6163 3M Eva180f MTR Elec Stop
6163 3M Eva180f MTR Elec Stop
Revision # 0
Issue Date 2023-09-25
Next Revision Date TBD
PV-P-PRM-001-0 Page 1 of 4
Assigned Dept: 160 (PMES) PV area: 6163 Main Work Center: 10EB-TAD
Frequency: 3 MON Time to Complete: 2.5 hours Shutdown Required: YES
□ An open work permit Open Permit #:
This work is covered by:
□ A new work permit Permit Board #:
Acceptance:
I have reviewed the work permit and carried out the required risk assessment. I have received the
necessary training and have been deemed competent to accomplish safely and correctly the required
tasks associated with this work instruction.
Document Register
Register identification Type Location Retention period
Maintenance Planning Permanent.
Process Plant MWI Register Copy/filing cabinet Latest version is kept.
office
Permanent:
Livelink Electronic IT server All versions are kept.
Permanent
RCMCost Electronic IT server Latest version is kept
Revision History
Task Details
PV9-6163-EVA180F-MTR (MOTOR & MOTOR CONTROL COOL TOWER 6 SOLUTION)
Not Not
Task Description OK
OK Complete Observations
Realizar la prueba megger y el índice de polarización en los
motores Agitadores. Compruebe las conexiones a tierra
(cepillo de carbón si está instalado). Comprobar el □ □ □
funcionamiento del calentador del motor Prueba de la
resistencia de la insolación y corriente.
Maintenance Work Instruction Code: 6163 3M EVA180F ELEC RUN
Revision # 0
Issue Date 2023-01-19
Next Revision Date TBD
PV-P-PRM-001-0 Page 4 of 4