Operation Research

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

3E C 8 A 42 0 D7 55 A 9

0 2 F
EAACDD80 6A9 9420 002 D7F F557 7AB B9F A00
C 8 6A 42 0 D7 55 A 9 A0 6A
AC D8 06A 94 00 2D F5 7A B9 FA 06 8
0 2 2 7 5 F 0 A E
CDD80 6A9 942 002 D7F F55 7AB B9F A00 06A 8E3 3EA
6 4 0 D 5 7 A 8
D8 806AA94 200 02D 7F5 57AAB9 9FA 006 6A8 E3E EAC CD8
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A
80 A9 2 02 7F 5 AB 9F 00 A E3 A D 06 9
6 0 D 7 A
06 A94 420 02D 7F5 557 AB 9FA 006 6A8 8E3E EAC CD8 806AA94 4200
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D

66307
A9 420 02 D7F 557 AB 9F A00 6A 8E3 EA CD 806 A9 420 02D 7F
4 D 5 A 6 8 C 8 A 4 0 5

a) One
94 200 02D 7F5 57AAB9 9FA 006 A8E E3E EAC D8 06A 942 200 2D7 7F5 57A
20 2D 7F 57 B FA 00 A8 3 A D8 06 94 00 2D F5 57 B9

_________
42 02 7 55 AB 9F 0 6A E EA CD 0 A9 20 2 7F 5 AB F

__________
00 D F5 7A 9 A 06 8 3E C 8 6A 4 0 D 5 7A 9 A
00 2D7 7F5 57A B9 FA 006 A8E E3E AC D80 06A 942 2002 2D7 7F55 57A B9F FA0 006A

the problem.
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8

_____________
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
2Hrs 30 min

55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA

c) Only positive
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
allowed.

a) Saddle points
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80

b) Zero

a) Optimistic time
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A

a) Objective function
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20

a) Problem is degenerate
c) Problem is degenerate
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02

a) North west corner rule


3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9

c) It is a maximization problem
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A

c) Vogel’s Approximation method


2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3

c) Highest
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD

postponements is termed as ____________


B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A

b) Most likely time


00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94

b) Decision variable

d) Only negative
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
2. Figures to the right indicate full marks.

AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
Q1.A) Multiple choice questions (Attempt Any 8)

d) Solution is optimal

a) Idle time b) Processing time c) Elapsed time


D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
6. Graph papers will be supplied on request.

Page 1 of 7
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
a) There is no degeneracy b) Problem is unbalanced

a) Either zero or positive b) Either zero or negative


A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
iii) Floats for critical activities will be always ___________
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
(Where ‘M’ is number of rows and ‘N’ is number of columns)

55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA

b) Problem is unbalanced

while finding initial basic feasible solution in transportation?


7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80

b) Least cost method


FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A

d) Row minima metho


c) Redundancy
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
i) In linear programming, unbounded solution means ____________

6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20

006A8E3EACD806A942002D7F557AB9FA
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02

b) Strategies c) Pay off d) ‘n’ player game


Note : 1. All questions are compulsory. ( Subject to Internal Choice )

d) Optimal solution is not possible


3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
Paper / Subject Code: 86001 / Operation Research

4. Normal distribution table is printed on the last page for reference.

A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
d) Processing order
d) Same as duration of the activity

42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
Please check whether you have got the right question paper.

00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
ii) If M + N – 1 = Number of allocations in transportation, it means ___________

2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
5. Support your answers with diagrams / illustrations, wherever necessary.

55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
3. Use of non–programmable calculator is allowed and mobile phones are not

a) Infeasible solution b) Degenerate solution c) Infinite solutions d) Unique solution

B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6
d) Constraints

00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A

ix) In simplex, a maximization problem is optimal when all Delta J, i.e. Cj – Zj values are
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06
iv) The total time required to complete all the jobs in a job sequencing problem is known as

c) Pessimistic time d) Expected time


8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 4
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94

vii) The maximum time in which an activity will be completed assuming all possible delays and

x) Which of the following considers difference between two least costs for each row and column
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 2

viii) The various alternatives or courses of actions available to each player in a game are called as
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 20
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
vi) If in an assignment problem, number of rows is not equal to number of columns then _________
75 Marks

