Professional Documents
Culture Documents
STD - S0080-Kerbside Bus Stop With Spoon Drain OPTION B - RevC
STD - S0080-Kerbside Bus Stop With Spoon Drain OPTION B - RevC
(DATE)
COVER FLUSH WITH CONCRETE LEVEL. IF
FALL IS THE OPPOSITE WAY, DRAINAGE PLACE TGSI & FLAG SLEEVE PER STANDARD
SOLUTION SHOULD BE REVERSED TO PUT POLE LAYOUT STD_S0064 & STD_S0062
DRAINAGE SYSTEM ON HIGH SIDE.
450 APPROX
PIPE MAY BE UNDER PAVEMENT.
1.00m 3.20m CONTACT COUNCIL TO CONFIRM
SIZE OF PIPE.
(SIGNATURE)
EX KERB B2 KERB
EX KERB
EX D EX D EX D EX D EX D EX D EX D EX D EX D EX D EX D EX D EX D EX D EX D EX D EX D
1:40~1:100
VARIES
CONSTRUCT NEW PTV STANDARD PAD
MAINTAIN MAX 1:6 BATTERS STD_SD0064 COMPRISING:
150Ø PVC
125MM DEPTH 25MPA CONCRETE PAD ON 50MM
EX NATURESTRIP (WIDTH VARIES) FALL FALL CL3 FCR (COMPACTED) WITH SL72 MESH
CENTRALLY LOCATED AND DOWELLED TO KERB.
SAW CUT AND REMOVE Ex SPOON
DRAIN AND CONNECT PAD TO EX PATH.
> > >
EX SPOON DRAIN > > > > > > > > > > > > > > > > > > > > > > > > > > > > >
SAWCUT EX FOOTPATH AND INSTALL SPOON
EX FOOTPATH DRAIN PIT ON HIGH SIDE OF PAD. CONNECT PIT
TO ADJACENT COUNCIL DRAIN. PIT AND PIPE
CONNECTION TO LOCAL COUNCIL STANDARDS.
(BLOCK LETTERS)
GENERALDESIGNDETAILPLANNOTES
LAYOUT PLAN APPLEISN
IALLCASESUNLESSSTATEDOTHERWSIE
· ALLKERBSITOBEASDETALIEDBYTHECOORDNIATNIG
SCALE 1:100 ROADAUTHROTIY
· ALLKERBRETURNSARERADUISTOBoK
Certified By:
SEALED KERB
PAVEMENT
CONCRETE NATURESTRIP
FOOTPATH LANDSCAPING
NOTES.
2. BUS STOP AND PEDESTRIAN CROSSING WARNING SIGNAGE (W6-1, W6-3, W8-213, ETC) TO BE INSTALLED IN KERB NOTES
TYPICAL SPOON DRAIN PIT DETAIL ADVANCE OF STOP AS REQUIRED BY COORDINATING ROAD AUTHORITY.
9. IF THE EXISTING KERB IS NOT A BARRIER KERB, REPLACE THE EXISTING KERB WITH A BARRIER KERB
(REFER INFRASTRUCTURE DESIGN MANUAL (IDM) SD495) 3. DIRECTIONAL HAZARD MARKER (D4-1-2B) TO BE INSTALLED IN ADVANCE OF SERVICE ROAD NARROWING MINIMUM 9.2M LENGTH AND A MINIMUM 150MM HIGH (MAX 190MM) FROM KERB INVERT. IF THE EXISTING
AS REQUIRED BY COORDINATING ROAD AUTHORITY. KERB IS A BARRIER KERB WITH A HEIGHT LESS THAN 150MM FROM THE KERB INVERT, REPLACE THE
BARRIER KERB UP TO THE LENGTH OF THE BUS STOP HARDSTAND. KERB INVERT TO BE ALIGNED.
4. PARKING RESTRICTION SIGNAGE TO BE INSTALLED ON SERVICE ROAD THROUGH NARROWING AS
REQUIRED BY COORDINATING ROAD AUTHORITY. 10. KERB TRANSITION SHALL BE PROVIDED IN ACCORDANCE WITH VICROADS STANDARD DRAWING SD2102.
PAD SHALL GENERALLY BE GRADED AWAY FROM KERB (-1.0 ~ REQUIRED CLEAR AREAS AND RAMP GRADES 11. KERB RETURN SHALL BE PROVIDED IN ACCORDANCE WITH VICROADS STANDARD DRAWING SD2101.
-2.5%) TO ACHIEVE MINIMUM ADJUSTMENT OF EXISTING PATH AT
REAR OF PAD (IF NECESSARY). IF THIS CANNOT BE ACHIEVED, VARIES 5. A MINIMUM 1.2M GAP CLEAR OF OBSTACLES MUST BE PROVIDED PAST ANY OBSTRUCTION TO ALLOW FOR 12. IF A DRIVEWAY IS SITUATED WITHIN 9m OF THE BUS STOP FLAG POLE ON APPROACH, THE DRIVEWAY
PAD CAN BE GRADED TOWARDS KERB IF NOT ALREADY BARRIER KERB, WHEELCHAIR ACCESS (EG GAP BETWEEN SHELTER AND FLAG, ETC) WILL NEED TO REMAIN, SO ANY NEW BARRIER KERB SHALL BE TIED INTO THE EDGE OF DRIVEWAY.
ENSURE THAT FOOTPATH GRADES AWAY FROM ADJACENT DEMOLISH EX KERB AND
PROPERTY. WHERE DRAINING AWAY FROM PROPERTY NOT CONSTRUCT NEW BARRIER KERB PATH NOTES
6. A MINIMUM 2.2M X 2.2M AREA MUST BE AVAILABLE ADJACENT TO THE FLAG IN FRONT OF THE FRONT DOOR
POSSIBLE, DRAINING TOWARD PROPERTY CAN BE ALLOWED IF REQUIRED. (REFER NOTES 19-20)
BOARDING LOCATION TO ENABLE A WHEELCHAIR USER TO TURN AROUND AND BACK UP AND TO ALLOW
SUBJECT TO PTV AND COUNCIL APPROVAL. FOR A RAMP TO BE EXTENDED OUT FROM THE BUS TO FACILITATE THEIR BOARDING / DISEMBARKING. 13. IF DDA COMPLIANT GRADES ARE NOT ACHIEVABLE BETWEEN EXISTING PATH AND FACE OF KERB, THE
1.0~2.5% EXISTING PATH MAY BE REQUIRED TO BE RAISED OR LOWERED. ANY RAISING OR LOWERING SHALL
EX FOOTPATH 7. A MINIMUM 2.0M X 1.5M TURNING AREA MUST BE AVAILABLE AT ANY CHANGE IN DIRECTION ASSOCIATED REQUIRE THE APPROVAL OF PTV AND COORDINATING ROAD AUTHORITY. ADJACENT PROPERTY OWNERS
EX PAVEMENT WITH A PRAM CROSSING. TO BE NOTIFIED AND IMPACT OF PATH RAISING OR LOWERING ON ADJACENT FENCES, ENTRANCES AND
CROSSOVERS TO BE CONSIDERED.
Ex SPOON DRAIN EXISTING COUNCIL DRAIN CONCRETE INFILL SLAB @ GRADIENT OF 1 IN 20 ~ 1 IN 33
LOCATION IS INDICATIVE ONLY.
14. WHERE THE RAMP IS LESS THAN 3m IN LENGTH, INSTALL 300mm DIRECTIONAL TGSI'S CENTERED ALONG
PIPE MAY BE UNDER PAVEMENT.
RAMP LENGTH. NO DIRECTIONAL TGSI'S ARE REQUIRED FOR RAMP OR ACCESSIBLE PATH WHICH IS
RECOMMEND 150Ø PVC PIPE CONTACT COUNCIL TO CONFIRM
SIZE OF PIPE.
LONGER THAN 3m AND PROVIDED WITH A SHORELINE.
(SUBJECT TO ROAD AUTHORITY APPROVAL)
CONCRETE INFILL SLAB @ GRADIENT OF 1 IN 33 ~ 1 IN 1000
CONNECT TO EXISTING UNDERGROUND
15. NO DIRECTIONAL TGSI'S ARE REQUIRED FOR AN ACCESSIBLE PATH WHICH IS NO LONGER THAN 3m AND
DRAINAGE USING FLOWCON CONNECT OR
COUNCIL APPROVED EQUIVALENT. TYPICAL BUS STOP SECTION PROVIDED WITH A SHORELINE.
NTS
ORGANISATION AUTHORISED BY DATE
DOT <5123456.123>
<123456.123> <5123456.123>
<123456.123>
TOMKINSON B 11/10/21 AMENDMENTS AS PER DOT COMMENTS OB JH MM MM dimensions. Up Location Down Location Datum Drawing Number Revision
JG RQ JG In Serv.
TOMKINSON A 31/07/19 AS SUBMITTED TO PTV JH This drawing is provided only for the information of the East.
Revised By In Serv Rev. Date Description Designed Checked Ind. Review Approved person or organisation to whom PTV provides it. It may
not be provided to, or used by, any other person without North.
PTV's prior written consent. ID#
East.
North.
ID#
Scale
AS SHOWN
Sheet Size
A3
STD_S0080 C