Document Submittal Form

Document 01-000000-1100001344-ASB
Contractor Awad Saad BinZafrah
submittal no. CIV-PQD-000002_02

Contract no. 1100001344/004 Date 20-06-22

To PMC AECOM

Document no. Type Description Rev no. Action required

Approval Comments
1100001344/004 - Pre-
01-000000-1100001344-
Qualification for Arab Company
ASB PQD 02
CIV-PQD-000002_02 For Laboratories and Soil
(ACES) Other
Information

Approval Comments

Withdrawn
Other
Information
Approval Comments

Other
Information

Contractor authorized signature


Name Amr Elbetany Date 20-06-22

Signature

PMC’s comments

Exception is noted revise and


No exception taken Revise and resubmit
Status code resubmit for record
Rejected Review not required Issued for Construction
Engineer’s Date
name
Signature

Received by Contractor

pdf
Pdf
Pdf
Pdf
Pdf
Pdf
PDF
FilePDF
PDF 6.01.NEOM
01-NEOM
01.NEOM
01.NEOM
01.NEOM
01.NEOM
01.NEOMBay
Bay
01.NEOM
01.NEOMBay
Bay
Bay
Bay
Bay
Bay
---Luxury
C. EQUIPMENT-Luxury
-Luxury
-Luxury
-Luxury
-Luxury
Luxury
Luxury
Luxury
Mansions
Mansions
Mansions
Mansions
Mansions
Mansions
Mansions
Mansions No Weekly Report
01-630000-0000100185-ASB-HRM-CVS-000005
01-630000-0000100185-ASB-ENV-PLN-000003
MONITORING01-630000-0000100185-ASB-QMN-PLN-000001
01-630000-0000100185-ASB-PCO-SCD-000001
01-630000-0000100185-ASB-GEO-RPT-000001
01-630000-0000100185-ASB-HRM-CVS-000006
01-630000-0000100185-ASB-HRM-CVS-000007
01-630000-0000100185-ASB-CIV-ITP-000001
01-650000-0000100185-ASB-CPM-INS-000001
01-630000-0000100185-ASB-ENV-PLN-000003
01-630000-0000100185-ASB-QMN-PLN-000001
01-630000-0000100185-ASB-PCO-SCD-000001
01-630000-0000100185-ASB-PCO-SCD-000001
01-630000-0000100185-ASB-ENV-PLN-000003
01-630000-0000100185-ASB-PCO-SCD-000001
01-630000-0000100185-ASB-CIV-ITP-000002
01-630000-0000100185-ASB-CIV-MST-000007
Document 01
02
01
01
03
01
01
01
01
03
01
02
02
01
Revision Date PLAN
Inspection
IN
0000100185/04-DEMOLITION
MANAGEMENT AREA
Statement
0000100185/04-Time-Schedule
0000100185/04-Time-Schedule
0000100185/04-PROJECT
0000100185/04-Time-Schedule
0000100185/04-Method
0000100185/04-Company
0000100185/04-PROJECT
0000100185/04-Curriculum
0000100185/04-PROJECT
0000100185/04
0000100185/04-Inspection
Title Insurance
QUALITY
&QUALITY
B4
ENVIRONMENTAL
QUALITY
10Vitae
8Test
0000100185/04-Time-Schedule
01-630000-0000100185-ASB
Report
12-Dec-2020
No. 01 & Test
Plan
for
PLA
Plan
PLAN
PLAN

Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 1 of 82


Withdrawn

Prequalification Documents

1100001344/004 - Pre-Qualification for Arab Company For Laboratories


and Soil (ACES)

“ 01 - 0 0 0 0 0 0 - 1 1 0 0 0 0 1 3 4 4 - A S B - C I V - P Q D - 0 0 0 0 0 2 _ 0 2 ” , “ J U N 2 0 2 2 ”

Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 2 of 82


Document history

Revision code Description of changes Purpose of issue Date

01 First Submission For Approval 31-05-2022

02 Incorporated Comments For Approval 20-06-2022

Document approval

Prepared by Reviewed by Approved by


Name Omer Hussain Omer Hussain Amr Elbetany

Withdrawn
Job Title QC Manager QC Manager Project Manager

Signature

Date 20-06-2022 20-06-2022 20-06-2022

Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 3 of 82


Withdrawn
Partners for Quality Construction
Company Profile 2022

Arab Company For Laboratories and Soil


Tabuk Branch

Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 4 of 82


Table of Content

1.0 Introduction 1— 10
1.1 General Information……………………………………………………………………….. 1
1.2 Company Information……………………………………………………………………… 2
Tabuk Branch Organizational Chart……………………………………………………….. 3
1.3 ACES Services……………………………………………………………………………..… 4
1.4 Tabuk Key Personnel………………………………………………………………………. 5
1.5 Accreditation Certificates & license……………………………………………………….. 7
1.6 Vision, Mission & Values……………………………………………………………………. 8
1.7 Health, Safety & Environment Policy……………………………………………………… 9

2.0 Facilities 11 — 32
2.1 Geotechnical Drilling Facilities ..........................…………………………………………. 11
2.2 Geotechnical Field Testing Facilities ..................................……………………………… 12
2.3 Geotechnical Sampling Facilities ..................................…………………………………. 13
2.4 Geophysical Testing Facilities ..................................……………………………………... 14

Withdrawn
2.5 Pile Testing & Instrumentation ...................................................…….……. …………..... 15
2.6 Material Testing Facilities .....................................................................……...…………… 18
2.7 Special Studies Services & Facilities ...........................……………………. ……………… 23
2.8 Pavement Studies & Evaluation ...........................…………...………………………….... 24
2.9 Quality Control Projects ....................……....................……...…………………………... 26
2.10 Surveying Services Facilities & Equipment's ....................………………………...….….... 27

3.0 List of Selected Projects 33 — 35


3.1 Materials Technology & Quality Control Projects….…………….……………………… 33

4.0 Appendices 36 — 77
4.1 Appendix A.1 (Tabuk Branch)
Accreditation Certificates & Licenses……..……….………………………………… 36
Appendix A.2 (Western Region-KSA)
Accreditation Certificates & Licenses……..……….………………………………… 46
4.2 Appendix B
ACES Tabuk Location Map……………………….……...………………………....... 77

Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 5 of 82


Partners for Quality Construction

Introduction
1.1 General Information

Arab Company for Laboratories & Soil (ACES) is a specialized engineering com-
pany in site & geotechnical investigation, materials technology & testing, quality control of
projects, special studies, environmental studies & testing, and land & marine surveying.

ACES has an excellent track record for delivering the best value for its clients in terms of
responsiveness, consistency, and practical solutions. ACES main goal is to partner with its
clients, understand and exceed their expectations.

Withdrawn

ACES possesses a highly skilled and specialized workforce and modern equipment,
which allows to provide its clients with punctual, competitive and high standard services
at all times and in all projects regardless of their size.
All of ACES tests are conducted in accordance with the highest international stand-
ards such as the British Standards (BS), the American Standards ( ASTM), the German
Standards (DIN), and the European Standards (EN), and the requirements of ISO 9001-
2015 and ISO/IEC 17025-2017.
ACES was established in 2006 in Jeddah-Saudi Arabia, and is part of the Arab Cen-
ter for Engineering Studies (ACES Group), which is headquartered in Amman-Jordan.

ACES Tabuk is one of the satellite offices under the ACES Western Region which
was established in 2019.

Tabuk Company Profile - 2022 1


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 6 of 82
Partners for Quality Construction

Information
1.2 Company Information

Company Name Arab Company for Laboratories & Soil - ACES

P.O. Box 47716, Tabuk, KSA.


