Download as pdf or txt
Download as pdf or txt
You are on page 1of 282

Draft

CONCEPT ROURKELA
COMPREHENSIVE
DEVELOPMENT PLAN 2031

TOWN AND COUNTRY PLANNING ORGANISATION


MINISTRY OF URBAN DEVELOPMENT
GOVERNMENT OF INDIA

ROURKELA DEVELOPMENT AUTHORITY


DIRECTORATE OF TOWN PLANNING
GOVERNMENT OF ODISHA

30th October, 2015


Town and Country Planning Organisation (TCPO), E- Block , Vikas Bhawan, I. P. Estate, New Delhi – 110002; Ph: 011-23379353 Fax: 23379197
Making Cities Smart and Sustainable
Draft
ROURKELA COMPREHENSIVE DEVELOPMENT PLAN, 2031

TOWN AND COUTNRY PLANNING ORGANISATION


MINISTRY OF URBAN DEVELOPMENT
GOVERNMENT OF INDIA

ROURKELA DEVELOPMENT AUTHORITY


DIRECTORATE OF TOWN PLANNING
GOVERNMENT OF ODISHA

30th October, 2015


CONTENTS

CHAPTER 1: INTRODUCTION
1.1 HISTORY

1.2 PLANNING AREA

1.3 VISION
1.3.1 BALANCED COMMUNITY DEVELOPMENT
1.3.2 COMMUNITY AND SERVICE ORIENTED TOWN
1.3.3 FULFILLMENT OF COMMUNITY GOALS

1.4 CHALLENGES
1.4.1 BALANCING DEVELOPMENT
1.4.2 UNITING COMMUNITY MEMBERS
1.4.3 PROVIDING COMMUNITY SERVICES

1.5 COMPREHENSIVE DEVELOPMENT PLAN FOR ROURKELA

1.6 THE PROCESS OF COMPREHENSIVE DEVELOPMENT PLAN FOR ROURKELA

1.7 DEVELOPMENT CONCEPT FOR PREPARATION OF ROURKELA CDP


1.7.1 DATA AND MAPPING ASSESSMENT
1.7.2 PRIMARY DATA SURVEY
1.7.3 MAPPING
1.7.4 OUTREACH, VISIONING AND COMMUNITY ASSESSMENT
1.7.5 COMPREHENSIVE DEVELOPMENT PLAN PREPARTATION

1.8 GOALS OF COMPREHENSIVE DEVELOPMENT PLAN

i. Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
CONTENTS

1.9 OBJECTIVES

1.10 APPROACH

CHAPTER 2: REGIONAL CONTEXT


Figure 2.2: Regional Linkages of RPA
2.1 REGIONAL SETTING
2.1.1 LOCATION AND LINKAGES
2.1.2 CLIMATE
2.1.3 PHYSIOGRAPHY
2.1.4 GEOLOGY
2.1.5 SOIL
2.1.6 LAND UTILISATION
RPA
2.1.7 VISUAL APPRAISAL

2.2 LOOKING BACK


2.2.1 INDUSTRIAL TOWNSHIP

2.3 RIVER AND RAW MATERIAL INFLUENCE IN DEVELOPMENT

2.4 POPULATION GROWTH

2.5 MAJOR POLICY DECISIONS

2.6 PLANNING SYNTHESIS

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. ii
CONTENTS

2.6.1 STATE AND LOCAL GOVERNMENT ADMINISTRATIVE STRUCTURE RELATED TO URBAN PLANNING AND
DEVELOPMENT

CHAPTER 3: EXISTING CONDITION ANALYSIS

3.1 DEMOGRAPHIC CHARACTERISTICS


3.1.1 GROWTH AND DISTRIBUTION OF POPULATION
3.1.2 AGE COMPOSITION
3.1.3 SEX RATIO
3.1.4 LITERACY RATE
ure 3.4:
3.1.5 HOUSEHOLD SIZE

3.2 ECONOMIC CHARACTERISTICS


3.2.1 WORKER FORCE PARTICIPATION RATE (WFPR)
3.2.2 SECTOR WISE DISTRIBUTION OF WORKERS
3.2.3 HUMAN DEVELOPMENT INDEX
3.2.4 GENDER DEVELOPMENT INDEX
3.2.5 ISSUES
3.2.6 OCCUPATION STRUCTURE

3.3 HOUSEHOLD SURVEY RESULTS


3.3.2 DEPENDENCY RATIO
3.3.2 ISSUES
3.3.3 VARIATIONS IN POPULATION DENSITY
3.3.4 WOMEN ILLITERACY

i. Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
CONTENTS

3.4 EXISTING LAND USE AND DEVELOPMENT IN ROURKELA TOWN


3.4.1 PAST PLANNING EFFORTS
3.4.2 EXISTING LAND‐USE
3.4.3 RESIDENTIAL USES
3.4.4 MAJOR SOCIO‐ECONOMIC CHARACTERISTICS
3.4.5 HOUSING MOBILITY
3.4.6 PRIVATE HOUSING
3.4.7 HOUSING AND NEIGHBOURHOODS
3.4.8 EXISTING HOUSING TYPOLOGIES
3.4.9 SLUMS
3.4.10 SNAPSHOT OF PRESENT HOUSING CONDITION
3.4.11 HOUSING STOCK AND SHORTAGE CALCULATIONS
3.4.12 CONCLUSION AND ISSUES

