Sub: Quotation for Supply and Erection of “Lorven Elevators” (6) persons
(408Kgs) (Passenger) lift for your Building/Project at ( Sircilla)
We trust our offer will receive your favorable consideration and acceptance.
In this connection, we wish to inform you that the lift we have offered is completely
indigenous make. We have already supplied and installed several lifts in Hyderabad
& we are into Interiors, Fabrication, and Construction.
Please return the duplicate copy of this quotation duly signed in token of your acceptance
of our offer together with advance payment at the earliest.
We trust you will find our offer in order and if you require any further information, we
shall be pleased to provide the same.
Rs: 8,70,000.00/- (Eight Lakhs Seventy Thousand Rupees Only) + 18% GST
Rs: 2,99,040.00/- (Two Lakhs Ninety-Nine Thousand Forty Rupees Only) +18% GST
Rs: 12,99,040.00/-( Twelve Lakhs Ninety Nine Thousand Forty Rupees Only)+18%GST
All Payments must be drawn in favor of “Lorven Homes Pvt Ltd” in the form of Cheque
/Drafts. This offer accepted by we shall constitute the contract between us to make this offer a
legal and valid contract binding on both parties.
TERMS OF PAYMENT:
Accepted by:
For Lorven Elevators
CANCELATION OF CONTRACT:
In the event cancellation of contract, we shall be charging you as follows:
a) 10% of the contract value if the order is cancelled before the general arrangements
drawing is prepared.
b) 25% of the contract value if the order is cancelled within a month after the
general arrangement drawing is approved.
c) 40% of the contract value if the order is cancelled after 4 months of the approval
of the general arrangement drawing.
d) 90% of the contract value if the order is cancelled after materials has been delivered
at your life.
TERMINATION:
a) In case the supply of the lift materials is not completed within 75 days from the
date of conclusion of the contract due to de fault or delay in compliance of any
terms of the contract by customer, company shall be at liberty any time thereafter
to offer a revised time schedule for execution of the contract at revised price and
payment terms.
b) In case customer does not accept the revised offer made in accordance with
clause (a) within 4 weeks of such revised offer company shall be at liberty to
treat the contract as cancelled by customer and proceed in accordance with
above cancellation of contract.
TITLE OF PROPERTY:
Any materials supplied by us shall remind our property until payment is received in full
and the lift handed over, we reserved the right to remove any equipment supplied by us at
your cost in case of default of any payment by you, irrespective of the manner of
attachment to the reality, sale mortgage or lease of the premises.
VALIDITY:
Unless otherwise specified, our quotation is effective for (30) days from the date of offer
and there after it is subject to change or withdrawal without notice at our sole discretion.
The tender excludes, the following items and it shall be responsibility of the customers to
provide these to meet our requirements.
1. The lift well should be reasonable plumb and completed in all aspects.
2. The lift pit should be waterproof with necessary concreting done and its depth
should be as per our drawing.
3. Suitable weatherproof storage room with locking arrangement, preferable at the
ground floor level near lift well for safe custody of our materials.
4. To do all cuttings of walls, floors, or partition together with any repairs
made necessary thereby.
5. You have to complete your necessary work and running of mains and obtaining
power so as not to cause any delay in the completion of our work.
6. Scaffolding in the lift well as per our drawing.
7. Carrying out all minor builder works as per requirements of our site
engineer/ erector inclusive of grouting, making pockets for landing boxes
etc.,
8. You should provide 3 phase and single-phase power supply with suitable earthling
and lighting arrangements with suitable switches & starters as per requirements in
the machine room. All conductors should be copper four cores – armoured cable (for
3 phase power supply).
9. Lift shaft should be 3 – pin plug point and bulb at every second landing.
I/We confirm the above.
Please note that he above set of drawings will give complete information for the civil
constructions by the Customer.
> Necessary help while casting the machine room floors lab.