PRIORITY / KEY ISSUES / CLIENT AGREEMENT Wasl comments on milestone Wasl comments on milestone
REF NO DISCIPLINE ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT COMMENT CATEGORY PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: IMPACT LEVEL INTERNAL STATUS
CRITICAL STAUS submission 2023/07/20 submission 05/08/2023
HVAC COMMENTS
Extract fan from dirty spaces such as grease trap room and toilet area are Open. Grease trap room fans are Updated on drawings Reference MEC-
HVAC Extract ducts from dirty spaces to be kept at negative pressure and Extract fan to R1029-02-CKR-DWG-B01-MEC-
1 HVAC installed at same space beginning of extract duct which will lead to positive Extract fan to be installed at end of extract air duct close to discharge point. MEDIUM TECHNICALLY APPROVED COORDINATION
be located close to discharge point
LEVEL 1 closed located near to room and not close to B01- 1211
pressure inside extract duct. ELECT. POWER 1211,1213,1214 discharge point MEC- B01-1212 , MEC-B01-1213, 1214
R1029-02-CKR-DWG-B01-MEC-
1211,1212,1213,1214 B02-MEC-1201
HVAC CLIENT CLOSED, IN
2 HVAC Install FSMD at supply and return ducts serving electrical rooms. Only FD can be installed and acceptable to DCD.
ELECT. POWER
MEDIUM
PROGRESS
COORDINATION MSFD shall be provided for all rooms protected with clean agent system. 1202 LEVEL 1 closed Closed
GFL-MEC-1221,1224
L01-MEC-1233,1234
CLIENT CLOSED, NO Sand trap not required for car park area make up air. All other make up air shall Louver/intake mesh sizing calculations louver free area calculation submitted
6 HVAC No sand trap is provided for makeup air system of parking area. Sand trap can be provided at makeup air inlet point. HVAC LOW
ACTION
COORDINATION & COST
be with sand trap louvers. Comment closed by WASL N/A closed to be submitted for verification. along with car park fan calculations
Total m2 required
Treated fresh air not required for unoccupied rooms as per ASHRAE 62.1
CLIENT CLOSED, IN R1029-02-CKR-DWG-B01-MEC-1210 Schedule of individual space ventilation
7 HVAC Fresh air is provided for IDF and electrical rooms. ASHRAE standard to be followed. HVAC LOW
PROGRESS
COORDINATION However the same shall be provided for rooms opening to ambient air to LEVEL 1 closed to be submitted for review.
Ventilation schedule submitted
maintain positive pressure. GFL-MEC-1221,1224
Some of BOH areas such as security control room, landscape Asst. Manager are R1029-02-CKR-DWG-B01-MEC-1210 Closed. However, air balance sheet to
10 HVAC
not provided with fresh air.
Fresh air to be provided. HVAC LOW TECHNICALLY APPROVED COORDINATION & COST Ventilation to be provided as per ASHRAE 62.1 requirements LEVEL 1 closed be submitted for review
Ventilation schedule submitted
B02-MEC-1201
Page 1 of 15
# Classification: Shared - Confidential
T H E I S L A N D - VALIDATION TRACKER
Exhaust provided. However, air balance
Lifting station is provided with fan coil unit for air conditioning purpose without HVAC CLIENT CLOSED, IN Ventilation to be provided with duty/standby fans. Exhaust to be Discharged at R1029-02-CKR-DWG-B01-MEC-1210 Lifiting station ventilation calculation
11 HVAC
ventilation system.
Ventilation system to be provided. MEDIUM
PROGRESS
COORDINATION & COST
roof top.
LEVEL 1 closed sheet and sequence of FCU operation to
attacehd
ELECT. POWER B02-MEC-1201 be submitted for review.
HVAC Condensate drain piping for all types of AHUs, FCUs to be indicated in drainage R1029-02-IBA-DWG-B01-DRA-1210 Closed. Revision in Drainage layouts 02-
16 HVAC Condensate drain for HVAC equipment (PHE) not shown on the drawings Condensate drain to be implemented. LOW TECHNICALLY APPROVED COORDINATION
layout
LEVEL 1 closed 1210, 02-1190 noted..
closed
DRAINAGE R1029-02-IBA-DWG-B02-DRA-1190
CLIENT CLOSED, IN Stair Pressurization fans located inside enclosed floor space to be fire rated as closed. However, revision cloud with
17 HVAC Pressurization fan installed within an enclosed space is not fire rated. Staircase pressurization fan installed in an enclosed space to be fire rated. HVAC MEDIUM
PROGRESS
COORDINATION & COST
per UAE FLS code Fan schedule fire rating updated LEVEL 3 closed tracker reference to be provided
R1029-02-IBA-DWG-ALL-MEC-9208
Total m2 required
Page 2 of 15
# Classification: Shared - Confidential
T H E I S L A N D - VALIDATION TRACKER
Stage -4
R1029-02-CKR-DWG-B01-MEC-
1211,1212,1213,1214,1215, B02-mec-
1202,1203,1204,1205
GFL-MEC-1221 1223,1224, L01-MEC-
CLIENT CLOSED, IN 1233,-L01-MEC-1234
20 HVAC Hap calculations to be submitted For review Revised Hap calculation submitted to be submitted HVAC COORDINATION LEVEL 3 closed
PROGRESS
R1029-09-IBA-DWG-ALL-MEC-9001
R1029-09-IBA-DWG-ALL-MEC-9202,
DPCV , DRV to be provided on chilled water drawings and CLIENT CLOSED, IN COORDINATION & R1029-16-IBA-DWG-ALL-MEC-9001
21 HVAC Chilled water drawings to be segregated HVAC level 3 closed
drawings to be segregated PROGRESS COST
Total m2 required
Page 3 of 15
# Classification: Shared - Confidential
T H E I S L A N D - VALIDATION TRACKER
02 - FPR - PODIUM & BASEMENT
IMPACT ON PROCUREMENT
PRIORITY / KEY ISSUES / CLIENT AGREEMENT Wasl comments on milestone Reply of Wasl comments on milestone
REF NO DISCIPLINE ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: IMPACT LEVEL INTERNAL STATUS
CRITICAL STAUS submission 2023/07/20 submission 2023/08/05
Sprinkler coverage to be ensured for all required areas as per UAE FLS code and Closed.
NFPA 13 requirement
Sprinklers shall not be provided for electrical rooms. All electrical rooms above Closed. However, schedule of Clean Clean Agent schedule will be seperately
10 sqm shall be protected with clean agent system. agent systems to be included in submitted.
drawings
The electrical room is partially protected with a sprinkler system and clean agent The drawing shall be updated. The sprinkler head shall be omitted from the
3 FIRE FIGHTING Fire Fighting LOW TECHNICALLY APPROVED COORDINATION & COST R1029-02-CKR-DWG-B01-FPR-1211-PDF [I] LEVEL 3 CLOSED
system electrical room
Drawings to be revised as per UAE FLS code and FHC locations to be coordinated Closed.
with architect.
The drawing shall be updated. The FHC shall be provided as per the UAE Fire
4 FIRE FIGHTING 3 Nos. FHC located nearby each other. Fire Fighting MEDIUM TECHNICALLY APPROVED COORDINATION & COST R1029-02-CKR-DWG-B01-FPR-1211-PDF [I] LEVEL 3 CLOSED
code.
Drawing to be revised by providing wet raiser pipe connection to FHC Not found in refered drawing Refer to DWG No: R1029-02-IBA-DWG-B01-
FPR-1211. DWG No mentioned in the
tracker comment number is wrong. As the
drawing mentioned in the tracker is from
Ground floor with Basement 01 tag.
5 FIRE FIGHTING No pipe connection to FHC Wet riser pipe connection shall be provided. Fire Fighting LOW TECHNICALLY APPROVED COORDINATION & COST R1029-02-CKR-DWG-B01-FPR-1223-PDF [I] LEVEL 3 CLOSED
6 FIRE FIGHTING No pipe connection for sprinkler. Pipe distribution for sprinkler with pipe size shall be provided. Fire Fighting LOW TECHNICALLY APPROVED COORDINATION & COST R1029-02-CKR-DWG-B01-FPR-1223-PDF [I] LEVEL 3 CLOSED
7 FIRE FIGHTING Fire extinguishers are located in the middle of the room and parking area. The drawing shall be updated. Fire Fighting LOW TECHNICALLY APPROVED COORDINATION & COST R1029-02-CKR-DWG-B01-FPR-1223-PDF [I] LEVEL 3 CLOSED
Clean agent shall be deleted for all electrical/ GSM room less than 10 sqm as per Implimented in MGM 1 drawing ref.07- Already implemented, drawings attached
the UAE fire code 2018. 1199
CLIENT CLOSED, IN
8 FIRE FIGHTING Clean agent system is provided for electrical room P-B01-145 of area 8 sqm. The clean agent system shall be omitted. Fire Fighting MEDIUM VALUE ENGINEERING R1029-02-CKR-DWG-B01-FPR-1234-PDF [I] N/A CLOSED
PROGRESS
9 FIRE FIGHTING FHC location is not correct. The FHC shall be relocated as per the architectural background. Fire Fighting LOW TECHNICALLY APPROVED COORDINATION & COST R1029-02-CKR-DWG-B01-FPR-1234-PDF [I] LEVEL 1 CLOSED
Page 4 of 15
# Classification: Shared - Confidential
T H E I S L A N D - VALIDATION TRACKER
02 - LPG - PODIUM & BASEMENT
IMPACT ON PROCUREMENT
PRIORITY / KEY ISSUES / Wasl comments on milestone Reply of Wasl comments on milestone
REF NO DISCIPLINE ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: IMPACT LEVEL INTERNAL STATUS
CRITICAL submission 2023/07/20 submission 2023/08/05
LPG COMMENTS
Location of LPG yard and related piping Drawings attached, requested for latest
route, accessories to be updated as per landscape architecture
latest master plan
1 LPG The LPG pipe corssing the road without RCC enacasmet RCC pipe encasment to be provided LPG/Structural MEDIUM COORDINATION & COST R1029-01-CKR-DWG-ALL-GAS-1001- PDF [A] .pdf LEVEL 3 ISSUED TO IMPLEMENT
3 LPG The LPG pipe riser inside the F&B area are exposed Coordination with architect consultant is required LPG/Architectural HIGH COORDINATION & COST R1029-07-CKR-DWG-B01-GAS-1199-PDF [H] LEVEL 3 ISSUED TO IMPLEMENT
LPG pipe routing shall be
as per UAE fire code and
the location shall be
coordinated with ID/
Archtiect.
