Rolling Block Program - 24.09.23 revised on 16.09.

23
Traffic Section: DDU Division Road: UP/DN/REV/SL
BCM/325+ BCM/57104+MDU FRM/57333/GYA,
BRM/4789/GRRU
UTV/1031/ DDU (09.00-17.00) (11.00) UTV/3065/GYA, UTV/1056/BBU DUO/8053/SQS
DUO/8123/DGS/342/SSM (9:00-17:00)(10:00) (08:00-16:00) (09.00)
(09:00-17:00) MPT/ 56653/SYJ (10:00-18:00) (09.30 -17.30) (10.30 ) (11.00-18.00)
(08:00-16.00) T/Exp/56757/ SEB MPT/57128/DDU (09.00-
10:00 (09:30-17:30) (11.00) (12.00)
10.00 (09.00 - 17.00) (10.00) 17.00) (10.00)
(10:30)
Block Works Planned Location
Tentative Corridor period
Major Block Depart Supervisor
Corridor Block Line (Required Quantum of Resources
Section Section ment SN Type of work From Km To Km deputed
Block Timing Duration block work
duration)
5 labours + TRD +
MDJ-SZF 16:20-18:20 02 hrs UP 2 1 Machine work-DUO 1800 Sleepers 341/1 347/1 Sig+TRD Staff
S&T
BD
Sig staff with Drill
NBG S/L 09:05-11:05 2 hrs UP 2 2 Rail changing + Welding work 260 m, 2 joints Station limit 25 labours + S&T + TRD
machine+TRD Staff
1.5 3 TRR(P) Work + Welding 260 m , 2 joints DDU Yard 20 labours
DDU-JEP DN ALD
13:00-14:30 1.5 hrs 4 Machine work- UTV 15 rails 674/04 675/19 M/c + 6 labours
DDU-FOCS DNGC 1.5 5 TWS Work - Pt no. 52A 1 set 673/2 669/1 25 labours + S&T + TRD
DN Control
3 6 Rail changing work 26 m , 2 joints DDU Yard 20 labours
DDU Area Tower
12:00-15:00 PF-3 3 7 Apron breaking work 10 m DDU Yard 20 labours
DDU Yard FOC-Rec M/c + 6 labours +
(other lines) 3 8 Machine work- MPT 1500 sleepers DDU Yard Sig+TRD Staff
cabin S&T+TRD
UP ALD Avd.
Line
3 9 Sleeper changing work 15 sleepers DDU Yard 20 labours

SSM-KMGE 11.20-14.20 3 10 BCM+DUO+DGS WORK Sig+TRD Staff


UP
BBU S/L 11:50-14:50 3 11 Machine work-UTV 15 rails Station Limit M/c+ 6 labours
M/c + 25 labours +S&T +
DCX-KMS 12:05-15:05 REV 3 12 TRT Work 500 Tm 634/1 640/1
TRD
ENGG Sig staff with Drill
GC-1 GAQ S/L 11:00-14:00 3 13 Rail changing work 260 m Station limit 20 labours + S&T + TRD
machine+TRD Staff
M/c + 25 labours +S&T +
CDMR-SYJ 11:05-14:05 DN 3 14 BCM+MPT work 300 Tm 657/02 649/02 Sig+TRD Staff
TRD
KMGE S/L 11:55-14:55 03 hrs 3 15 TFR Work 500 Sleeper Station limit 25 labours
SSM-KWD 3 16 TRR(P) work + Welding 260 Tm, 2 joints 572/2 565/2 25 labours +S&T + TRD TRD STAFF
WCB-KSTA 15:35-18:35 3 17 Machine work-FRM 1500 Tm 470 478 M/c + 6 labour
Sig staff with Drill
PRY S/L 15:40-18:40 3 18 SEJ Changing work 1 set Station limit 20 labours + S&T + TRD
machine+TRD Staff
UP
RFJ-DRD 16.00-19.00 3 19 BRM MACHINE Sig+TRD Staff
Machine work-Tamping
BHKH-PES 16:15-19:15 3 20 2000 Tm 524 529 M/c + 6 labour Sig+TRD Staff
Express
GC-II Sig staff with Drill
SEB S/L 12:55-15:55 3 21 TWS Work 1 set Station Limit 25 labours + TRD +S&T
machine+TRD Staff
Machine work-Tamping
PES-BHKH 13:00-16:00 3 22 2000 Tm 524 529 M/c + 6 labour Sig+TRD Staff
DN Express
DRD-RFJ 13.15-16.15 3 23 BRM MACHINE Sig+TRD Staff
KSTA-WCB 13:45-16:45 3 24 Machine work-FRM 1500 Tm 470 478 M/c + 6 labour Sig+TRD Staff
GAYA S/L 14:00-17:00 3 25 Machine work-UTV 15 rails PG line. GAYA M/c + 6 labours