Contract No.: LSP-CA-136 INSPECTION TEST RECORD EPC Project No.: 036909C
Date: ….........07/07/2022..............................................................
Standard: EE-020: Air Conditioning, Ventilating and Ducting Design; EE-024: Substation Design
1 Equipment Information:
RAUP400D1EEA/
1.3 ACCU Model & Serial No : RAUP400
3T0321-800530
2.2 Power
Comments: