Compliances of Safety Audit-Anji Khad
Compliances of Safety Audit-Anji Khad
Sr.
Observation Picture Recommendation Compliance Evidence
No.
Records of Periodic
inspection of WAH
Complied Complied
equipments, permit to
4
work and tool box
talks maintained at
site.
COMPLIANCES OF SAFETY AUDIT
Anji Khad Cable Stayed Bridge Project
Doc No.-AKB/SA/23-24/01 Revision-03 Date-02 June 2023
It is
The OEM certification
recommended to The said document is
12 for lifting equipments N/A
do a quarterly not available at site.
is not available on site.
OEM test of
Lifting
equipments on
site.
Site to arrange
On-site certified defensive
drivers are available, driving and road
13
but there is no safety training
Defensive driving
COMPLIANCES OF SAFETY AUDIT
Anji Khad Cable Stayed Bridge Project
Doc No.-AKB/SA/23-24/01 Revision-03 Date-02 June 2023
defensive driving/ road for drivers training done
safety training records every year
of the drivers.
COMPLIANCES OF SAFETY AUDIT
Anji Khad Cable Stayed Bridge Project
Doc No.-AKB/SA/23-24/01 Revision-03 Date-02 June 2023
The work-at-height
permit system is
followed by site Complied Complied
17
members, and tasks
performed at height are
welding, cutting, nut
bolting, etc.
COMPLIANCES OF SAFETY AUDIT
Anji Khad Cable Stayed Bridge Project
Doc No.-AKB/SA/23-24/01 Revision-03 Date-02 June 2023
No external work-at-
height training has been N/A Competency
carried out in previous training for WAH
19 Scope of HO in future
years for workers and site to be scheduled
members. (1st external for the staff and
training conducted 1 day workers by a
prior to the audit). Internal third party agency.
training records are
maintained.
Stressing platforms
On-site, there is no Certified spider kit is are already available,
protection provided to be provided to which have adequate
24 for falling objects, workers and also a protections like-
especially from the surrounded by green
25mm x 25mm safety
top of the Main mesh, top and mid-
net is to be installed to rails. Practically it is
pylon 1. arrest the fall of not possible to fix
equipments, safety nets.
tools/tackles or any Also, please note that
heavy object. no work is pending
outside the main
pylon-1.
-
COMPLIANCES OF SAFETY AUDIT
Anji Khad Cable Stayed Bridge Project
Doc No.-AKB/SA/23-24/01 Revision-03 Date-02 June 2023
SOP for hot work &
working at height is
Operational control SOP’s for Work at prepared.
procedures and safe Height, Hot work,
25 operating procedures N/A are to be prepared,
SOP-Hot Work-
are not available on approved and
HCC P 3357 15 001
site. followed
Rev-0,date-
25.04.2023
SOP- Working at
height- HCC P 3357
15 002
Rev-0,date-
03.05.2023
Incident/Accident Reporting
records maintained on site. Complied Compl
32 ied
It is recommended to
On site near-miss records are improve Incident
available but no records of Reporting system at
34 LTI found. No records of site. Workers are to
Corrective or Preventive be communicated
actions found in case of the No LTI happened. So,
regarding LTI/
maintaining records are not
LTI. Incidents through possible.Training room is
trainings and videos. not available at site .
Therefore, showing videos
is not possible.
COMPLIANCES OF SAFETY AUDIT
Anji Khad Cable Stayed Bridge Project
Doc No.-AKB/SA/23-24/01 Revision-03 Date-02 June 2023
Complied.
The record of HIRA Risk
is available and well assessments to be
42 maintained on-site; carried out and followed
the last HIRA was before the start of any
done on April 5, new activity on site.
2023.
Trained WAH
51 No WAH rescue Rescuers (IRATA qualified) to
team or rescue kit N/A
be deployed on site for the
available on site entire duration of project. Team Scope of HO in future
should be responsible for
Conducting rescue mock drills
and preparation of emergency
rescue plan.
COMPLIANCES OF SAFETY AUDIT
Anji Khad Cable Stayed Bridge Project
Doc No.-AKB/SA/23-24/01 Revision-03 Date-02 June 2023
Ambulance was
available on site for any
type of medical
52 emergency, equipped Complied Complied
with all kinds of
equipment, and a
checklist was also kept.
The DG area
should be cordoned SLD, danger sticker is
The control panel signage available. Operator
off. SLD, Danger
name is displayed with
in the assembly yard is signage, and contact number.
56 discolored, and the control contact no. of the
panel door glass is also operator should be
broken. displayed. It is
recommended to
display an electric
shock treatment
chart for
emergency use.
COMPLIANCES OF SAFETY AUDIT
Anji Khad Cable Stayed Bridge Project
Doc No.-AKB/SA/23-24/01 Revision-03 Date-02 June 2023
A maintenance Maintenance matrix is
matrix for available.
57 Mechanical and
The maintenance matrix for electrical machines
mechanical and electrical and equipment needs
machines and equipment is N/A
to be prepared and
not available on site. followed.
Proper
There is no signage posters/signage’s
available in the staff need to be Staff colony is marked
58 quarters, and a hand- displayed
operated siren is not at the staff colony
available in the quarters as
for any emergency. Per the norms.
COMPLIANCES OF SAFETY AUDIT
Anji Khad Cable Stayed Bridge Project
Doc No.-AKB/SA/23-24/01 Revision-03 Date-02 June 2023