 3.485 2.00 1.00 " " " 6.97 " " "
14.00 11.085 3.00 1.00 " " " 33.26 " " "
14.00 2.585 3.00 1.00 " " " 7.76 " " "
ST 8.00 1.100 53.00 1.0058.30 " " " " " "
" " " " " " "
GB5 14.00 3.680 3.00 1.00 " " " 11.04 " " "
14.00 1.885 3.00 1.00 " " " 5.66 " " "
14.00 3.685 3.00 1.00 " " " 11.06 " " "
ST 8.00 1.100 14.00 1.00 15.40 " " " " " "
" " " " " " "
GB6 14.00 1.950 2.00 1.00 " " " 3.90 " " "
14.00 1.950 2.00 1.00 " " " 3.90 " " "
ST 8.00 1.100 7.00 1.00 7.70 " " " " " "
" " " " " " "
Ground Floor slab " " " " " " "
On axis 1''-1 b/n A-B 8.00 1.430 16.00 1.00 22.88 " " " " " "
8.00 4.500 6.00 1.00 27.00 " " " " " "
" " " " " " "
On axis 1-2 b/n A-B 8.00 5.750 15.00 1.00 86.25 " " " " " "
8.00 4.130 20.00 1.00 82.60 " " " " " "
" " " " " " "
On axis 2-3 b/n A-B 8.00 3.930 15.000 1.00 58.95 " " " " " "
8.00 4.130 14.000 1.00 57.82 " " " " " "
" " " " " " "
On axis 1''-1 b/n B-C 8.00 1.430 16.00 1.00 22.88 " " " " " "
8.00 4.500 6.00 1.00 27.00 " " " " " "
" " " " " " "
On axis 1-1' b/n B-C 8.00 1.980 15.00 1.00 29.70 " " " " " "
8.00 4.130 8.00 1.00 33.04 " " " " " "
" " " " " " "
On axis 1-2 b/n B-C 8.00 3.520 14.00 1.00 49.28 " " " " " "
8.00 3.875 13.00 1.00 50.38 " " " " " "
" " " " " " "
On axis 2-3 b/n B-C 8.00 3.930 15.00 1.00 58.95 " " " " " "
8.00 4.130 14.00 1.00 57.82 " " " " " "
" " " " " " "
On axis 3-3' b/n B-C 8.00 2.580 5.00 1.00 12.90 " " " " " "
8.00 1.050 10.00 1.00 10.50 " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
TOTAL LENGTH 1,717.545 0.000 0.000 1,331.650 391.200 0.000 0.000 #
UINT WEIGHT in KG/ML 0.395 0.617 0.888 1.210 1.580 2.470 3.550 4
TOTAL WEIGHT IN KG 678.430 0.000 0.000 1,611.297 618.096 0.000 0.000 #

Contractor:‐ _______________
Consultant: ‐ ______________
Client: ‐ __________________
PROJECT: - Page 3 of 7
CLIENT: -
CONTRACTOR: -
CONSULTANT: -

Dia. Length No. of No. of Bar Length in meter


No Location
(mm) (m) Bar Memb 8 10 12 14 16 20 24
SUPER STRUCTURE " " " " " " "
Elevation Column " " " " " " "
Ground-Roof " " " " " " "
C1 16.00 11.490 8.00 1.00 " " " " 91.92 " "
St-1 8.00 1.300 17.00 1.00 22.10 " " " " " "
St-2 8.00 1.100 34.00 1.00 37.40 " " " " " "
" " " " " " "
C1' 16.00 4.030 6.00 1.00 " " " " 24.18 " "
16.00 3.430 8.00 1.00 " " " " 27.44 " "
St-1 8.00 1.300 17.00 1.00 22.10 " " " " " "
St-2 8.00 1.100 17.00 1.00 18.70 " " " " " "
" " " " " " "
C2 16.00 11.490 8.00 1.00 " " " " 91.92 " "
St-4 8.00 1.500 17.00 1.00 25.50 " " " " " "
St-2 8.00 1.100 34.00 1.00 37.40 " " " " " "
" " " " " " "
C2' 16.00 15.090 8.00 2.00 " " " " 241.44 " "
St-4 8.00 1.500 17.00 2.00 51.00 " " " " " "
St-2 8.00 1.100 49.00 2.00 107.80 " " " " " "
" " " " " " "
C3 16.00 11.490 8.00 2.00 " " " " 183.84 " "
St-1 8.00 1.300 17.00 2.00 44.20 " " " " " "
St-2 8.00 1.100 34.00 2.00 74.80 " " " " " "
" " " " " " "
C4 16.00 15.090 8.00 1.00 " " " " 120.72 " "
St-1 8.00 1.300 34.00 1.00 44.20 " " " " " "
St-2 8.00 1.100 32.00 1.00 35.20 " " " " " "
" " " " " " "
C5 16.00 11.490 8.00 2.00 " " " " 183.84 " "
St-1 8.00 1.300 17.00 2.00 44.20 " " " " " "
St-2 8.00 1.100 34.00 2.00 74.80 " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "
" " " " " "

