CONTROL DE CONCRETO (03 AGOSTO 2023)

RESISTENCIA CANTIDAD DE
FICHA HORA
ELEMENTO #CONDUCE HORMIGON HORA FIN PROBETA OBSERVACION CONCRETO
CAMION INICIO
(KG/M2) (M3)
753 FC-17 280 7:45 PM 7:55 PM M1 VACIADO DIRECTO
754 FC-14 280 9:30 PM 11:00 PM M2 VACIADO DIRECTO
ZAP 41 15.59
755 FC-18 280 11:05 AM 12:07 AM M3 VACIADO CON BOMBA
753 FC-17 280 7:45 PM 7:55 PM M1 VACIADO DIRECTO
754 FC-14 280 9:30 PM 11:00 PM M2 VACIADO DIRECTO
ZAP 40 10.56
755 FC-18 280 11:05 AM 12:07 AM M3 VACIADO CON BOMBA

755 FC-18 280 11:05 AM 12:07 AM M3 VACIADO CON BOMBA


COLUMNAS 12.32
760 FC-15 280 1:00 AM 1:26 AM M4 VACIADO CON BOMBA
METROS TOTALES 42.32