Total m2 required
Page 5 of 15
# Classification: Shared - Confidential
T H E I S L A N D - VALIDATION TRACKER
02 - PHW - PODIUM & BASEMENT
IMPACT ON PROCUREMENT
PRIORITY / KEY ISSUES / Wasl comments on milestone IBA REPLY ON WASL COMMENTS-
REF NO DISCIPLINE ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: IMPACT LEVEL INTERNAL STATUS
CRITICAL submission 2023/07/20 02-08-23
CCU humidifiers to be Not Done. Example security server Noted and included in as part of
provided with water room CCU not provided with water latest submission, refer item no 19
connection connection. Please check all CCU units 2. water distribution for server room
locations for water connection. in aria building will be part of aria
submission refer drawing no:R1029-
04-IBA-DWG-B02-WAT-1198
2 Public Health-Water No water supply provision considered for server rooms CCU. To add water supply provision for each electrical room provided with CCU Water MEDIUM COORDINATION & COST R1029-02-IBA-B02-WAT-1200 LEVEL 3 IMPLEMENTED
Water supply and drainage Water distribution for toilet is part of confirm that water distribution is
network to be completed Aria 04-L02-WAT-1202 part of Aria 04-L02-WAT-1202
considering latest
architectural, ID and
kitchen layouts
3 Public Health-Water Public toilets water supply distribution is not provided. To provide all missing wet areas with water supply service distribution Water MEDIUM COORDINATION & COST R1029-02-IBA-L02-WAT-1244 LEVEL 3 IMPLEMENTED
Water supply and drainage Open. All drawings related to plaza plaza Public health design
network to be completed area to be coordinated with architect coordination is work in progress as
considering latest and landscape designer per email dated 25th july
architectural, ID and
kitchen layouts
To update the design as per latest arch and verify areas provision requirement
Plaza area and surrounding water supply network to be coordinated with latest
4 Public Health-Water for events. Also to be checked with the Main Consultant for the type of each Water MEDIUM COORDINATION R1029-02-IBA-L02-WAT-1244 LEVEL 3 IMPLEMENTED
arch.
retail.
Haze machines to be Please check details of proposed haze plaza public health design
provided with potable machines and their requirements. coordination is work in progress as
water supply. Scope to be Incorporate services accordingly. per email dated 1st of august
coordinated by kling
R1029-02-IBA-B01-WAT-1210,
This part to be shifted to irrigation design not under water supply as part of
Part of the design drawings include site irrigation provisions for landscape areas GFL-WAT-1220,
5 Public Health-Water coordination and design verification in coordination with the Landscape Water MEDIUM COORDINATION & COST LEVEL 1 IMPLEMENTED
and events Haze machines locations L01-WAT-1230,
Consultant. Haze machines shall be supplied with DEWA water.
L02-WAT-1240,
Bib taps with lock shield Noted bib taps addition in 02-1200, 02- Noted and included in as part of
key to be provided in 1210. However same to be latest submission
public accessible car park coordinated with architect as
areas. All mechanical plant proposed locations are clasing with car
rooms to be provided with parks. Refer to drainage layout where
Bib taps to be provided where missing in basement car parking and plant room water supply (bib tap) and 600*600 catch pit indicated for
6 Public Health-Water Shortage for car parking and plant rooms Bib taps Water MEDIUM COORDINATION & COST R1029-02-IBA-B01-WAT-1210, B02-WAT-1200, LEVEL 3 IMPLEMENTED
such as TSE plant. floor drain
Total m2 required
Water supply and drainage Not Done. No revision noted on 02- Noted and included in as part of
network to be completed 1210 with this tracker reference. latest submission
considering latest
architectural, ID and
kitchen layouts
To review the network and update where required including to remove pipe
7 Public Health-Water Pipe connection at basement without connection for identification. Water MEDIUM COORDINATION R1029-02-IBA-B01-WAT-1210 LEVEL 1 IMPLEMENTED
that are having no connection to use.
Minimum flow Decoupler Boiler circuit delta T to be 20 Deg C. Noted and included in as part of
line shall be provided to Flow rates to be revised accordingly. latest submission
ensure flow in the primary Also, boiler closed circuit to have
circuit. expansion vessels. Each boiler burner
to be provided with separate LPG
Boiler provided with variable primary flow circulating pump without bypass pressure regulator
8 Public Health-Water To provide minimum flow by pass pipe connection. Water MEDIUM COORDINATION & COST R1029-01-IBA-DWG-ALL-WAT-6723 LEVEL 3 IMPLEMENTED
connection for minimum flow
The boiler circulation Motorized control valve to be provided Noted and included in as part of
system between boilers for each boiler latest submission
and calorifiers shall be
based on variable primary
pumping system.
Boiler variable primary flow circulating pump is controlled via differential R1029-01-IBA-DWG-ALL-WAT-6723,
9 Public Health-Water boiler operation updated considering constant flow . Water MEDIUM COORDINATION LEVEL 1 IMPLEMENTED
Temperature R1029-01-IBA-DWG-B02-WAT-6708,
Solar panel with overheat To be considered in MGM, Aria, After reviewing the solar system
protection to be specified Bellagio submissions specification, it can be conformed
and safety relief valves to that emergency cooler will not be
be provided required due to:
The solar panels specified are
powder coated dark blue aluminum
10 Public Health-Water For solar no overheating protection is used Built-in over heating protection is required other than radiation type. Water MEDIUM COORDINATION & COST R1029-08-IBA-DWG-ALL-WAT-9303 LEVEL 3 IMPLEMENTED
frame with thermal switching
absorber layer with phase change
temperature dependent shutdown
properties consisting of crystalline
structure and thermochrom coating
i.e. when the solar collector reach
Page 6 of 15
# Classification: Shared - Confidential
T H E I S L A N D - VALIDATION TRACKER
IBA to prepare and submit Calculations to be attached along with Noted and included in as part of
water demand this submission latest submission
calculations for review.
The total domestic water
storage shall be 2 days as
Calculation domestic To be removed for daily water demand calculation only but shall be maintained per DEWA requirement.
11 Calculation include 10% safety on demand Water MEDIUM COORDINATION & COST R1029-02-IBA-CAL-WAT-9003 LEVEL 3 IMPLEMENTED
daily demand for equipment calculation.
IBA to prepare and submit Water piping material to be clarified Refer updated reply.
