Business Case :
Where multiple M
in this case , You
Example :
FGX
S 10000
Config
Need to defne special procurement key for Receivin
Save
Test Case
1 Extend Material Master (Y_101) from Y100 to the plant Y101
2 Assign Special proc key in MM MRP2 tab and Costing1 tab in the receiv
3 Run the cost estimate for Y_101 in Plant Y101
MM01
Save
CK11N
or CK40N
Save cost estimate
aterial to be procured and it specifies procure the material from specific sou
curement type
be maintained in MRP2tab and Costing1 tab
est priority than costing 1 tab in case of procurement
htest prioity than the mRP1tab in case of Costing
the below strategy while generating cost estimate for Depo products
It transfer cost estimate from Supplying (Mfg) plant if already cost estimate
If no cost estimate exists at the suplying plant , then is uses supllying plant b
ble to add aditive cost like freight , insurance , stroage cost in addition to th
Products
mate from Mfg plant and this cost estmate need to be updated in the Depo
tion to the Mfg plant cost while updating cost to the Depo Products
po products
ready cost estimate exists in the supplying plant
ses supllying plant bOM and routing to generate cost estimate for Receiving
st in addition to the supplyig plant cost whle updating cost to the Depo by u
ting 1tab-SpKey read from PlanFGX Costing 1tab-SpKey read from Plant2
S 11000
ated in the Depo plant
Products
Configuration:
need to activate aditive cost indcator in valation variant and als
OKKN
Save
Scenario1
Add addtive cost to the Depo Plant
Example :
Add aditive cost 3000inr to th
Y_101
S
Process Steps
CK74N Maintain Aditiv cost for Y_101
CK11N/CK24 Run Cost estimate (CK11N, CK
Test Case
CKR1 Delete the existing cost estimate for Y_101 in Plan
CK11N
e of product
e , delivery cost, stroage cost
on to the procurement cost in the cost estimate of product and also to be inventorise
and depos
by reading cost estimate from supllying plant and also to be consider delevery cost ,
It reads the aditive cost in the cost estimae if any aditive cost ma
Y_101
75,549.23 + Aditive cost(3000)===> S
costing variant
plying plant(Y100) cost
ng Plant)
78549.23
Click on GlobalTypes
Y11
For SFG-Inhouse Mfg
Save
Save
Back Arrow
Same way need to be done for valuation category 8
Saved
Test Case
Y_102
Y_201
Inhouse Mfg
Ext Procurement Local
Ext Procurement Import
Procurement of Material Locally and Import for Y_304
MM01
Save Material Y_304 created
Op20
OP30
Save
MM02
Continue
Save
ME21NCreate PO
Save Standard PO created under the number 4500000267
MIGO 101
MIRO
MM03 Y_304
Imported Mat ( Valuation Type 11)
Valuation Type ====> Y10 Local Procument
Check Header Level
Goods Issue 1PC Local Proc and 1PC import to Cost center
MIGO 261
Save
Purpose :
It is is used where same material having multip
Where you need to account to different GL acc
Where you need to valuate inventory different
Valuation category
Valuation Types
Example :
RMX====> Procuring both f
Requirement : Need
Proposed Solution :
Mateial split valuation can be applied for any Type of Material i.e for both RM
Mateial split valuation can be applied for any Type of procurement i.e for bot
Valuation type3
Valuation type4
FGZ
BOM
RMX(Split Mat)
Val Type 1
Val Tpe2
Procuree xternally
on type " Import Procurement"
Y_201
OM and also BOM Item levels
100 PC
70 PC
GR from Vendor to Stock
material having multiple or alternative procurements and each alternative procureme
unt to different GL accouts based on source of procurement
te inventory differently based on source of procurement
Activate Split valuation for Material then Material having Header Tab and also Valuati
tion of Inventory and account determination possible at the Valuation Type Level
aterial i.e for both RM and FG ( External procurment o Inhouse Procurement mat or
ocurement i.e for both external procurement of material and also Inhouse Mfg Prod
e Mfg Products
/ FGX produce some times producing inhouse and some times procuring externally
irement : Need to vauate differently for External procurement and Inhouse Mfg and
erform STD cost estimate At vauation type Level and STD price updates both Header
RMX(Split Mat) CE 10070 1Kg X 110 Whih Price will apply in the co
In cost estimate , Component
level Component Header Price and Header Tab valuation class apples in the Cost esti
ault valuation type while creating PO , During the goods movements
s the default valuation type while creaing PO, during the goods movements
t Valuation
rnative procurement gives different price.
ke BOM
ng 1 tab
ossible to valuate inventory with different methods and possible to use different valu
ment and for RMX Import Procurement
ed on procuremet like Local procurement and Import Procurement
ol should be V at the Header tab level and price atomatecially calculates based on val
price control i.e either V or S and can be used different valuation class
price control i.e either V or S and can be used different valuation class
curing externally
Inhouse Mfg and also need to account different GL account for External procuremen
Valuation Class Y200 Only Accounting tabs availabl and No Costing Tabs
Valuation Class Y201 Only Accounting tabs availabl and No Costing Tabs
dates both Header tab level and also Specific Valuation Type Level
will apply in the cost estimate of SFGX===> Alwys applier Split materia Header price a
mate , Component Header tab valuation class applies in the cost estimate of Higher ev
o use different valuation class at valuatio type level for the same material
aluation Class===> example : Price control V or S and Valution class : Y100
aluation Class===> example : Price control V and Valution class : Y110
osting Tabs
osting Tabs
CK11N Y_201
CO01
Save
OP30
Save
100
150 System Picked Highest Price
Val Category
Default inhouse Val Type
Val Cat Based
Prd Order
05 (25Minutes)
Mixed Cost Estimate
A_303 FGX
Alternative 1====> BOM1, Routing1
Or
Alternative 2====> BOM2, Routing2
Alternative 1
Aternative2
Config Steps
1 Define QtyStructure Type
2 Define Costing Versions
Master Data
1 Edit Procurement Alternatives
2 Maintan Mixed Ratio
Config :
Quantity Structure Type
It specifies how the Mixed ratio c
It specifies which procurement a
Save
Time Dependancy :
0
1
2
Percentage Valid :
If Indicator is activa
Test Case
Y_106 FGZ
Alternative1 BOM1
Alternative2 BOM2
Process Steps
1 MM01 Create MM for Y_105
2 CS01 BOM1
BOM2
3 CA01 Routing1
Routing2
10 MIGO 261 GI
11 CO11N Confirmations
12 MIGO 101 GR
2 CS01 BOM1
Create BOM
Save
Create BOM2
Save
OP30
Routing was saved with group 50001763 and material A_303.
Production versions
Which BOM , Routing to be consider and lot size
Wether allow to use in Repeteive mfg or not ?
Prd versions maintained with the combintion M
Example :
Prd version1( Alternative1 process)----------> BO
Prd version2( Alternative2 process)----------> BO
MM02
Click on Continue
Save
Save
Only for Understanding purpose, Just run CK11N without saving cost e
CK11N Alternative1
Alternative1 60%
Alternative2 40%
MR: The relevant alternativ includes in the mixed cost estim
If indicator not activated====> It excludes from mixed c
Save
CK11N Run the Mixed cost estimate
Save
CO01
Release Order and Save
Order number 840022 saved
OP20
Save
OP30
Save
MIGO 101 GR from Prd order to stock
(10000 X60+13000X40)/(60+40)
11200 ====> It Updates as Std Price
Variance = Difference between Mixed Std price and Alternative cost estimate
Mixed Price Variance
(11200-10000) 1200
(11200-13000) -1800
ructure Type
ng Versions
ment Alternatives
ed Ratio
Based on period
Ratio Is valid for the specific Period
If Indicator is activated then it insures that all the alternatives of the total mixed % s
maintaing mixed ratio and it calls the while generating cost estimate
sting versons , we can generate multiple cost estimates and results can be saved in t
n be assigned to the combination of Costing type +Valation variant +Costing version
t estimate , Costing version along with costing variant it calls the qty str type to appli
ernatives
ernatives
ify the possible procurement alternatives for the specific products
cess categories , we need to specify the posssible relevant procurement alternatives
rocess categories
Producion
Purchase Order
Sub contracting
tain mixed ratio for possible pocurement alternatives that means weighatage given t
Mixed ratio
Routing1 60%
Routing 2 40%
or Y_105
mations
of the order
and material A_303.
rial A_303.
consider and lot size of versions
eteive mfg or not ?
h the combintion Mat per plant combination
stimate = (4742067*60+5808313*40)/100
lotsize 100 5168565.4
Per Unit 51685.654
and Routing
ng to be used while creating Production Order
100units Mixed Ratio 100unit
4742067.29 60 2845240
5808313.49 40 2323325
Mixed Cost estimate /unit 5168566
(4742067*60+5808313*40)/100
5168565.4
51685.654
- Target Credit
Weighate assigned) + Alternative2 Production Proces cost estimate XMixed Ratio( W
==========
cost estimate
atios consider while generating Mixed cost estimate
f the total mixed % should be equal to 100% otherwise it rejects to save Ratios.
ults can be saved in the different versions for future analysis purpose
ant +Costing version
qty str type to applies the mixes ratio in the cost estimate
rement alternatives
4000PC
to save Ratios.
