1) Place bricks carefully, leaving space for vertical joints and ensuring rows end flush. Include wicks that penetrate at least 40cm into the masonry for anchoring.
2) Check the verticality of the brick wall using a plumb line, allowing no more than 4mm of drop over the entire height. Check verticality every 4 rows.
3) Key steps in brick laying include verification of foundation lines, use of a template for the first row, placing horizontal and vertical mortar, and careful placement of each brick.
1) Place bricks carefully, leaving space for vertical joints and ensuring rows end flush. Include wicks that penetrate at least 40cm into the masonry for anchoring.
2) Check the verticality of the brick wall using a plumb line, allowing no more than 4mm of drop over the entire height. Check verticality every 4 rows.
3) Key steps in brick laying include verification of foundation lines, use of a template for the first row, placing horizontal and vertical mortar, and careful placement of each brick.
1) Place bricks carefully, leaving space for vertical joints and ensuring rows end flush. Include wicks that penetrate at least 40cm into the masonry for anchoring.
2) Check the verticality of the brick wall using a plumb line, allowing no more than 4mm of drop over the entire height. Check verticality every 4 rows.
3) Key steps in brick laying include verification of foundation lines, use of a template for the first row, placing horizontal and vertical mortar, and careful placement of each brick.
Place the brick in the corresponding g. Placement of wicks position, move it slightly and press down The rows of brick end flush and not in a until it seats correctly. Be careful to leave “toothed” way; “chicotes” or “wicks” must adequate space to form the vertical joint. be included for anchoring, composed of 6 mm diameter rods, which penetrate at least Willinton Gabriel Sinisterra España 40 cm into the interior of the masonry, and File.2560792 12.5 cm inside, the column, ending in a hook 10 cm long STEPS TO MAKE A WALL a. Verification and rectification d. Plazing the horizontal of the line mortar First you must check that its surface is clean With the badilejo, take a portion of the and level. If you find imperfections, they mixture from the tray and place a uniform should be filled with mortar. layer on the foundation or lower row of Then the design of the foundation is bricks, distributing it longitudinally. observed, its dimensions are reviewed and e. Brick laying all the references that delimit the area where h. Control and verification the wall is going to be built are marked, as Place the brick in the corresponding position, move it slightly and press down Using the plumb line you must control the well as the position of the doors. until it seats correctly. Be careful to leave verticality of the brick wall. Do not allow a adequate space to form the vertical joint. drop of more than 4 mm over the entire height of the wall. It is advisable to check the Keep in mind that the thickness of the mortar verticality every 4 rows. in the vertical joints should be on average 1.5 cm and in the horizontal joints 1.0 to 1.5 cm. f. Placing the vertical mortar b. Template Once the bricks are set, you can place the We call the first row of bricks placed on the vertical mortar. Take a portion of the surface a template. mixture and introduce it into the vertical joint Remember that making the template with the help of the badilejo and a small guarantees that the wall is built exactly on the wooden paddle that serves to contain the axes indicated on the plans. mixture and prevent it from falling to the ground