Engineering Advance Programme On Date 24.09
Engineering Advance Programme On Date 24.09
23
Traffic Section: DDU Division Road: UP/DN/REV/SL
BCM/325+ BCM/57104+MDU FRM/57333/GYA,
BRM/4789/GRRU
UTV/1031/ DDU (09.00-17.00) (11.00) UTV/3065/GYA, UTV/1056/BBU DUO/8053/SQS
DUO/8123/DGS/342/SSM (9:00-17:00)(10:00) (08:00-16:00) (09.00)
(09:00-17:00) MPT/ 56653/SYJ (10:00-18:00) (09.30 -17.30) (10.30 ) (11.00-18.00)
(08:00-16.00) T/Exp/56757/ SEB MPT/57128/DDU (09.00-
10:00 (09:30-17:30) (11.00) (12.00)
10.00 (09.00 - 17.00) (10.00) 17.00) (10.00)
(10:30)
Block Works Planned Location
Tentative Corridor period
Major Block Depart Supervisor
Corridor Block Line (Required Quantum of Resources
Section Section ment SN Type of work From Km To Km deputed
Block Timing Duration block work
duration)
5 labours + TRD +
MDJ-SZF 16:20-18:20 02 hrs UP 2 1 Machine work-DUO 1800 Sleepers 341/1 347/1 Sig+TRD Staff
S&T
BD
Sig staff with Drill
NBG S/L 09:05-11:05 2 hrs UP 2 2 Rail changing + Welding work 260 m, 2 joints Station limit 25 labours + S&T + TRD
machine+TRD Staff
1.5 3 TRR(P) Work + Welding 260 m , 2 joints DDU Yard 20 labours
DDU-JEP DN ALD
13:00-14:30 1.5 hrs 4 Machine work- UTV 15 rails 674/04 675/19 M/c + 6 labours
DDU-FOCS DNGC 1.5 5 TWS Work - Pt no. 52A 1 set 673/2 669/1 25 labours + S&T + TRD
DN Control
3 6 Rail changing work 26 m , 2 joints DDU Yard 20 labours
DDU Area Tower
12:00-15:00 PF-3 3 7 Apron breaking work 10 m DDU Yard 20 labours
DDU Yard FOC-Rec M/c + 6 labours +
(other lines) 3 8 Machine work- MPT 1500 sleepers DDU Yard Sig+TRD Staff
cabin S&T+TRD
UP ALD Avd.
Line
3 9 Sleeper changing work 15 sleepers DDU Yard 20 labours