Inno. and RD - Oct 20 '21 Final

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 17

Smile & Friendly

ยิมละมุน อบอุน
่ ไมตรี

Innovation and R&D


Oct 22’2021

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly Innovation and R&D
ยิมละมุน อบอุน
่ ไมตรี

1) Product sanction
2) Raw Material Development Flow
3) R&D - Key Project update
- New Raw Materials (Alternative source)
- Cost saving Ink & Adhesive
4) Non-Food & Medical - Key Project update
5) Food & Pharma - Key Project update

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly Innovation and R&D
ยิมละมุน อบอุน
่ ไมตรี

1) New Raw Material


- Identify : Alternative or Cost saving , Done
2) PS & BOM
- BOM master can revise and save : Practice by create new version , Confirmed
- Proof Plan 7D : Review process among concerned area , Done
- Add R/M in BOM : Implement Change control , On progress
3) NPD
- % CM & MOQ : Review process of transfer Trial lot 2 to Commercial lot , On progress
- Ensure to complete Sample phase before move to Trial lot , On progress

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Current
RM Development Flow
Previous
Request for Raw Material Request for Raw Material
- Raw Material Information - Raw Material Information
- Sample Raw Material - Sample Raw Material

Risk Assessment & Legal compliance Preliminary Test

DOE for Raw Material (Sample lot)


Preliminary Test
Observation for M/C Trial
DOE for Raw Material (Sample lot)
Pre meeting(1.RD&Supplier, M/C Trial Evaluation Report
2.RD&Production ) - R/M Specification (Temporary)
Observation for M/C Trial
Trial lot 1 (6,000 - 12,000m.)
Post Evaluate (RD&Production)
1st Trial lot result (@ Customer site)
M/C Trial Evaluation Report
Trial lot 2 (12,000 - 24,000m.)
- R/M Specification (Temporary)
2nd Trial lot result (@ Customer site)
Trial lot 1 (6,000 – 24,000m.)
Trial lot 3 (24,000 - 36,000m.)
1st Trial lot result (@ Customer site)
3rd Trial lot result (@ Customer site)

Trial lot 2 (24,000 – 36,000m.) - R/M Specification (Permanent)


2nd Trial lot result (@ Customer site) Risk Assessment & Legal compliance
- R/M Specification (Permanent)

Commercial Commercial
Smile & Friendly
ยิมละมุน อบอุน
่ ไมตรี
New Raw Materials (Alternative source)

Film Thickness Current Supplier New Alternative Status

OPP 20 AJ, TFI, Argha karya, Sentosa, Sientex SRF Waiting for printing plan

WLL (FLM01NEW) 100-120 Unique Polyplex Waiting for printing plan

WLL (FLM03) 100 Unique Polyplex Waiting for printing plan

LL (FLM19) 100-130 Unique W&H Waiting for printing plan

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly Cost saving status update : Ink & Adhesive
ยิมละมุน อบอุน
่ ไมตรี

Project Timelines Status update


Category Supplier Project Est. saving Remark ; Issues
Start Finished Sample/Trial Print Lam 1,2 Slit Bag, Spout
E355/21 16/8 28/9,29/9 - 6/10
CW.3.5 gsm., Curing time 48 hrs. ; เคลือ บที 40% Solid (Vis.15 - 17 s. #Z3)
Henkel To Henkel SB-1) LA3644:LA6055 To LA3975:LA6219 42% 16-Aug Nov-21 E356/21 16/8 28/9,29/9 - 6/10 Cyl.165LPI/47u CW.3.65 - 3.84 gsm.
Dip Test (60oC/3Day) : Comfort ,Hygiene = FAIL , Lux = PASS
E357/21 1/9 28/9 - 5/10
Adhesive (SB)
- CW.2.8 gsm., Curing time 48 hrs. ; เคลือบที 40% Solid (Vis.15 - 17 s. #Z3)
Henkel To Henkel SB-2) LA2741:LA5000 To LA3975:LA6219 2% 16-Aug Nov-21 E359/21 8/9 28/9,29/9 5/10
- Cyl.180LPI/45u CW.2.96 - 3.13 gsm.
CW.3.5 gsm., Curing time 48 hrs. ; เคลือ บที 40% Solid (Vis.15 - 17 s. #Z3)
Takeda To Henkel SB-3) PP9530:I9300 To LA3975:LA6219 14% 16-Aug Nov-21 E382/21 9/9 28/9 5/10 - Cyl.165LPI/47u CW.3.65 - 3.84 gsm.
o
Dip Test (60 C/3Day) : Fine line = PASS
CW.2.3 gsm., Curing time 12 hrs. ; Slit หลังจาก 96 hrs. พบปัญหาฟองอากาศทงั
E361/21 6/9 15/9 17/9 - ม้วน (ม้วนเคลือบ 3,000m.)