GRE PN20 shall be used for domestic hot water pipe material based on
hydraulic calculations
following:
determining pump head
-Hot water guest room & public toilet(hws/hwr) with calorifier water
for review. Riser piping
temperature 60c if the water network pressure higher than 12.1 BAR,the
material shall be suitable
pressure
The design pressure for hot water system is reaching 13 to 16 bar and the pipe for 1.5 times the design
12 Public Health-Water limit (12.1 bar) shall be based on ppr manufacture approved material. Water HIGH COORDINATION & COST ALL LEVEL 3 IMPLEMENTED
material is PPR PN20. pressure.
-Hot water kitchen & laundry(khws/khwr) with calorifier water temprature 70c
if the water network pressure higher than 8.1 BAR,the pressure
limit (8.1 bar) shall be based on ppr manufacture approved material.
The remote point residual Calculations to be attached along with Noted and included in as part of
pressure to be considered this submission latest submission
for domestic water
calculation shall be 3 bar.
Each guestroom fixture shall have pressure between 30 to 75 PSI (2.0 to 5.0 bar) However pressure at
The pressure range used for domestic water pumps head calculation for sanitary as per MGM brand standards. fixture shall be between 2
14 Public Health-Water Water/Power HIGH COORDINATION & COST LEVEL 1 IMPLEMENTED
fixtures residual pressure was between 2.5 – 4.0 Bar. As agreed with WASL, 3.0bar will be used for each guest room fixture to verify to 5 bar as per MGM
the domestic water pump head calculation. standards.
Part of pipe sizes on the drawing are not complying with the nominal pipe sizes
list such as
15 Public Health-Water - 75 mm needs to be 80 mm. Pipe sizes on the drawings to be reviewed following the nominal pipe size list. Water HIGH COORDINATION & COST All Drawing LEVEL 3 IMPLEMENTED
- 110 mm needs to be 125 mm.
- 160 mm needs to be 150 mm.
To add the missing contractor work requirement points in the standard general
16 Public Health-Water Typical general notes does not cover all needed contractor work requirement. Water LOW COORDINATION All Drawing LEVEL 1 IMPLEMENTED
notes.
18 Public Health-Water Updation in equipment schedule. Equipment schedule upadated based on the current design Water LOW COORDINATION R1029-01-IBA-DWG-ALL-WAT-9001& 9002 LEVEL 1 IMPLEMENTED
missing control valve for cooled cold water heat exchanger to allow for control
20 To add heat exchanger conyrol valve as per cooled cold sequence of operation Water LOW COORDINATION & COST R1029-01-IBA-DWG-ALL-WAT-6703 LEVEL 3 IMPLEMENTED
requirement as per sequence of operation
Page 7 of 15
# Classification: Shared - Confidential
T H E I S L A N D - VALIDATION TRACKER
DRAINAGE AND STORM WATER COMMENTS
Lifting shall be based Schedule revised except one set. 1. for drainage revised schedule
based on 1 duty and 1 Please correct all equipment. Lift pit refer item no 13
assist pumps. drain pump discharge to be connected 2. For Lift pit drainage pump into
to nearest Car park lifting station. nearest car parking lifting station
To modify the design to have all basement lifting pumps sequence ( duty + 1 Control panels location to be refer item no 20
1 PUBLIC HEALTH DRAIN The current all basement lifting pumps sequence ( duty + 1 standby) Drainage MEDIUM COORDINATION R1029-01-IBA-DWG-ALL-DRA-6705 LEVEL 1 IMPLEMENTED
backup). reviewed. Missing grease trap and 3. The same shown in electrical
Sewage lifting station equipment to be drawing refer power layout.
incorporated 4.For grease trap & sewerage lifting
station equipment refer item no 20
Water supply and drainage Gym wet area and office wet area work in progress, accordingly to
network to be completed drainage piping in 08-1198 indicated current design seperation for wet
considering latest with note for pipe in pipe (which is area above kitchen is required this
architectural, ID and running in high level of B2 kitchen). update is in incoordination with
kitchen layouts Please check and revise. architect so that to be implemented
2 PUBLIC HEALTH DRAIN Wet areas not connected into drain network To connect all missing wet areas into the drainage network Drainage MEDIUM COORDINATION R1029-02-IBA-DWG-B01-DRA-1212 & B02-DRA-1194 LEVEL 1 IMPLEMENTED
car parking area drains to please provide calculation for basis of please note carparking drain points
be provided as per DM aditional drains in 02-1190, 02-1200, where provided where drain way
drainage requirement 02-1210.. Also, back flow preventers found to be not provided with the
locations to be reviewed. same
The car parking provided drain points are not enough to cover the complete To add where required car parking drain points to cover the complete car R1029-02-IBA-DWG-B01-DRA-1210, R1029-02-IBA-DWG-B02-DRA-1190, carparking drain considering not to
3 PUBLIC HEALTH DRAIN Drainage MEDIUM COORDINATION & COST LEVEL 3 IMPLEMENTED
parking areas. parking areas. R1029-02-IBA-DWG-B02-DRA-1200, exceed distance 30m b/w two
carparkig drains.
For back preventor refer item no 25
To be coordinated with Refered drawing not included in this Noted and included in as part of
structural Drawings and submission for review. Drainge latest submission
shall not pass through drawing for Ground Floor, L01 & L02
shear wall. are missing in this submission.
Current design to be coordinated with structure, and to avoid the crossing Drainage /
4 PUBLIC HEALTH DRAIN Drainage pipes crossing structural shear wall. MEDIUM COORDINATION R1029-02-IBA-DWG-B02-DRA-1205, B02-DRA-1200 & B01-DRA-1215 LEVEL 1 IMPLEMENTED
where possible. Structure
Drain grating to be Open. Not incorporated. included also updated foul tank
provided with seal sewage pump calculation included
trap/gully with revised discharge pipe size
Drainage /
Update the design for Foul pump & TSE pump room to provide grating for drain
5 PUBLIC HEALTH DRAIN Foul pump & TSE pump room missing drainage grating. Structure / MEDIUM COORDINATION & COST R1029-02-IBA-DWG-B02-DRA-1191 LEVEL 3 IMPLEMENTED
and connect into drainage system.
