Professional Documents
Culture Documents
Rafter-2 Detail Rafter-3 Detail Detail of Gutter: 10mm Ø BAR STIRRUPS SPACED 3@0.05m, 4@0.10m, 6@0.15m REST at 0.20m O.C
Rafter-2 Detail Rafter-3 Detail Detail of Gutter: 10mm Ø BAR STIRRUPS SPACED 3@0.05m, 4@0.10m, 6@0.15m REST at 0.20m O.C
Rafter-2 Detail Rafter-3 Detail Detail of Gutter: 10mm Ø BAR STIRRUPS SPACED 3@0.05m, 4@0.10m, 6@0.15m REST at 0.20m O.C
0.2
0.64 0.67 0.67
0.64 0.67 0.67 DIAGONAL BRACING
0.64 0.67 0.67
0.66 0.67
0.61
0.15
0.67
SEE DETAIL OF GUTTER CEILING LINE
0.56
10 DETAIL OF GUTTER
1.2 9 RAFTER-2 DETAIL S-02 SCALE: 1:15m
1.8
1.2
TOP OF BEAM
0.15
1.2
1.2
1.1
0.2
NGL
0.2
10mmØ TEMPERATURE BAR 1.11
0.2
SPACED @ 0.20m. O.C.
1.25
0.2
0.2
0.25
0.2
0.05M THICK LEAN CONCRETE
0.2
16MMØ MATT BARS SPACED
0.2
@ 0.20M O.C. BOTHWAYS
0.1
3.2
SECTION
0.2
0.1M THICK
GRAVEL BEDDING 12mmØ LONGITUDINAL BAR
0.2
SPACED @ 0.15m. O.C.
LINTEL BEAM
0.2
10mmØ TEMPERATURE BAR SEE DETAIL
0.2
0.2
0.45 0.3
1.5
0.3
0.2
0.3 0.03
0.4
0.2
0.03
0.2
0.2
0.03
0.2
0.2
0.2
1.5
PLAN
1 CANOPY 01 DETAIL
S-02 SCALE: 1:20m
2 F1C1 DETAIL 3 SPOT DETAIL B'B" 4 DETAIL OF STAIR
S-02 SCALE: 1:30m
S-02 SCALE: 1:40m S-02 SCALE: 1:30m
PRCN: PROJECT TITLE: APPROVED BY: DRAWN BY: SHEET CONTENT: SHEET NO:
PTRN: CHECKED BY: CANOPY 01 DETAIL RAFTER-1 DETAIL
RENOVATION OF BUNGALOW HOUSE INTO 2-STOREY
ARIEL F. EPALAN DATE: RESIDENCE DATED:
F1-C1 DETAIL
SPOT DETAIL B'B"
RAFTER-2 DETAIL
RAFTER-3 DETAIL
5
REG. CIVIL ENGINEER PLACE: OWNER
DETAIL OF STAIR RAFTER-4 DETAIL S-02
LOCATION: BRGY. STA. CRUZ DUMALAG, CAPIZ REVISION: SPOT DETAIL A'A" DETAIL OF GUTTER