ABSTRACT
The fishing shipyard in Banda Aceh City is a privately owned shipyard and is managed in a family manner. The
shipyard here is active in carrying out maintenance, repair and construction of new ships when there is demand
from consumers. The shipyards in Banda Aceh City generally make ships made of wood. The problem that is
currently being faced is that there are many abandoned ships due to lack of finance, natural resources, human
resources and environment, this is an obstacle to the progress and development of shipyards. The purpose of this
study was to determine the inhibiting factors that exist in shipyards in the city of Banda Aceh and find alternative
solutions to these problems. The method used in this study was a survey method used to look at existing symptoms
and collect data on the factors related to research variables and then analyzed using the Fuzzy AHP method. The
results of this study indicate that the financial inhibiting factor is the most influential factor in shipyards with a
resulting value of 0.4635, the inhibiting factor of Natural Resources is worth 0.35675, the inhibiting factor of Hu-
man Resources is worth 0.2865 and the inhibiting factor from the environment is the inhibiting factor which is the
lowest or less influential with a value of 0.14325. The alternative solutions to financial problems are capital loans
and investments. An alternative for natural resources is the addition of a minimum stock to anticipate stock scarcity
and delays in the delivery of materials and tools. The alternative for human resources is the existence of an office,
organizational structure, and division of tasks as well as raising awareness of occupational health and safety. As for
the alternatives for the environment, namely the need for buildings or installation of tarpaulins for the areas where
ships are built, good land management and studies of other natural impacts.
38
Ecological Engineering & Environmental Technology 2023, 24(7), 38–45
39
Ecological Engineering & Environmental Technology 2023, 24(7), 38–45
40
𝑗𝑗𝑗𝑗𝑆𝑆𝑆𝑆
�
𝑗𝑗𝑗𝑗 =1𝑀𝑀𝑀𝑀
𝑔𝑔𝑔𝑔𝑆𝑆𝑆𝑆
𝑗𝑗𝑗𝑗 =1
𝑚𝑚𝑚𝑚
𝑚𝑚𝑚𝑚
Ecological Engineering & Environmental� 𝑢𝑢𝑢𝑢𝑗𝑗𝑗𝑗
Technology 2023, 24(7), 38–45
𝑗𝑗𝑗𝑗�
=1 𝑙𝑙𝑙𝑙𝑗𝑗𝑗𝑗
Compile a comparison matrix between all To compare the values 𝑗𝑗𝑗𝑗 =1 of M1 and M2, it takes
1
elements or criteria using the Triangular Fuzzy the values V(M2≥M1𝑚𝑚𝑚𝑚) and V(M1≥M2) , the 𝑆𝑆𝑆𝑆𝑖𝑖𝑖𝑖 𝑚𝑚𝑚𝑚bench-
2 ≥ 𝑚𝑚𝑚𝑚2
0
Number (TFN) scale which can be seen in the ta-𝑉𝑉𝑉𝑉 (𝑀𝑀𝑀𝑀mark
2 ≥ 𝑀𝑀𝑀𝑀of 1 ) which
= � is m1(𝑙𝑙𝑙𝑙. If−the
�1𝑚𝑚𝑚𝑚𝑗𝑗𝑗𝑗 𝑢𝑢𝑢𝑢2 ) 1
M value 𝑆𝑆𝑆𝑆is𝑖𝑖𝑖𝑖 𝑙𝑙𝑙𝑙greater
1 ≥ 𝑢𝑢𝑢𝑢2
ble above. The Fuzzy value scales. than the M2 value, the value is 1. If the M , value
𝑜𝑜𝑜𝑜𝑜𝑜𝑜𝑜ℎ 𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑆𝑆𝑆𝑆is𝑒𝑒𝑒𝑒𝑒𝑒𝑒𝑒
(𝑚𝑚𝑚𝑚2 −𝑗𝑗𝑗𝑗 =1
𝑢𝑢𝑢𝑢2 ) − (𝑚𝑚𝑚𝑚1 − 𝑙𝑙𝑙𝑙1 ) 1
Determine the value of Fuzzy Synthetic Ex- less than the M 2
value, the formula is used:
tent (Si). According to Suciadi [12], determining 𝑚𝑚𝑚𝑚
𝑙𝑙𝑙𝑙1 − 𝑢𝑢𝑢𝑢2
the Fuzzy Synthetic Extent (Si) value of each cri- 𝑉𝑉𝑉𝑉 (𝑀𝑀𝑀𝑀2 ≥ 𝑀𝑀𝑀𝑀1 ) = � 𝑢𝑢𝑢𝑢 (4)
�(𝑚𝑚𝑚𝑚2 − 𝑢𝑢𝑢𝑢2 ) − (𝑚𝑚𝑚𝑚1 − 𝑙𝑙𝑙𝑙1 )�
𝑗𝑗𝑗𝑗
terion in the main criteria matrix is as follows: 𝑗𝑗𝑗𝑗 =1
41
Ecological Engineering & Environmental Technology 2023, 24(7), 38–45
42
Ecological Engineering & Environmental Technology 2023, 24(7), 38–45
and Lampulo, it is known that several inhibiting delays, the appropriate alternative is to consider
factors are found in several shipyards including: adding a minimum stock to the warehouse to an-
Financial, Natural Resources, Human Resources ticipate raw material shortages. The next alterna-
and Environment. The inhibiting factors on these tive solution is to have a backup or use a backup
shipyards were analyzed using the Fuzzy AHP supplier if the main supplier experiences prob-
method. The ranking results for each of these in- lems in the procurement process or not. can fulfill
hibiting factors can be seen in the graph (Fig. 3). orders. Reserve suppliers should prioritize local
On the basis of the graph above, it is known suppliers to facilitate the process of sending ma-
that the highest ranking in this study is the finan- terials [15].
