Building Tender
Building Tender
SR. AMOUNT
DESCRIPTION QTY UNIT RATE
NO.
A
EXTERNAL BUILDING REPAIR WORK.
BEXTERNAL PAINTING
1 EXTERNAL PAINTING (ICI DULUX WEATHER SHEILD
POWERFLEX/ASIAN APEX PRODUCT)
Providing & applying exterior paint to surface of building, parapet
wall & O.H. tanks etc.
On existing scaffolding erecting for civil works, scraping, cleaning
the surface, washing & filling the srevices with approved sealant. SFT
|Applying the paint with one Base coat of Approved brand of paint
by Consultant/ society with brush &roller as per the
manufacturer's specification or as directed &approved etc.
Complete. then appliaction of two coat approved paint.
providing and surfacing the existing wall surface remove all loose
paint particles with putty knife or with lambi patra / scrapping tools
then application of plaster and putty then application of one coat SFT
primer followed by two coat putty application then again surfacing
the wallthen application of one more coat prime followed by two
coat application of plastic paint with all necessary brush, roller,
ladders with paint and labours
CPLUMBING
UPVC DoWN TAKE PIPE LINE:
Providing &fixing UPVC pipes of approved brand including all
fittings, bracket, removal of existing pipes.
New PVC pipe line fitting &fixing including scaffolding all
Jaccessories (fittings) ((Sl mark), Cement patching. Also including
existing pipeline dismantling/cutting, Removing etc.
RFT
A11/2" water Pipe Line
B1"water Pipe Line RFT
RET
c1/2" water Pipe Line
SUMMARY SHEET
A EXTERNAL BUILDING REPAIR WORK
BPAINTING WORK
c PLUMBING WORK
D TOTAL AMOUNT
TERMS& CONDITIONS
quantity of work excuted.
1. Quatíties indicated are approximate. Payment has to be made on atual
2. Water and electricity to be prvided by society free of cost.
submission.
3. Running billevery 15 days to be paid within 3 days from the date of
4. 30% advance payment along with work order.
advance payment.
s. Work sall be started within one week from the date of work order and
Measurements will be jointly.
7. Work completion within 90 days.