Architectural
Coordinate with Refered drawing not included in this Noted and included in as part of
Landscape consultants and submission for review. Drainge latest submission, please note this
provide all required drain drawing for Ground Floor, L01 & L02 item work was inprogress as per our
To update the site planter drains to be connected through network into TSE points and drain network are missing in this submission. email dated 25th july 2023
Site planter drain are shown without connection into drainage network, and
Tank and to provide planter drains for the missing green areas incoordination to be completed R1029-03-IBA-DWG-GFL-DRA-1201, GFL-DRA-1220
6 PUBLIC HEALTH DRAIN part of the landscape areas are missing the planter drain, also Geo. Textile Drainage MEDIUM COORDINATION & COST LEVEL 3 IMPLEMENTED
with landscape designer, also to include Geo. Textile membrane and gravel with R1029-03-IBA-DWG-L02-DRA-1240, L02-DRA-1243 & L03-DRA-1254
membrane and gravel are not used for the planter detail.
planter drain detail.
Drain to be considered for Basement 2 high level Part drawings Provided Refer latest submission
CCUs not availble for review.
R1029-02-IBA-DWG-B02-DRA-1200
7 PUBLIC HEALTH DRAIN No drain provision considered for server rooms CCU. To add drain provision for each electrical room provided with CCU Drainage MEDIUM COORDINATION & COST LEVEL 3 IMPLEMENTED
and R1029-02-IBA-DWG-B01-DRA-1210
Coordinate with Refered drawing not included in this Noted and included in as part of
Landscape consultants and submission for review latest submission, please note this
provide all required drain item work was inprogress as per our
points and drain network email dated 25th july 2023
Podium irrigation drainage network to be completed and collected for re-use
Podium planter irrigation drain network is incomplete, also planter drain to be completed
8 PUBLIC HEALTH DRAIN into TSE tank also the additional lifting pump is cancelled as yhe planter drain Drainage MEDIUM COORDINATION & COST R1029-01-IBA-DWG-ALL-DRA-6710- LEVEL 3 IMPLEMENTED
provided with additional pump which is not required
network is provided by gravity
Total m2 required
Reroute / rearrange Drain Part drawings not availble for review included part plan, refer latest
pipe with out cross submission
substation and electrical
rooms as per DEWA
Drainage pipes shall be rerouted. Otherwise, attic slab to be provided at Drainage / R1029-02-IBA-DWG-B02-DRA-1190
requirements
9 PUBLIC HEALTH DRAIN Drainage pipes crossing substation and electrical rooms electrical rooms H/L as per DM. This to be coordinated with arch. And Structure / MEDIUM COORDINATION & COST R1029-02-IBA-DWG-B02-DRA-1200 LEVEL 3 IMPLEMENTED
structure, to be specified where applicable for entire building Architectural R1029-02-IBA-DWG-B01-DRA-1210
Revision (02-DRA-12) noted in 02-DRA- this comment is not applicable for this
1200. Please include in tracker podium and basement submission this
comment is related to building storm
To modify the design to have the roof rain water collection with network free Agreed, however, the water & emergency free discharge
Rain water riser continuity not reflected in floor plan same as schematic. discharge at site surrounding areas. building permit condition R1029-02-IBA-DWG-B01-DRA-1210 which covers under building podium &
10 PUBLIC HEALTH DRAIN Roof rain water outlets coordination with architect. For car parking drainage to be connected into drainage lifting station through Drainage HIGH NEW ITEM on storm water design to R1029-03-IBA-DWG-GFL-DRA-1220 NOT APPLICABLE IMPLEMENTED basement drawings, accordingly for
sand trap. be complied and agreed R1029-03-IBA-DWG-L02-DRA-1240 this podium and basement submission
Also rain water roof outlets to be coordinated with architect layout with DM this comment is not valid.
Lifting pumps were designed without conserving sprinkler drain condition Where applicable to update the lifting pumps flow rate considering sparkler
drain condition.
Page 8 of 15
# Classification: Shared - Confidential
T H E I S L A N D - VALIDATION TRACKER
Drawing Ref. 01-DRA-6710 to be noted and incooperated, refer item no
revised with dicharge of lift pit pumps 20&21
to nearest car park lifting station. Also
notes regarding SCADA system to be
To add the missing contractor work requirement points in the standard general revised
14 PUBLIC HEALTH DRAIN Typical general notes does not cover all needed contractor work requirement. Drainage HIGH COORDINATION & COST ALL LEVEL 2 IMPLEMENTED
notes.
Drawing Ref. 01-DRA-6709 Overall Site Noted and included in as part of latest
Gravity Drainage Schematic to be submission
revised by mentioning the Manhole
Not applicable for
referance of external drainage
drainage.
Irrigation tank using condensate drain collection and municipality domestic To provide details including note,calculation,section and layout for the tank leve R1029-02-IBA-DWG-B01-DRA-1214, network.