cial factor which is the most inhibiting factor in
the shipyard in Banda Aceh city with a value of Human resources
0.4635 and the lowest factor is the environment
with a value of 0.14325. Then, the inhibiting fac- On the basis of the problem, there are no offic-
tors will be sought alternative solutions. The fol- es and warehouses for storing tools and materials
lowing alternative solutions are offered for these in the Banda Aceh City shipyard, which causes
inhibiting factors: the management of the shipyard to be less organ-
ized. According to Rizwan [16], a shipyard must
Financial provide an office building; this serves to make
it easier when outsiders come to the shipyard to
On the basis of the financial problems dis- place orders for ships. According to Ekoanindi-
cussed earlier, a suitable alternative is to borrow yo [17] warehouses in industry have an impor-
capital and invest from outsiders. This is in ac- tant role because they function as a place to store
cordance with the statement [13]. Capital is a materials and tools from exposure to sunlight and
source of fear when the industry has started to be rain which result in a decrease in the quality of
pioneered but it is difficult to grow and develop. raw materials.
Capital issues include how to determine business Besides, related to the problem of lack of
capital needs, and how to obtain funds or sources awareness of Occupational Health and Safe-
of capital and procedures for managing limited ty (OSH), the alternative needed is to create a
capital to achieve maximum benefits. In connec- safe and comfortable work atmosphere. The
tion with the problem of limited capital an indus- proprietor or supervisor of the dockyard must
try requires support from financial institutions in- endeavor to enforce safety measures effectively.
cluding banks, cooperatives, and others [14]. To attain the goal of ensuring the safety of dock-
yard laborers, it is imperative to create an Occu-
Natural resources pational Health and Safety (OSH) scheme. The
initial action to be taken is to compile a roster
On the basis of the problem of material scar- of prerequisites in the dockyard to satisfy OSH
city such as raw materials and material delivery prerequisites. As a reference, one can refer to
43
Ecological Engineering & Environmental Technology 2023, 24(7), 38–45
44
Ecological Engineering & Environmental Technology 2023, 24(7), 38–45
menggunakan metode Fuzzy Analytic Hierarchy 17. F.A. Ekoanindiyo and Y.A. Wedana.2012. Perenca-
Process.Calyptra, 2(1), 1–17. naan tata letak gudang penggunakan metode shared
13. Reschiwati, Effrida, Ibrahim I.M. 2021. The role of storage di pabrik plastik Kota Semarang. Din. Tek.
financial performance of indonesia’s banking firms Ind., 6(1),46–56.
in influencing the rate of stock return. International 18. Y.R.M.B. Sitompul and V.P.A. Simarmata. 2022.
Journal of Latest Engineering and Management Re- Description of work accident and occupational
search (IJLEMR), 6(3), 20–32. safety and health activities of paint manufactur-
14. Sihaloho T., Muna N. 2010. Kajian dampak eko- ing industry PTSU, In West Java 2016–2017.Int. J.
nomi pembentukan kawasan ekonomi khusus.Bul. Health Sci. Res., 12 (8), 280–289.
Ilm. Litbang Perdagang., 4(1), 75–101. 19. A.A.A. Dharma. 2013. Perencanaan jaringan
15. Mishra P., Mishra P., Purohit R. 2018. Material De- kerja pada erection block kapal untuk meningkat-
livery Problems In Construction Projects: A Pos- kan efisiensi waktu pembuatan (studi kasus di PT.
sible Solution.mater. today proc., 5(2), 6497–6501. Dok dan Perkapalan Surabaya),J. Tek. Mesin, 1(2),
16. Rizwan T., Hikmah D., Muhammad M., Chalilud- 42–51.
din M.A., Akhyar A.,Thaib R. 2022. A study on the 20. T. Rizwan, Z. Jalil, A. Akhyar, and H. Husaini. 2021.
development of a fishing shipyard in peukan bada Oceanographic Factors as the indicators for ship-
district, Aceh Besar using fishbone analysis: a short yard industry development in Kutaraja Fishing Port:
comunnication. Depik, 11(2), 246–251. a preliminary study. J. Ecol. Eng., 22(9), 237–245.