14%
Sample2
16-Aug Nov-21 E395/21 - 18/21 20/10 - CW.1.9 gsm.,Curing time 48 hrs. ;Ratio 100:65

Adhesive (SF) Bostik To Henkel SF-1) 2K-LF520:H107 To LA7829:LA6254 CW.1.8 gsm.,Curing time 12 hrs. ; Slit 120 hrs. พบปัญหาฟองอากาศ ของดี 500
E363/21 10/9 15/9 17/9 - m.จากก้นแกนเคลือ บ (ม้วนเคลือ บ 6,000 m.)

33%
Sample2
E409/21 - 18/21 20/10 - CW.2.0 gsm.,Curing time 48 hrs. ;Ratio 100:65

I-1) Ink cost down 4.52MB/Yr. 31-Aug 31-Oct E410/21 26/10 27/10 - 29/10 W.Color matching ; Sakata ส่งเฉดใหม่ 1/10 หมึกเข้า 19/10

E223/21 19/7 22/7,23/7 - 3/8 ไม่พบปัญหาสีอุ ดสกรีน

Ink Sakata I-2) Green Solvent 5.18MB/Yr. 31-Aug 31-Oct T067/21 (T1) 21/9 24/9,25/9 27/9 - Slit พบปัญหาเคลือ บย ับเป็นลอนตามแนว CD

T071/21 (T2) 11/10 12/10,16/10 21/10 - ไม่พบปัญหาสีอุ ดสกรีน

อยูร่ ะหว่างศึกษาความเป็นไปได้และผลกระทบ เพือเร่งโครงการ


I-3) Sustainable 4.97MB/Yr. Oct-21 Dec-21 n/a n/a n/a n/a n/a

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly Cost saving status –Back up plan
ยิมละมุน อบอุน
่ ไมตรี
Project Timelines Status update
Category Supplier Project Est. saving Remark ; Issues
Start Finished Sample/Trial Print Lam 1,2 Slit Bag, Spout
E381/21 1/9 14/10 - 21/10
CW. 3.5 gsm., Curing time 48 hrs. ; กาวเข้า18/10 (ย ังไม่ได้ขายในไทย),
Henkel To GDC SB-4) LA3644:LA6055 To JOZ310A:B 44% 16-Aug Nov-21 E389/21 16/9 14/10,15/10 - 21/10
เคลือบที 35% Solid (Vis.16 - 18 s. #Z3) Cyl.120LPI/65u CW. 3.23-3.91 gsm.
E390/21 4/6* 14/10,15/10 - 21/10

Adhesive (SB)
CW. 2.5 gsm., Curing time 48 hrs. ; กาวเข้า18/10 (ย ังไม่ได้ขายในไทย)
Henkel To GDC SB-5) LA2741:LA5000 To JOZ775A:B 35% 16-Aug Nov-21 E380/21 8/9 14/10,15/10 20/10 -
เคลือบที 35% Solid (Vis.16 - 18 s. #Z3) Cyl.180LPI/45u CW. 2.40-3.17 gsm.

CW. 3.5 gsm., Curing time 48 hrs. ; กาวเข้า18/10 (ย ังไม่ได้ขายในไทย)


Takeda To GDC SB-6) PP9530:I9300 To JOZ775A:B 25% 16-Aug Nov-21 E383/21 9/9 14/10 20/10 -
เคลือบที 35% Solid (Vis.16 - 18 s. #Z3) Cyl.180LPI/45u CW. 3.43-3.48 gsm.

CW. 2.2 gsm., Curing time 48 hrs. ; Slit หลังจาก 96 hrs. ไม่พบปัญหาฟองอากาศ
28% E360/21 6/9 15/9 17/9 - (A.S. = 2.6-3.6 ,STD.≥ 3.6 N/15mm.)

