Professional Documents
Culture Documents
B130279001P08
B130279001P08
NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:
115KV BUS 2B
115KV BUS 1B
K608 K609
1. GROUND AND TEST DEVICES SHALL BE PROVIDED
A611 A612 A613 A614 FOR EACH SWITCHGEAR LINEUP.
D621 D622 D623 D624 D625 D626 D627 D628 2. BUS DUCT RATING SHOWN IS BASED ON 58^C
( AMBIENT PLUS SOLAR EXPOSURE AND SPACE
T-601 HEATING)
115-13.8KV HAW. BSP SUBSTATION
3. SEC-ER 1998 115kV FAULT LEVELS AT HAWIYAH
A301 LINE A LINE B GOSP-2 BASED ON DOUBLE CIRCUIT ARE-
HARADH
VILLAGE MAX 3-PH - 11.5kA (X/R=11.1)
J601 D601
MIN 3-PH - 2.6kA (X/R=9.5)
MAX 1-PH TO GND-7.2kA (X/R=5.0)
TO HARADH GOSP-1 T601 TO HARADH GOSP-1 T603
D621 D622 MIN 1-PH TO GND-1.6kA (X/R=5.3)
T301
4. VARIABLE FREQUENCY CONVERTOR UNIT, INCLUDING
D624 D625 POWER TRANSFORMER.
(LOCATED NEAR HRD. GOSP-1)
D602 D604
1200A 1200A
J601/J602/J603
J604/J605/J606
TYPICAL FOR ALL GOSP VOLTAGE XFRS
115 115 115
VOLTAGE XFRS
kV V V 115 115 115
3 3 3 kV V V REFERENCE DRAWINGS FILE No.
3 3 3
H13-SA-607/608/609 H13-SA-610/611/612 MAIN SUBSTATION LAYOUT BA-130538 BA130538.001
3000A
LEGEND
1000MVA BUS B
13.8kV, 3000A, 3PH, 3W, 60Hz, 1000MVA, BUS A
POWER TRANSFORMER
NO
B303
P.T. OR C.P.T. UNIT
B305
B304
B322
B308
B309
B307
B311
B321
B310
B312
B306
B316
B315
B317
B313
B314
1200A
B320
1200A 1200A 1200A 1200A 1200A 1200A 1200A 1200A 1200A 1200A
B318
B319
1200A 1200A 1200A 1200A 1200A 1200A
1000MVA 1000MVA 1000MVA 1000MVA 1000MVA 1000MVA 1000MVA 1000MVA 1000MVA 1000MVA 1000MVA 1000MVA FUSE (NON-DISCONNECTABLE)
1000MVA 1000MVA 1000MVA 1000MVA 1000MVA
DISCONNECT SWITCH
SPACE SPARE SPACE
H14-XFR(T)-304
T302
100 MOTOR WITH INDICATED H.P. RATING
1MVA, OA 65^C H14-XFR
13.8kV 2x2, (T)-305
2010 7370 7370 5%/480V TRANSFORMER NEUTRAL
D-3369
1000
J302 J304 Z=4.75% GROUNDING RESISTOR
kVA
H13-KM-002 H13-KM-001A H13-KM-001B
LPPT COMP HPPT COMP HPPT COMP CONTACTOR OR STARTER
H14-G-4001
INJ PUMP
H14-XFR(T)-301
T302A 1000 1000 1000
1MVA, OA 65^C T302B
4MVA-Dy5/Dd0 kVA kVA kVA
13.8kV+-2x2.5%/480V 4MVA-Dy5/Dd0
1 MVA
Z=4.75% 13.8kV+
-2x2,5%/ 13.8kV+
CATHODIC -2x2,5%/ H14-G-3001
2,2kV-2,2kV H14-G-2001 H14-G-5001
2,2kV-2,2kV
PROTECTION INJ PUMP INJ. PUMP INJ. PUMP
T301
DWG
BA280424.001
2.5/3.125MVA
OA/FA 65^C
1000 NOTE 12 REVISION VALIDATION
NOTE 12 13.8kV+2x2.5%/
kVA -
480V T302 THIS REVISION NO. 08 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
A B A B A B REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
H14-G-1001 Z=8% 2.5/3.125MVA
OA/FA 65^C 18P004-005
INJ PUMP
DWG
BA130384.001 13.8kV+
-2x2.5%/480V AFD SYSTEM DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
AFD SYSTEM Z=8% (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
OA/FA 65^C OA/FA 65^C kVA kVA kVA ELECTRICAL ONE LINE DIAGRAM
(N.O.) E1L
13.8kV+-2x2.5%/4.16kV 13.8kV+-2x2.5%/4.16kV
B-306 H13-GR(Y)-201 H13-GR(Y)-202 MAINTENANCE BLDG H13-XFR(T)-304 H16-XFR(T)-307
Z=5.5% Z=5.5% 115-13.8KV
400A,10SEC 400A,10SEC H13-MCC-004 COMMUNICATION OPERATION
B-306 HARADH GOSP-2 GAS GATHERING
DWG BA135598.001 BUILDING , SUPPORT BUILDING
GOVERNMENT SECURITY
HAW.3
HARADH SAUDI ARABIA
FACILITY.
13.2KV BUS CONTINUED ON CONTINUED ON PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
13.2KV BUS
47
BA130279.002
DWG BA130279.002
DWG