Contractor:‐ _______________
Consultant: ‐ ______________
Client: ‐ __________________
PROJECT: - Page 4 of 7
CLIENT: -
CONTRACTOR: -
CONSULTANT: -

Dia. Length No. of No. of Bar Length in meter


No Location
(mm) (m) Bar Memb 8 10 12 14 16 20 24
Floor Beam " " " " " " "
1st &2nd Floor " " " 57.60 " " "
FB1 14.00 9.600 3.00 2.00 " " " " 11.31 " "
16.00 1.885 3.00 2.00 " " " " 17.52 " "
16.00 2.920 3.00 2.00 " " " " " 11.31 "
20.00 1.885 3.00 2.00 " " " 57.60 " " "
14.00 9.600 3.00 2.00 90.20 " " " " " "
St-1 8.00 1.100 41.00 2.00 " " " " " " "
" " " 115.20 " " "
FB2 14.00 9.600 3.00 4.00 " " " " " 45.24 "
20.00 1.885 6.00 4.00 " " " " " 35.04 "
20.00 2.920 3.00 4.00 " " " 115.20 " " "
14.00 9.600 3.00 4.00 180.40 " " " " " "
St-1 8.00 1.100 41.00 4.00 " " " " " " "
" " " 32.10 " " "
FB3 14.00 5.350 3.00 2.00 " " " 11.31 " " "
14.00 1.885 3.00 2.00 " " " 32.10 " " "
14.00 5.350 3.00 2.00 54.60 " " " " " "
St-1 8.00 1.300 21.00 2.00 " " " " " " "
" " " 72.00 " " "
FB4 14.00 12.000 3.00 2.00 " " " " " 23.70 "
20.00 3.950 3.00 2.00 " " " " " 20.76 "
20.00 3.460 3.00 2.00 " " " " " 11.76 "
20.00 1.960 3.00 2.00 " " " 72.00 " " "
14.00 12.000 3.00 2.00 123.20 " " " " " "
St-1 8.00 1.100 56.00 2.00 " " " " " " "
" " " 26.85 " " "
FB5 14.00 4.475 3.00 2.00 " " " 59.82 " " "
14.00 9.970 3.00 2.00 " " " " " 25.14 "
20.00 6.285 2.00 2.00 " " " " " 13.84 "
20.00 3.460 2.00 2.00 " " " " " 13.84 "
20.00 1.985 2.00 2.00 " " " " " 7.94 "
14.00 3.360 3.00 2.00 " " " 20.16 " " "
14.00 12.000 3.00 2.00 " " " 72.00 " " "
St-1 8.00 1.100 61.00 2.00 134.20 " " " " " "
" " " " " " "
FB6 14.00 12.000 3.00 2.00 " " " 72.00 " " "
20.00 5.435 2.00 2.00 " " " " " 21.74 "
20.00 3.460 2.00 2.00 " " " " " 13.84 "
20.00 1.985 2.00 2.00 " " " " " 7.94 "
14.00 12.000 3.00 2.00 " " " 72.00 " " "
St-1 8.00 1.100 55.00 2.00 121.00 " " " " " "
" " " " " " "
3rd Floor " " " " " " "
FB1 14.00 5.350 3.00 2.00 " " " 32.10 " " "
14.00 1.885 3.00 2.00 " " " 11.31 " " "
14.00 5.350 3.00 2.00 " " " 32.10 " " "
St-1 8.00 1.300 21.00 2.00 54.60 " " " " " "
" " " " " " "
FB2 14.00 5.350 3.00 1.00 " " " 16.05 " " "
14.00 1.885 3.00 1.00 " " " 5.66 " " "
14.00 5.350 3.00 1.00 " " " 16.05 " " "
St-1 8.00 1.300 21.00 1.00 27.30 " " " " " "
" " " " " " "
FB3 14.00 8.130 3.00 1.00 " " " 24.39 " " "

