POC-M1.

2-RA-0049
PENTA-OCEAN CONSTRUCTION CO. LTD.
Revision: D
PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 8 of 15
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023

Risk Assessment – Lifting Operation

Initial Risk Residual Risk Owner (Action Officer)


Possible Accident / Level Risk Level
Additional Risk
No Work Activity Hazard Ill Health & Existing Risk Control Follow-
Control
Persons-at-Risk F S R F S R Name Designation up
Period
Unsafe and uneven Crane collapse Briefing of RA, SWP and 1 5 M Display crane 1 3 L Lifting Ongoing
ground conditions Lifting Plan operator photo on the Supervisor
crane cabin
Only trained and licence
Supervisor to assess
crane operator to operate lifting zone area and
crane ensure its safe for
lifting before
Banksman to guide crane commence
during movement
Line of fire during
crane collapse to be
Provision of steel plate on
identified and kept
ground if required away from personnel

Outriggers fully extended Strictly nobody stand


and properly set. under lifting
zone/suspended load.
Lifting Supervisor to
determine the crane
travel route and ground
condition prior to the
crane setting up.

8
POC-M1.2-RA-0049
PENTA-OCEAN CONSTRUCTION CO. LTD.
Revision: D
PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 9 of 15
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023

Risk Assessment – Lifting Operation

Initial Risk Residual Risk Owner (Action Officer)


Possible Accident / Level Risk Level
Additional Risk
No Work Activity Hazard Ill Health & Existing Risk Control Follow-
Control
Persons-at-Risk F S R F S R Name Designation up
Period
Lifting gears snapped Falling object Lifting zone to be 2 3 M Sharp edges of load to 1 3 L Lifting Ongoing
barricaded with safety be away from any Supervisor
signage contact to lifting gears

Pre-operation checklist Supervisor to assess


which include LG checks lifting zone area and
to be done before using ensure its safe for
the gears lifting before
commence
Lifting gears to be
inspected by lifting Pre-plan of rigging
supervisor on monthly method to prevent
basis direct contact of lifting
gears to sharp edges
Colour coding to lifting
gears to be implemented Daily inspection of
on site lifting gears by lifting
supervisor
Rigger to inspect all lifting
gears before usage for Line of fire for falling
rigging of material during
work to be identified
All damaged lifting gears by lifting team and
shall be removed from site kept away from
unauthorized entry

9
POC-M1.2-RA-0049
PENTA-OCEAN CONSTRUCTION CO. LTD.
Revision: D
PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 10 of 15
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023

Risk Assessment – Lifting Operation

Initial Risk Residual Risk Owner (Action Officer)


Possible Accident / Level Risk Level
Additional Risk
No Work Activity Hazard Ill Health & Existing Risk Control Follow-
Control
Persons-at-Risk F S R F S R Name Designation up
Period
Improper rigging Falling object Briefing of Lifting Plan by 2 3 M Lifting net to be used 1 3 L Lifting Ongoing
method lifting supervisor when lifting of small Supervisor
and loose items
Only trained and
competent rigger man to Line of fire for falling
rig the load of material during
work to be identified
To secure all loads prior by lifting team and
to lifting operation kept away from
unauthorized entry
Rigger man to ensure
proper rigging of loads

Lifting supervisor to
inspect and approve
rigging method before any
lifting to be done

Proper lifting gears to be


used appropriately
considering load size and
material

10
POC-M1.2-RA-0049
PENTA-OCEAN CONSTRUCTION CO. LTD.
Revision: D
PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 11 of 15
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023

Risk Assessment – Lifting Operation

Initial Risk Residual Risk Owner (Action Officer)


Possible Accident / Level Risk Level
Additional Risk
No Work Activity Hazard Ill Health & Existing Risk Control Follow-
Control
Persons-at-Risk F S R F S R Name Designation up
Period
Finger caught in Lacerations Provision of eye-piece if 2 3 M Lifting supervisor to 1 3 L Lifting Ongoing
between lifting gears necessary for easy lifting brief team of the Supervisor
and stack material Minor Fracture of stack material lifting plan and load
description that is
Only trained and going to be lift
competent rigger man to
rig the load Only 1 person shall
give signal to the
Crane operator not to Operator to avoid
operate crane when miscommunication.
rigging in progress