Sample2
E411/21 - 18/10 20/10 - CW.2.0 gsm.,Curing time 48 hrs. ;Ratio 100:60

Bostik To Huber SF-2) 2K-LF520:H107 To MPU8100:MPU5000 16-Aug Nov-21 CW. 1.8 gsm., Curing time 24 hrs. ; Slit 120 hrs. พบปัญหาฟองอากาศ ได้ของดี
Adhesive (SF) E362/21 10/9 15/9 17/9 - 500 m. จากก้นแกนเคลือบ (ม้วนเคลือบ 6,000 m.)

41%
Sample2
E412/21 - 18/10 20/10 - CW.2.6 gsm.,Curing time 48 hrs. ;Ratio 100:60

Bostik To GDC SF-3) 2K-LF520:H107 To JZ910A:JZ910B 44% 14-Oct Dec-21 n/a n/a n/a n/a n/a รอต ัวอย่างกาวเข้า กลางเดือนพย.

E398/21 19/10 25/10 27/10 -

E399/21 19/10 21/10 23/10 -


Toyo To Sakata Lami PP To PPL Mark II 13% 31-Aug Dec-21 ไม่พบปัญหาในระหว่างพิมพ์
E400/21 19/10 21/10 23/10 -

E401/21 19/10 21/10 23/10 -

Ink Sakata To Sakata XGL 220 To Lamiall 118(White) 31-Aug Nov-21 E406/21 20/10 22/10 26/10 - กลุ ่มงาน Fine line ; หมึกเข้า 30/9

E350/21 27/8 31/8,3/9 - 8/9 กลุ ่มงาน Comfort ; ใช้ Solvent SP-532 ไม่พบปัญหาสีอุ ดสกรีน

DIC To Sakata Smart 700 To Lamiall 118(White) 9% 27-Aug Nov-21 E351/21 27/8 1/9,2/9 - 8/9 กลุ ่มงาน Hygiene

T075/21 (T1) 22/10 23/10,24/10 26/10 n/a หมึกเข้า 30/9

Toyo To Sakata LP Gem 65 To Lamiall 118(White) 31-Aug Nov-21 TBI TBI TBI TBI TBI กลุ ่มงาน Hotta ; หมึกเข้า 30/9 รอ Order

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly
ยิมละมุน อบอุน
่ ไมตรี

Non Food &Medical & Sustain


Project Update

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly Non Food &Medical , Sustainability
ยิมละมุน อบอุน
่ ไมตรี + Explore project Update’ 2021
Customer Project Spec Process Status QTY/Year MOQ %CM Remark

ULT Pouch for Vasline Nylon15//WLLDPE120 PT/SB/B 2nd Trial lot 200,000 pcs 50,000 pcs 23

ULT Pouch for Sunsilk , Dove , Clear Nylon15//WLLDPE120 PT/SB/B 1st Trial lot 1,000,000 pcs 50,000 pcs 23

Pouch Hygine 1300ml + Spout ( improve


IP One PET12/VMPET12/LLDPE170u PT/SB1,2/B/SP 2nd Trial lot 400,000 pcs 30,000 pcs 37
stiffness)
Estimate
Lion Pouch Shokubutsu 200- 500 ml BOPE25/WLLDPE110u PT/SB/B/Die cut Waiting for trial result 1,200,000 pcs 200,000 pcs 40
Q1,2022
CP Rice ม้วนข้าวตราฉัตร 5 kg - Bag in Roll UPI Matt LLDPE40//LLDPE70 PT/SB/B Waiting for trail result 60,000 5,000 kg 27
Nipro Film PET12 PE30 W96 Syringe Japan 1 ml. PET12/PE30 (Gloss) PT/Ext/RW/SL 1st trial lot 1,200,000 mt 36
100,000 mt
IP One Pouch Whiz GC 500 ml Nylon15//WLLDPE120 PT/SB/B 1st trial lot 150,000 pcs 70,000 pcs 29

Neo FLF 580 ml. PI (Metalucene) Nylon15//WLLDPE100 PT/SB/SL 2nd trial lot 6,000,000 mt
500,000 mt 18
Sachet Beauty Body Wash H90 mm (Roll
NMT PET10//VMPET12//LLDPE50 PT/SB/SL 1st Trial lot 47 rolls 47 rolls 75
Form) Sachet 4 Lane
OPP20u//MCPP/LLDPE45(PC Estimate
ULT Sample Breeze Excel 190-250 g (PCR35%) PT/SB/SL Sample pass NA NA NA
R35%) Q2,2022
Recyclable Breeze Excel 90 g Estimate
ULT MDO23/I/VMLLDPE30 PT/SB/SL Sample pass NA NA NA
(MDO23VMLLDPE30) A-Plus Dec’2021