(8)

v) In linear programming, ________ represents mathematical equation of the limitations imposed by

42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7
7A 9 A0 06 8E 3E C 80 6A 42 02 D7
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F
FA 006 A8 E3 AC D8 06A 94 200 2D F5
00 A8 E3 EA D 06 94 20 2D 7F5 5
6A E EA CD 80 A 2 02 7 5
3E C 8 A 42 0 D7 55 A 9
0 2 F
EAACDD80 6A9 9420 002 D7F F557 7AB B9F A00
C 8 6A 42 0 D7 55 A 9 A0 6A
AC D8 06A 94 00 2D F5 7A B9 FA 06 8
0 2 2 7 5 F 0 A E
CDD80 6A9 942 002 D7F F55 7AB B9F A00 06A 8E3 3EA
6 4 0 D 5 7 A 8
D8 806AA94 200 02D 7F5 57AAB9 9FA 006 6A8 E3E EAC CD8
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A
80 A9 2 02 7F 5 AB 9F 00 A E3 A D 06 9
6 0 D 7 A
06 A94 420 02D 7F5 557 AB 9FA 006 6A8 8E3E EAC CD8 806AA94 4200

LPP.
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D

66307
Q2. A)
A9 420 02 D7F 557 AB 9F A00 6A 8E3 EA CD 806 A9 420 02D 7F
4 D 5 A 6 8 C 8 A 4 0 5

x2 ≤ 125
94 200 02D 7F5 57AAB9 9FA 006 A8E E3E EAC D8 06A 942 200 2D7 7F5 57A
20 2D 7F 57 B FA 00 A8 3 A D8 06 94 00 2D F5 57 B9

Factory

Method.
42 02 7 55 AB 9F 0 6A E EA CD 0 A9 20 2 7F 5 AB F
00 D F5 7A 9 A 06 8 3E C 8 6A 4 0 D 5 7A 9 A

C
B
A
x1 + x2 ≤ 200

x1 ≥ 0; x2 ≥ 0
x1 + 2x2 ≤ 300
00 2D7 7F5 57A B9 FA 006 A8E E3E AC D80 06A 942 2002 2D7 7F55 57A B9F FA0 006A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3

operations.
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA

assignment.

Customers
Max Z = 8x1 + 16x2
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80

Subject to constraints:
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
problem is unbalanced.

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A

6
7
P
12
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9

pessimistic time estimates.


A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A termed as ‘unique solution’.
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
Q1.B) True or false (Attempt Any 7)

7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
iii) Slack represents unutilized resources.

FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A


00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7

Q
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5

16
11
10
and idle time of each machine are maximum.

OR
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A

Page 2 of 7
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20

006A8E3EACD806A942002D7F557AB9FA
8
R
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02

(ii) Find the total cost of transportation schedule obtained using VAM.
11
12
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
Paper / Subject Code: 86001 / Operation Research

ii) If saddle point is available in a game, it is called as pure strategy game.

A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA

The 4 customers P, Q, R and S require 180, 150, 350 and 320 units respectively.
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
i) Probability of a project completing in its expected time (Te) will be always 100%.

FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6


v) If we introduce an unnecessary dummy activity, the error is termed as redundancy.

7
S
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A

14
13
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06

(i)You are required to find the Initial Basic Feasible Solution using Vogel’s Approximation
and B respectively. The following objective function along with constraints is given to you:

The 3 factories A, B and C have capacity to supply 500, 300 and 200 units respectively.
Q2.B) You are given the per unit cost of transporting goods from 3 factories to 4 customers.
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 4
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94
vii) When more than one optimal solution is possible in a linear programming problem, it is

viii) Regret matrix is made to convert a maximization problem into minimization problem in

Find how many units of Product A and Product B should be produced by the company so that the

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 2


ix) Critical path method (CPM) considers the three time estimates: most likely, optimistic and
iv) If in a transportation problem, number of rows is not equal to number of columns, then the

vi) Job sequencing problems are solved to ensure that, both, the total time to complete all jobs

profit is maximized. Is it a case of multiple optimal solutions? Use graphical method to solve the

