Load Schedule - BOM

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Project : FEEDLOT MESS HALL OPTION 1

Location : PALABUCAN, LIBONA


Date : SEPTEMBER 9, 2023

BILL OF MATERIALS

Item Description UoM Qty Unit Cost Net Cost


Board, Panel 3x3 Plug-In type pc 1
Breaker, Circuit 15AT Plug-In type pc 1
Breaker, Circuit 20AT Plug-In type pc 1
Breaker, Circuit 30AT Plug-In type pc 1
Breaker, Main Circuit 40AT Plug-In type pc 1
Pipe, EMT 1/2" x 10' pc 20
Box, Junction Metal pc 10
Box, Utility Metal pc 6
Connector, EMT 1/2" pc 40
Clamp, Metal 1/2" 2-holes pc 40
Elbow, EMT 1/2" pc 10
Wire, THHN 2.0mm2 roll 1
Wire, THHN 3.5mm2 roll 1
Wire, THHN 8.0mm2 m 20
Outlet, 2-Gang pc 5
Switch, 3-Gang pc 1
Switch, 1-Gang pc 1
Screw, Wood 3/4" box 1
Cap, Service Entrance 8.0mm2 pc 1
Receptacle 4x4 pc 4
Tape, Electrical pc 2
Bulb, Light 11W pc 4
GRAND TOTAL COST

Prepared by: Approved by:

PIOLO JULIUS G. CABAGNOT JONNIE E. NOYNAY .

MEPFS Engineer Resident Engineer - CE

You might also like