Cost Center - all -

Data
Equipment MaintItem text Plan for FY-23~24 Completed FY-23~24
4013327 CBM schedule of COOLING TOWER PUMP-H- 12 4
4013328 CBM schedule of C. TOWER PUMP-H-2 (S/B) 12 4
4027042 CBM schedule of COOLING TOWER PUMP -C 12 4
4027043 CBM schedule of COOLING TOWER PUMP -C 12 4
4027044 CBM schedule of PROCESS PUMP NO. - 1 12 4
4027045 CBM schedule of PROCESS PUMP NO. - 2 12 4
4027046 CBM schedule of PROCESS PUMP NO. - 3 12 4
4027047 CBM schedule of PROCESS PUMP NO. - 4 12 4
4027048 CBM schedule of CT PUMP NO. - 1 12 4
4027049 CBM schedule of CT PUMP NO. - 2 12 4
4027050 CBM schedule of CT PUMP NO. - 3 12 4
Department Equipment Type MaintItem text Equipment Planned date

CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Apr-23
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Apr-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Apr-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Apr-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Apr-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Apr-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Apr-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Apr-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Apr-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Apr-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Apr-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-May-23
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-May-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-May-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-May-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-May-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-May-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-May-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-May-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-May-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-May-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-May-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Jun-23
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Jun-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Jun-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Jun-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Jun-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Jun-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Jun-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Jun-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Jun-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Jun-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Jun-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Jul-23
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Jul-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Jul-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Jul-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Jul-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Jul-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Jul-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Jul-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Jul-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Jul-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Jul-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Aug-23
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Aug-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Aug-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Aug-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Aug-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Aug-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Aug-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Aug-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Aug-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Aug-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Aug-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Sep-23
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Sep-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Sep-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Sep-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Sep-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Sep-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Sep-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Sep-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Sep-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Sep-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Sep-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Oct-23
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Oct-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Oct-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Oct-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Oct-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Oct-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Oct-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Oct-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Oct-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Oct-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Oct-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Nov-23
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Nov-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Nov-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Nov-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Nov-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Nov-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Nov-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Nov-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Nov-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Nov-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Nov-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Dec-23
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Dec-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Dec-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Dec-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Dec-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Dec-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Dec-23
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Dec-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Dec-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Dec-23
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Dec-23
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Jan-24
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Jan-24
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Jan-24
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Jan-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Jan-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Jan-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Jan-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Jan-24
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Jan-24
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Jan-24
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Jan-24
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Feb-24
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Feb-24
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Feb-24
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Feb-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Feb-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Feb-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Feb-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Feb-24
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Feb-24
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Feb-24
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Feb-24
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP-H-1 4013327 14-Mar-24
CBM Cooling Tower CBM schedule of C. TOWER PUMP-H-2 (S/B) 4013328 14-Mar-24
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -1 4027042 14-Mar-24
CBM Cooling Tower CBM schedule of COOLING TOWER PUMP -C -2 4027043 14-Mar-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 1 4027044 14-Mar-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 2 4027045 14-Mar-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 3 4027046 14-Mar-24
CBM Cooling Tower CBM schedule of PROCESS PUMP NO. - 4 4027047 14-Mar-24
CBM Cooling Tower CBM schedule of CT PUMP NO. - 1 4027048 14-Mar-24
CBM Cooling Tower CBM schedule of CT PUMP NO. - 2 4027049 14-Mar-24
CBM Cooling Tower CBM schedule of CT PUMP NO. - 3 4027050 14-Mar-24
MaintenancePla Completion
Order Main WorkCtr n date Cost Center

