Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Republic of the Philippines

DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS

July 24,2013

MEMORANDUM CIRCULAR ,NO. 2013-42,

For Undersecretaries
Assistant Secretaries
Heads of Sectoral Offices and Attached Agencies
and Corporations
Head Executive Assistant
Service Directors
RMC Chairmen
Division Chiefs
This Department

For your information and dissemination, transmitted herewith is:

NATURE DATE SUBJECT

OP-Administrative July 16,2013 "PROVIDING FOR THE


Order No. 40 ESTABLISHMENT OF INTERIM
TRANSPORT TERMINALS IN
PREPARA TION FOR THE
INTEGRA TED TRANSPORT SYSTEM
UNDER EXECUTIVE ORDER (EO)
No. 67 (5. 2012)."

ROWENA ~~E
Director III7:j2UIOGC
Administrative Service

THE COLUMBIA TOWER TELEFAX: (632) 723-4925


BRGY. WACK-WACK, ORTIGAS AVENUE TRUNKLlNE: 727-7960 TO 79
1555 MANDALUYONG CITY, PHILIPPINES DOTC ACTION CENTER HOTLlNE: 7890
, ,

MALACANANG RECORDS OFFICE

Manila, July 17,2013

HON. JOSE PH EMILIO A. ABAYA


Secretary
Department of Transportation and Communications
Mandaluyong City

Sir:

I have the honor to transmit for your information and guidance,


certified copy of Administrative Order No. 40 dated July 16, 2013 entitled
"PROVIDING FOR THE ESTABLISHMENT OF INTERIM TRANSPORT
TERMINALS IN PREPARATION FOR THE INTEGRATED TRANSPORT
SYSTEM UNDER EXECUTIVE ORDER (EO) NO. 67 (5.2012)."

Thank you.

Very truly yours,

MAR~DiMAANDAL
Director IV

Rm 101, Mabini Hall, Malacanang, Manila Trunkline 784-4286 lac. 4184/4008/4117


MALACANAN PALACE
MANILA

BY THE P~ESIOENT OF THE PHILIPPINES

ADMINISTRATIVE ORDER NO.L}O

PROVIDING FOR THE ESTABLISHMENT OF INTERIM TRANSPORT TERMINALS IN


PREPARATION FOR THE INTEGRATED TRANSPORT SYSTEM UNDER
EXECUTIVE O~bER (EO) NO. 67 (s. 2012)

WHEREAS, Executive Order No. 6l (s. 2012) provides for the establishment of
inteqrated transport systems in the North and South of Metro Manila which are
projected to be established and fully-operational by 2016 (ITS Project);

WHEREAS, the Department of Transportation and Communication (DOTC), as


the designated lead agency in the planning, implementation and monitoring of the ITS
Project, proposes that one method of immediately decongesting traffic in Metro Manila
is to restrict provincial buses and Asian utility vehicles (AUVs) from entering EDSA;

WHEREAS, in preparation for the full implementation of the ITS project, there is
a need to establish interim transport terminals (ITTs) to provide a convenient, efficient,
and systematic transport system; to decongest roadways; to promote road and
commuter safety; and, to reduce pollution in EDSA; and,

WHEREAS, the LTFRB has issued Memorandum Circular (MC) No. 13-2008
which prescribes standards for the establishment, construction, and maintenance of
facilities for the safety, protection, comfort and convenience of persons and property
within terminals.

NOW THEREFORE, I, BENIGNO S. AQUINO Ill, President of the Philippines, by


virtue of the powers vested in me by law, do hereby order:

SECTION 1. Interim Transport Terminals. ITTs shall be established for the


loading and unloading of passengers by buses and AUVs plying provincial routes
entering Metro Manila, and their efficient transfer to city buses and AUVs operating
within Metro Manila.

The DOTC and the LTFRB shall promulgate guidelines on the definition and
identification of the provincial buses and AUVs affected by this Order.

SECTION 2. ITT Sites. ITTs shall be located in the following areas:

a. North Interim Transport Terminal. For provincial buses and AUVs


originating from provinces north of Metro Manila,and entering via the
North Luzon Expressway, MacArthur Highway, Mindanao Avenue,
Quirino Avenue, and/or Commonwealth Avenue;

.s
r "

b. South Interim Transport Terminal. For provincial buses and


AUVs originating from provinces south of Metro Manila and
entering via the South Luzon Expressway; and,

c. Southwest Interim Transpo!~ Terminal. For provincial buses and


AUVS originating from provinces south of Metro Manila, entering
via Coastal Road and/or Manila Cavite Expressway.

SECTION 3. Implementing Agencies. The Inter-Agency Committee created


under Section 6 of EO 67 (s. 2012), tasked to fast-track the implementation of the
ITS, shall assist the DOTe in the implementation of the ITTs, specifically as follows:

a. The DOTC shall be responsible for the developmentof the North


Interim Transport Terminal;

b. The DPWH, in coordination with the DOTC, shall be responsible for


the development of the South Interim Transport Terminal; and,

c. The MMDA, in coordination with the DOTC, shall be responsible for


the development of the Southwest Interim Transport Terminal.

The DOTC shall be the coordinating and lead agency in the


implementation of this Order.

SECTiON 4. Maintenance of the Interim Transport Terminals. The ITTs


shall be maintained in accordance, with the standards prescribed in MC No. 13-2008
issued by the LTFRB. Such maintenance will include, among others, providing
sanitation, security, repair and other administrative services.

The DOTC, with the assistance of the MMDA, shall maintain the ITTs, without
prejudice to such other arrangements that can be made with the affected bus and
AUV operators or owners. Appropriate fees for the maintenance of the ITTs may be
collected by the DOTC, MMDA, the bus operators/owners, or a designated private
entity, subject to the provisions of applicable laws, rules and regulations.

SECTION 5. Amendment and Adjustment of Routes and Areas of


Operation of Affected Buses and AUVs. The LTFRB is hereby directed to amend
the routes and areas of operation of affected provincial buses and AUVs such that
their routes shall end on the ITTs that will be established pursuant to this Order. The
LTFRB is likewise directed to adjust the routes and areas of operation of city buses,
AUVs and jitneys in Metro Manila to enable them to bring and pick-up passengers
and goods to and from the ITTs.

SECTION 6. Period of Operation of the Interim Transport Terminals. The


ITTs shall cease to operate within sixty (60) days from the date that the OOTC has
determined that the permanent ITS Terminals are fully-operational.

SECTiON 7. Funding. Funds required for the implementation of this Order


shall be sourced from funds appropriated for the ITS Project, 8S well as from funds

2
· ,~

identified by the Department of Budget and Management (DBM), subject to existing


government accounting and auditing laws, rules and procedures.

SECTiON 8. Separability Clause. Should any part of this Order be declared


invalid or unconstitutional, the other provisions not affected shall remain in full force
and effect.

SECTiON 9. Repealing Clause. All previous issuances inconsistent with the


provisions of this Order are hereby repealed or modified accordingly.

SECTION 'to. Effectivity. This Order shall take effed immediately upon
publication in a newspaper of general circulation.

DONE in the City of Manila, tllis16 t h day of J u 1y in the year


of Our Lord, Two Thousand and Thirteen.

By the President:

~/
~ PAQUIT~CHOA, JR.
( EXf)eCttive Secretary
~/

,. -- •• ~ T •••

tERlfflEl'J COpy'

You might also like