06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 20


x) In solving a job sequencing problem, it is assumed that all jobs require the same sequence of

A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20

(2)
(5)
(8)
(7)

42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
A company produces 2 products A and B . x1 and x2 are the quantities manufactured of Products A

00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7
7A 9 A0 06 8E 3E C 80 6A 42 02 D7
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F
FA 006 A8 E3 AC D8 06A 94 200 2D F5
00 A8 E3 EA D 06 94 20 2D 7F5 5
6A E EA CD 80 A 2 02 7 5
3E C 8 A 42 0 D7 55 A 9
0 2 F
EAACDD80 6A9 9420 002 D7F F557 7AB B9F A00
C 8 6A 42 0 D7 55 A 9 A0 6A
AC D8 06A 94 00 2D F5 7A B9 FA 06 8
0 2 2 7 5 F 0 A E
CDD80 6A9 942 002 D7F F55 7AB B9F A00 06A 8E3 3EA
6 4 0 D 5 7 A 8
D8 806AA94 200 02D 7F5 57AAB9 9FA 006 6A8 E3E EAC CD8
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A
80 A9 2 02 7F 5 AB 9F 00 A E3 A D 06 9
6 0 D 7 A
06 A94 420 02D 7F5 557 AB 9FA 006 6A8 8E3E EAC CD8 806AA94 4200
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D

66307
A9 420 02 D7F 557 AB 9F A00 6A 8E3 EA CD 806 A9 420 02D 7F
4 D 5 A 6 8 C 8 A 4 0 5
94 200 02D 7F5 57AAB9 9FA 006 A8E E3E EAC D8 06A 942 200 2D7 7F5 57A
20 2D 7F 57 B FA 00 A8 3 A D8 06 94 00 2D F5 57 B9

V
II
42 02 7 55 AB 9F 0 6A E EA CD 0 A9 20 2 7F 5 AB F

VI
IV
III
00 D F5 7A 9 A 06 8 3E C 8 6A 4 0 D 5 7A 9 A

JOB
activity.
00 2D7 7F5 57A B9 FA 006 A8E E3E AC D80 06A 942 2002 2D7 7F55 57A B9F FA0 006A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8

machine.
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7 F
E
C
B

H
G
D
A

AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A

(ii) Find total elapsed time.


06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9

II

V
III
IV

VI
ACTIVITY

Job
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA

5
7
8
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00

(iii) Find free float for activity B.

10
11
12
completing all the jobs.
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3

(ii) Calculate the total elapsed time


(A) - hours
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA

time for each job in each machine.


7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80

Time in Machine
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94

(iii) Find idle time for both the machines.


5-6
3-6
4-6
2-4
2-3
1-5
1-3
1-2

6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
NODE

8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7

8
9
5
2
4
7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A

Page 3 of 7
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA

Machine (A)
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A

4
2
5
2
4
3
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
(i) Draw the network diagram and identify the critical path.

7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD

(B) - hours
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80

(iii) Find idle time on Machine A, Machine B and Machine C.


FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A

Time in Machine
6
5
6
4

00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94


16
10
20
13

6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20

006A8E3EACD806A942002D7F557AB9FA
1
4
6
6
8
3

8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
Machine (B)

06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9


Paper / Subject Code: 86001 / Operation Research

DURATION (days)

A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
Q2.C) You are given the following details for a project consisting of 8 activities:

2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3

4
6
9
7

11
10
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6

(C) - hours
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06

Time in Machine
Q2. D) There are 6 jobs to be performed in a factory and each would go through 2 machines
A and B in the order AB. The processing time (in hours) is given for each job in each

8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9
(i) Determine the sequence of performing the jobs that would minimize the total time of

3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 4


AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 2
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 20

(i) Find the sequence that minimizes the total elapsed time required to complete the jobs. (2)
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
Q3.A) Six jobs are to be processed in three machines A, B and C in the order A-B-C. You are given
(2)
(1)
(ii) Find earliest start time, earliest finish time, latest start time and latest finish time for each (4)

(3)
(3)
(3)
(2)
(3)