90123938 CBM_2015 40030948 08-Jul-23 LP Fab


90123939 CBM_2015 40030949 08-Jul-23 LP Fab
90123936 CBM_2015 40030946 08-Jul-23 LP Fab
90123937 CBM_2015 40030947 08-Jul-23 LP Fab
90123940 CBM_2015 40030950 08-Jul-23 Prima
90123941 CBM_2015 40030951 08-Jul-23 Prima
90123942 CBM_2015 40030952 08-Jul-23 Prima
90123943 CBM_2015 40030953 08-Jul-23 Prima
90123944 CBM_2015 40030954 08-Jul-23 Prima
90123945 CBM_2015 40030955 08-Jul-23 Prima
90123946 CBM_2015 40030956 08-Jul-23 Prima
90130392 CBM_2015 40030948 08-Jul-23 LP Fab
90130393 CBM_2015 40030949 08-Jul-23 LP Fab
90130390 CBM_2015 40030946 08-Jul-23 LP Fab
90130391 CBM_2015 40030947 08-Jul-23 LP Fab
90130394 CBM_2015 40030950 08-Jul-23 Prima
90130395 CBM_2015 40030951 08-Jul-23 Prima
90130396 CBM_2015 40030952 08-Jul-23 Prima
90130397 CBM_2015 40030953 08-Jul-23 Prima
90130398 CBM_2015 40030954 08-Jul-23 Prima
90130399 CBM_2015 40030955 08-Jul-23 Prima
90130400 CBM_2015 40030956 08-Jul-23 Prima
90136886 CBM_2015 40030948 08-Jul-23 LP Fab
90136887 CBM_2015 40030949 08-Jul-23 LP Fab
90136884 CBM_2015 40030946 08-Jul-23 LP Fab
90136885 CBM_2015 40030947 08-Jul-23 LP Fab
90136888 CBM_2015 40030950 08-Jul-23 Prima
90136889 CBM_2015 40030951 08-Jul-23 Prima
90136890 CBM_2015 40030952 08-Jul-23 Prima
90136891 CBM_2015 40030953 08-Jul-23 Prima
90136892 CBM_2015 40030954 08-Jul-23 Prima
90136893 CBM_2015 40030955 08-Jul-23 Prima
90136894 CBM_2015 40030956 08-Jul-23 Prima
90142918 CBM_2015 40030948 25-Jul-23 LP Fab
90142919 CBM_2015 40030949 25-Jul-23 LP Fab
90142916 CBM_2015 40030946 25-Jul-23 LP Fab
90142917 CBM_2015 40030947 25-Jul-23 LP Fab
90142920 CBM_2015 40030950 25-Jul-23 Prima
90142921 CBM_2015 40030951 25-Jul-23 Prima
90142922 CBM_2015 40030952 25-Jul-23 Prima
90142923 CBM_2015 40030953 25-Jul-23 Prima
90142924 CBM_2015 40030954 25-Jul-23 Prima
90142925 CBM_2015 40030955 25-Jul-23 Prima
90142926 CBM_2015 40030956 25-Jul-23 Prima
CBM_2015 40030948 LP Fab
CBM_2015 40030949 LP Fab
CBM_2015 40030946 LP Fab
CBM_2015 40030947 LP Fab
CBM_2015 40030950 Prima
CBM_2015 40030951 Prima
CBM_2015 40030952 Prima
CBM_2015 40030953 Prima
CBM_2015 40030954 Prima
CBM_2015 40030955 Prima
CBM_2015 40030956 Prima
CBM_2015 40030948 LP Fab
CBM_2015 40030949 LP Fab
CBM_2015 40030946 LP Fab
CBM_2015 40030947 LP Fab
CBM_2015 40030950 Prima
CBM_2015 40030951 Prima
CBM_2015 40030952 Prima
CBM_2015 40030953 Prima
CBM_2015 40030954 Prima
CBM_2015 40030955 Prima
CBM_2015 40030956 Prima
CBM_2015 40030948 LP Fab
CBM_2015 40030949 LP Fab
CBM_2015 40030946 LP Fab
CBM_2015 40030947 LP Fab
CBM_2015 40030950 Prima
CBM_2015 40030951 Prima
CBM_2015 40030952 Prima
CBM_2015 40030953 Prima
CBM_2015 40030954 Prima
CBM_2015 40030955 Prima
CBM_2015 40030956 Prima
CBM_2015 40030948 LP Fab
CBM_2015 40030949 LP Fab
CBM_2015 40030946 LP Fab
CBM_2015 40030947 LP Fab
CBM_2015 40030950 Prima
CBM_2015 40030951 Prima
CBM_2015 40030952 Prima
CBM_2015 40030953 Prima
CBM_2015 40030954 Prima
CBM_2015 40030955 Prima
CBM_2015 40030956 Prima
CBM_2015 40030948 LP Fab
CBM_2015 40030949 LP Fab
CBM_2015 40030946 LP Fab
CBM_2015 40030947 LP Fab
CBM_2015 40030950 Prima
CBM_2015 40030951 Prima
CBM_2015 40030952 Prima
CBM_2015 40030953 Prima
CBM_2015 40030954 Prima
CBM_2015 40030955 Prima
CBM_2015 40030956 Prima
CBM_2015 40030948 LP Fab
CBM_2015 40030949 LP Fab
CBM_2015 40030946 LP Fab
CBM_2015 40030947 LP Fab
CBM_2015 40030950 Prima
CBM_2015 40030951 Prima
CBM_2015 40030952 Prima
CBM_2015 40030953 Prima
CBM_2015 40030954 Prima
CBM_2015 40030955 Prima
CBM_2015 40030956 Prima
CBM_2015 40030948 LP Fab
CBM_2015 40030949 LP Fab
CBM_2015 40030946 LP Fab
CBM_2015 40030947 LP Fab
CBM_2015 40030950 Prima
CBM_2015 40030951 Prima
CBM_2015 40030952 Prima
CBM_2015 40030953 Prima
CBM_2015 40030954 Prima
CBM_2015 40030955 Prima
CBM_2015 40030956 Prima
CBM_2015 40030948 LP Fab
CBM_2015 40030949 LP Fab
CBM_2015 40030946 LP Fab
CBM_2015 40030947 LP Fab
CBM_2015 40030950 Prima
CBM_2015 40030951 Prima
CBM_2015 40030952 Prima
CBM_2015 40030953 Prima
CBM_2015 40030954 Prima
CBM_2015 40030955 Prima
CBM_2015 40030956 Prima