11 Key Projects from 7 Customers ( Total 65 projects)


5 Current projects + 6 New entry projects
( 7 projects for commercial , 2 projects pass waiting for order, 2 projects waiting for trial result )
Smile & Friendly
ยิมละมุน อบอุน
่ ไมตรี HG EPC 540ml Yellowish issue
Customer : IP One
 Spec : PET12//VMPET12//LLDPE130u Sealing test result
 Status : 2nd Trial lot

 Back ground development :


 SF supply Hygine EPC 540ml . Blooming Touch ( Roll form )
 since Jul ’21 batch no.21060088 ( 3 rolls )
 2nd lot Oct’21 batch no.21090130 ( 10 rolls)
 IP One found burn at 190c
 Note  Improvement Plan
 Ink : Color from Sakata  เปลียน ไปใช้ หมึก High heat resistance
 White color from smart ( DIC) • -1. Lamiall G B 355=0.40%, B Grade เปลียน เป็ น Lamiall G R 365
• -2. Lamiall Magenta B 435=1.70%, B-R Grade
• -3. Lamiall White 110=32.90%, R Grade
• -4. Lamiall Orange B 304=1.50%, B Grade เปลียน เป็ น Lamiall Orange R 337
 Possible cause • -5. Lamiall Red R 337=0.40%, R Grade
 Substrate • -6. Medium 63.10%, R Grade
 PET ไหม้หลังจาก seal ที อุณหภูมิ สูง
• -7. HD Hardener 5% HD ให้ ใช้ 3 % ปกติ
 Ink Low heat resistance
 Sealing temperaturอุณหภูมิในการ seal ไม่เหมาะสม
 สุม่ check วิธีการทดสอบ ภายใน Lab ด้วย การ seal ที อุณหภูมิ > 230 0c

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly
ยิมละมุน อบอุน
่ ไมตรี

Food & Pharma Project Update

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly Food & Pharma Project Update’ 2021
ยิมละมุน อบอุน
่ ไมตรี

Customer Product Name Spec Process Status QTY/Year MOQ %CM Remark
Winchance Film easy peel 486 mm x 500 m PET12/INK3/DL3/LLDPE45 PT/SB1/S 1 Trial lot
st 200 50 rolls 25
Republic Food ซองนอกใส่ครีมเทียม 150 g. PET12/DL3/CPP40 PT/ 1st Trial lot 400,000 100,000 pcs 25
4 Republic Food ม้วนครีมเทียม 3g PET12/PE20/Alu7/PE20/LLDPE40 PT/Ext/S 1st Trial lot 120 30 rolls 28
The Peace Canning Retort pouch ผักกาดดอง PET12//ALU7//Nylon15//BPP70 PT/SB1,2,3/SL/B 1 Trial lot
st 2,400,000 200,000 pcs 30
1 Thai Lotte Roll Foil Toppo 20 g. PET12//MCPP35 PT/SF/SL sample pass 600 100 rolls 22 AW development, wait PO
Mitr Phol ซองนําเชือม 1800ml Nylon15//LLDPE200 PT/SB/SP Wait result 600,000 100,000 pcs 28 Expect launch Q1’22
Thai Glico Unprinted Roll C5-OPP OPP20//MCPP35 SB/SL Wait result 1,200 100 rolls 20 Sale&MKT follow up
Thai Glico Roll Caplico PET12//MPET12//LLDPE25 PT/SB1,2/SL Wait result 1,200 50 rolls 20 Expect launch Q1’22
7 Thai preserved food ฟิ ลม์ เส้นหมี 180 กรัม (RC Film) CPP50/INK3 PT/S Wait result 6,000 500 rolls 20 Expect launch Q1’22
UFM ม้วนแป้งพัดโบก 1000g OPP30//LLDPE75 PT/SF/B Wait result 900 100 rolls 25 Expect launch Q1’22
CP Rice ม้วนข้าวตราฉัตร 5 kg - Bag in Roll UPI Matt LLDPE40//LLDPE70 PT/SB/B Wait result 60,000 5,000 kg 27 Expect launch Q1’22
Wonnapob ม้วนถุงข้าว 1 kg LLDPE40//LLDPE40 PT/SB/B Wait result 4,500 100 rolls 25 Expect launch Q1’22
UFM ซอง Brownies MIX OPP30//VMPET12//LLDPE35 PT/SB1,2/B Hold (Pass) 450,000 60,000 pcs 28 ติด MOQ
2 UFM ซอง Corn Dog PET12//LLDPE75 PT/SB/B Hold (Pass) 570,000 60,000 pcs 31 ติด MOQ
Mitr Phol ม้วนฟิ ลม์ นําเชือมคาราเมล ตรา อเมซอน Nylon15//LLDPE95 PT/SB/SL Sample 600 50 rolls 30 Expect launch Q1’22
Perfect ซอง Retort (4 Layers) PET12//ALU7//Nylon15//BPP70 PT/SB1,2,3/SL/B Sample 1,200,000 150,000 pcs 23 Expect launch Q1’22
Thai Roong Rueng Chilli Sauce ซองบรรจุซอสและนําจิม ตราม้าบิน Nylon15//WLLDPE70 PT/SB/B Sample 1,200,000 100,000 pcs 21 Expect launch Q1’22
6 New Concept Roll Hotta 4 Lanes PET10//PE15//ALU7//PE25 PT/Ext/S Sample 2,400 200 rolls 20 Expect launch Q1’22
ENCAP Center Seal Gusset ALU PET12//ALU7//OPA15//LLDPE130 PT/SB1,2,3/B Sample 240,000 10,000 pcs 30 Expect launch Q2’22
ENCAP Center Seal Gusset EVOH PET12//OPA15//WLLDEVOH150 PT/SB1,2/B Sample 240,000 10,000 pcs 30 Expect launch Q2’22

