Introduction 2
Project Background 2
Risk Register 2
Probability Impact matrix5
Conclusion 5
References 6
1|Page
INTRODUCTION
This project seeks to offer accommodation to students as a way to curb congestion and
offer a platform that allows for self-isolation.
PROJECT BACKGROUND
Risk Register
3|Page
ent to boost their
turnover understandin
g of the work
9 Poor Poor 1 2 Contracts HR
contractor contract must be manager
performance managem signed to
during ent leads protect client
construction to damage performance
to the bonds to be
reputation obtained
10 Satisfying EIA Compliance Incidents 2 3 Compliance
requirements risk occurring with the EIA
can stops to ensure no
the work environment
and al hazards
actions
needed to
solve the
issue. EIA
prohibition
s
Probability/Impact Matrix
5 5 10 15 20 25
Probability
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
4|Page
1 2 3 4 5
Impact
Conclusion
This being the case, the introduction of Covid-19 to the wellbeing of the nation has been
nothing short of distraught, slow advancement and null development. These being the
case, Covid-19 protocols have affected the daily wellbeing of students within the IDM
facility. Social distancing has proven to be a pivotal method in the fight against Covid-
19, in this, inclusive of student accommodation.
References
5|Page
Agency, J., 2017. https://expertise.jetruby.com/7-common-project-management-risks-
and-how-to-avoid-them-2395f3af9cab. [Online]
Available at: https://expertise.jetruby.com/7-common-project-management-risks-and-
how-to-avoid-them-2395f3af9cab
[Accessed 26 October 2021].
Hazem, Z., 2021. 7 major risks in construction projects and how to avoid them. [Online]
Available at: https://www.planradar.com/builders-risk/
[Accessed 25 10 2021].