***Column J (Min Qty) - Where it is mentioned "YES", please be guided by the remarks mention in Column L (Completed Date)

CHEMICAL TANKER
Vessel: Vessel Type:

Sr. No. Item Min Qty Qty on board Completed Date

1 No of Personal Multigas Detector on board 6 6

2 No of Portable Multigas detector on board 2 2

3 No of Portable oxygen Analyser on board 2 2

4 No of Tank Scope on board 2 2

5 No of Toxic Gas detector on board 2 2


Fire Detectors fitted in the Accommodation (Common spaces including All crew cabins / laundry / Galley / Bridge to
6 YES
Cabin) be installed
7 Are Personal Gas Detectors provided to all crew on board 1 per crew Requisition raised NOP/D/210/22

8 Full body Safety harness with twin hook arrangement 6 6

9 Fall Arrestor device and Tripod to be supplied on board 2 2

10 Inflatable Working Life vest on board 6 6

11 Dedicated Citadel phone 1 1


Electric Lamps with 24 V supply to be supplied on board, for Enclosed
12 4 8
Space. ( For Engine Room Use only)

13 Pneumatic Lights, for Enclosed Space. 4 4

No of Intrinsicaly safety head lamps / Safety torches / Lantern (6V) -


14 6/6/4 6/6
Deck
No of Intrinsicaly safety head lamps / Safety torches / Lantern (6V) -
15 3/6/4
Engine
16 Annual Shore Calibration of ODMCS / OCM carried out YES YES Last annual shore calibration:23/02/2022
Oil Content meter should be MEPC 107(49). If 60 (33), anti tricking
17 YES YES Type of OCM onboard: FOCAS 2000
device to be installed.
18 Maximum flow rate to be stenciled on the bunkering line. YES Date of Stenciling:26-SEPT-2022

19 No of Spare Coalesce filter for OWS on board 1 2 SETS

20 Timer to be installed for D.O and F.O transfer pump YES Date of installation:09-MARCH-2018
NO DEADMAN
21 UMS vessel be fitted with Dead man alarm. NO Date of installation if UMS classed
ALARM
22 Is vessel Supplied with spares as per the Company spare inventory. YES Has all the spares been supplied
Overflow line of Bunker tanks is not blanked. HL alarms are installed and
23 YES Date of installation:09-MARCH-2018
working
24 Renewal of Cargo gear wire as per CMSVM (Section 7.0) YES Date of Renewal:09-MARCH-2018

25 Intrinsically Safe Alcometer to be supplied on board tankers. 3 3

26 Intrinsically safe thermometer to be supplied on board tankers. 1 NO


***Column J (Min Qty) - Where it is mentioned "YES", please be guided by the remarks mention in Column L (Completed Date)

Vessel: Vessel Type: Oil Tanker

Sr. No. Item Min Qty Qty on board Completed Date


1 No of Personal Multigas Detector on board 4

2 No of Portable Multigas detector on board 2

3 No of Portable oxygen Analyser on board 2

4 No of Tank Scope on board 2

5 No of Toxic Gas detector on board 2


Fire Detectors fitted in the Accommodation (Common spaces including All crew cabins / laundry / Galley / Bridge to
6 YES
Cabin) be installed
7 Are Personal Gas Detectors provided to all crew on board 1 per crew

8 Full body Safety harness with twin hook arrangement 6

9 Fall Arrestor device and Tripod to be supplied on board 2

10 Inflatable Working Life vest on board 6

11 Dedicated Citadel phone 1


Electric Lamps with 24 V supply to be supplied on board, for Enclosed
12 Space. ( For Engine Room Use only) 4

13 Pneumatic Lights, for Enclosed Space. 4

No of Intrinsicaly safety head lamps / Safety torches / Lantern (6V) -


14 Deck 6/6/4

No of Intrinsicaly safety head lamps / Safety torches / Lantern (6V) -


15 3/6/4
Engine
16 Annual Shore Calibration of ODMCS / OCM carried out YES last Annual shore calibration
Oil Content meter should be MEPC 107(49). If 60 (33), anti tricking
17 device to be installed. YES Type of OCM on board

18 Maximum flow rate to be stenciled on the bunkering line. YES Date of Stenciling

19 No of Spare Coalesce filter for OWS on board 1

20 Timer to be installed for D.O and F.O transfer pump YES Date of installation

21 UMS vessel be fitted with Dead man alarm. YES Date of installation if UMS classed

22 Is vessel Supplied with spares as per the Company spare inventory. YES Has all the spares been supplied

23 Overflow line of Bunker tanks is not blanked. HL alarms are installed and YES Date of installation
working
24 Renewal of Cargo gear wire as per CMSVM (Section 7.0) YES Date of Renewal:

25 Intrinsically Safe Alcometer to be supplied on board tankers. 3

26 Intrinsically safe thermometer to be supplied on board tankers. 1