Tel : (+966) 12 6641 422
Office Address & Contacts Fax : (+966) 12 6635 448
Email : acestabuk@aces-int.com
Web : www.aces-int.com

Office Location Prince Mohammed bin Naif St, Ghurnatah Dist., Tabuk

Company Registration 3550126653

• Materials Technology and Testing


Nature of Business
• Quality Control and Supervision Works

ACES Tabuk Established in 2019 as part of ACES Group;


• Madinah
• Amman

Withdrawn
• Makkah
• Aqaba
• Buraydah
• Riyadh
• Muscat
• Jeddah
Establishment • Dubai
• Khobar
• Abu Dhabi
• Najran
• Al - Ain
• Yanbu
• Tabuk

ISO 9001 – 2015 Certificate 4676808

ISO 17025 Certificate IAS—TL-1045

Commercial Activity License 43037596026

GAZT (ZAKAT) Certificate 1110020497

VAT Certificate 300056345200003

GOSI Certificate 46288305

Saudization Certificate 20002205004104

Tabuk Company Profile - 2022 2


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 7 of 82
Partners for Quality Construction

Organization
ACES Tabuk Branch Organizational Chart

Withdrawn

Tabuk Company Profile - 2022 3


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 8 of 82
Partners for Quality Construction

1.3 ACES Services

Services
ACES provide specialized consulting services in the fields of Site & Geotechnical Investiga-
tions, Materials Technology and Testing, Special Studies and Quality Control of Projects.
ACES always use state-of-art technologies. New materials are used and new processes are
initiated as soon as they are discovered from a wide range of inputs from customers, sup-
pliers, employees and other sources.

The following services are offered by Arab Company For laboratories and Soil.

• Site and Geotechnical Investigations (Off-shore & On-Shore)


• Materials Technology and Testing
• Special Studies & Projects
• Quality Control and Supervision Works
• Cavity Probing and Grouting
• Geotechnical Drilling, Sampling and Field Testing
• Testing of Piles

Withdrawn
• Geophysical Investigations (Off-shore & On-Shore)
• Environmental Studies and Testing
• Testing of Water
• Instrumentations
• Pumping Test and Piezometer Installation
• Pavement Evaluation and Testing
• Survey Services (Off-shore & On-Shore)
• Polymer Testing
• Oil Testing

• Chemical Testing

Tabuk Company Profile - 2022 4


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 9 of 82
Partners for Quality Construction

1.4 ACES Tabuk Personnel

Personnel
The staff consist of highly qualified and experienced materials and foundation engineers in
addition to the highly experienced laboratory technicians and well trained labors. A list of the
names and degrees of the key staff of Tabuk Branch are as follows:

ARAB COMPANY FOR LABORATORIES AND SOIL – KSA

Management and Administration


Name Job Title Education Qualification Experience

Eng. Farid Wajieh Taher Ghadieh General Manager M.Sc., B.Sc. (Civil Engineering) 36 Years

Ayman Tanninah Materials & QC Manager B.Sc. (Civil Engineering) 21 Years

Tariq Ameen Nayef Diab QA-QC Manager B.Sc. (Civil Engineering) 13 Years

Shaher Abu Mizar Technical Manager B.Sc. (Civil Engineering) 12 Years

Mohammad Baseet QA Officer B.Sc. (Civil Engineering) 5 Years

Hamza Al Kalha RSO B.Sc. (Civil Engineering) 6 Years

Nassar Amireh Lab Supervisor B.Sc. (Civil Engineering) 6 Years

Musab Al Balawi Civil Engineer B.Sc. (Civil Engineering) 3 Years

Withdrawn
Mohammad Al Saman Civil Engineer B.Sc. (Civil Engineering) 3 Years

Abdul Majeed Al Sulami Human Resource Officer Diploma 1 Year

Rais Ahamad Secretary Diploma 3 Years

Mehboob Sherwani Data Entry Diploma 18 Years

Akbr Ali Data Entry Diploma 3 Years

Muhammed Rashid Data Entry Diploma 1 Year

Soil Lab

Wazir Ahmad Senior Technician Diploma 14 Years

Yaqoob Ahmad Senior Technician Diploma 12 Years

Ajmal Khan Technician Diploma 3 Years

Omer Abdelrahman Technician BCs. 1 Year

Meshal Al Balawi Technician Diploma 1 Year

Asphalt Section

Mohammad Belal Senior Technician BCs. 8 Years

Muhammad Ismail Senior Technician Diploma 6 Years

Aggregate Section

Christopher Balili Senior Technician Diploma 15 Years

Arsalan Khan Technician Diploma 1 Year

Concrete Section

Tariq Ata Al Manan Senior Technician BCs. 18 Years

Sami Al Atawi Technician Diploma Year

Tabuk Company Profile - 2022 5


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 10 of 82
Partners for Quality Construction

ACES Tabuk Personnel (Cont’d...)

Personnel
Site Technicians

Name Job Title Education Qualification Experience

Mohammed Al Badawy Technician - Concrete & Agg. BCs. 7 Years

Abdul Rahman Deeb Skeek Technician - Soil, Concrete & Diploma 8 Years

Mohamed Goda Technician - Soil, Concrete & Diploma 1 Year

Chaudhry Sajid Iqbal Technician - Agg., Concrete & Diploma 8 Years

Mohammad Tahseen Technician - Soil & Concrete Diploma 11 Years

Mohammad Junaid Technician - Concrete BCs. 1 Year

Tanveer Ahmad Technician - Soil, Concrete & Diploma 10 Years

Syed Fida Hussain Technician - Soil & Concrete Diploma 1 Year

Shiju Sulaiman Technician - Concrete Diploma 10 Years

Shoaib Zada Technician - Soil & Concrete Diploma 1 Year

Arif Likat Technician - Soil, Concrete & Diploma 14 Years

Rehmatualaa Technician - Soil Diploma 2 Years

Withdrawn
Mohammad Irfan Technician - Soil & Concrete Diploma 5 Years

Siraj Ud Din Khadim Technician - Concrete Diploma 4 Years

Mohammad Adnan Technician - Concrete Diploma 8 Years

Muteb Al Balwi Technician - Concrete Diploma 1 Year

Mohannad Hassan Technician - Soil, Concrete & Diploma 5 Years

Emran Hossain Technician - Soil, Concrete & Diploma 2 Years

Ziad Al Etui Technician - Concrete Diploma 1 Year

Mohammad Shafiq Technician - Soil, Concrete & Diploma 3 Years

Mohammad Sufyan Technician - Soil & Concrete Diploma 9 Years

Muhammad Ishaq Labor Diploma 1 Year

Details can be furnished upon request

Tabuk Company Profile - 2022 6


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 11 of 82
Partners for Quality Construction

Accreditation
1.5 Accreditation Certificates & License
ACES is an independent house, approved by various ministries (Municipal and Rural Af-
fairs, Jeddah Municipality, Defense, Education, Higher Education, Health, Interior, Financial,
Transport, Agriculture, Saudi Telecom Co. …etc.) and registered with Ministry of Trade and Indus-
try Since 2006.

Please see Appendix A.2 for Certificates.

ACES Tabuk is also accredited from International Accreditation Services (IAS), Inc., USA to
ISO/IEC 17025:2017. IAS is one of the leading accreditation bodies in the United States, accrediting
testing and calibration laboratories. IAS is a nonprofit, public-benefit corporation that has been a
recognized accreditation body since 1975.

Please see Appendix A.1 for Certificates.

