The document outlines 51 important points related to uprating a transmission line, including obtaining tension and pulling equipment from local and international suppliers, renting winch machines, obtaining certifications for equipment, complying with various company safety standards, hiring subcontractors for electrical testing and anticorrosion work, obtaining necessary approvals from regulatory authorities, and acquiring additional resources like portable toilets, fall arrestors, supervisors, rigging equipment and tensioner and pulling machines.
The document outlines 51 important points related to uprating a transmission line, including obtaining tension and pulling equipment from local and international suppliers, renting winch machines, obtaining certifications for equipment, complying with various company safety standards, hiring subcontractors for electrical testing and anticorrosion work, obtaining necessary approvals from regulatory authorities, and acquiring additional resources like portable toilets, fall arrestors, supervisors, rigging equipment and tensioner and pulling machines.
The document outlines 51 important points related to uprating a transmission line, including obtaining tension and pulling equipment from local and international suppliers, renting winch machines, obtaining certifications for equipment, complying with various company safety standards, hiring subcontractors for electrical testing and anticorrosion work, obtaining necessary approvals from regulatory authorities, and acquiring additional resources like portable toilets, fall arrestors, supervisors, rigging equipment and tensioner and pulling machines.
2. T&P from inside UAE supplier 3. Winch machine rental – small size 4. T&P + Block to verify & 3rd party certification. 5. Stringing machine maintenance and ready for activity. 6. CCS CS(NA) to comply (share with CCS) 7. Pan Arabia CS(AEN) to comply (share with PA) 8. ADNOC Crossing MOS +FRA to get sign & approval (Done) 9. ADNOC Crossing approved MOS submitted to TRANSCO as information 10. Union submitted MOS Design, drawing advance comments to update - Done 11. Final Comment sheet for Scaffolding MOS Design & Drawing. – REV-A submitted 12. Subcontractor for Electrical Line Test 13. CP/AC Mitigation quotation and execution (discuss with Javed to reduce scope) 14. MOS ER crossing without scaffolding to ER 15. MOS ER with Scaffolding to ER 16. MOS AR Maintenance & Plat form 17. Civil Engineer (Aboobacker + Dipin) Competencies 18. Egytech or subcontractor for OPGW 19. ITC drawings & approval 20. Traffic management company - quotation, contract & arrangement 21. Check of TSE + Winch with UTC 22. Union Contract update & Review 23. OPGW testing & Splicing S/C to finalize and PO 24. UTC - Access Road and platform maintenance Requirement & Quotation. 25. UTC - 220kV quotation and PO 26. UTC - CICPA passes 27. New S/S & OHTL Competent interview and hiring 28. Safety Blocks 29. Concrete block 30. Site supervisors 31. Store assistant 32. Scaffolding volume and cost reduction 33. Alco meter, steel galvanization + paint 34. Uprating 400 + 220 NOC renewal, especially ADNOC 35. Store Rest area + Washroom + drinking water 36. S/C for 220kV Stringing 37. S/C for 400kV OPGW Stringing 38. Empty Drums for conductor rerolling 39. S/S MOS & Doc approval 40. 5-6nos Winch machine req 41. 6nos Rope ladder 42. Portable Toilet 43. 10nos retractable fall arrestor 44. Telecom signal shifting 45. 2nos of supervisors 46. Additional subcontractor 47. 2nos TSE & operator Elsewedy 48. Slings – 1m X 25 + 2m X 75 for each Team 49. OPGW Aerial Rollers not available in Elsewedy store – as per Transco Specs. 50. OPGW TSE not available in Elsewedy 51. Turn Buckle ~ 18-20 for 2teams 52. Balance T&P