15 PUBLIC HEALTH DRAIN Drainage HIGH COORDINATION & COST This was included in
water is missing lcontrol requirement for storage. R1029-02-IBA-DWG-B02-DRA-1201,
water, refer above water
item 17.
plant rooms having calorifiers are using floor drains which will required complecated
18 PUBLIC HEALTH DRAIN To use channel grating close to calorifiers instead of flpoor drains for the plant rooms Drainage MEDIUM COORDINATION & COST R1029-02-IBA-DWG-B02-DRA-1190 LEVEL 3 IMPLEMENTED
and additional drain piping from the equipment
schmatic for condensate drain collectted from ac equipoment including comment and To updated the schematic the note and nrv so that to confirm that the network
19 PUBLIC HEALTH DRAIN Drainage HIGH COORDINATION & COST R1029-01-IBA-DWG-ALL-DRA-6711 LEVEL 3 IMPLEMENTED
nrv for pressurized network were as the network is having gravity design working by gravity
to update the design considering lift pit discharge pipe to be connected into nearest
20 PUBLIC HEALTH DRAIN Lift pits discharge pipe connected into foul tank including additional piping Drainage MEDIUM COORDINATION & COST R1029-02-IBA-DWG-B02-DRA-1190,B01-DRA-1210 LEVEL 1 IMPLEMENTED
car parking pit as more effective design with less piping requirement
SCADA is used for basement for sewerage lifting stations control due to the reson SCADA is not required instead all the sewerage lifiting pump control wiil be through
that operation to be not allowing for more than one pump to be WORKING TO BMS as cost effective this is appplicable after updating the drainage design for
21 PUBLIC HEALTH DRAIN Drainage MEDIUM COORDINATION & COST R1029-01-IBA-DWG-ALL-DRA-6710- LEVEL 3 IMPLEMENTED
DISCHARGE INTO FOUL TANK, as the discharge line is common for all sewerage lifting sewerage lifting considering each station to have separate discharge line connected
pumps into the fouil tank
Total m2 required
to updated the design with providing for each ventilation tunnels with gerneral
22 PUBLIC HEALTH DRAIN car parking mechanical ventilation tunnles are not provided with general drain points Drainage MEDIUM COORDINATION & COST R1029-03-IBA-DWG-L02-DRA-1240,GFL-DRA-1220,B01-DRA-1210 LEVEL 1 IMPLEMENTED
drainage points.
R1029-03-IBA-DWG-L02-DRA-1240,L01-DRA-1230,GFL-DRA-1220,B01-DRA-
23 PUBLIC HEALTH DRAIN missing drainage for staircase open to outside to prvide the missing drainage in open to outside staircases Drainage MEDIUM COORDINATION & COST LEVEL 1 IMPLEMENTED
1210,
Current Slopes for horizontal runs drainage pipes requirement provided on design To change the horizontal runs drainage pipes slopes requirement to comply with DM
24 PUBLIC HEALTH DRAIN drawings: requirement as follow: Drainage MEDIUM ALL LEVEL 3 IMPLEMENTED
100 MM - 1:90, 150 MM - 1:120 and 200 MM - 1:150 100 MM - 1:60, 150 MM - 1:90 and 200 MM - 1:120
basement 02 drainage back flow preventor require manhole for accesibility to confirm that that all basement drainage network with back flow preventor to be
25 PUBLIC HEALTH DRAIN Drainage MEDIUM R1029-02-IBA-DWG-B02-DRA-1191,-B02-DRA-1192,-B02-DRA-1194
(maintanance and replacement) installed for manhole for accesibility.
Page 9 of 15
# Classification: Shared - Confidential
T H E I S L A N D - VALIDATION TRACKER
02 - ELE - PODIUM & BASEMENT
IMPACT ON PROCUREMENT
ELECTRICAL COMMENTS
A - AUTHORITY /
Proceed to comply with
1 ELECTRICAL TX's transportation routes to be identified from GF, B1 and B2. Approval shall be obtained from Dewa OPERATOR MEDIUM COORDINATION NO R1029-02-IBA-DWG-ALL-ELE-6605 LEVEL 1 IMPLEMENTED
authority requirement
COMPLIANCE
A - AUTHORITY /
Proceed to comply with TO BE SUBMITTED FOR
3 ELECTRICAL Dewa approval is not obtained for transformer and RMU room arrangements Dewa HV approval shall be obtained OPERATOR MEDIUM COORDINATION YES LEVEL 3
authority requirement AUTHORITY APPROVAL
COMPLIANCE
A - AUTHORITY / R1029-01-IBA-DWG-ALL-ELE-6606,
DEWA external Mobile Generator Trucks to be coordinated with Archi and Proceed to coordinate
5 ELECTRICAL Mobile generator transportation not indicated OPERATOR MEDIUM COORDINATION YES R1029-03-IBA-DWG-ALL-ELE-6607 LEVEL 3 IMPLEMENTED
structural Engineers, as the weight of DEWA Gen Truck around 30 Tons. with Kling
COMPLIANCE
Routings for standby generators busbar from L02/GF to B2 is not properly The busbar route and structural opening shall be properly coordinated with T- TECHNICAL
7 ELECTRICAL MEDIUM COORDINATION Proceed to coordinate with Kling NO R1029-01-IBA-DWG-ALL-ELE-6615 LEVEL 1 IMPLEMENTED
indicated in the layouts structure engineer CORRECTNESS
A - AUTHORITY /
All MV cables to be coordinated with ducts space form at least one side as per Proceed to comply with
8 ELECTRICAL MV cable routing is not coordinated with other MEP services OPERATOR LOW COORDINATION YES R1029-02-IBA-DWG-ALL-ELE-6613 LEVEL 3 IMPLEMENTED
DEWA. authority requirement
COMPLIANCE
A - AUTHORITY /
Directional exit signs shall be provided as per DCD requirements. Proceed to comply with
9 ELECTRICAL Directional exit signs are not provided in most of the areas OPERATOR LOW COORDINATION & COST YES R1029-02-IBA-DWG-B02-EML-1200 LEVEL 3 IMPLEMENTED
UAE FLS requirement
COMPLIANCE
Page 10 of 15
Classification: Shared - Confidential
#
T H E I S L A N D - VALIDATION TRACKER
A - AUTHORITY /
Proceed to comply with
11 ELECTRICAL Normal Lighting switches are provided in wet areas Weather proof switches shall be provided for wet areas OPERATOR LOW COORDINATION & COST YES R1029-02-IBA-DWG-B02-ELT-1200 LEVEL 3 IMPLEMENTED
DEWA standard
COMPLIANCE
12 ELECTRICAL Building reference not provided for earth pits Revise the drawings to provide the earth pits reference. C - COMPLETENESS LOW COORDINATION Proceed to correct the drawings NO R1029-02-IBA-DWG-B02-ELE-1200 LEVEL 1 IMPLEMENTED
13 ELECTRICAL Two numbers of earth pits provided for LV Panels One earth pit can be provided for LV panels with all earth bars linked. O - OPTIMISATION (VE) LOW VALUE ENGINEERING Proceed to comply with DEWA Regulations NO N/A OPEN
Proceed to coordinate
The 3rd generator for MGM02 is located at ground floor of central Generator room to be provided near MGM or building in coordination with
15 ELECTRICAL O - OPTIMISATION (VE) LOW COORDINATION with Kling (Space palnning NO N/A OPEN
entertainment which is around 170m away from MGM02 room. Architect
required)
ECC room shall be located and easily accessible from outside. The same to be
A - AUTHORITY /
coordinated with FLS. Proceed to comply with
16 ELECTRICAL ECC rooms are located inside the building and opening to service corridors OPERATOR LOW COORDINATION YES R1029-03-IBA-DWG-L02-FAS-1240 LEVEL 3 CLOSED
UAE FLS requirement
COMPLIANCE
The ECC room location is acceptable as confirmed by the FLS.