ACES Tabuk Quality Management System is also certified to ISO 9001:2015 by BVQI

SN Name of Certificates Issued by

Withdrawn
1 Professional License Ministry of Trade & Industry

2 Commercial Registration Ministry of Trade & Industry

SAGIA( Saudi Arabian General


3 Investment Certificate
Investment)

Accreditation and Certifications

1 ISO 9001-2015 BVQI

2 ISO 17025 IAS

Tabuk Company Profile - 2022 7


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 12 of 82
Partners for Quality Construction

Vision, Mission & Values


1.6 Vision, Mission & Values

Withdrawn

Tabuk Company Profile - 2022 8


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 13 of 82
Partners for Quality Construction

HSE Policy
1.7 Health, Safety & Environmental Policy

Safety Policy Goals

Apply a safe and healthy work is considered

Company goal and future targeted aim, considered also

Employees safety, health and environment are the first priority which

Support, maintain and increase people respect and appreciate for our branch of Tabuk

ACES is committed to managing health, safety and environmental (HS & E) matters as an integral
part of our business. In particular, it is our policy to assure the HS & E integrity of our processes and
facilities at all times and at all places.

We will comply with all applicable laws and regulations and will implement programs and
procedures to assure compliance. Strict compliance with HS & E standards will be a key ingredient in

Withdrawn
the training, performance reviews and incentives of all employees.

Where existing laws and regulations are not adequate to assure protection of human health, safety
and the environment, we will establish and meet our own HS & E quality standards.

We will employ management systems and procedures specifically designed to prevent activities and/
or conditions that pose a threat to human health, safety or the environment. We will minimize risk
and protect our employees and the communities in which we operate by employing safe technologies
and operating procedures, as well as being prepared for emergencies.

We will strive to prevent releases to the atmosphere, land or water. We will ensure the safe
treatment and disposal of waste.

We will communicate our commitment to HS & E quality to our employees, clients and contractors.
We will solicit their input in meeting our HS & E goals and in turn will offer assistance to meet their
goals.

We will continuously seek opportunities to improve our adherence to these principles, and will
periodically report progress to our contractors and consultants.

We will consider environmental factors and the full acquisition, use, and disposal costs when making
planning, purchasing, and operating decisions.

Tabuk Company Profile - 2022 9


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 14 of 82
Partners for Quality Construction

Quality Policy
1.8 Quality Policy

ACES is committed to ensure accurate and timely testing services and to continuously meet or
exceed the stated or implied expectations of our clients by:

1. Laboratory services are always carried out in accordance with stated standardized methods
and customer’s requirements.
2. Providing accurate, timely delivery of our services to our customers.
3. Managing our business by meeting the needs of our customers.
4. Personnel familiarize themselves with quality documentation and implement the policies
and procedures in their work.
5. Maintaining a formal Quality system that meets the requirements of ISO/IEC 17025: 2017
and ISO 9001: 2015.
6. Maintaining a mode of continuous improvement by way of employing qualified personnel's,
addition of new equipment, enhancing skills of personnel through training/ refresher
courses etc.

To achieve this aim, ACES has developed and maintained and implement procedures for all
functions in accordance with the requirements of ISO/IEC 17025: 2017 and ISO 9001: 2015. These
procedures are subject to schedule audits and to an overall annual review.

Withdrawn
The goal behind these procedures is to direct the staff of the Center with regard to their required
duties, and to provide sufficient assurance that the work undertaken by the Center shall achieve
fitness for purposes in every service, by planned and systematic methods that determine, assess
and achieve quality, in conformance with the ISO/IEC 17025: 2017 and ISO 9001: 2015 along with
the local Administrative Rules & Regulations.

The top management and employees of ACES are strongly committed to ensure compliance to
ACES policy.

Tabuk Company Profile - 2022 10


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 15 of 82
Partners for Quality Construction

Facilities
2.0 Facilities
2.1 Geotechnical Drilling Facilities
ACES is equipped to carry out Off-shore and On-
shore drilling projects ranging from small size drilling
depth of few meters to big projects depth of more than
150m. Deep boreholes. Drilling activities include sam-
pling, soil-rock sampling, field testing etc. ACES has 18
drilling rigs and ready to start the projects in Western
Region of Saudi Arabia.
Truck Mounted Rigs
SN. Rig Name Drilling Method
1 TOHO I RJ05 Rotary Drill Rig
2 ARDECO I RJ16 Rotary Drill Rig
3 ARDECO II RJ17 Rotary Drill Rig
4 ARDECO III RJ18 Rotary Drill Rig
5 ARDECO IV RJ19 Rotary Drill Rig
6 ARDECO V RJ20 Rotary Drill Rig

Withdrawn
7 ARDECO VI RJ21 Rotary Drill Rig
8 ARDECO VII RJ22 Rotary Drill Rig
9 ARDECO VIII RJ23 Rotary Drill Rig
10 ARDECO IX RJ24 Rotary Drill Rig
11 ARDECO X RJ25 Rotary Drill Rig
12 JOY I RJ26 Rotary Drill Rig
13 TADANO I RJ27 Rotary Drill Rig
14 JOY II RJ28 Rotary Drill Rig
15 ARDECO XI RJ29 Rotary Drill Rig
16 ARDECO XII RJ30 Rotary Drill Rig
17 Mobile Drill I RJ31 Rotary Drill Rig
18 Mobile Drill II RJ32 Rotary Drill Rig
19 ARDECO XIII RJ33 Rotary Drill Rig

Tabuk Company Profile - 2022 11


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 16 of 82
Partners for Quality Construction

Facilities
2.2 Geotechnical Field Testing Facilities

1. PENETRATION TEST
 Cone Penetration Test with Electrical Piezocone (CPTU) & Cone Penetration Test with
Electrical Seismocone
 Dynamic Cone Penetration Test (DCPT)

 Standard Penetration Test (SPT) and Cone Penetration Test (CPT)

2. PRESSURE-DEFORMATION MODULUS CHARACTERISTIC


 'OYO' Elastmeter Testing Equipment (High Pressure for
Rock)

3. PERMEABILITY TESTS

Withdrawn
 Constant Head Permeability Test

 Falling Head Permeability Test

 Pneumatic Single Packer Test in Boreholes (Lugeon Test)

 Pneumatic Double Packer Test in Boreholes (Lugeon Test)

4. HYDRAULICS
 Infiltration Test

 Percolation Test

5. OTHER FIELD TESTING


 Plate Load Test

 Field CBR

 Field Density

 Deep excavation monitoring by inclinometer

 Borehole camera Cavity detection by diagraphic drilling to determine drilling Parameters

Tabuk Company Profile - 2022 12


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 17 of 82
Partners for Quality Construction

Facilities
2.3 Geotechnical Sampling Facilities

 Double tube core barrels for hard soil and rock coring

• PQ Wire line core barrel – (Nominal core dia. 84mm)

• HQ Wire line core barrel – (Nominal core dia. 64mm)

 Large diameter split barrel samplers for Bulk Samples.

 Split barrel tubes with cone accessory for Standard Penetration Test (SPT)

 Thin wall tubes for soil sampling (Shelby tubes) 3” dia. according to ASTM D 1587

 Piston samplers 3 inch dia.

 Drilling rods with various diameters and lengths.

 Augured rods with various diameters and lengths.

 Casing with various outside diameters and lengths.

 Air compressors with various capacities.


Withdrawn
Water and mud pumps with various capacities.

