FORMER BUDGET TERMINAL FUEL HYDRANT EXTENSION BAYS G15, G16 & G17

FIT-UP & WELDING VISUAL INSPECTION REPORT


CLIENT: CAFHI
MAIN CONTRACTOR: WEC A
PROJECT NO: P4218

AREA:

ISO DWG NO.: D B DATE :

LINE CLASS: REPORT NO. :


SPOOL NO.: PREPARE BY :

C
ROOT WELDER CAPPING FINAL
PIPE LGHT. SIZE WPS TYPE OF FIT UP GAP (MM) FIT UP CHECKED BY NUMBER CHECKED BY WELDER VISUALCHECKED
S.NO JOINT NO. (mm) HEAT NO-1 HEAT NO-2 DIA THK . NO WELD A B C D DATE WEC CAFHI W1 W2 WELD DATE WEC CAFHI W1 W2 WELD DATE WEC CAFHI

NOTE:
DURING FIT UP JOINTS SHALL BE FREE FROM RUST

PIPE INTERNAL CLEANLINESS CHECKED

ONLY QUALIFIED WELDER WILL BE USED

FILLER WIRE / ELECTRODE BATCH:

INTERPASS TEMP. MAINTAINED:

CHECKED BY:WEC QA/QC INSPECTOR REVIEWED & APPROVED BY:CAFHI

NAME: NAME:

DESIGNATION DESIGNATION

SIGNATURE SIGNATURE

DATE DATE
REMARKS