42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7
7A 9 A0 06 8E 3E C 80 6A 42 02 D7
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F
FA 006 A8 E3 AC D8 06A 94 200 2D F5
00 A8 E3 EA D 06 94 20 2D 7F5 5
6A E EA CD 80 A 2 02 7 5
3E C 8 A 42 0 D7 55 A 9
0 2 F
EAACDD80 6A9 9420 002 D7F F557 7AB B9F A00
C 8 6A 42 0 D7 55 A 9 A0 6A
AC D8 06A 94 00 2D F5 7A B9 FA 06 8
0 2 2 7 5 F 0 A E
CDD80 6A9 942 002 D7F F55 7AB B9F A00 06A 8E3 3EA
6 4 0 D 5 7 A 8
D8 806AA94 200 02D 7F5 57AAB9 9FA 006 6A8 E3E EAC CD8
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A

S
P
E

N
R

O
80 A9 2 02 7F 5 AB 9F 00 A E3 A D 06 9
6 0 D 7 A
06 A94 420 02D 7F5 557 AB 9FA 006 6A8 8E3E EAC CD8 806AA94 4200

F
E
C
B

H
G
D
A
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D

(i)

66307
(ii)
A9 420 02 D7F 557 AB 9F A00 6A 8E3 EA CD 806 A9 420 02D 7F
4 D 5 A 6 8 C 8 A 4 0 5
94 200 02D 7F5 57AAB9 9FA 006 A8E E3E EAC D8 06A 942 200 2D7 7F5 57A
20 2D 7F 57 B FA 00 A8 3 A D8 06 94 00 2D F5 57 B9

P4
P3
P2
P1
42 02 7 55 AB 9F 0 6A E EA CD 0 A9 20 2 7F 5 AB F
00 D F5 7A 9 A 06 8 3E C 8 6A 4 0 D 5 7A 9 A
00 2D7 7F5 57A B9 FA 006 A8E E3E AC D80 06A 942 2002 2D7 7F55 57A B9F FA0 006A

7–8
6–7
5–7
4–6
3–5
2–4
2–3
1–2
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94

22
20
31
27
J1
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02

No advt (I)
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5

Lacko textiles Mod advt (II)


6
1
4
8
4
5
4

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
10

06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9

Heavy advt (III)


A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
(i) Draw the network diagram.
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8

several combinations of strategies:


7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA

28
17
24
18
J2
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD

75
70
50
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A

(ii)Is it a case of alternative optimal solution?


00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20

No advt (I)
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5

Find the saddle point and value of game.


OR

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A

Page 4 of 7
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
7
2
8
9
8
7
6

18

42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
JOB

52
50
40
20
20
21
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A J3

Rayon textiles
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA

(i)Obtain optimal assignment and find cost of such assignment.

pay-off in Rs.10,000/-
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
(iii) What is the probability of the project completing in 55 days?

6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20

006A8E3EACD806A942002D7F557AB9FA
different persons. P1 cannot perform J3. P3 cannot perform J4.

8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
Q3.B) You are given the following details for a project with 8 activities:

AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5

50
45
28

Comment on the strategy to be selected by both the companies.


X

16
12
20
J4

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
Paper / Subject Code: 86001 / Operation Research

A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8

Mod advt (II) Heavy advt (II)


8
3
8

(ii) Find the expected time of project completion along with standard deviation.

7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
12
16
26
12
15

55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6
27
16
17
21
J5

00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A


6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9
Activity Node Optimistic time (days) Most likely time (days) Pessimistic time (days)

3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 4

given the pay off matrix from view point of Lacko textiles, showing its market share under
Q3.D) Two firms, Lacko texiles and Rayon textiles have 3 strategies each to select from. The 3
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 2
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 20
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
Q3. C) You are given information about the cost (in Rs. Thousands) of performing different jobs by

