Parallel wiring
Control room
IEC 61850
Merging IEC 61850-9-2
Unit
*for simplification the required IEEE 1588v2/PTP master clock is not shown
with detached
with integrated operation panel
operation panel
Field/Bay
Automatic voltage
Interlocking
regulator
Logic for transformer
cooling group control Inductive
Other user
defined logic Current
measurement core Transformer Inductive
Circuit Breaker protection core 1A, 5A Voltage
Trip, Control and Position Transformer
Trip Circuit Supervision
Point on Wave Switching
Disconnector Flow sensor
Control and Position 4..20 mA
Pressure sensor
Pressure relief devices Temperature Sensor for SF6, …
up to 12x PT100
TR1200 IP
Up to 4x plug-in
Process bus communication
communication modules • SMV: IEC 61850-9-2 / IEC 61850-9-2 LE / IEC 61869-9,
GOOSE, MMS: IEC 61850-8-1
Optical and electrical
Ethernet interfaces Scada communication
Optical and electrical
• IEC 61850-8-1 MMS & GOOSE, DNP3 TCP, DNP3 serial, IEC 60870-5-104,
serial interfaces Modbus TCP, Profinet IO, IEC 60870-5-103
Redundant communication
• IEC 62439-3.4 PRP, IEC 62439-3.5 HSR, RSTP, dual homing
Phasor Measurement Unit (PMU)
• Synchrophasor (IEEE C37.118)
Time synchronization
• IEEE 1588V2 (profiles: IEC 61850-9-3 and C37.238:2017)
• Optical and electrical PPS, IRIG-B
Additional applications
• SNMP V3
• Slave Unit Protocol for external temperature or 4-20 mA measuring devices
• Arc sensors for arc flash protection
HSR PRP
(High Availability Seamless Redundancy) (Parallel Redundancy Protocol) Ensure availability
PRP Process Bus networks need to be
LAN A PRP LAN A
reliable and thus seamless
redundancy is the key.
RedBox
HSR
✓ Up to 16 IED per HSR ring and
2x Redundancy Box (RedBox)
✓ IEEE 1588v2/PTP (P2P TC)
PRP
RedBox
✓ IEEE 1588v2/PTP (OCSO)
PRP PRP LAN B
LAN B
Transparent Clock
Challenge
Not all merging unit vendors support IEC 61850 Edition 2.1 Benefits
3rd party ICD/CID files often lack important settings from Siemens's point of Use of not IEC 61850 Edition 2.1
view compliant Merging Units without
compromising protection
Solution: “9-2 Client Instrument Transformer settings” editor
functionality
✓ Merging Unit (MU) database for
MU TCTR MU-specific settings
specific ✓ Enter missing or edit Merging
Available ScndTmms Rat Unit settings
IEC 61850 HzRtg Clip ✓ Enter missing or edit current
setting (TCTR) and voltage (TVTR)
measuring point settings
✓ SCD file remains valid and stays
unchanged
New
Interoperability also at
the process bus level:
In February 2020, the new SET Los Sauces substation was energized in Lima, Peru.
The entire protection and control system is based on Siemens technology:
• Core of the digital substation solution is the new SIPROTEC 6MU85 merging unit (MU)
based on SIPROTEC 5 system.
• 14 units of 6MU85 and various SIPROTEC 5 protection and automation devices,
including line differential, transformer differential, busbar differential protection and fault
recording.
• SICAM AK3 remote terminal unit and SICAM SCC SCADA system are used on the
station level.
• 6 Ruggedcom switches are used for redundant PRP Ethernet network.
IEEE1588 IEEE1588
GMC GMC
PI PI 220 kV
220 kV
Merging Unit Merging Unit Merging Unit
Merging (Main 2) Merging (Main 2) Merging (Main 2)
Unit (Main 1) Local control Unit (Main 1) Local control Unit (Main 1) Local control
SIEMENS SIEMENS SIEMENS
10 kV Transformer 1 /
Line 1 / Line 2 Coupler Transformer 2
IEEE1588 IEEE1588
GMC GMC
PI PI 220 kV
220 kV
Merging Unit Merging Unit Merging Unit
Merging (Main 2) Merging (Main 2) Merging (Main 2)
Unit (Main 1) Local control Unit (Main 1) Local control Unit (Main 1) Local control
SIEMENS SIEMENS SIEMENS
10 kV
Transformer 1 /
Line 1 / Line 2 Coupler Transformer Transformer 2
IEEE 1588v2/
PTP GMC
Line 1 / Line 2
6MU85
PI
FO
PI
Line 1 / Line 2
SET Industriales
Energy meter
LCU + MU 2
MU 1
Time
synchronization
(redundant)
Process bus switches x 4 pcs.
Station bus
switches x 2 pcs.
• Less wiring:
Replacing miles of copper cables with cost-effective fiber-optic cables
saves not only cost for civil works, but also project execution time.
• Faster commissioning:
Enables significant installation and maintenance savings
with increased operational flexibility and performance.
• Higher safety:
Creating much safer working environment by avoiding all dangerous voltages from
protection and control cubicles as MU digitizes the data already in the switchyard.
• Higher flexibility:
Enables interoperability and simplifies future extensions of substation
• Space saving:
Primary part and secondary become smaller – less space is required to build substations.
Luz del Sur has a lot of substations in Lima, Peru.
• Process bus based protection and control system is a standard for all
future substations at Luz del Sur (greenfield and brownfield).
• SIEMENS solution provides easier separation of process bus network
from station bus to simplify substation commissioning and maintenance
for Luz de Sur.
It is now the standard for process bus installation at Luz de Sur.
• Maintenance crews had to be trained on protection testing procedures
and tools for process bus substations.
• SAT time has been reduced to the primary connection testing.
Complete protection and control testing during FAT at SIEMENS.
• Proper documentation of GOOSE and SMV's are important for
troubleshooting, test and commissioning.