1. Ignition System
2. Pilot Burner
3. LP Flare Tip
4. Pilot Burner and Flare Start up
GOPB
1. Ignition System
2. Pilot Burner
3. Flare Tip
4. Pilot Burner and Flare Start up
MEPA
1. Ignition System
2. Pilot Burner
3. Flare Tip
4. Pilot Burner and Flare Start up
1. Ignition System
1.1 Power & 1.2 Panel Lamp
Power lamp lighted on when power was supplied. All lamps lighted on when lamp test button was pushed.
1 / 18
Original condition After replacement
Replaced
Note
Original HEI module
for PB#1 and PB#3 are
still good and can be
used as spare.
2 / 18
2. Pilot Burner
2.1 Pilot burner tip & 2.2 Orifice plate inside tip
Pilot burner #1 : Tip has some cracks. Almost half of the orifice plate inside the tip were gone due to crack or heat corrosion.
As one spare new pilot burner is available, this damaged pilot burner #1 was replaced with new one.
Replaced
Pilot burner #2 : Tip has no cracks. But, the orifice plate inside tip has some minor cracks. This crack condition must be
checked again in next shutdown and if the orifice plate are missing, the pilot burner must be changed to new one in order to
sustain stable pilot flame.
Note
Murphy has no more spare for
pilot burner. Applicot
recommend to purchase new
pilot burners until next
shutdown
Pilot burner #3 : Tip has no cracks. But, the orifice plate inside tip has some minor cracks. This crack condition must be
checked again in next shutdown and if the orifice plate are missing, the pilot burner must be changed to new one in order to
sustain stable pilot flame.
3 / 18
Current condition of pilot burner #3
Note
Murphy has no more spare for pilot burner. Applicot recommend to
purchase new pilot burners until next shutdown
2.3 Strainer & 2.4 Orifice nozzle
Pilot burner #1 : Installed new pilot burner, therefore strainer and orifice nozzle is in good condition. No checking was made.
Pilot burner #2 : Strainer is in good condition and cleaning was performed. Orifice was blocked by coke and cleaning was
performed.
Pilot burner #3 : Strainer is in good condition and cleaning was performed. Orifice had no blockage and cleaning was
performed.
Orifice nozzle
Strainer
4 / 18
3. LP Flare Tip
3.1 Flare tip wall & 3.2 Flame holder & 3.3 Inner V plate
Still in good condition as no crack or deformation was observed
Flame holder
Inner V plate
Tip wall
3.4 Windshield
Cracks and deformations were observed and shall be replaced in next shutdown for longer life of flare tip.
5 / 18
4. Pilot burners and flare start up
Pilot burners and flare were succesfully ignited as shown in below photo.
6 / 18
Applicot Corporation
Elevated Flare System Check Sheet
Customer Name : MURPHY
Title : Offshore Flares Inspection and Maintenance
Date : 9 to 15 September 2017
Site Description : Bintulu, Sarawak
Applicot PIC : Adib Rahimi
Platform : GOPB
1. Ignition System
1.1 Power & 1.2 Panel Lamp
Power lamp lighted on when power was supplied. All lamps lighted on when lamp test button was pushed.
7 / 18
Original condition After replacement
8 / 18
1.5 HEI modules (Transformers)
All HEI modules are still in good condition as sparking were confirmed by using test ignition probe
Ignition cables from test probe were Spark came out here
connected to HEI module Test ignition probe
9 / 18
2. Pilot Burner
2.1 Pilot burner tip & 2.2 Orifice plate inside tip
Pilot burner #1 : No cracks were observed at tip and orifice plate. Still in good condition
Pilot burner #2 : No cracks were observed at tip and orifice plate. Still in good condition
10 / 18
Pilot burner #3 : Tip has some cracks. Cracks also were observed at welding portions of pipe near pilot tip. This pilot
burner must be replaced to new one one in next shutdown.
Note
Murphy has no more spare for pilot burner. Applicot recommend to
purchase new pilot burners until next shutdown
11 / 18
2.3 Strainer & 2.4 Orifice nozzle
Pilot burner #1 : Strainer was dirty and cleaning was performed. Orifice also dirty and cleaning was performed
Strainer
Orifice
Pilot burner #2 : Strainer was dirty and cleaning was performed. Orifice was blocked by coke and cleaning was
performed.
Strainer
Orifice nozzle
Orifice hole was
blocked by coke
Before cleaning After cleaning
Pilot burner #3 : Strainer was dirty and cleaning was performed. Orifice was blocked by coke and cleaning was
performed.
Strainer
Orifice
12 / 18
2.5 Ignition Probe
Pilot burner #1 : Ignition probe is in good condition as spark sound was confirmed
Pilot burner #2 : Ignition probe is in good condition as spark sound was confirmed
Pilot burner #3 : Ignition probe was in faulty condition as no spark sound was confirmed. This was rectified by replacing
the faulty probe with spare new ignition probe.
3. Flare Tip
3.1 Flare tip wall & 3.2 Flame holder & 3.3 Inner V plate
Still in good condition as no crack or deformation was observed
Flame holder
Inner V plate
Tip wall
13 / 18
3.4 Windshield
Cracks and deformations were observed and shall be replaced in next shutdown for longer life of flare tip.
Welding portions here that hold the windshield to flare tip are cracking. If these
cracks worsen the windshield will drop. These shall be rewelded or totally replaced
new windshield in next shutdown.
14 / 18
Applicot Corporation
Elevated Flare System Check Sheet
Customer Name : MURPHY
Title : Offshore Flares Inspection and Maintenance
Date : 8 to 15 September 2017
Site Description : Bintulu, Sarawak
Applicot PIC : Adib Rahimi
Platform : MEPA
1. Ignition System
1.1 Power & 1.2 Panel Lamp
Power lamp lighted on when power was supplied. Red lamps of PB#2 and PB#3 were in faulty condition as they
did not light on when lamp test button was pushed.
15 / 18
Original condition After replacement
16 / 18
2. Pilot Burner
2.1 Pilot burner tip & 2.2 Orifice plate inside tip
Cannot confirm due to no scaffolding
3. Flare Tip
3.1 Flare tip wall & 3.2 Flame holder & 3.3 Inner V plate
Cannot confirm due to no scaffolding
3.4 Windshield
Cannot confirm due to no scaffolding
17 / 18
Recommended spare parts based on this inspection result
3 Ignition probe 8 pcs Currently, only 4 spares available. Total required is 12 spares
4 Thermocouple 12 pcs We observed that current double element thermocouple is having no advantage as once the 1st element
damage, there is high possibility that 2nd element also damage. We also noticed that current 6.4mm
→Single element sheath diameter is not thick enough to protect the elements from the heat radiation.
→Sheath diameter 8mm
→Less MI cable
5 Windshield for GOPA & GOPB 2 pcs Current windshields are in bad condition
6 Pilot light (red) 8 pcs Currently, only 4 spares available. Total required is 12 spares
7 HEI module 7 pcs Currently, only 5 spares available. Total required is 12 spares
18 / 18