DRAWING
TRUE
NOTES
1. FOR GENERAL NOTES; REFER TO DRAWING:
2. THIS DRAWING IS THE PROPERTY OF AECOM AND MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE LEAD
EARTH BAR EARTH BAR
CONSULTANT'S AUTHORITY.
LOCATED IN LOCATED IN MV ROOM 3. ALL DIMENSIONS ARE SHOWN IN MM, UNLESS NOTED OTHERWISE.
GENERATOR EARTH BAR, EARTH BARS EARTH BARS EARTH BAR
LOCATED IN GENERATOR ROOM LOCATED IN LV ROOM LOCATED IN LV ROOM LOCATED IN
TRANSFORMER ROOM 4. DO NOT SCALE OFF THIS DRAWING, CHECK ALL DIMENSIONS ON SITE AND NOTIFY THE COMPANY OF ANY DISCREPANCIES
TRANSFORMER ROOM BEFORE PROCEEDING WITH THE WORK.
5. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE SPECIFICATION.
6. FOR COLUMN SIZES / RC WALL THICKNESS, SLAB THICKNESS & BEAM SIZES, REFER TO STRUCTURAL.
LV EQUIPMENT 80 40 80 80 40 80 TRANSFORMER
LV EARTH BAR LPS EARTH BAR MOUNTING TRANSFORMER EARTH BAR 7. THE LOCATION & SIZE OF THE MECHANICAL EQUIPMENTS & EQUIPMENT PLINTH ARE SHOWN FOR INDICATIVE PURPOSES
EARTH BAR EARTH POINT INSULATOR
ONLY.
223 8. FOR ADDITIONAL INFORMATION ON MEP FIXTURES & EQUIPMENTS, SEE RELATED MEP DRAWINGS.
9. HVAC EQUIPMENT LOCATED WITHIN THE BUILDING ARE FED FROM 20A DOUBLE POLE SWITCHED FUSED SOCKET & FLEX
AS INDICATED. THE FEEDER HVAC EQUIPMENT IS DENOTED AT THE POWER SUPPLY OF EACH POINT.
10. ACCESS HATCH OPENINGS FOR MEP SHAFTS: CONTRACTOR TOALLOW FOR ACCESS HATCH OPENINGS FOR SHAFTS AS
FROM TRANSFORMER
FROM TRANSFORMER
DISTRBUTION BOARD
INSULATOR INSULATOR INSULATOR BE REMOVABLE FOR INSULATOR
POINT IN LV ROOM
POINT IN LV ROOM
ROOM EARTH BAR
FROM MAIN
FROM MAIN
12. PRESENCE DETECTORS SHALL BE MOUNTED AT THE SAME HEIGHT AS LUMINAIRES WITHIN EACH AREA, AND SHALL
COVER A DETECTION RADIUS OF 10M
13. ALL LEVELS ARE RELATED TO DATUM LEVEL OF 0.000 WHICH IS THE EXTERNAL ROAD LEVEL AT POINT OF ENTRY INTO
THE BUILDING. FOR GRADING LEVELS REFER TO DRAWING NUMBERS BELOW:
LV EARTH RING 14. FINAL COORDINATION OF CONTAINMENT WILL BE DONE ON SITE.
GENSET 15.HVAC EQUIPMENT LOCATED AT THE ROOF LEVEL ARE FED FROM ISOLATORS AS INDICATED. THE FEEDER HVAC
EQUIPMENT IS DENOTED AT THE POWER SUPPLY OF EACH POINT.
4000mm
EXOTHERMIC CADWELD AD-90.0-C-01030 DAS ISLAND -AREA 90.0 GRADING LAYOUT ROAD WORKS
LIGHTNING EARTH
MAIN DISTRIBUTION BOARD OR CROSBY CLAMP
70mm² BCEW AD-90.0-C-01031 DAS ISLAND -AREA 90.0 GRADING LAYOUT ROAD WORKS
AD-90.0-C-01032 DAS ISLAND -AREA 90.0 GRADING LAYOUT ROAD WORKS
FROM LV EARTH BAR
REBAR
EARTH
4000mm
LEGEND
MOUNTING MOUNTING
INSULATOR INSULATOR
MAIN WATER SUPPLY VALVE
1×120mm² INSULATED
EARTH CONDUCTOR
4000mm
4000mm
EXOTHERMIC CADWELD EXOTHERMIC CADWELD
OR CROSBY CLAMP OR CROSBY CLAMP
80 40 80 MV EARTH BAR
MV EQUIPMENT BAR
NOTE 6 NOTE 6
FROM TRANSFORMER
APPROVAL STATUS A B C D
DRAWING STATUS FOR TENDER
NOTE 5
NOTE 5
NOTE 5
NOTE 5
1×240mm² INSULATED
EARTH CONDUCTOR FROM
240mm² ICEW MV EARTH RING
C2 08-12-2020 RE-ISSUED FOR TENDER J.B A.J J.W M.T
EXOTHERMIC CADWELD C1 25-11-2020 ISSUED FOR TENDER J.B A.J J.W M.T
OR CROSBY CLAMP
MV EARTH RING
C0 18-11-2020 ISSUED FOR TENDER J.B A.J J.W M.T
TFR 1 REV DATE DESCRIPTION BY CHK SD APPD
TO
TFR 2
CONSULTANT/CONTRACTOR/SUB CONTRACTOR
4000mm
MV SWITCHGEAR
PROJECT/PMR TITLE
7M MINIMUM SPACING BETWEEN LV AND MV EARTH RING & LPS EXPANSION AND REHABILITATION OF
DAS ISLAND HARBOR
CLIENT