9 commercial, 11 On going key products, 8 New entry key projects (26 key projects, total 112 projects)
Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork
Smile & Friendly
ยิมละมุน อบอุน
่ ไมตรี Food & Pharma Project Update’ 2021
The Peace Canning: Retort pouch ผักกาดดอง (PET12u//Alu7u//Nylon15u//BPP70u)
Activities Timeline
Sample for customer 29/10/21
1st Trial lot RM 15/10/21
1st Trial lot delivery plan (100,000 pcs) 26/11/21
1st Trial lot result 15/12/21
*RM PR/PO*
2nd Trial lot RM Mid Dec’21 – Mid Jan’22
2nd Trial lot delivery plan (200,000 pcs) 21/02/22
Commercial RM End Jan’21 – Mid Feb’22
Commercial material PO (400,000 pcs, 2skus) Mar’22
Commercial RM (continue) End Feb’21 – Early Mar’22
Commercial material PO (400,000 pcs, 2skus) Apr’22

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly
ยิมละมุน อบอุน
่ ไมตรี Food & Pharma Project Update’ 2021
CP Rice : Roll Royal Umbrella Rice 5 KG Project (Matt LLDPE40//LLDPE70)
Additional condition

 6 samples need to be qualified before bidding


 Samples were delivered on 29/09/21
 Including new design of 5 kg bag (without handle)

Drop test

 LLDPE alternative source


Mould venting gap 4.5 mm -> actual 3-3.5 mm
-> Innoplas : RM received on 8/10/21
-> Polyplex : RM delivery plan 18/10/21

 Venting gap
-> Extend mould venting gap from 4.5 mm to 6 mm

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly
ยิมละมุน อบอุน
่ ไมตรี Food & Pharma Project Update’ 2021
OISHI: KFC Project (PET12u//MPET12u//LLDPE30u)
Status & Plan Tomato ketchup Chilli Sauce

 Discontinued order

 In-house development

- Cast film -> Done

- Wang pack LLDPE & Olympia machine  Done

- Wang pack LLDPE & Comexi machine  End Oct’21

 Overall project conclusion  Mid Nov’21

 New KFC single lane  Estimate cost

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly
ยิมละมุน อบอุน
่ ไมตรี Food & Pharma Project Update’ 2021
Mitr Phol : Syrup 1800 ml Project (Nylon15//LLDPE200)
Front standing

 Standing property 90% match with competitor

 Sample will be delivered on 20/10/21

 Next plan
Side standing
- Improve standing properties by reducing bottom seal from 10 mm to 8 mm.

- Increase distance of bottom seal to gusset corner from 60 mm to 70 mm

60mm 70mm

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork


Smile & Friendly Innovation and R&D
ยิมละมุน อบอุน
่ ไมตรี

Sustainable Growth  Passion to Win  Innovative Thinking  Responsibility  Integrity  Teamwork

You might also like