Professional Documents
Culture Documents
UPD BATB Chimney Layout
UPD BATB Chimney Layout
1220
850 3050 850 250 850 3050 850 250 850 3050 850 250 850 3050 850 206 Boiler No.1 Boiler No.3
Boiler No.2
11,700kg/hr 10,000kg/hr
3000
10,000kg/hr
(Combination Boiler) (PHASE-2)
3800 2950 600 1200 4700 2600 600 1200 4700 2600 600 1200
1972
856 451 6500 6500
998
998
3392
1050
8235
Staircase to
Staircase to
Staircase to
342
5548
5548
G-4 G-3 G-2 G-1
5808
SECTION A-A
11156
8961
150
2 Generators Duty
900
940
940
1137
6245
SECTION B-B
4TH Pass
1001
G-1 Connect to Boiler -1 Economizer
Foundation
4260
4260
705
26755
710
198
8176
4079
GENERATOR ROOM BOILER ROOM Low Level Steam Header
4824
703
650
5538
864 Air
Boiler Feed Water Receivers Receivers
Pump Set 1350 1500750 1200 1100
SECTION C-C
Oil Injected
Air
Rotary
13761 1200 Dryers
Screw
2500
3429
Air
2439
4157 Compressor-3
Oil (PHASE-2)
Transfer 8800
Pump Set
3236 7897
2255
Condensate Tank and Pump De-aerator Pressurised Vessel
10,000 Litres
6000mm Attenuators / 6000mm Attenuators / 6000mm Attenuators / 6000mm Attenuators / 6000mm Attenuators / 6000mm Attenuators / 6000mm Attenuators / 6000mm Attenuators /
Louvres Louvres Louvres Louvres Louvres Louvres Louvres Louvres
310
ENERGY CENTER REAR WALL
1500 1500 1500
500
500 500