(5)
(2)
(1)
(7)
(2)
(2)
(3)

strategies are no advertisement, using moderate advertising and using heavy advertising. You are
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7
7A 9 A0 06 8E 3E C 80 6A 42 02 D7
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F
FA 006 A8 E3 AC D8 06A 94 200 2D F5
00 A8 E3 EA D 06 94 20 2D 7F5 5
6A E EA CD 80 A 2 02 7 5
3E C 8 A 42 0 D7 55 A 9
0 2 F
EAACDD80 6A9 9420 002 D7F F557 7AB B9F A00
C 8 6A 42 0 D7 55 A 9 A0 6A
AC D8 06A 94 00 2D F5 7A B9 FA 06 8
0 2 2 7 5 F 0 A E
CDD80 6A9 942 002 D7F F55 7AB B9F A00 06A 8E3 3EA
6 4 0 D 5 7 A 8
D8 806AA94 200 02D 7F5 57AAB9 9FA 006 6A8 E3E EAC CD8
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A
80 A9 2 02 7F 5 AB 9F 00 A E3 A D 06 9
6 0 D 7 A
06 A94 420 02D 7F5 557 AB 9FA 006 6A8 8E3E EAC CD8 806AA94 4200
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D

66307
(i)
A9 420 02 D7F 557 AB 9F A00 6A 8E3 EA CD 806 A9 420 02D 7F

(ii)
4 D 5 A 6 8 C 8 A 4 0 5
94 200 02D 7F5 57AAB9 9FA 006 A8E E3E EAC D8 06A 942 200 2D7 7F5 57A
20 2D 7F 57 B FA 00 A8 3 A D8 06 94 00 2D F5 57 B9

Z
Y
X
42 02 7 55 AB 9F 0 6A E EA CD 0 A9 20 2 7F 5 AB F
00 D F5 7A 9 A 06 8 3E C 8 6A 4 0 D 5 7A 9 A
00 2D7 7F5 57A B9 FA 006 A8E E3E AC D80 06A 942 2002 2D7 7F55 57A B9F FA0 006A

Demand
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8 customers.
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD

x1 ≥ 0; x2 ≥ 0
5–6
4–6
3–6
2–5
2–4
1–4
1–3
1–2
Node
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80

x1 + 2x2 ≤ 200
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A

3x1 + 4x2 ≤ 500


8x1 + 5x2 ≤ 600
180
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94

delay more than 17 days.


6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
A

11
17
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7 13

180

Max Z = 30x1 + 40x2


Subject to constraints:
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00

6
8
5
3
5
8
6
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A

12
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8

(days)
120

7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
200

(iii) Find optimal transportation cost.


55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
7

B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
B

22
18

320

Normal Duration
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5

OR
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A

Page 5 of 7
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
100

-
-

50
40
30
90
80
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00

200
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
C

14
15
19

2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8

day (Rs)
100

Draw the network diagram and find critical path.


7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
Crash cost per
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
(i) You are required to check the above solution for optimality.

FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A


00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20

006A8E3EACD806A942002D7F557AB9FA
The cost of completing the eight activities in normal time is Rs.6,500.
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
20
380

3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7

The following objective function and constraints are given to you:


AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
B) You are given the following information for a project with 8 activities:

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
5
7
0
D

400

06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9


Paper / Subject Code: 86001 / Operation Research

A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA

0
3
4
2
0
2
4
2

42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
crash time

7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
(ii) If it is not optimal, use modified distribution method to obtain optimal solution.

B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
Maximum possible

FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6


00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06
300
500
200

8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9
allocated for transportation. X, Y and Z are the 3 factories and A, B, C and D are the 4

3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 4


per unit transportation cost. Figures in circle within each cell represent number of units

Supply

AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94

Q4.C) A company produces 2 products x1 and x2 using three resources S1, S2 and S3. Product x1
Q4. A) You are given a solution for a transportation cost problem. Figures in each cell represent

S1, S2 and S3 are available to the extent of 200 units, 600 units and 500 units respectively.
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 2
Indirect cost is Rs.160 per day. The contract includes a penalty of Rs.100 per day for every day of

gives profit of Rs.30 per unit and product x2 gives profit of Rs.40 per unit. The 3 resources
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 20
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
(2)
(3)
(3)