3.5 COMMERCIAL USES


3.5.1 INFORMAL SECTOR

3.6 INDUSTRIAL USES

3.7 PUBLIC AND SEMI PUBLIC USES


3.7.1 RELIGIOUS USES

3.8 RECREATIONAL AND GREENS USES

3.9 INFRASTRUCTURE DEVELOPMENT


3.9.1 WATER SUPPLY
3.9.2 POWER SUPPLY
3.9.3 TRANSPORTATION

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. iv
CONTENTS

3.9.4 TELECOMMUNICATION
3.9.5 POST AND TELEGRAPH

3.10 LAND VALUE ANALYSIS


3.10.1 RESIDENTIAL LAND USE
3.10.2 AGRICULTURE LAND USE

3.11 SWOT ANALYSIS


3.11.1 STRENGTH
3.11.2 WEAKNESS
3.11.3 OPPORTUNITY
3.11.4 THREAT

CHAPTER 4: SYNTHESIS AND HOLDING CAPACITY SCENARIOS

4.1 FUTURE ASSUMPTIONS OF ROURKELA


4.1.1 ROLE WILL CONTINUE
4.1.2 GROWTH INFLUENCED BY REGIONAL TRENDS
4.1.3 POPULATION PROJECTION
4.1.4 WORKFORCE PROJECTION
4.1.5 TRIBAL POPULATION

4.2 UNDERSTANDING GROWTH


4.2.1 SUSCEPTIBILITY TO CHANGE ANALYSIS
4.2.2 POPULATION HOLDING CAPACITY AND ALTERNATIVE GROWTH SCENARIOS

4.3 CONCEPT OF ROURKELA COMPREHENSIVE DEVELOPMENT PLAN

i. Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
CONTENTS
4.3.1 WATERSHED APPROACH FOR COMPREHENSIVE DEVELOPMENT PLANNING FOR ROURKELA PLANNING AREA
4.3.2 STRATEGIES FOR URBAN FLOOD MANAGEMENT
4.3.3 FLOOD MANAGEMENT MEASURES

CHAPTER 5: ROURKELA CDP PROPOSALS

5.1 THE LAND USE PLAN


5.1.1 LAND‐USE PROPOSED ON SUSTAINABILITY GOALS
5.1.2 LAND‐USE GOALS
5.1.3 LAND‐USE DEGREE OF COMPATIBILITY
5.1.4 DESIGN WITHIN ELEMENTS OF A COMPREHENSIVE PLAN

5.2 MIXED LAND USE

5.3 RESIDENTIAL PLAN


5.3.1 HOUSING DEMAND
5.3.2 NEW POPULATION ALLOCATION AND DENSITY DISTRIBUTION
5.3.3 DISTRIBUTION OF HOUSEHOLDS ACCORDING TO INCOME GROUPS AND LAND AREA REQUIREMENT
5.3.4 SECTOR WISE PROPOSALS
5.3.5 STRATEGIES AND POLICIES FOR DEVELOPMENT

5.4 TRAFFIC AND TRANSPORTATION


5.4.1 PROJECTIONS
5.4.1 PROPOSALS TO IMPROVE TRAFFIC AND TRANSPORTATION
5.4.2 GUIDELINES FOR NON MOTORIZED TRACKS
5.4.3 PROPOSALS FOR PEDESTRIAN MOVEMENT

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. vi
CONTENTS

5.5 PHYSICAL INFRASTRUCTURE


5.5.1 WATER SUPPLY

5.6 SEWERAGE
5.6.1 INTRODUCTION

5.7 STORM WATER DRAINAGE


5.7.1 INTRODUCTION

5.8 SOLID WASTE MANAGEMENT


5.8.1 INTRODUCTION
5.8.2 OBJECTIVES
5.8.3 PROPOSALS
5.8.4 WASTE GENERATION
5.8.5 WASTE COLLECTION

5.9 EDUCATION
5.9.1 REQUIRED NUMBER OF EDUCATIONAL INSTITUTIONS AS PER UDPFI GUIDELINES
5.9.2 FUTURE PROPOSALS
5.9.3 PROPOSED SITES FOR EDUCATIONAL INSTITUTES

5.10 HEALTH CARE FACILITES


5.10.1 UDPFI GUIDELINES FOR CREMATORIUM:
5.10.2 REQUIREMENT OF HEALTH CARE FACILITIES WITH RESPECT TO POPULATION
5.10.3 REQUIREMENT OF HEALTH CARE FACILITIES WITH RESPECT TO DISTANCE AND AREA

5.11 CREMATION & GRAVEYARD

i. Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
CONTENTS
5.11.1 GUIDELINES FOR CREMATORIUM
5.11.2 REQUIREMENT OF CREMATORIUMS WITH RESPECT TO POPULATION
5.11.3 PROPOSED SITES FOR CREMATORIUM

