Professional Documents
Culture Documents
2 Storeyed RCC Building (8.5.2023) Structure
2 Storeyed RCC Building (8.5.2023) Structure
2 Storeyed RCC Building (8.5.2023) Structure
60'-0"
6'-3" 19'-0" 19'-0" 15'-9"
7'-0"
15"
6'-416
15"
4'-616
2'-683"
1'-0"
1'-0"
1'-0"
1'-0"
B
6"
1'-6"
1'-0"
1'-0"
C1
1'-6"
C2 C1
1'-6"
C2 C1
27'-0"
3'-6" 3'-6"
SB1
3'-6"
OWNER / APPLICANT
20'-0"
18'-0"
18'-0"
19'-6"
19'-6"
19'-6"
16'-9"
17'-0"
18'-0"
19'-0"
17'-0"
18'-0"
17'-0"
18'-0"
18'-0"
SB1
SB1
SB1
SB1
7'-0"
A' C1
C1 C1
3'-6" F1
7'-0"
SF1 SF2 SF2 SF3
PROJECT PROPOSED (2 )STOREYED
1'-0"
1'-0"
1'-0"
C2
1'-0"
C2 C1 R.C.C BUILDING
1'-0"
C1 C1
6"
6"
6"
6"
6"
6"
1'-6" 2'-0" 5'-6" 2'-3" BOUNDARY LINE 2'-3" 2'-3" 3"
3'-6" 3'-6" 3'-6" 3'-6"
6"
SUBJECT
1 2 2' 3 4 5 FOUNDATION & COLUMN LAYOUT PLAN
60'-0"
6'-3" 9'-6" 9'-6" 19'-0" 15'-9"
1 IN : 7 FT SHEET-NO.
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
6" 6" 6" 6" 6"
B
6"
6"
6"
6"
6"
C2 S-01
1'-0" C2 1'-0" C1 1'-0" C1 1'-0" C1 1'-0" 8.5.2023
9'-0"
R.S.E/Construction
1'-0"
1'-0"
1'-0"
6" 6" 6"
18'-0"
6"
6"
6"
A' C1
C1 1'-0" C1 1'-0" 1'-0"
9'-0"
C1= 12"x12"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
6"
6"
6"
6"
A C2
1'-0" C2 1'-0" C1 1'-0" C1 1'-0" C1 1'-0"
GROUND ,FIRST FLOOR COLUMN LAYOUT PLAN f 'c =3000 psi(C25)
(+1'-6" , 12'-6" LEVEL) f y =50000 psi
(HRB-400)
1 2 2' 3 4 5
60'-0"
6'-3" 9'-6" 9'-6" 19'-0" 15'-9"
1'-0"
1'-0"
6" 6"
B
6"
6"
C2 C2 C1 C1 C1
1'-0" 1'-0"
9'-0"
18'-0"
A' C1 C1 C1
9'-0"
1'-0"
1'-0"
6"
OWNER / APPLICANT
A C2
1'-0"C2 1'-0" C1 C1 C1
C1 Column End At This Level. ROOF FLOOR COLUMN LAYOUT PLAN
(+21'-6" LEVEL)
1 2 2' 3 4 5
60'-0"
6'-3" 9'-6" 9'-6" 19'-0" 15'-9" PROJECT PROPOSED (2 )STOREYED
B C2
R.C.C BUILDING
C2
9'-0"
BLOCK NO.
18'-0"
LOT NO.
A'
9'-0"
A'
9'-0"
4'-0"
GB1 GB1 GB1
9'-0"
GB2
GB3
GB3
12'-0"
GB3
CP1 GB2 GB2
18'-0"
GB2
GB3
GB3
A'
GB1
GB2
GB3
9'-0"
CP1
OWNER / APPLICANT
GB3
BLOCK NO.
1 2 2' 3 4 5
LOT NO.
60'-0"
6'-3" 9'-6" 9'-6" 19'-0" 15'-9" 2'-6"
FB3A
FB3A
FB3A
FB3A
3'-0"
SUBJECT
FB2
GROUND & FIRST FLOOR BEAM PLAN
S1 S1 S1 S1 S1
FB3 FB3 FB3 FB3
B
4'-712"
FB3A
S2
FB1
9'-0"
FB2
FB4
FB3
S1 S2 S1
FB4
VOID 1 IN : 7 FT SHEET-NO.
12'-0"
4'-412"
S2
FB1
FB2A
FB2A
S2 S2 S2 8.5.2023
FB3
FB3
S1
A' FB3A
FB3
4'-412"
S3
FB1
FB1 R.S.E/Construction
FB1 S2
FB2
FB4
9'-0"
S1 S1
FB3
CP1
FB4
S3
4'-712"
S2
RB3A
RB3A
RB3A
RB3A
RB3A
3'-0"
RB2
S1 S1 S1 S1 S1
RB3 RB3 RB3 RB3
B
RB3A
9'-0"
RB4
RB3
RB2
S2 S2 S1
RB4
VOID
12'-0"
RB4 RB4
18'-0"
RB2
RB2
S2 S2 S2 S2
RB3
RB3
A' RB3A
RB3
RB1
OWNER / APPLICANT
RB3
RB4
RB2
S2 S2
9'-0"
S1
RB4
S2
LOT NO.