DTH Hammer with various diameter

Groundwater samplers and bailers

Tabuk Company Profile - 2022 13


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 18 of 82
Partners for Quality Construction

Facilities
2.4 Geophysical Testing Facilities

Geophysical Investigation has become essential for major civil projects due to the important data
obtained on the subsurface space with reasonable time and cost. ACES is a leading provider of
geophysical testing services in the Gulf region. Our methods below apply to all fields of engineering
geophysics on shore, as well as off-shore:
 Surface Geophysical Surveys

 Seismic Refraction Surveys (SR)


 Electrical Resistivity Tomography (ERT)
 Multichannel Analysis for Surface Waves (MASW)
 Ground Penetrating Radar (GPR)
 Magnetic surveys
 Microgravity surveys

 Borehole Geophysical Surveys

 P-S Wave Suspension – Seismic Sonic Logging


 Cross Hole Seismic Testing Down Hole Seismic Testing
 Borehole Verticality
 Three Arm Caliper Logging
 Natural Gamma Logging
 Self-Potential Logging (SP)
 Formation Density Logging
 Determining Drilling Parameters by Diagraphic Drilling

Withdrawn
 Borehole Camera

 Marine Geophysical Services

 Bathymetric Survey (Single/ Multi-beam echo-sounding


surveys)
 Sub-bottom Profiling
 Marine ERT Survey
 Magnetometer survey
 Side Scan Sonar Survey

Tabuk Company Profile - 2022 14


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 19 of 82
Partners for Quality Construction

Facilities
2.5 Pile Testing & Instrumentation

The testing and quality control of piles at construction and post construction stages has become a
common practice in most of the projects. ACES delivers quality services with a focus on safety,
value, innovation and excellence. Our comprehensive pile
testing services includes:

 Caliper Logging
Caliper log determines the shape and size variations
of the drilled pile borehole to assess zones of likely
collapse, necking or bulging prior to concreting of
the shaft.

Withdrawn
 Ultrasonic Crosshole Logging
An important very common test to investigate the quality of the shaft concrete and locate
defective zones within the pile shaft.

 Static Load Test (Vertical, Uplift & Lateral)


Pile Load Test (PLT) is most reliable tests to ascertain pile load capacity and behavior. ACES pro-
vides full monitoring of PLT with displacement transducers, dial gauges and load cells including
pile shaft instrumentation, in addition to inclinometers for laterally loaded piles tests.

Tabuk Company Profile - 2022 15


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 20 of 82
Partners for Quality Construction

Facilities
Pile Testing & Instrumentation (Cont’d...)

 Low Strain Integrity Test


This is a fundamental test conducted on almost all
constructed piles to investigate pile shaft integrity
and detect defects such as necking and cracking of
the pile shaft, in addition to checking the pile length.

 High Strain Dynamic Test


This important test determines the pile carrying
capacity and settlement properties. The facility
enables real-time analysis of the pile data, which
can highlight any pile problems while the piling rig

Withdrawn
is still on site.

 Pile Instrumentation by Using Vibration Wire Strain Gauges & Extensometer


The purpose of the static load in compression on instrumented piles are to evaluated the
following;

 Load transfer & distribution along the pile shaft.


 Skin friction along the pile shaft.
 Load – Settlement relationship of the pile.

Tabuk Company Profile - 2022 16


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 21 of 82
Partners for Quality Construction

Facilities
Pile Testing & Instrumentation (Cont’d...)

 Shrinkage Monitoring
This instrumentation using Vibrating Wire Strain Gauges
(Embedment type) is carried out to monitor strain in the
concrete structure due to shrinkage. Shrinkage after
hardening of concrete is the decrease with time of concrete
volume.


Withdrawn
Temperature Monitoring of Mass Concrete (Thermocouple Sensors)
Temperature monitoring is carried out during the execution of mass concrete structures of
which the character of concrete is technically specified as a structure with large dimensions
and has the tendency to rise its temperature due to many factors such as mix design and
progress of heat of hydration.

 Estimated Concrete Strength by the Maturity Method


The maturity method is a technique that can be used to
estimate the strength of in-placed concrete in terms of the
temperature - Time factor.

Tabuk Company Profile - 2022 17


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 22 of 82
Partners for Quality Construction

Facilities
2.6 Materials Testing Facilities

1.0 AGGREGATES & STONE


• Physical Properties – Grain Size Distribution, Density, Specific Gravity & Water Absorption
• Shape – Flakiness and Elongation Tests, Partially Crushed Faces
• Sand Equivalent Value
• Mechanical Properties – Aggregate Impact Value, Aggregate Crushing Value, Ten Percent
Fines Value, Los Angeles Abrasion Value
• Chemical Tests – Sulphate, Chloride, Organic Impurities, Potential Silica Alkali Reactivity

2.0 SOIL
• Classification Tests – Grain Size Distribution including Hydrometer, Plasticity Characteristics,
Particle Density & Specific Gravity, Linear Shrinkage
• Compaction Related Tests – Proctor, C.B.R, Maximum & Minimum Dry Density
• Shear Strength – Direct Shear Test (Small Box & Big Box), Triaxial Test (CU & UU), Unconfined
Compression Tests
• Permeability – Falling and Constant Head Permeability Tests
• Compressibility – One Dimensional Consolidation Test
• Chemical Tests – Sulphate, Chloride, Carbonate Content, Organic Matter Content
• Thermal Resistivity
• Electrical Resistivity

Withdrawn
3.0 ROCK

• Unconfined Compression Test


• Modulus of Elasticity & Poisson’s Ratio
• Point Load Test
• Direct Shear Test
• Cerchar Abrasion Test
• Petrographic Study
• Brazilian Test (Indirect Tensile)
• Thermal Resistivity
• Drop test Breaking Index, Length to thickness Ratio for Stone
• Rock Grading
• Till test of as built – Rock fill

4.0 CONCRETE
• Tests on Fresh Concrete – Workability, Compaction Fraction, Bleeding, Drying Shrinkage and
Air Content & etc
• Self Compact Concrete test—L Box, V Funnel, Slump-Flow, T 500, Sieve Segregation& etc
• Test for Grout Materials - Trial Mix, Shrinkage, Volume change, Fluidity, Bleeding, Compressive
and Setting Time.
• Tests on Hardened Concrete – Compressive Strength, Flexural & Transverse Strength Tests,
Density, Modulus of Elasticity, Poisons Ratio & etc
• Durability Tests – RCP, ISAT, chloride migration coefficient,
Water Absorption, Water Permeability & Capillary Index
• Non-Destructive Testing – Rebound Hammer, Ultrasonic Pulse Velocity,
Reinforcement Scanning and Crack Monitoring.
• Chemical Testing – Cement Content, Sulphate Content,
Chloride Content & Alkali Content
• Concrete Maturity and Temperature by using Digital Thermocouple
Wires using Manual and logger reader.
• Concrete Mix Design

Tabuk Company Profile - 2022 18


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 23 of 82
Partners for Quality Construction

Facilities
Materials Testing Facilities (Cont’d...)

5.0 CEMENTITIOUS MATERIAL (OPC, S SRC, Micro Silica, PFA, GGBS, SLAG)
• Chemical Analysis
• Physical Analysis
• Heat of Hydration

6.0 STEEL REINFORCEMENT


• Tensile, Bend & Rebend
• Chemical Testing of Steel
• Steel Grade Analysis
• Steel shear
• Tests of Manhole
• Testing of Anchor Bolts
• Hardness Test
• Pull Out Test

7.0 ASPHALT
• Hot mix design for all types of asphalt. (Marshall & Superpave)
• Asphalt Testing - Extraction test, Marshall Properties, GMM, Voids, Retained Stability

Withdrawn
Asphalt Cores - Asphalt core obtaining, Thicknesses, Density, Degree of Compaction, Visual
Examination

8.0 EMULSIFIED ASPHALT


• Viscosity Saybolt Furol @ 25oC & 50oC
• Storage Stability Test
• Particle Charge Test
• Sieve Test
• Cement Mixing Test
• Distillation by Volume to Residue
• Coating Dry Aggregate
• TEST ON RESIDUE
• Penetration @ 25oC
• Ductility @ 25oC
• Solubility by Trichloroethylene

9.0 CUTBACK ASPHALT


• Kinematic Viscosity @ Various Temp.
• Flash Point
• Water Content
• Distillation by Percent Volume
• Saybolt Furol @ 50oC
• TEST ON RESIDUE
• Ductility 5cm/Min
• Solubility

Tabuk Company Profile - 2022 19


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 24 of 82
Partners for Quality Construction

Facilities
Materials Testing Facilities (Cont’d...)

