Professional Practice 1 REVIEWER

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

PROFESSIONAL PRACTICE 1

PRBOA -responsible in regulating the practice of


architecture
Exempted for application of Building Permit:
Circle- Washroom signage shape for women
-Sheds, greenhouses, not exceeding 6.00 sqm in
total area Service mark- a word, phrase, symbol, and/or
design that identifies and distinguishes the
-Garden pools not exceeding 500 mm in depth
source of a service rather than goods.
and in private use
1.5%- An additional fee is mandated to be given
-Addition of open terraces or patio not
to Architect-of-Record working in the
exceeding 20.00 sqm in total area
government to cover his/her civil liability.
Qualifications of members of the PRBOA: White- Color of the symbols in signages for
-not a faculty member of any architectural pedestrian suitable for the disabled.
school within 5 years from nomination UN Blue -Color for the background signages for
-in active practice for at least 10 years pedestrian suitable for the disabled.

-Filipino citizen Copyright -the legal right granted to an author


to exclusive publication of a work.
Grounds for suspension or removal of
Copyright infringement- unauthorized use of
members of the board:
copyrighted material
-Manipulation or rigging of the ALE results,
Type I buildings- shall be a wood construction
disclosure of secret and confidential
information in the examination questions prior 6-8% -basic minimum fee for a P50-Million
to the conduct of the said examination or project cost
tampering of grades.
120 days -days of an open excavation without
-Neglect of duty or incompetence any work being done in the site, else,
considered grave violation
-having crimes in involving moral turpitude
Preliminary Sketches -includes concept
-Violation or tolerance of the violation of RA
drawings, floor plans, and design ideas
9266, or its implementing rules and regulations
or the Code of Ethical Conduct and Standards of October 2018 -All OJT experiences rendered
Professional Practice after what month in 2018 shall not be
considered as part of the 2-year DAE.
Qualifications of Applicant for Examination:
2 years -re-issuance of COR after revocation
-Filipino Citizen or a foreign qualified to take
15 years -architect or engineer who drew up
-of good moral character plans and specifications are liable for damages
-has not convicted of any criminal offense
involving moral turpitude

-Degree holder of BS Architecture


RA 9266 -Architecture Act of 2004 Group G -Storage and hazardous
- Signed into law, March 17, 2004 Div. 1 -Hazardous and highly flammable
Div. 2 -Handing of flammable
RA 545 - “An act to regulate the practice of
Div. 3 -Wood working establishments,
architecture in the Philippines” was repealed by
planning mills and box factories, etc. warehouse
RA 9266
Div. 4 -Repair garages
RA 1378- National Plumbing Code of the Div. 5 -aircraft repair hangars
Philippines of January 28, 1959 and latest
Group H -Assembly other than group I
revision on Dec. 21,1999
Div. 1 -less than 1000 in the building
RA 8293 -Intellectual Property Code of the Div. 2 -300 or more in the building
Philippines Div. 3 -less than 300 in the building

Designated Building Groups: Group I -Assembly load 1000 or more


Group J -Accessory
Group A -Residential Dwellings Div. 1 -agricultural structures
Div. 1- for single family occupants Div. 2 -private garages over 1.80 meters
Div. 2- for non-leasing occupants not high, tanks, swimming pools and towers.
exceeding 10 persons 28 sqm. -minimum area per person (Residential
Group B -Residentials, Hotels, and Apartments. Dwelling)
Multiple dwelling units 0.65 sqm -minimum area per person (Place of
Group C -Education and Recreation. Assembly/Standing room)

Group D -Institutional 1.20 -minimum width of walkways and


Div. 1 -Hospitals passageways
Div. 2 -Nurseries 10% of floor area -room window size
Div. 3 -Nursing homes for ambulatory
patients 0.90m- Doorknob heights and other hardware

Group E -Business and Mercantile 1.20m to 1.30m- positions of manual switches


Div. 1 -Gasoline and filling service above the floor

200mm -location of manual switch from the


Div. latch side of the door
2-
2.70m -minimum ceiling height

1.10m x 1.40m -minimum dimension of


elevator
1.70 x 1.80m -minimum dimension of an
accessible toilet cubicle

1.2sqm and 90cm -Minimum area and


Wholesale and retail stores, office buildings dimensions of bathroom
Div. 3 -Aircraft hangars & open garages
5m -minimum length of PWD parking slot
Group F - Industrial
6m- maximum length of a ramp according to BP
344

1.50m -landing for ramps after every 6.00m

0.30m -extension of handrails

13.50m -total length of ramp if rise is 1 meter.

1.20m -minimum clear width of a ramp

450mm- Minimum height of water closets

PRBOA- Professional Regulatory Board of


Architecture

PRC -Professional Regulation Commission

CPD- Continuing Professional Development

SEC- Securities and Exchange Commission

DTI- Department of Trade and Industries

IAPOA- Integrated and Accredited Professional


Organization of Architects

UAP- United Architects of the Philippines

ALE- Architecture Licensure Examination

You might also like