Mixed Price Var
-4265.0271
6397.43 ===> Mixed Price Var for alternative2
4500000267
1000012
1000013
Mixed Cost Estimate
A_303 FGX
Alternative 1====> BOM1, Routing1
Alternative 1
Aternative2
Config Steps
1 Define QtyStructure Type
2 Define Costing Versions
Master Data
1 Edit Procurement Alternative
2 Maintan Mixed Ratio
Config :
Quantity Structure Type
It specifies how the Mixed ra
It specifies which procuremen
Save
Time Dependancy :
Percentage Valid :
Test Case
Y_106 FGZ
Alternative1
Alternative2
Process Steps
1 MM01 Create MM for Y_105
2 CS01 BOM1
BOM2
3 CA01 Routing1
Routing2
10 MIGO 261
11 CO11N
12 MIGO 101
CS01 BOM1
CS01 BOM2
Save
CA01 Routing2
OP10
Op20
Op30
Op10
Op20
Op30
Save
CK11N Run cost estimate then observe the mixed cost estimate
Working notes
CK 11N ===> Run cost estiumate with version1
CK 11N ===> Run cost estiumate with version2
MIGO 261
CO11N OP10 OP20
Save
Mixed Price Variance = Difference between Mixed Std price and Alternative cost esti
Mixed Price Variance
Alternative 1 (11200-10000) 1200
Aternative2 (11200-13000) -1800
CK11N or CK40N
estimate
CK24 or CK40N
re Type
It specifies how the Mixed ratio can be maintained / applied
It specifies which procurement alternatives are to be used and what mixed ratios co
endancy :
0 No time-dependency
1 Based on fiscal year
2 Based on period
2 Based on period
Ratio Is valid for the specific Period
e Valid :
If Indicator is activated then it insures that all the alternatives
e used while maintaing mixed ratio and it calls the while generating cost estimate
ifferent costing versons , we can generate multiple cost estimates and results can be
ure type can be assigned to the combination of Costing type +Valation variant +Costi
erating cost estimate , Costing version along with costing variant it calls the qty str ty
rement Alternatives
Mixed Ratio
rement Alternatives
Need to specify the possible procurement alternatives for the specific products
By using process categories , we need to specify the posssible relevant procurement
Mixed Ratio
We will maintain mixed ratio for possible pocurement alternatives that means weigh
Mixed ratio
BOM1 Routing1 60%
BOM2 Routing 2 40%
Routing1
Routing2
Mixed Ratio
Cost estimate
Observe Mixed Cost estimate
Mark and Release ost estimate
GI
Confirmations
GR
nd process
nd Process
Reval of Acty
Actual OH
Val calculation
Observe the Mixed Price var analysis
Mixed Ratio
version1 37431.86 Version1 60
version2 132146.6 Version2 40
(37431 X60+132147*40)/(60+40)
tion version while creating Prd Order
OP30
Order 214036.7
CC 214036.7
Co entry
Prd Order
Prd Order
Prd Order
Cost Center
Cost Center
Cost Center
75317.75
132146.59
56828.84
ettelement
ACB COPA
Prd Order
timte X Mixed Ratio( Weighate assigned) + Alternative2 Production Proces cost estim
==========================
Weighatage)
Poducton Plan during the year (Mixed RaMy Production Plan ===>10000PC
6000PC
4000PC
s Std Price
specific year
specific Period
all the alternatives of the total mixed % should be equal to 100% otherwise it rejects
cost estimate
and results can be saved in the different versions for future analysis purpose
tion variant +Costing version
calls the qty str type to applies the mixes ratio in the cost estimate
cific products
vant procurement alternatives
10000PC
otherwise it rejects to save Ratios.