10.0 PERFORMANCE GRADED (PG) TESTING

• Standard Test Method for Viscosity Determination of Asphalt at Elevated Temperatures


Using a Rotational Viscometer (RV)
• Test Method for Determining the Flexural Creep Stiffness of Asphalt Binder Using the
Bending Beam Rheometer (BBR)
• Test Method for Determining the Rheological Properties of Asphalt Binder Using a Dynamic
Shear Rheometer (DSR)
• Standard Practice for Accelerated Aging of Asphalt Binder Using a Pressurized Aging Vessel
(PAV)
• Test Method for Effect of Heat and Air on a Moving Film of Asphalt (Rolling Thin-Film Oven
Test) RTFOT
• Multiple Stress Creep Recovery (MSCR) Test of Asphalt Binder Using a Dynamic Shear
Rheometer (DSR)
• Performance-Graded Asphalt Binder Multiple Stress Creep Recovery (MSCR) Test
• Penetration of Bituminous Materials
• Determination of Needle Penetration
• Determination of Softening Point (Ring & Ball Method)
• Density of Semi-Solid Bituminous Material (Pycnometer Method)

Withdrawn
• Separation tendency of polymer
• Sieve test on polymer
• Solubility in toluene by centrifuge
• Mixing & Blending of Raw Polymer & Pellets Using High Shear Mixer
• Laboratory Determination of Mixing & Compaction of Asphalt Binder @ Elevated Temp.

11.0 ROAD MARKING – THERMOPLASTIC

• Binder Content • Crack Resistance


• Glass Bead Content • Cold Impact Resistance
• Grading of Constituents • Flow ability of Residue
• Softening Point • Flow ability Extended Heating
• Density • Flow Resistance
• Open Flash Point • Abrasive Test
• Initial Luminance • Dry Film Thickness
• Luminance Heat Stability • Wet Film Thickness
• Drying Time • Skid Resistance
• Bond Strength • Retro reflectivity

12.0 ROAD MARKING – GLASS BEADS

• Ballotini
• Graduation
• Sphere Counts
• Refractive Index
• Acid Resistance
• Floatation Test
• Moisture Proof Coating
• Rate of Application of Glass Beads

Tabuk Company Profile - 2022 20


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 25 of 82
Partners for Quality Construction

Facilities
Materials Testing Facilities (Cont’d...)

13.0 PAINT TESTING


• Chemical resistance of paint
• Coating thickness
• Spark holiday

14.0 FINISHING WORK TESTING


• Plaster, Anchor bolt tests—Pull out, Pull off
• Water leakage test
• Load test—Space frame, Concrete structures, Bridges...etc

15.0 TILES & STONES

Granite/Limestone/Marble Ceramic Tile


• Compressive Strength • Determination of Dimension & S.Quality
• Water Absorption • Water Absorption
• S.Gravity (Density) / Apparent • Modulus of Rupture
Density • Scratch Hardness of Surface
• Modulus of Rupture • Resistance to Surface Abrasion
• Flexural Strength • Coefficient of Linear Thermal
• Abrasion Resistance Expansion
• Slip Resistance • Resistance to Chemicals

Withdrawn
• Thermal Expansion

Terrazzo Tile Concrete Paver Tile


• Transverse Strength • Transverse Strength
• Water Absorption • Compressive Strength
• Dimension • Water Absorption

16.0 INSULATION BOARD / BITUMEN BOARD TESTING


• Recovery After 50% Compression
• Compression (Stress up to 50% of thickness)
• Extrusion (Thickness after compression to 50%)
• Density and Water Absorption
• Bitumen content
• Thermal Expansion

17.0 MEMBRANES (Geo Textile, Water Proof, Water Stops, Polymer Membranes,
Polyethylene Sheets)
• Tensile Strength • Hardness
• Elongation • Impact Resistance Peel Strength
• Puncture Resistance • Coefficient of Friction
• Moisture Vapor Transmission • Crack Bridging
• Adhesion to Prime Concrete • Water Permeability
• Tear Resistance

18.0 WELDING TESTING


• Magnetic Particle Inspection (MPI)
• Dye Penetrant Inspection (DPI, LPT)
• Ultrasonic Contact Examination
• Ultra sound tests of Wdd

Tabuk Company Profile - 2022 21


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 26 of 82
Partners for Quality Construction

Facilities
Materials Testing Facilities (Cont’d...)

19.0 PIPES & Fittings (HDPE, UPVC, CPVC, PP-R Etc.)

• Appearance & Marking


• Heat Deflection Test
• Melt Flow Index
• Oxidation Induction Time
• Longitudinal Reversion
• Impact Test (Free Fall)
• Impact Test – Izod
• Density
• Dimension
• Ovality
• Opacity
• Vicat Softening Point
• Tensile & Elongation

20.0 HDPE & LLDPE LINERS

• Shear
• Peel in

Withdrawn
• Peel out
• Melt Flow Index
• Puncture Strength
• Oxidation Induction Time
• Thickness
• Tensile and Elongation

Tabuk Company Profile - 2022 22


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 27 of 82
Partners for Quality Construction

Facilities
2.7 Special Studies Services & Facilities
ACES have developed good reputation in solving “Construction Problems”. Accordingly, ACES
established a special studies & project department to handle a wide range of projects with an
open-ended scope. ACES employs highly qualified specialists in highways, structural and
geotechnical engineering for this purpose. Also, state of the art equipment for destructive and
non-destructive testing are utilized by ACES. All available equipment are calibrated and in
accordance with the International Standards such as BS, EN, ASTM, DIN, AASHTO, CIRIA etc.

ACES have conducted this specialized work in several countries in the Arab World and in Asia.

The scope of services of the special studies and projects department are:

 Evaluation of condition and damage of existing structures.


 Evaluation of fire damaged structures and design of repair.
 Non-destructive testing of reinforced concrete to determine diameter, spacing and
direction of reinforcing steel.
 Non-destructive testing of reinforced concrete to evaluate the internal condition of
concrete , voids , honeycombing and delamination.
 Evaluation and determination of actual concrete compressive strength.
 Durability Tests for evaluation of old structures .
 Studies and design for rehabilitation, maintenance and repair of structures.

Withdrawn
 Inspection of pipes and small places by using Crawler camera.
 Conduct studies, design and supervision on the installation of retaining systems for
building and roads.
 Studies, management and supervision of major excavations.
 Consultation on the design of dams, water structures and special foundations.
 Consultation on drainage and dewatering systems.
 Load testing of structures (Bridges, Slabs etc.)
 Pavement evaluation for highways and airports.
 Pavement Condition Index (PCI)
 Geological Mapping and Surveys
 Consultation and research related to special problems in construction projects.
 Other Specialized Studies.
NON DESTRUCTIVE TESTING

Most of Non destructive testing for evaluating concrete structures are available. (Cover meter,
Half-cell, Ultrasonic, Crack Monitoring, Crack Microscope, Schmidt Hammer, Ferro scan, Impact
Echo, Impulse Response,…..etc.)

Tabuk Company Profile - 2022 23


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 28 of 82
Partners for Quality Construction

Facilities
2.8 Pavement Studies & Evaluation

The following are the equipments and instruments which are relevant to pavement assessment
and rehabilitation studies:

Laser Profiler with Video Logging System

Determine the road roughness, longitudinal profile and macro-texture data, whist
providing fully linked video images.

The laser Profiler is capable of collecting


longitudinal profile, roughness, shape-files
and macro-texture, whilst providing fully
linked video images. Roughness is reported in
International Roughness Index (IRI), Ride
Number (RN) and NAASRA units. The
macro-texture is reported in Mean Profile
Depth (MPD) and Sensor-Measured Texture

Withdrawn
Depth (SMTD) units, while Road safety can be
assessed through the digital imagery.

Non-Destructive Structural Evaluation of Highway & Airport Pavements Using Heavy Fall-
ing Weight Deflectometer (HWD)

A heavy weight deflectometer, HWD, is a testing device used by civil engineers to


evaluate the physical properties of pavement. This could include (but is not limited to)
highways, local roads, airport runways and railway tracks. The machine is usually contained
within a trailer that can be either towed to a location by another vehicle or, when used on
railway tracks, placed on a hand trolley and pushed to the location.

Tabuk Company Profile - 2022 24


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 29 of 82
Partners for Quality Construction

Facilities
Pavement Studies & Evaluation (Cont’d...)
Surface Irregularities Test by Travelling Beam

Three meter long travelling beam device is used to check any irregularities in both
concrete and bituminous road surface. A sensing unit comprising a wheel connected to an
indicator provides a magnification of 4: 1. Deviation of the surface from a straight line is shown
on a incremental graduated scale.

- Surface irregularities tested by straight edge 3m & 4m.

- Friction properties of asphalt road using skid resistance pendulum test.

Visual Inspection Using (PCI) Pavement Condition Index technique

Determine the Pavement Condition Index (PCI) of the roads:

In order to obtain a useful condition assessment of the pavements, unbiased and


repeatable survey procedures must be used. To provide for maximum usefulness, the survey

Withdrawn
procedures must be easily understood and relatively simple to perform in the field. ACES had
extensive experience in “condition-assessment” survey procedures that are applicable to a wide
variety of user's needs.

Determine the pavements structural characteristics through destructive testing program


(test pit and cores) for the pavement layers:

Determine, by use of laboratory and field testing, the physical and mechanical properties of the
materials of each pavement layer.

Determine, by use of test pits and cores, the existing thickness of each pavement layer.

Tabuk Company Profile - 2022 25


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 30 of 82
Partners for Quality Construction

Facilities
2.9 Quality Control of Projects

The quality control of projects department is one of the largest departments of ACES.
ACES pioneered this activity in Jordan several years ago and this service is gaining popularity
with owners, engineers and contractors. ACES has implemented quality control programs for
majors projects in UAE, Qatar and Jordan such as Airports, Hotels, Hospitals, Thermal Power
Plants, Highways, Large Fuel Tanks, Dams, Precast Factories and other major industrial projects.
ACES maintain several sets of laboratory equipment in order to establish site laboratories when-
ever requested.

The scope of services of quality control of project department is:

 Design and implementation of quality control programs for construction projects.


 Supply testing equipment and manage site laboratories.
 On site materials testing.
 Prepare periodic quality control reports.
 Design and implementation of quality control programs for manufacturing facili-

Withdrawn
ties such as: Ready Mix Concrete Plants, Asphalt Production Plants, Precast Unit
Plants, Blocks and Tiles Factories, Concrete additives manufacturing plants and
Building materials factories.
 Calibration of laboratory testing equipment.
 Calibration of Asphalt and Concrete Batch Plants.
 Evaluate and assess the level of materials quality for projects utilizing statistical
evaluation techniques.
 Prepare technical specifications for materials.
 Conduct training courses and seminars for Engineers and Technicians.

Tabuk Company Profile - 2022 26


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 31 of 82
Partners for Quality Construction

Facilities
2.10 Surveying Services Facilities & Equipment's

The Surveying Department of ACES include a very capable team of professionals that are
able to conduct and complete all forms of land & marine survey projects. Our teams are
also able to cope professionally with all sorts of scales of projects, should they be
small .projects or mega projects
Teams from our branches (Saudi Arabia) have a very healthy and Knowledgeable relation
with ACES-UAE and ACES-QATAR branches surveying department, that by which we
achieve maximum experience potential and coordination, which results in very qualitative
results

The offered services include:


 Topographical survey.
 Corridor alignments and profiling.
 Establishing survey control network.
 Underground Utility Detect ion.
 Radio detection Methods.
 Ground Penetrating Radar Methods.

Withdrawn
 Hydrographic Surveys
Side scan sonar.
Sub bottom Profiling.
Management survey.
Tide gauge.
 Bathymetric Surveys.
• Single beam echo sounder.
• Multi beam echo sounder.
 Precise Leveling.
 Settlement Monitoring.
 Earthwork Volume Calculation.
 As-Built surveys.
 Construction Survey.
 CAD solution.
 Setting Out.
 Survey Consultancy.

Tabuk Company Profile - 2022 27


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 32 of 82
Partners for Quality Construction

Facilities
Surveying Services Facilities & Equipment's (Cont’d...)

Dual Frequency, Geodetic, Real Time


Kinematic, Radio/GSM Modern and
Automatic Data Logger.

226 Universal Channel Vanguard


Global Positioning System
Technology™ Track every satellite
(GPS)
constellation above today and
Leica GS 10-14-15-16 tomorrow. Single scrubbing Fence
ICON Antenna® to provide ultimate signal
Topcon Hiper V
lock Highest accuracy positioning for
RTK, network, and more Multiple
communication configurations for your
multiple project scenarios

Total Stations High Accuracy, Wide Range Onboard


Leica TC 407 Software and Large Internal Memory
Lieca TS06 and coded data.
Topcon OS101

MOBILE MAPPING:
Withdrawn
Mobile mapping is the process of geographical data collection using a mobile vehicle, this system is
composed of a synchronized group of topographical and photographical devices completed with remote
sensing technology which work in compatibility in order to form and create high quality point-maps.

Speedy topographical surveying


Accuracy in all areas that may be hard to reach with GPS systems
Quality Control and Data Archiving
All data documented with relative dates and pictures
The ability to form three Dimensional maps
Huge amount of relative and required information

The formation of High Quality and Accurate data bases

Tabuk Company Profile - 2022 28


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 33 of 82
Partners for Quality Construction

Facilities
Surveying Services Facilities & Equipment's (Cont’d...)

3D LASER SCANNING

3D Laser Scanning is a non-contact, non-destructive technology


that digitally captures the shape of physical objects using a line of
laser light. 3D laser scanners create “point clouds” of data from
the surface of an object. In other words, 3D laser scanning is a way
to capture a physical object’s exact size and shape into the com-
puter world as a digital 3-dimensional representation.

GLOBAL POSITIONING SYSTEM (GPS):

Global Positioning System (GPS) technology is a space-based radio-navigation system that provides users
worldwide with valuable information including three-dimensional position, navigation, velocity and time
data.

Withdrawn
 Static GPS Baseline

 Real Time Kinematic (RTK) Observations

 Continuously Operating Reference Stations (CORS)

 Fast and Easy Survey

 GPS technology provides highly accurate information, including digital maps of land and
infrastructure, such as highways.

Tabuk Company Profile - 2022 29


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 34 of 82
Partners for Quality Construction

Facilities
Surveying Services Facilities & Equipment's (Cont’d...)

TOTAL STATION

A total station or TST (total station theodolite) is an electronic/optical instrument used


for surveying and building construction, and topographical survey.

 Field work is carried out very fast.

 Accuracy of measurement is high.

 Manual errors involved in reading and recording are eliminated.

 Calculation of coordinates is very fast and accurate. Even corrections for temperature and pressure
are automatically made.

 The instrument is capable of adjusting itself to the level position.

LEVELLING

Withdrawn
Levelling is the measurement of geodetic height using an optical levelling instrument and a level staff
or rod having a numbered scale. Common levelling instruments include the spirit level, the dumpy
level, the digital level, and the laser level.

Digital Level Auto Level

Tabuk Company Profile - 2022 30


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 35 of 82
Partners for Quality Construction

Facilities
ACES Experience in Airports Inspection and Some of the Pavement
Evaluation Projects in the Region

 Pavement Condition Evaluation of South Runway at


Queen Alia International Airport

 Pavement Evaluation of Dubai International Airport


South Runway, Associated Taxiways, Taxilinks,
Rapid Exits, Holding Bays and GSE Roads

 Withdrawn
Pavement Evaluation of Dubai International Airport
North Runway, Associated Taxilinks, Rapid Exits and
Holding Bays

 Pavement Evaluation of Al Maktoum International


Airport Runway, Associated Taxiways, Taxilinks,
Rapid Exits

Tabuk Company Profile - 2022 31


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 36 of 82
Partners for Quality Construction

Facilities
ACES Experience in Airports Inspection and Some of the Pavement
Evaluation Projects in the Region (Cont’d...)

 Pavement Condition Evaluation of Road Exten-


sion (Link Road between Emirates Road E611)

 Pavement Condition Evaluation RL200 Dubai


Tram Project

 Pavement Evaluation of Oman International


Airport

 Pavement Evaluation of Salalah International


Airport


Withdrawn
Structural Evaluation of the Roads in Riyadh
Metro Project – Lines 4, 5 and 6

 Asphalt Pavement Evaluation for Northern


Ring Road Underpass - Al Olaya Street- Riyadh,
KSA

 Structural Pavement Evaluation of North Run-


way at Queen Alia International Airport

 Asphalt Pavement Evaluation for Northern


Ring Road Underpass - Al Olaya Street- Riyadh,
KSA

 Asphalt Pavement Evaluation for Saudi Driving


School Princess Nora Bent Abdullrahman
University - Riyadh-KSA

 Asphalt Evaluation Study at Sabr Bridge


Crossing Dhahran, KSA

Tabuk Company Profile - 2022 32


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 37 of 82
Partners for Quality Construction

Major Projects
3.0 List of Selected Projects
3.1 Tabuk Projects

ARAB COMPANY FOR LABORATORIES AND SOIL - TABUK – KSA


Selected Materials and Quality Control Projects
NO. Project Title CLIENT
1 NSP WTS - Haqil Al-Rashed Trading & Contracting Co. Ltd.
2 NSP WTS - Duba Al-Rashed Trading & Contracting Co. Ltd.
3 NPISPA - Al Wajh Middle East Tasks Co. Ltd. (METCO)
4 CH-47 Bed Down Facilities OCC Weavers Ltd.
5 Triple Bay Project Saudi Bauer Foundation Contractors Ltd.
6 Sharma Batching Plant - NEOM Abdullah Abdin AL Bukhari Factory For Industry
7 Private BADER AWAD MOHAREB
8 Site Crusher No.1 Keller Turki Co. Ltd.
9 Privet BEEAH PLANNERS ARCHITECTS ENGINEERS
Asala Al Khaleej Real Estate Development and Investment
10 Private
Company
11 NEOM Project Fields Modern Solutions Co
12 Private TAASEES ALMODON CONRTACTING COMPANY Ltd

Withdrawn
Isam Kabbani and Partners for Construction and Maintenance
13 Al Durra Port Bridge
Co
Dredging work for the marina basin and Navigation
14 Rawabi Specialized Contracting Co
channel - NEOM - Sindalah Island
15 NEOM Project MADAF Trading & Contracting Co, Ltd.
Consortium of Advanced Water Technology,Rawafid Industri-
16 S.W.C.C
al,Sete Energy and Al Fatah International
17 NEOM Project Al Babtain LeBLANC Telecommunication Systems Ltd
18 Spectrum Monitoring Station Project ALMOWATIN INTERNATIONAL CORP.
19 Highway 8784 Upgrade Work (100201-WO-29) Rawabi Specialized Contracting Co
20 NEOM Truck Station MOBCO For Civil Construction
21 Asphalt Mix design ( Super Pave ) Mofarreh Marzouq Al Harbi & Partners Co. Ltd.
22 MOBCO DUBA, Design office and fire fighting work MOBCO For Civil Construction
Quality Control of SRM Batching Plant - Duba
23 SAUDI READYMIX
Amaala Airport
Site preparation framework - spine grading coastal
24 MOBCO For Civil Construction
region
25 Temporary Site Protection Barriers - WO-036 Mofarreh Marzouq Al Harbi & Partners Co. Ltd.
26 Green Land Project United Durra General Contracting Est.
Spine Project Shibh Al Jazira Contracting Co.
27 AMAALA Airport SAUDI READYMIX
Site Pteraratory Work of AL Bada Reservoir and Day
Mofarreh Marzouq Al Harbi & Partners Co. Ltd.
Tank - WO-039
28 NEOM Project - Sharma Batching Plant Saudi Engineering Company Khatib & Alami (SCEC-K & A)
29 Anwar Alqadesiah 518 Saleem Dhaifallah Alhwaity
30 Tabuk Batching Plant Abdullah Abdin AL Bukhari Factory For Industry

31 Construction of Al Buhairah 380/132/13.8 kv BSP. Solaiman Bin Saleh Al-Mohaleb & Sons Holding Company.

Tabuk Company Profile - 2022 33


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 38 of 82
Partners for Quality Construction

Major Projects
Materials Technology and Quality Control Projects (Cont’d...)

ARAB COMPANY FOR LABORATORIES AND SOIL - TABUK – KSA


Selected Materials and Quality Control Projects
NO. Project Title CLIENT
32 NEOM - Site Preparation FW3 - WO-02 Al Yamama Company for Trading and Contracting
33 NEOM Project - Sharma Laydown Area Saudi Engineering Company Khatib & Alami (SCEC-K & A)

34 Site Investigation According to Tabuk Court Letter Mohammad Naser Albalawi

35 Private Yasser Mohammed Ibrahim Alshari


Traffic Diversion at Sharma Truck Filling Station &
36 SAUDI PAN KINGDOM COMPANY - SAPAC
PERMANENT WATER SUPPLY TO 12 NEOM
37 Oxagon Port Terminal 2 Phase 2 - WO-05 Al Yamama Company for Trading and Contracting
Neom Spine Infarstructure - Tunnel Access & Portal
38 China Railway Construction Corporation Sadui limited
and Adit Formation
39 Access Platform Formation for Adit 3N - WO # 37 Mofarreh Marzouq Al Harbi & Partners Co. Ltd.
40 Jabal Al Lawz Project - NEOM AlKifah Readymix & Blocks
41 Private Advanced Communications and Electronics Systems Co
42 NEOM Mountain Road Nesma and Partner Contracting Co. LTD.
43 Asphalt Batch Plant Saudi Al-Terais Co.
44 NEOM Meeting Rooms & Multi-Purpose Hall Beijing Emirates International Construction Company

Withdrawn
45 Jossor Al-Mostaqbal Factory Jossor Al-Mostaqbal Ready Mix Concrete Factory
46 Green Concrete Green Concrete
47 Concrete Batch Plant Al Imtiyaz Al wataniya Contracting Company
48 NSP WTS - Al Wajh Al-Rashed Trading & Contracting Co. Ltd.
49 NPISPA - Tabuk Middle East Tasks Co. Ltd. (METCO)
50 Material Testing in Al Ula & Amaala Tabuk Modern Contracting Company
51 RSLFAC 3 Bases Expansion Project EG&G Middle EAST COMPANY
52 AMAALA Airport Project Rawabi Butec Ltd. Co.
53 NEOM Landfill Sites CIT Group
54 Privat villa Ahmed Ayesh Al-Balawi
55 Privet Solaiman Bin Saleh Al-Mohaleb & Sons Holding Company.
Isam Kabbani and Partners for Construction and Maintenance
56 AMAALA Airport Project
Co
57 U.S Army Project OCC Weavers Ltd.
58 Basateen Tabuk Housing Project SHAMAEL AL-KHALEEJ CO. FOR CONT
59 Golf Course Construction - Sindalah Island Nesma United Industries Co. Ltd.
60 Tabuk Project Contrack Watts
61 New Grain Silos Project Haif Company
62 AL Rajhi Bank Seedaq Company Est.
63 Sharma Site Landfill Desert Fence Company Ltd (DEFCO)
64 NEOM Data Center Horizons Contracting Co.
65 Anwar Al Qadesiah 881 Fahad Ali Al Motairy
66 OTHAIM MALL SAUDI PILLAR CONTRACTING CO
Neom Temporary Roads work order #29 HW 8784
67 Mofarreh Marzouq Al Harbi & Partners Co. Ltd.
Upgrade Works
68 Private Ali Mohammed Al Sheikh Contracting Est

Tabuk Company Profile - 2022 34


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 39 of 82
Partners for Quality Construction

Major Projects
Materials Technology and Quality Control Projects (Cont’d...)

