Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Week WEEK I WEEK II WEEK III

Days I II III IV V VI VII I II III IV V VI VII I II III IV V VI VII

Start

Data Water Availability Analysis


Collection Water Demand Analysis:
FLOW CHART WATER BALANCE

1. population/community and Pani


Gold Project (CIL Processing Plant)
NRECA MOCK Taluduyunu River
2. population/community and Pani
Primary Data Secondary Data Gold Project (Heap Leach Processing
Result Plant) Botudulunga
Hydrometry Survey:
Climatology Data: 1. NRECA Model Mainstream 3. population/community and Pani
1. Taluduyunu River
1. Daily Rainfall (> Last 10 Discharge FDC 90% Gold Project (CIL Processing Plant &
2. Botudulunga River
years) 2. FDC 90% Mock Discharge Model Heap Leach Processing Plant) Marisa
2. Temperature
Tools 3. Solar Irradiance Rules
1 set unit Current Meter 4. Air Humidity No
5. Wind Velocity SNI 6728-1-2015, On the Preparation
6. Existing Water Balance of Spatial Balances of Natural
Data Resources Part 1: Water Resources
Calibration:
Sources 1. Hydrometry
Survey
1. Website BMKG 2. Existing Water
Water Balance Analyses &
Reports

Yes
Finish

COLLECTING DATA &


SURVEY ANALYSIS & REPORTS