RMU rooms to be located at plot limit unless DEWA approval is obtained by Proceed to obtain DEWA
A - AUTHORITY /
infra team in the current proposed location. approval on current
17 ELECTRICAL RMU incoming cables are passing through the basement floor OPERATOR MEDIUM COORDINATION YES R1029-01-IBA-DWG-B02-ELE-1001 LEVEL 3 OPEN
design, Client will support
COMPLIANCE
(To be submitted for Dewa for the approval) for the same
A - AUTHORITY /
FFL for main LV rooms is the same FFL of the driveway. The trench depth in the Raise the FFL by 100mm. The trench shall be of same depth as the transformer Proceed to coordinate
18 ELECTRICAL OPERATOR LOW COORDINATION YES R1029-02-KCD-DWG-B02-ARC-1200 LEVEL 3 IMPLEMENTED
LV room is 850mm. room of 950mm. with Kling
COMPLIANCE
Total m2 required
A - AUTHORITY /
R1029-02-CKR-DWG-ALL-ELE-9001,
19 ELECTRICAL Normal isolators are provided for fire life safety equipment Fire rated isolators to be provided for FLS equipment. OPERATOR MEDIUM COORDINATION & COST Proceed to comply with authority requirementNO LEVEL 1 IMPLEMENTED
R1029-02-CKR-DWG-ALL-ELE-9002
COMPLIANCE
R1029-02-CKR-DWG-ALL-ELE-9001,
20 ELECTRICAL 65KA breaking capacity are considered for the incoming breakers. Breaking capacity of main incoming breaker can be reduced to 50KA. O - OPTIMISATION (VE) LOW COORDINATION Proceed to comply with DEWA standard NO LEVEL 1 IMPLEMENTED
R1029-02-CKR-DWG-ALL-ELE-9002
Fuel tank capacity inside generator room is 3000Lit which is exceeding UAE code
A - AUTHORITY / Proceed with 3000 lit and
requirement (2498 L) with UAE code. As indicated in the received close out TO BE SUBMITTED FOR
21 ELECTRICAL DCD official approval is required to be obtained for 3000 L per tank. OPERATOR MEDIUM COORDINATION coordinate with FLS to YES R1029-03-IBA-DWG-GFL-ELP-1220 LEVEL 3
report, the amount of 3000L per tank inside the generator room has been AUTHORITY APPROVAL
COMPLIANCE obtain DCD approval.
agreed with Dubai Civil Defence.
Page 11 of 15
Classification: Shared - Confidential
#
T H E I S L A N D - VALIDATION TRACKER
Proceed to corect the
A - AUTHORITY /
drawings as per revised DESIGN CHANGE UNDER
24 ELECTRICAL Incoming power cables for RMU are not matching with the updated infra design. Incoming cables to RMUs to be coordinated with the updated infra design. OPERATOR MEDIUM COORDINATION YES LEVEL 3
infra design in PROCESS
COMPLIANCE
coordination with Kling.