Crash the project duration to find the total cost of completing the project in 17 days (4)
(3)
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7
7A 9 A0 06 8E 3E C 80 6A 42 02 D7
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F
FA 006 A8 E3 AC D8 06A 94 200 2D F5
00 A8 E3 EA D 06 94 20 2D 7F5 5
6A E EA CD 80 A 2 02 7 5
3E C 8 A 42 0 D7 55 A 9
0 2 F
EAACDD80 6A9 9420 002 D7F F557 7AB B9F A00
C 8 6A 42 0 D7 55 A 9 A0 6A
AC D8 06A 94 00 2D F5 7A B9 FA 06 8
0 2 2 7 5 F 0 A E
CDD80 6A9 942 002 D7F F55 7AB B9F A00 06A 8E3 3EA
6 4 0 D 5 7 A 8
D8 806AA94 200 02D 7F5 57AAB9 9FA 006 6A8 E3E EAC CD8
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A
80 A9 2 02 7F 5 AB 9F 00 A E3 A D 06 9
6 0 D 7 A
06 A94 420 02D 7F5 557 AB 9FA 006 6A8 8E3E EAC CD8 806AA94 4200
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D

66307
A9 420 02 D7F 557 AB 9F A00 6A 8E3 EA CD 806 A9 420 02D 7F
4 D 5 A 6 8 C 8 A 4 0 5

0
0
C
94 200 02D 7F5 57AAB9 9FA 006 A8E E3E EAC D8 06A 942 200 2D7 7F5 57A

40
20 2D 7F 57 B FA 00 A8 3 A D8 06 94 00 2D F5 57 B9
42 02 7 55 AB 9F 0 6A E EA CD 0 A9 20 2 7F 5 AB F
00 D F5 7A 9 A 06 8 3E C 8 6A 4 0 D 5 7A 9 A

following:
00 2D7 7F5 57A B9 FA 006 A8E E3E AC D80 06A 942 2002 2D7 7F55 57A B9F FA0 006A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
X
x2

S3
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD S2
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A

alternative solution?
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
Cj

8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
Zj
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
B

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
100
100
100

06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9


A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00

C) Answer any 3 of the following :


00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3

v) Distinguish between PERT and CPM.


55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
1
x1

20
30

1/2

FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A


11/2

00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94


ii) If it is not optimal, find optimal solution.

6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02

iii) Explain time cost trade off in project crashing.


i) Check if the above solution is optimal or not.

3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7


AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5

OR
iii) Find the optimal product mix and optimal profit

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A

Page 6 of 7
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
0
0
1

A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
x2

40
40

42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00 vi) What are the shadow prices of the resources? Justify.
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
v) Is it a case of alternative solution? Justify your answer
iv) Which resources are scarce and which are unutilized?
A) With reference to the above table answer the following :

2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A
You are given the following simplex solution to the above problem:

00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94


6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20

006A8E3EACD806A942002D7F557AB9FA
0
S1

20

8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
1/2

(-) 2

3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7


(-) 5/2

AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
Paper / Subject Code: 86001 / Operation Research

A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
B) Discuss any 5 areas where techniques of operations research can be applied.

i) Explain the terms: Redundant constraint and infeasibility in linear programming

7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
0
0
1
0
0

55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
S2

7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A
Q5 A) Explain the concepts: Total float, Free float, Independent float and Interfering float.

6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06
alternative solution in a transportation problem? Further what is the procedure to find that
ii) What do you mean by alternative optimal solution in transportation? How do you identify

8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9
0
1
0
0
0
S3

3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 4


iv) Discuss the significance of theory of games. Briefly discuss the terms: Players and Pay off.

AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94
B) With reference to the optimal simplex table in the above problem obtained by you, answer the

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 2


06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 20
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
(2)
(5)

(7)
(8)
(2)
(2)
(2)
(2)

(15)