ARAB COMPANY FOR LABORATORIES AND SOIL - TABUK – KSA


Selected Materials and Quality Control Projects
NO. Project Title CLIENT
69 University Hospital AL TAAFUF COMPANY FOR ELECTRICAL WORK
NEOM- Quay Wall, Marina Rock Lining and Electrical
70 Mena'a Al Gharb Est
& Mechanical Systems
71 Gas Station AlSawadi Trading, Contracting and Design
72 Comatec Alrashed COMATEC Saudi Arabia Limited
73 Al-Ayuni Investment & contracting Co. Al-Ayuni Investment & contracting Co.
74 NEOM Project Shapoorji Pallonji Mideast L.L.C
Orchards Desert Base Camp Enabling Works - WO-
75 Mofarreh Marzouq Al Harbi & Partners Co. Ltd.
041
Enabling Works Contract (Remeasurement) Relat-
76 Mofarreh Marzouq Al Harbi & Partners Co. Ltd.
ing to Tabuk Development.
77 Private Abdullah Abdin AL Bukhari Factory For Industry
78 Anwar Alqadesiah - Private MOHAMMED SALEH ALBALAWI

79 Golf Course Construction - Sindalah Island JABAL CONSTRUCTION GENERAL CONTRACTING COMPANY

Withdrawn
NEOM- Quay Wall, Marina Rock Lining and Electrical
80 Rawabi Specialized Contracting Co
& Mechanical Systems
81 Private JV DOUBLE MARKS AL MAIMOUNI CO
MASS Grading Works for GOA South and Magna
82 Mofarreh Marzouq Al Harbi & Partners Co. Ltd.
Camp Construction - WO-038
83 Water Transmission Systems - NEOM Almabani General Contractors Co.
84 Private Kasktas Arabia Company Ltd.
85 Sindalah Island Backbone Infrastructure Nesma and Partner Contracting Co. LTD.
MOHAMMED ABDULRAHMAN FARHAT CO. FOR CONTRACT-
86 D & B Temporary Sound Stage (2) Round
ING (FMC).
87 NEOM - Site Preparation FW3 - WO-03 Al Yamama Company for Trading and Contracting
88 Al Tawi Factory Sharma - NEOM Al Tawi Ready Mix Concrete Factory
89 NEOM - Media Tatweer AL Sahel Contracting Co.
90 NEOM - Site Preparation FW3 - WO-01 Al Yamama Company for Trading and Contracting
91 NEOM - Site Preparation FW3 - WO-04 Al Yamama Company for Trading and Contracting
92 Haql - Zetah Batch Plant SAUDI PAN KINGDOM COMPANY - SAPAC
93 Sharma - Asphalt Batch Plant SAUDI PAN KINGDOM COMPANY - SAPAC
94 NEOM/RM99 SAUDI READYMIX
95 NEOM Project Awad BinZafrah Contracting.
96 PERMANENT WATER SUPPLY TO 12 NEOM SAUDI PAN KINGDOM COMPANY - SAPAC

Tabuk Company Profile - 2022 35


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 40 of 82
Partners for Quality Construction

4.0 Appendices (TABUK BRANCH)

Appendix
4.1 Appendix A.1:
Accreditation Licenses
Withdrawn
(Tabuk Branch)

Tabuk Company Profile - 2022 36


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 41 of 82
Partners for Quality Construction

Appendix
4.1 Appendix A.1: Accreditation Certificates & Licenses (Tabuk Branch)

Withdrawn

Tabuk Company Profile - 2022 37


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 42 of 82
Partners for Quality Construction

Appendix
4.1 Appendix A.1: Accreditation Certificates & Licenses (Tabuk Branch)

Withdrawn

Tabuk Company Profile - 2022 38


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 43 of 82
Partners for Quality Construction

4.1 Appendix A.1: Accreditation Certificates & Licenses (Tabuk Branch)

Appendix
Withdrawn

Tabuk Company Profile - 2022 39


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 44 of 82
Partners for Quality Construction

4.1 Appendix A.1: Accreditation Certificates & Licenses (Tabuk Branch)

Appendix
Withdrawn

Tabuk Company Profile - 2022 40


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 45 of 82
Partners for Quality Construction

4.1 Appendix A.1: Accreditation Certificates & Licenses


(Western Region Including Tabuk Branch)

Appendix
Withdrawn

Tabuk Company Profile - 2022 41


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 46 of 82
Partners for Quality Construction

4.1 Appendix A.1: Accreditation Certificates & Licenses


(Western Region Including Tabuk Branch)

Appendix
Withdrawn

Tabuk Company Profile - 2022 42


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 47 of 82
Partners for Quality Construction

4.1 Appendix A.1: Accreditation Certificates & Licenses


(Western Region Including Tabuk Branch)

Appendix
Withdrawn

Tabuk Company Profile - 2022 43


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 48 of 82
Partners for Quality Construction

4.1 Appendix A.1: Accreditation Certificates & Licenses


(Western Region Including Tabuk Branch)

Appendix
Withdrawn

Tabuk Company Profile - 2022 44


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 49 of 82
Partners for Quality Construction

4.1 Appendix A.1: Accreditation Certificates & Licenses


(Western Region Including Tabuk Branch)

Appendix
Withdrawn

Tabuk Company Profile - 2022 45


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 50 of 82
Partners for Quality Construction

4.0 Appendices (Western Region)

Appendix
4.1 Appendix A.2:
Accreditation Certificates & Licenses
Withdrawn
(Western Region)

Tabuk Company Profile - 2022 46


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 51 of 82
Partners for Quality Construction

4.0 Appendices (Western Region)

Appendix
4.1 Appendix A.2: Accreditation Certificates & Licenses (Western Region)

Withdrawn

Tabuk Company Profile - 2022 47


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 52 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 48


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 53 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 49


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 54 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 50


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 55 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 51


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 56 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 52


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 57 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 53


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 58 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 54


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 59 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 55


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 60 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 56


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 61 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 57


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 62 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 58


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 63 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 59


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 64 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 60


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 65 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 61


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 66 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 62


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 67 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 63


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 68 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 64


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 69 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 65


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 70 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 66


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 71 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 67


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 72 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 68


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 73 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 69


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 74 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 70


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 75 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 71


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 76 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 72


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 77 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 73


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 78 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 74


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 79 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 75


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 80 of 82
Partners for Quality Construction

Appendix
Withdrawn

Tabuk Company Profile - 2022 76


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 81 of 82
Partners for Quality Construction

4.2 Appendix B: ACES Tabuk- Location Map

Appendix
Scan below QR Code

Withdrawn
Building No. 2571, Mohammad Bin Al-Khateeb
Street, Ghurnatah Dist., P.O. Box 47716,
Kingdom of Saudi Arabia

Tabuk Company Profile - 2022 77


Doc No. 01-000000-1100001344-CIV-PQD-000002 Rev 02 Page 82 of 82

You might also like