Contractor:‐ _______________
Consultant: ‐ ______________
Client: ‐ __________________
PROJECT: - Page 5 of 7
CLIENT: -
CONTRACTOR: -
CONSULTANT: -

Dia. Length No. of No. of Bar Length in meter


No Location
(mm) (m) Bar Memb 8 10 12 14 16 20 24
20.00 3.800 3.00 1.00 " " " " " 11.40 "
20.00 2.510 3.00 1.00 " " " " " 7.53 "
14.00 8.130 3.00 1.00 " " " 24.39 " " "
St-1 8.00 1.300 37.00 1.00 48.10 " " " " " "
" " " " " " "
FB4 14.00 8.130 3.00 1.00 " " " 24.39 " " "
20.00 3.800 2.00 1.00 " " " " " 7.60 "
20.00 2.510 2.00 1.00 " " " " " 5.02 "
14.00 8.130 3.00 1.00 " " " 24.39 " " "
St-1 8.00 1.100 36.00 1.00 39.60 " " " " " "
" " " " " " "
Toptie & WT Beam " " " " " " "
RB1 14.00 3.680 3.00 1.00 " " " 11.04 " " "
14.00 3.680 3.00 1.00 " " " 11.04 " " "
St-1 8.00 1.100 14.00 1.00 15.40 " " " " " "
" " " " " " "
RB2 14.00 1.950 2.00 2.00 " " " 7.80 " " "
14.00 1.950 2.00 2.00 " " " 7.80 " " "
St-1 8.00 1.100 7.00 2.00 15.40 " " " " " "
" " " " " " "
RB3 14.00 9.600 2.00 1.00 " " " 19.20 " " "
14.00 9.600 2.00 1.00 " " " 19.20 " " "
St-1 8.00 1.100 41.00 1.00 45.10 " " " " " "
" " " " " " "
RB4 14.00 6.200 2.00 1.00 " " " 12.40 " " "
14.00 6.200 2.00 1.00 " " " 12.40 " " "
St-1 8.00 1.100 26.00 1.00 28.60 " " " " " "
" " " " " " "
RB5 14.00 5.350 3.00 1.00 " " " 16.05 " " "
14.00 5.350 3.00 1.00 " " " 16.05 " " "
St-1 8.00 1.100 21.00 1.00 23.10 " " " " " "
" " " " " " "
RB6 14.00 5.350 3.00 1.00 " " " 16.05 " " "
14.00 5.350 3.00 1.00 " " " 16.05 " " "
St-1 8.00 1.100 21.00 1.00 23.10 " " " " " "
" " " " " " "
RB7 14.00 5.350 3.00 1.00 " " " 16.05 " " "
14.00 1.885 3.00 1.00 " " " 5.66 " " "
14.00 5.350 3.00 1.00 " " " 16.05 " " "
St-1 8.00 1.100 21.00 1.00 23.10 " " " " " "
" " " " " " "
RB8 14.00 4.800 3.00 1.00 " " " 14.40 " " "
14.00 4.800 3.00 1.00 " " " 14.40 " " "
St-1 8.00 1.100 21.00 1.00 23.10 " " " " " "
" " " " " " "
RB9 14.00 4.800 3.00 1.00 " " " 14.40 " " "
14.00 4.800 3.00 1.00 " " " 14.40 " " "
St-1 8.00 1.100 20.00 1.00 22.00 " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "

Contractor:‐ _______________
Consultant: ‐ ______________
Client: ‐ __________________
PROJECT: - Page 6 of 7
CLIENT: -
CONTRACTOR: -
CONSULTANT: -