1 2 2' 3 4 5
60'-0"
6'-3" 9'-6" 9'-6" 19'-0" 15'-9"
1 IN : 7 FT SHEET-NO.
S-04
18'-0"
S1
TRB1
TRB1
8.5.2023
A'
R.S.E/Construction
A TRB1
SIZE REINFORCEMENT
TYPE TOP BAR BOTTOM BAR REMARK
L B H
SHORT DIRECTION LONG DIRECTION SHORT DIRECTION LONG DIRECTION
MAIN REINFORCEMENT
SIDE BAR STIRRUP REMARK
TYPE END SPAN(LEFT) MID SPAN END SPAN(RIGHT) OWNER / APPLICANT
SIZE OR
TOP BOTTOM TOP BOTTOM TOP BOTTOM TORSION WITHIN 2h MID SPAN
Ground Floor Slab = 4" Thk; Ground Floor Slab = 4" Thk;
3" thk; (1:3:6:)Lean Concrete 3" thk; (1:3:6:)Lean Concrete
BLOCK NO.
11" thk; Hard Core 11" thk; Hard Core
GROUND FL(+1'-6"LV) GB GROUND FL(+1'-6"LV) GB GB GB
1'-6"
LOT NO.
5'-0"
9"
2'-9"
9" Thk; Retaining Wall 9" Thk; Retaining Wall 9" Thk; Retaining Wall
3"
6"
GB2
R.S.E/Construction
C1
7'-6"
6'-0"
12"
GROUND FL(+1'-6"LV)
1'-6"
GB3 GB3 GB3
7'-6"
6'-0"
C1 C1
OWNER / APPLICANT
SB1(12"x24")
SF2
2'-0"
1'-4"
Ld Ld
3" Thk; (1:3:6)Lean Conc;
12" Thk; Hard Core PROJECT PROPOSED (2 )STOREYED
R.C.C BUILDING
1'-0" 17'-0" 1'-6"
19'-6"
BLOCK NO.
SF2 STRIP FOOTING SECTION GRID LINE-3
NOTE: SOIL BEARING CAPACITY IS 0.8 TSF.
LOT NO.
1'-6"
GROUND FL(+1'-6"LV)
GB3 GB3
1 IN : 4 FT SHEET-NO.
C1 S-06
7'-6"
6'-0" 8.5.2023
R.S.E/Construction
SB1(12"x24")
SF1
2'-0"
1'-4"
Ld
3" Thk; (1:3:6)Lean Conc;
12" Thk; Hard Core
3'-6" 3'-6"
7'-0"
12" 12"
SIZE
12"
12"
C1 &
DETAIL
MAIN STEEL
TIES
(clear Spacing) (clear Spacing) OWNER / APPLICANT
12"
12"
C2 &
DETAIL PROJECT PROPOSED (2 )STOREYED
R.C.C BUILDING
MAIN STEEL
BLOCK NO.
TIES S-07
8.5.2023
(clear Spacing)
R.S.E/Construction
GROUND FLOOR BEAM SCHEDULE
MAIN REINFORCEMENT
SIDE BAR STIRRUP
TYPE END SPAN(LEFT) MID SPAN END SPAN(RIGHT)
SIZE OR REMARK
TOP BOTTOM TOP BOTTOM TOP BOTTOM TORSION WITHIN 2h MID SPAN
MAIN REINFORCEMENT
SIDE BAR STIRRUP
TYPE END SPAN(LEFT) MID SPAN END SPAN(RIGHT)
SIZE OR REMARK
TOP BOTTOM TOP BOTTOM TOP BOTTOM TORSION WITHIN 2h MID SPAN
FB3 12"x16" + + + -
MAIN REINFORCEMENT
SIDE BAR STIRRUP LOT NO.
TYPE END SPAN(LEFT) MID SPAN END SPAN(RIGHT)
SIZE OR REMARK
TOP BOTTOM TOP BOTTOM TOP BOTTOM TORSION WITHIN 2h MID SPAN
TOP - - -
S1 4" ONE WAY
BOTTOM - - -
TOP -
S2 4" TWO WAY
BOTTOM -
TOP -
S3 5" TWO WAY
BOTTOM -
1 2
STAIR STEEL SCHEDULE
6'-0"
LB1 C1
TYPE THICKNESS
REINFORCEMENT
REMARK CP1 OWNER / APPLICANT
3'-3"
LB1
LB1
MAIN STEEL DIST; STEEL
MAIN STAIR /LS1
LS1
5" GB TO RB
CP1 CP1
LB1
5'-6"
PROJECT
B PROPOSED (2 )STOREYED
R.C.C BUILDING
3'-0" 9'-0"
A BLOCK NO.
6"
1'-
5"
LB
1 IN : 4 FT SHEET-NO.
LB LB (Main Steel) 9"
S-09
5'-6"
9"
5"
Tread =12"
R.S.E/Construction
Riser = 6.625"
GROUND FLOOR(+1'-6"LV) Waist =5" GB
1'-6"
LB1 SECTION