Professional Documents
Culture Documents
PPE Check Tanker
PPE Check Tanker
CHEMICAL TANKER
Vessel: Vessel Type:
20 Timer to be installed for D.O and F.O transfer pump YES Date of installation:09-MARCH-2018
NO DEADMAN
21 UMS vessel be fitted with Dead man alarm. NO Date of installation if UMS classed
ALARM
22 Is vessel Supplied with spares as per the Company spare inventory. YES Has all the spares been supplied
Overflow line of Bunker tanks is not blanked. HL alarms are installed and
23 YES Date of installation:09-MARCH-2018
working
24 Renewal of Cargo gear wire as per CMSVM (Section 7.0) YES Date of Renewal:09-MARCH-2018
18 Maximum flow rate to be stenciled on the bunkering line. YES Date of Stenciling
20 Timer to be installed for D.O and F.O transfer pump YES Date of installation
21 UMS vessel be fitted with Dead man alarm. YES Date of installation if UMS classed
22 Is vessel Supplied with spares as per the Company spare inventory. YES Has all the spares been supplied
23 Overflow line of Bunker tanks is not blanked. HL alarms are installed and YES Date of installation
working
24 Renewal of Cargo gear wire as per CMSVM (Section 7.0) YES Date of Renewal: