Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM

Tổ hợp hóa dầu Miền Nam Việt Nam

Package A1: OLEFINS PLANT

Contract No.: LSP-CA-136 INSPECTION TEST RECORD EPC Project No.: 036909C

INSPECTION REPORT FOR TESTING, ADJUSTING, BALANCING WORK IN-VNCN-HVAC…...........

Description/ Item: FINAL TEST - ACCU Location: ….............Sub C.....................................................

Date: ….........14/07/2022..............................................................

Standard: EE-020: Air Conditioning, Ventilating and Ducting Design; EE-024: Substation Design

NO. T&C Works Selected or Specified Field Measurement REMARKS:

1 Equipment Information:

1.1 ACCU No.: ACCU-HVAC-3001-01C-02 ACCU-HVAC-3001-01C-02

1.2 Manufacturer: TRANE/THAILAND TRANE/THAILAND

RAUP400D1EEA
1.3 ACCU Model & Serial No : RAUP400
3T0321-800535

2 Operation Test Data

2.1 Noise Level report (dB) ( Minimum dimension 3m ) 81 79

2.2 Power

Phase/Voltage /Hert 380-415v/3P/50HZ 380-415v/3P/50HZ

Starting current ( Amp ) 16.8 9.01

Running current ( Amp ) 153 35.4

RY-RB-YB (V) 380-415 389.9 / 390.5 / 389.8

CONCLUSION: A-ACCEPTED R-REJECT

Comments:

SUBCONTRACTOR CONTRACTOR OWNER

THIEN MINH VNCN E&C TPSK LSP

Date:….................................. Date:….................................. Date:….................................. Date:…..................................

You might also like