Professional Documents
Culture Documents
Aknan JSA For Tank 1
Aknan JSA For Tank 1
1
MA’ADEN GOLD AND BASE METALS
Version number: 1
Job/Task Title Change floor of CIL Tank # 1 Assessment Date 26 July 2023
Change floor of CIL Tank # 1 JSA L1 ☐ JSA L2 ☐
Job/Task Description
Risk
Job Steps Hazards Controls Risk Rating
Rating
Entry to Tank Oxygen deficiency and Toxic gases Ensure all entrants received confined
space entry training
H Isolate, close and locked all pipes L
entering in CIL Tank # 1.
Continuous monitoring of toxic gases.
Ensure the confined space work permit
before entering inside the tank.
Appoint stand by person at entrance.
Rescue plan implemented.
Informed ERT
Shifting of material inside the tank by Equipment failure during lifting Ensure the critical lifting plan in place.
crane Do the inspection of equipment before L
M
starting the lifting.
Any defective equipment shall be
removed from the site.
Ensure competent person perform lifting
operation.
Ensure certified equipment used for
lifting operation.
Collapse of crane due its insufficient Ensure the ground stability at set up are
stability. adequate for load. L
M
Provide sufficient support (timber, steel
sheet) as required.
Load Swing due to high wind H Stop the lifting activity if the wind speed
is more than 32 KMPH. L
Use tag line to control the swing of the
load.
Fire hazard from oil fuel leak or spark H Maintain Equipment in good condition
from loose electrical cable and ensure preventative maintenance on L
regular basis.
Daily inspection checklist must be filled
up and ensure it is free from defect.
Fire extinguishers shall be provided with
each equipment.
Document Number: MGBM-EHSS-02-F-11.1
Picture 4 ...
MA’ADEN GOLD AND BASE METALS
Version number: 1
Grinding (cutting the plate by LPG ) The cylinders may fall off the cart Never transport a cylinder, even across a
while transporting. M room, without the metal cap over the L
valve.
Secure the cylinder carrier trolley with a
chain or strap.
Use a hand trolley to transport cylinders.
Gas cylinders may fall over Restrain the gas cylinder with upper and
M lower chains to cylinder stand. L
Gas can leak from open valves Close the valve before taking off the
M regulator. L
Document Number: MGBM-EHSS-02-F-11.1
Picture 4 ...
MA’ADEN GOLD AND BASE METALS
Version number: 1
Warm areas or direct sunlight may Select a cool, dry and well-ventilated
cause pressure increases M area to store cylinders. L
The regulator may misread pressure Check the regulator for the correct
M pressure and set if necessary. L
The cylinder may leak slightly The solution around the tightened valve
M regulator junction to check for leaks. If L
there is no bubbling, then seal is good.
Welding Damaging of eyes and hands Ensure the welding of black glass and
M leather gloves.
L
Grinding (cutting of plate) and welding. Fire Ensure flash back arrestor are installed
Document Number: MGBM-EHSS-02-F-11.1
Picture 4 ...
MA’ADEN GOLD AND BASE METALS
Version number: 1
To be signed off when all actions are agreed upon and all hazards have been addressed
Level Name Signature Date
Supervisor Jose Marvin Hamor
Comments
Department Manager
Comments
HSE
Comments
General Manager
Comments