42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7
7A 9 A0 06 8E 3E C 80 6A 42 02 D7
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F
FA 006 A8 E3 AC D8 06A 94 200 2D F5
00 A8 E3 EA D 06 94 20 2D 7F5 5
6A E EA CD 80 A 2 02 7 5
3E C 8 A 42 0 D7 55 A 9
0 2 F
EAACDD80 6A9 9420 002 D7F F557 7AB B9F A00
C 8 6A 42 0 D7 55 A 9 A0 6A
AC D8 06A 94 00 2D F5 7A B9 FA 06 8
0 2 2 7 5 F 0 A E
CDD80 6A9 942 002 D7F F55 7AB B9F A00 06A 8E3 3EA
6 4 0 D 5 7 A 8
D8 806AA94 200 02D 7F5 57AAB9 9FA 006 6A8 E3E EAC CD8
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A
80 A9 2 02 7F 5 AB 9F 00 A E3 A D 06 9
6 0 D 7 A

4.0
3.0
2.9
2.8
2.7
2.6
2.5
2.4
2.3
2.2
2.1
2.0
1.9
1.8
1.7
1.6
1.5
1.4
1.3
1.2
1.1
1.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
06 A94 420 02D 7F5 557 AB 9FA 006 6A8 8E3E EAC CD8 806AA94 4200
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D

66307
A9 420 02 D7F 557 AB 9F A00 6A 8E3 EA CD 806 A9 420 02D 7F
4 D 5 A 6 8 C 8 A 4 0 5
94 200 02D 7F5 57AAB9 9FA 006 A8E E3E EAC D8 06A 942 200 2D7 7F5 57A

0.00
20 2D 7F 57 B FA 00 A8 3 A D8 06 94 00 2D F5 57 B9
42 02 7 55 AB 9F 0 6A E EA CD 0 A9 20 2 7F 5 AB F
00 D F5 7A 9 A 06 8 3E C 8 6A 4 0 D 5 7A 9 A

0.4981
0.4974
0.4965
0.4953
0.4938
0.4918
0.7893
0.4861
0.4821
0.4772
0.4713
0.4641
0.4554
0.4452
0.4332
0.4192
0.4032
0.3849
0.3643
0.3413
0.3159
0.2881
0.2580
0.2257
0.1915
0.1554
0.1179
0.0793
0.0398
0.0000

0.49968
0.49865
00 2D7 7F5 57A B9 FA 006 A8E E3E AC D80 06A 942 2002 2D7 7F55 57A B9F FA0 006A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
0.01
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A

0.4987
0.4982
0.4975
0.4966
0.4955
0.4940
0.4820
0.4896
0.4846
0.4826
0.4778
0.4719
0.4649
0.4464
0.4463
0.4345
0.4207
0.4049
0.3869
0.3665
0.3438
0.3186
0.2910
0.2612
0.2291
0.1950
0.1591
0.1217
0.0832
0.0438
0.0040
00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
0.02

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A

0.4987
0.4982
0.4976
0.4967
0.4956
0.4941
0.4922
0.4898
0.4868
0.4830
0.4783
0.4726
0.4656
0.5473
0.4474
0.4357
0.4222
0.4066
0.3888
0.3686
0.3461
0.3212
0.2939
0.2642
0.2324
0.1985
0.1628
0.1255
0.0871
0.0478
0.0080

06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9


A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
0.03

7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA

0.4988
0.4983
0.4977
0.4968
0.4958
0.4943
0.4925
0.4901
0.4871
0.4938
0.4788
0.4732
0.4664
0.4582
0.4484
0.4370
0.4236
0.4082
0.3907
0.3708
0.3485
0.3238
0.2967
0.2673
0.2357
0.2019
0.1664
0.1293
0.0910
0.0517
0.0120

7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A
Area Under the Standard Normal Distribution

00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94


6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
0.04

8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7

0.4988
0.4984
0.4977
0.4969
0.4959
0.4945
0.4927
0.4904
0.4875
0.4838
0.4793
0.4738
0.4671
0.4591
0.4495
0.4382
0.4251
0.4099
0.3925
0.3729
0.3508
0.3264
0.2995
0.2705
0.2389
0.2054
0.1700
0.1331
0.0948
0.0557
0.0160

AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A

Page 7 of 7
06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
0.05

00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8

0.4989
0.4984
0.4978
0.4970
0.4960
0.4946
0.4931
0.4906
0.4878
0.4842
0.4798
0.4744
0.4678
0.4599
0.4505
0.4394
0.4265
0.4115
0.3944
0.3749
0.3531
0.3289
0.3023
0.2734
0.2422
0.2088
0.1736
0.1368
0.0987
0.0596
0.0199

