JLF Project Intern

Hazard Identification Risk As


Project / Location First Agua's Site Office

Scope of Work Loading, Transport and Unloading of 2x Diesel Tank @ 5MT each

Covered Work Area Malabon City to Pakil Laguna

Hazard Identification
No Job Sequence

Potential Hazard Potential Risk

Reference:
roject International Inc.
ation Risk Assessment and Control
HIRAC No. JLF/HIRAC-2023-001

esel Tank @ 5MT each


Date: 9/23/2023

Risk Assessment Risk Assessment


(Before Recommended Control (After Recommended Control
Measures) Recommended Control Measures Measures)
Likelihood Severity Risk Rating Likelihood Severity
L S LxS L S
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-