PT WASTEC INTERNATIONAL

KETERANGAN :

PTM 20 kV

PUTR
BEBAN BEBAN BEBAN
NO PANEL LOKASI PLN GENSET EMERGENCY
(WATT) (WATT) (KVA)
SDP-GUDANG 150.000

PP-GUDANG 21.120

PP-WORKSHOP 15.280

PP-PJU 1.000

DISETUJUI :

HENDY SURJANTO
SUB TOTAL 1 209.900 WATT
DIPERIKSA :

PP-LAB 6.485 6.485


PDP.16
PTM
PANEL
CAP
MPRINSIP
UTR
DIV.
D.
DIESEL
LOKASI
PANEL
EMERGENCY
GENSET
BEBAN
(KVA)
TSUB
NORMAL
PLN
PADAM
SAAT
KEBAKARAN
LANGGANAN
NO OLOAD
P-LIFT.S
PP-PH
LT.ATAP
MCCB
OFF
ON
SPARE
119,186
S
756,02
1470,754
1.15
0,80
1086,779
2114,209
267,597
819,1818
1846,612
SDP.16
1455
SDP.20
15,75
SDP-PL
P-ELEKTRONIK
SDP.12
SDP.8
102,545
4,102
P2
P-HYD
55,3
110,935
72,154
176,815
105,361
293,869
PARKIR.1
SDP.3
SDP.GF
SDP.P1
P-LIFT.P
11,495
157
79,25
87,88
LT.
SDP.23
366,04
84,289
63,2169
176,321
235,095
DP-ATAP#(850
FACTOR
TFACTOR
20kVA
16
3812 TOTAL
DASAR
ATAP
23 A2X
TWR.1 20
TWR.1 KONTROL
KVAR)
kV
21OPERASI
LOPERATING
TWR.1
321TWR.1
TWR.1 GENSET
PUTRSYSTEM
PLN MANAGEMENT

SDP POMPA R. POMPA 98.000 98.000

PP-R.PANEL 2.868 2.868 MEILANI


PP-OFFICE/JEMBATAN TIMBANG 3.000 3.000 DIDESAIN : DIGAMBAR :

SUB TOTAL 2 110.353 110.353

RUDY Z. H EKAT L
PROYEK :
TOTAL 1+2 209.900 110.353

D. FACTOR 0,80 0,80

DIV. FACTOR 0,2 0,2 BANGUNAN WORKSHOP PLANT 3


D. LOAD 256.253 WASTEC - CILEGON
320 KVA

TITLE :

SINGLE LINE DIAGRAM


SYSTEM DISTRIBUSI

REVISI : 1_2_3_4_5

REV. ISSUED STATUS DATE

WIRING DIAGRAM SYSTEM DISTRIBUSI PLAN 3 0 ISSUED FOR APPROVAL 08.01.2021

DRAWING NUMBER SCALE SIZE SHEET

AR01-01 1:100 A3 1/28