Dia. Length No. of No. of Bar Length in meter


No Location
(mm) (m) Bar Memb 8 10 12 14 16 20 24
Floor Slab " " " " " " "
1st &2nd Floor " " " " " " "
On axis A-C b/n 2-3 10 12.00 27.000 2.00 " 648.00 " " " " "
10 5.89 29.000 2.00 " 341.62 " " " " "
10 7.24 29.000 2.00 " 419.92 " " " " "
14 3.06 27.000 2.00 " " " 165.24 " " "
14 3.29 29.000 2.00 " " " 190.82 " " "
" " " " " " "
On axis A-C b/n 1'-2 10 6.23 39.000 2.00 " 485.94 " " " " "
10 8.63 29.000 2.00 " 500.54 " " " " "
16 3.55 24.000 2.00 " " " " 170.40 " "
16 4.55 34.000 2.00 " " " " 309.40 " "
10 2.60 24.000 2.00 " 124.80 " " " " "
10 5.27 29.000 2.00 " 305.66 " " " " "
" " " " " " "
3rd Floor " " " " " " "
On axis A-C b/n 1'-3 10 2.60 24.000 1.00 " 62.40 " " " " "
10 4.68 29.000 1.00 " 135.72 " " " " "
16 2.48 29.000 1.00 " " " " 71.78 " "
" " " " " " "
WT & Roof Slab " " " " " " "
On axis A-C b/n 1'-3 10 2.60 24.000 2.00 " 124.80 " " " " "
10 6.96 9.000 2.00 " 125.19 " " " " "
10 4.02 9.000 2.00 " 72.36 " " " " "
10 1.45 12.000 2.00 " 34.80 " " " " "
" " " " " " "
Stair Case " " " " " " "
Sec A-A " " " 207.24 " " "
Bar-1 14.00 4.710 11.00 4.00 " 63.00 " " " " "
Bar-2 10.00 1.750 9.00 4.00 " " 74.27 " " " "
Bar-3 12.00 2.063 9.00 4.00 59.80 " " " " " "
Bar-4 8.00 1.150 13.00 4.00 73.60 " " " " " "
Bar-5 8.00 1.150 16.00 4.00 201.60 " " " " " "
Bar-6 8.00 0.900 56.00 4.00 " " " " " " "
" " " " " " "
Sec B-B " " " 209.22 " " "
Bar-1 14.00 4.755 11.00 4.00 " 79.38 " " " " "
Bar-2 10.00 2.205 9.00 4.00 " " 77.94 " " " "
Bar-3 12.00 2.165 9.00 4.00 55.20 " " " " " "
Bar-4 8.00 1.150 12.00 4.00 73.60 " " " " " "
Bar-5 8.00 1.150 16.00 4.00 172.80 " " " " " "
Bar-6 8.00 0.900 48.00 4.00 " 66.60 " " " " "
Bar-7 10.00 1.850 9.00 4.00 " " 77.40 " " " "
Bar-8 12.00 2.150 9.00 4.00 " " " " " " "
" " " " " " "
Sec C-C " " " 186.03 " " "
Bar-1 14.00 4.228 11.00 4.00 " 39.60 " " " " "
Bar-2 10.00 1.100 9.00 4.00 " " 51.05 " " " "
Bar-3 12.00 1.418 9.00 4.00 59.80 " " " " " "
Bar-4 8.00 1.150 13.00 4.00 73.60 " " " " " "
Bar-5 8.00 1.150 16.00 4.00 201.60 " " " " " "
Bar-6 8.00 0.900 56.00 4.00 " " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
" " " " " " "
TOTAL LENGTH 2,703.100 3,630.330 280.656 2,317.752 1,545.705 283.640 0.000 #
UINT WEIGHT in KG/ML 0.395 0.617 0.395 0.617 0.888 1.210 1.580 2
TOTAL WEIGHT IN KG 1,067.725 2,239.914 110.859 1,430.053 1,372.586 343.204 0.000 #

Contractor:‐ _______________
Consultant: ‐ ______________
Client: ‐ __________________
PROJECT: - Page 7 of 7
CLIENT: -
CONTRACTOR: -
CONSULTANT: -

Dia. Length No. of No. of Bar Length in meter


No Location
(mm) (m) Bar Memb 8 10 12 14 16 20 24

Contractor:‐ _______________
Consultant: ‐ ______________
Client: ‐ __________________