Rigger not to rig load if


the lifting gears is
tensioned

Rigger not to expose to


danger by placing hands
in between any material

Rigger to put on leather


gloves during rigging

11
POC-M1.2-RA-0049
PENTA-OCEAN CONSTRUCTION CO. LTD.
Revision: D
PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 12 of 15
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023

Risk Assessment – Lifting Operation

Initial Risk Residual Risk Owner (Action Officer)


Possible Accident / Level Risk Level
Additional Risk
No Work Activity Hazard Ill Health & Existing Risk Control Follow-
Control
Persons-at-Risk F S R F S R Name Designation up
Period
Overloading Crane collapse Briefing of Lifting plan by 2 3 M Crane operator to 1 3 L Lifting Ongoing
lifting supervisor to lifting refer to crane load Supervisor
team chart if necessary

Lifting of material to be Pre-plan of load to be


within the SWL of the lifted
machine
Line of fire during
crane collapse to be
Ensure that the specified identified and kept
lifting capabilities of the away from personnel
crane has not been
exceeded under any Conduct hoist-test
circumstances before fully hoist the
load
Load indicator in crane to
be in good working
condition

12
POC-M1.2-RA-0049
PENTA-OCEAN CONSTRUCTION CO. LTD.
Revision: D
PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 13 of 15
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023

Risk Assessment – Lifting Operation

Initial Risk Residual Risk Owner (Action Officer)


Possible Accident / Level Risk Level
Additional Risk
No Work Activity Hazard Ill Health & Existing Risk Control Follow-
Control
Persons-at-Risk F S R F S R Name Designation up
Period
Collision with site Damage to property Only trained and 2 3 M Ensure view is 1 3 L Lifting Ongoing
facility or property competent operator cleared for operator Supervisor
allowed to move

Ensure crane’s boom is Banksman to look for


fully retracted and obstruction when the
lowered before moving. crane is moving

Banksman to guide crane


operator during
movement

Operator to ensure centre


gravity of load
Swaying of load Hit by object Proper rigging of material 2 3 M Lifting supervisor to 1 3 L Lifting
at the centre of gravity ensure that no lifting Supervisor
to be carried out
Riggerman to ensure load during adverse
is stable before lifting weather, eg strong
wind
Tagline to be attached on
both side of the load Line of fire for
before lifting swaying of material
during work to be
Rigger man to control load identified by lifting
using tagline team and kept away
from unauthorized
Proper PPE to be used entry
such as safety helmet

13
POC-M1.2-RA-0049
PENTA-OCEAN CONSTRUCTION CO. LTD.
Revision: D
PROCUREMENT OF POWER PLANT AND PORT FACILITIES UNDER MATARBARI ULTRA SUPER Sheet: Page 14 of 15
CRITICAL COAL-FIRED POWER PROJECT PACKAGE 1.2 Dated: 20 Aug 2023

Risk Assessment – Lifting Operation

Initial Risk Residual Risk Owner (Action Officer)


Possible Accident / Level Risk Level
Additional Risk
No Work Activity Hazard Ill Health & Existing Risk Control Follow-
Control
Persons-at-Risk F S R F S R Name Designation up
Period
Night Work Night Impaired vision Hand / Body Injury Night works Pre- 1 4 M Close monitoring 1 3 L Site On-
planning. by Supervisor. Engineer / going
Tripping hazard Supervisor
Provide sufficient Ensure proper job
Workers could get hit lighting (not too dim rotation to avoid
due to dim or too not too bright). fatigue to workers.
bright light.
Not to work alone and
implement buddy
system.

Lifting gears are


stored properly after
use.

Ensure proper
housekeeping is
carried.

Wear safety helmet,


vest & shoes at all
time.

14