A - AUTHORITY /
Proceed to comply with R1029-02-CKR-DWG-ALL-ELE-9001,
25 ELECTRICAL Some equipment are not provided with Earth leakage breaker/ relay. Earth leakage protection/ sensor to be indicated for all equipment OPERATOR LOW COORDINATION & COST YES LEVEL 3 IMPLEMENTED
authority requirement R1029-02-CKR-DWG-ALL-ELE-9002
COMPLIANCE
Industrial equipment will be provided with 100ma/300mA as per DEWA in order T- TECHNICAL Proceed to comply with R1029-02-CKR-DWG-ALL-ELE-9001,
26 ELECTRICAL LOW COORDINATION NO LEVEL 1 IMPLEMENTED
to avoid possible trip CORRECTNESS authority requirement R1029-02-CKR-DWG-ALL-ELE-9002
A - AUTHORITY /
Proceed to comply with R1029-02-CKR-DWG-ALL-ELE-9001,
29 ELECTRICAL Spare breaker of 100A are provided in the LV panels Spare breaker less than 160A breaker shall be moved to SMDBs OPERATOR MEDIUM COORDINATION YES LEVEL 3 IMPLEMENTED
authority requirement R1029-02-CKR-DWG-ALL-ELE-9002
COMPLIANCE
A - AUTHORITY /
Different loads are considered for EV charging stations( 7kw, 11kw,17kw and Proceed to comply with
31 ELECTRICAL One value of electrical load (advisalbe 22 kW) to be considered for EV charger. OPERATOR LOW COORDINATION YES R1029-02-IBA-DWG-B02-ELP-1200 LEVEL 3 IMPLEMENTED
22kw) authority requirement
COMPLIANCE
Total m2 required
One lighting fixture can be provided for each staircase landing to achieve the Proceed to comply with
32 ELECTRICAL 2 lighting fixtures are provided for each staircase landing. O - OPTIMISATION (VE) LOW VALUE ENGINEERING NO N/A ISSUED TO IMPLEMENT
required lux level. authority requirement
Page 12 of 15
Classification: Shared - Confidential
#
T H E I S L A N D - VALIDATION TRACKER
A - AUTHORITY /
Electrical room are very congested. Panels are not properly sized especially for Actual panel size shall be considered and additional space shall be provided
36 ELECTRICAL OPERATOR LOW NEW ITEM YES R1029-02-IBA-DWG-B02-ELP-1200 LEVEL 3 IMPLEMENTED
the MCC panels inside the electrical room
COMPLIANCE
A - AUTHORITY /
37 ELECTRICAL Electrical room/ IDF room are provided with smoke detector with sounder base Electrical/IDF room shall be provided with smokde detector OPERATOR LOW NEW ITEM YES R1029-02-IBA-DWG-B02-FAS-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
A - AUTHORITY /
38 ELECTRICAL Plant rooms are provided with heat detector Combined smoke and heat detector shall be provided for plant rooms OPERATOR LOW NEW ITEM YES R1029-02-IBA-DWG-B02-FAS-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
A - AUTHORITY /
39 ELECTRICAL Detectors are not provided in service rooms All Service room shall be provided with fire alarm detectors OPERATOR LOW NEW ITEM YES R1029-02-IBA-DWG-B02-FAS-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
T- TECHNICAL R1029-02-CKR-DWG-ALL-ELE-9001,
40 ELECTRICAL The indicated power Cables types are not indicated correctly. Cables types to be indicated correctly (CU/XLPE/SWA/LSZH, CY/LSZH(Y/G) LOW NEW ITEM NO LEVEL 1 IMPLEMENTED
CORRECTNESS R1029-02-CKR-DWG-ALL-ELE-9002
A - AUTHORITY /
41 ELECTRICAL Detectors/Emergency light arrangements are not as per FLS requirements Emergency lights shall be provided as per FLS requirements OPERATOR LOW NEW ITEM YES R1029-02-IBA-DWG-B02-EML-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
A - AUTHORITY /
Directional exit light shall be provided by coordinating with FLS layout
42 ELECTRICAL Directional exit lights are missing OPERATOR LOW NEW ITEM YES R1029-02-IBA-DWG-B02-EML-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
Total m2 required
Electrical panels and naming shall be provided matching with SLD and load T- TECHNICAL
43 ELECTRICAL Electrical panels are missing or the annotations are wrong LOW NEW ITEM NO R1029-02-IBA-DWG-B02-ELP-1200 LEVEL 1 IMPLEMENTED
schedules CORRECTNESS
A - AUTHORITY /
44 ELECTRICAL Exit lights shall be re-arranged OPERATOR LOW STAGE 4 COMMENTS YES R1029-02-IBA-DWG-B02-EML-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
A - AUTHORITY /
45 ELECTRICAL Exit light shall be added OPERATOR LOW STAGE 4 COMMENTS YES R1029-02-IBA-DWG-B02-EML-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
A - AUTHORITY /
46 ELECTRICAL Exit lights shall be re-arranged as per FLS OPERATOR LOW STAGE 4 COMMENTS YES R1029-02-IBA-DWG-B02-EML-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
Page 13 of 15
Classification: Shared - Confidential
#
T H E I S L A N D - VALIDATION TRACKER
Level-01 (R1029-03-CKR-DWG-L01-EML-1230)
Battery room ventilation shall comply with UAE FLS chapter 6 Table 6.2 item
3.
Flame detector and Hydrogen detector shall be provided in battery rooms in
addition to heat detector (refer UAE FLS Chapter 8 Section 5 Table 8.14).
A - AUTHORITY /
48 ELECTRICAL Flame detector and hydrogen detector shall be provided in battery rooms OPERATOR LOW STAGE 4 COMMENTS YES R1029-02-IBA-DWG-B02-FAS-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
A - AUTHORITY /
49 ELECTRICAL Detectors shall be added in boiler room OPERATOR LOW STAGE 4 COMMENTS YES R1029-02-IBA-DWG-B02-FAS-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
A - AUTHORITY /
50 ELECTRICAL Only Smoke detector shall be provided in electrical room OPERATOR LOW STAGE 4 COMMENTS YES R1029-02-IBA-DWG-B02-FAS-1200 LEVEL 3 IMPLEMENTED
COMPLIANCE
Switches to be provided based on the number of doors. If multiple doors exists, provide
two way switches. Many room entrance are not provided with a switch. Verify and
provide the switches in coordination with architectural drawing. General comment
T- TECHNICAL
51 ELECTRICAL Two way switches are provided for multiple doors LOW STAGE 4 COMMENTS NO R1029-02-IBA-DWG-B02-ELT-1200 LEVEL 1 IMPLEMENTED
CORRECTNESS
Oversize cables are provided for feeders with respect to load. Provide voltage 2!.._ S.9
calculations to justify oversize feeders.
A - AUTHORITY /
R1029-02-CKR-DWG-ALL-ELE-9001,
52 ELECTRICAL Cables shall be revised asper the current rating OPERATOR LOW STAGE 4 COMMENTS YES LEVEL 3 IMPLEMENTED