is purpose
Cost estimate Without Qty structure
Business Cases :
Ext Proc mat 1 To capitalise or inventorie with Ad
Inhouse mfg 2 Where the Product does not have
1 To capitalise or inventorie the Add on cost i.e like freight , insurance, s
3 Costing sheet
Costing sheet
Add on cost obsorbed through Costing sheet Approach
Maintain Purchase info records
ME11 Base Procurement price
Costing sheet ==>OH can be calculated
MOH on mat cost
AOH on conversion cost
UOH on conversion cost
STd cost (1000+100)
Process Steps
1 MM01
2 ME11
3 CK74N
3 CK11N
4 CK24
1 MM01
Save
Save
OKKN
Maintain Costing sheet under Overhead on Material Compo
Save
CK11N Run cost estimate
CK24 Mark & Release cost estimate
MM03 Check MM
cost estimate for those products does not have Qty structure
pitalise or inventorie with Add on cost i.e like freight , insurance, stroage cost etc in a
e the Product does not have finalied qty structure ( especialy in the intial stage of pro
t i.e like freight , insurance, stroage cost etc in addition to the procurement cost for e
proach
Create MM
Maintain Purchase Info records
Aditive cost
Run cost estimate
Mark and release cost estimate
Create MM Y_306
ain Purchase Info records
verhead on Material Components
stroage cost etc in addition to the procurement cost for external procurement mater
he intial stage of product life cycle)
ocurement cost for external procurement materials
Total std ost =1150
ocurement materials ( Raw material cost estimate)
Cost estimate without qty str for inhouse mfg prd which doesn't have qty stru
Business Cases
1
Example :
Y_107 FGZX
Costing 1 tab===> Don't activat
Process Steps
1 MM01
2 run KKPAN instead of CK11N
3 CK24
1 MM01
Y_107 FGZX
Costing 1 tab===> Don't activate indic
Save
Item category need to be used "O" to build the formulas ====> 5% on total cos
5% X ( sum of row1 :8)
Formula field for calculations at item level
You can enter a formula in this field with items of item category S (totals item) and O (arithmetic operation).
Example
o = ('1':'8') *.05
Sum of Rows from 1 to 8 then multiply with 5%
How to make total
Save
CK24 Mark and release cost estimate
MM03 Check MM
sn't have qty structure
mponents and resource required directly in the cost estimate while generating cost e
Gift Box
Just adding few gift items making as Gift Box
Example Johnson Baby gift bo
Dry Fruits Box
Jut adding different dry fruits items making as Gift B
Intial Product life cycle , Where Qty structue (BOM , Routing still not finalised
Creae MM
ead of CK11N Run cost estimate Without Qty Str
Mark and release cost estimate
Creae MM
thmetic operation).
13446.19 5% 672.31
multiply with 5%
generating cost estimate without qty structure
s Gift Box
nson Baby gift box
Co Production orders
Can be used where Product does not have Qty sructure
To make Tool kit ( By adding different type of tools as a T
To produce product which doesnot have qty structue ( in
Example :
Tool Kit
Gift packs
Dry fruits pack
Cnfiguration :
1 Check Costing Variants for CO Production Orders
To gnerate plan cost for CO Order
Costing Type
Enter then change the valuation variant
Define CO Order Types
Order Category 4
Save
Define Cost-Accounting-Relevant Default Values for Order Types and Plants
Save
Front End
Dr Lab Acty Dr
Dr Pack Acty Dr
Cr Lab Acty Cr
Cr Pack Acty Cr
Note : System it applies below price while confirming activities
Priority1 Actual price for the perd if available
Priority2 Plan price if actual activity pice not availabl
Here no valuation stratey appiicable
Assume still Prd not yet completed and reached month end
Need to perform perd end process
System calculates WIP if CO order status do
System cancels WIP if CO Order status is DE
System calculates variance if CO Order statu
Actual CC Split
Actual Activity Allocations
KKBC_ORD
Techo or Close the Order status
KKF2
Save
es not have Qty sructure
fferent type of tools as a Tool Kit)
not have qty structue ( in the intial product life cycle)
tion Orders
09
CO Prd Orders
CP01
r Order Types and Plants
ual planning for CO Orders
on of CO Production Orders
for cO Production Orders
CO Prd Order
Confirmation
Prd order to Stock
nd process in CC
nd Process in PC for CO Prd Order
MFN1/CON2 Revaluation of Activities
KGI2/CO43 Actual oH cal
KKAX/KKAO WIP Calculation
KKS2/KKS1 Variance calculation
KO88/CO88 CO Order Settelemet
Production Orders
With qty str===> Prd Order
Without Qty Str====> Co prd Order
Dr CO Order
CO Prd Order
CO Prd Order
CC
CC
hile confirming activities
e perd if available
l activity pice not available for the period
rocess in FI
ocess in CC
ocess in PC
ocations
Co Order
CC
ctual price
der to Stock
14118.5
iod end process
ess in FI
ess in CC
ess in PC
atus is Delv
ttelement
PSG COPA
CO Prd Order
=> Prd Order
tr====> Co prd Order
How to change Production Order status to Techo or Closed
CO02