7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD

**********************
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80
NORMAL DISTRIBUTION TABLE

FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6A


0.06

00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94

0.4989
0.4985
0.4979
0.4971
0.4961
0.4948
0.4931
0.4909
0.4881
0.4846
0.4803
0.4750
0.4686
0.4608
0.4515
0.4406
0.4279
0.4131
0.3962
0.3770
0.3554
0.3315
0.3051
0.2764
0.2454
0.2123
0.1772
0.1406
0.1026
0.0636
0.0239

6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20

006A8E3EACD806A942002D7F557AB9FA
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 42 02 D7
AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94 00 D7 F5
D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 200 2D7 F5 57A
0.07

06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 200 2D F5 57A B9


Paper / Subject Code: 86001 / Operation Research

A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20 2D 7F 57 B FA

0.4989
0.4985
0.4979
0.4972
0.4962
0.4949
0.4932
0.4911
0.4884
0.4850
0.4808
0.4756
0.4693
0.4616
0.4525
0.4418
0.4292
0.4147
0.3980
0.3790
0.3577
0.3340
0.3078
0.2797
0.2486
0.2157
0.1808
0.1443
0.1064
0.0675
0.0279

42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02 7F 55 AB 9F 00
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02 D7 55 7A 9F A0 6A
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D F5 7A B9 A 06 8
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D 7F 57 B FA 00 A8 E3
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7F 557 AB 9F 00 6A E3 EA
0.08

7A 9 A0 06 8E 3E C 80 6A 42 02 D7 55 A 9F A0 6A 8E E CD
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F5 7A B9 A 06 8E 3E AC 80

0.4990
0.4988
0.4980
0.4973
0.4963
0.4951
0.4934
0.4913
0.4887
0.4854
0.4812
0.4761
0.4699
0.4625
0.4535
0.4429
0.4306
0.4162
0.3997
0.3810
0.3599
0.3365
0.3106
0.2823
0.2518
0.2190
0.1844
0.1480
0.1103
0.0714
0.0319

FA 006 A8 E3 AC D8 06A 94 200 2D F5 57A B9 FA 006 A8 3E AC D8 6


00 A8 E3 EA D 06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A
6A E EA CD 80 A9 20 02 7F 57 AB 9F 00 A E3 A D 06
8E 3EA CD 80 6A 42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9
0.09

3E C 8 6A 942 00 D7 F55 7A 9 A0 06A 8E 3E C 80 6A 4


0.224

AC D8 06A 94 00 2D F5 7A B9 FA 06 8 3E AC D8 6A 94

0.4996
0.4986
0.4981
0.4974
0.4964
0.4952
0.4936
0.4916
0.4890
0.4857
0.4817
0.4767
0.4706
0.4633
0.4545
0.4441
0.4319
0.4177
0.4015
0.3830
0.3621
0.3389
0.3133
0.2852
0.2549
0.1879
0.1517
0.1141
0.0753
0.0359

D8 06A 94 200 2D 7F5 57A B9 FA 006 A8 E3E AC D8 06A 94 2


06 94 20 2D 7F5 57 B FA 006 A8 E3E AC D8 06A 94 20
A9 20 02 7F 57 AB 9F 00 A E3 A D 06 9 20
42 02 D7 55 AB 9F A0 6A 8E EA CD 80 A9 420 02
00 D7 F5 7A 9 A 06 8E 3E C 80 6A 42 02
2D F5 57 B FA 00 A8 3 AC D8 6A 94 00 D
7F 57 AB 9FA 00 6A E3 EA D 06 94 20 2D
55 AB 9F 0 6A 8E EA CD 80 A9 20 02 7
7A 9 A0 06 8E 3E C 80 6A 42 02 D7
B9 FA 06 A8 3E AC D8 6A 94 00 D7 F
FA 006 A8 E3 AC D8 06A 94 200 2D F5
00 A8 E3 EA D 06 94 20 2D 7F5 5
6A E EA CD 80 A 2 02 7 5

You might also like