5.12 OPEN SPACES

5.13 ENVIRONMENT.
5.13.1 INTRODUCTION
5.13.2 IMMEDIATE ACTION PLANS
5.13.3 LONG TERM PROPOSALS

5.14 ASSESSMENT OF MUNICIPAL FINANCIAL HEALTH


5.14.1 EXOGENOUS FACTORS

CHAPTER 6: ZONING REGULATIONS AND DEVELOPMENT CODE

6.1 USE ZONES AND USE PREMISES DESIGNATED


6.1.2 USE ZONES

6.2 ZONING REGULATIONS


6.2.1 OBJECTIVES OF ZONING
6.2.2 SALIENT FEATURES OF ZONING REGULATIONS
6.2.4 CATEGORIES OF DIFFERENT ACTIVITIES/ UTILITIES
6.2.5 FLOATING ACTIVITIES

6.3 DEFINITIONS OF LAND‐USE PREMISES/ ACTIVITIES

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. viii
CONTENTS

6.4 ZONING REGULATIONS

6.5 SUB DIVISION OF REGULATIONS


6.5.1 RESIDENTIAL USE AREAS

CHAPTER 7: DEVELOPMENT AND FUNDING STRATEGIES

7.1 DEVELOPMENT AND FUNDING STRATEGIES


7.1.1 NEW INDUSTRIES (POLLUTING AND NON‐POLLUTING)
7.1.2 MODELS OF SLUM REDEVELOPMENT/ REHABILITATION
7.1.3 TRANSPORTATION
7.1.4 PHYSICAL INFRASTRUCTURE

7.2 BROAD STRATEGIES FOR DEVELOPMENT IN ROURKELA


7.2.1 PHASE 1, TILL 2021:
7.2.2 PHASE 2, TILL 2031:

7.3 URBAN GOVERNANCE REFORMS

7.4 SMART CITY SHCEMES


7.4.1 WHAT SHOULD BE THE VISION OF ROURKELA AS A SMART CITY?
7.4.2 WHAT SHOULD BE THE OBJECTIVES?
7.4.3 COMPONENTS THAT WILL MAKE ROURKELA A SMART CITY.
7.4.4 SMART CITY FEATURES
7.4.5 CONCLUSION

i. Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
CONTENTS

LIST OF TABLES

Table 3.1 : Population for the Rourkela Planning Area


Table 3.2 : Comparative HDI Indices
Table 3.3 : comparative GDI Indices
Table 3.4: Comparative Sex‐Ratio of Rourkela, Sundargarh, Odisha and India.
Table 3.5: Existing Land use of Rourkela Planning Area.
Table 3.6: No. of Households in Rourkela Urban Agglomeration
Table 3.7: Total No. of Household Comparison‐Ward wise (Rourkela Municipality)
Table3.8: Block wise Distribution of Households
Table 3.9: No. of Houses(Area wise) and their Age Category
Table 3.10: Land Price/sq. m Details
Table 3.11: Monthly Income Distribution as per Income Bars
Table 3.13: Location Preference and preference for Type of Property Purchase Area Wise
Table 3.14: Public Sector Housing Schemes
Table 3.15: Various Schemes undertaken by Rourkela Development Authority
Table 3. 16: Houses Constructed by OSHB
Table 3.17: Details of Plot distribution by HUDCO
Table 3.18: Details of Plot Distribution under Self‐Finance Scheme in Koel Nagar

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. x
CONTENTS

Table 3.19: Plot Area, Size and Plinth area data


Table 3.20: No. of Quarters in Railway Colonies
Table 3.21: License fee details
Table 3.22: Sail Quarters details
Table 3.23: No. of Quarters details
Table 3.24: Category of projects undertaken by Private Developers
Table 3.25: Land price variation as per Brahamani Developers
Table 3.26: Dwelling Units Details ( to be constructed)
Table 2.27: List of Slums
Table 3.28: PROGRESS OF ONGOING SCHEMES UNDER IHSDP
Table 3.29: No. of DUs under IHSDP
Table 3.30: IAY and Mokudia Blocks Fund Allocation Data
Table 3.31: Scheme Beneficiary Survey Result
Table 3.32: Satisfaction survey for provision of new houses through schemes
Table 3.33: Housing Shortage
Table 3.34: Sites where Traffic Volume survey undertaken.
Table 3.35: Distribution of Persons Trips by Trip Length
Table3.36: Distribution of Person Trips by Mode of Travel
Table 1 shows the categorization of wards / mouzas as per the varying land values of residential land use.
Table 3.37 : Categorization as per land values

i. Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
CONTENTS
Table 3.38 : Categorization as per land values
Table 3.40 : Categorization as per land values
TABLE : Factors contributing to urban flooding
Table 5.1: Proposed Land‐use 2031
Table 5.2: Total Housing Demand (Based on Housing Shortage and Future Housing requirement)
Table 5.3: Existing Ward vise Population and Density (excluding Slums
Table 5.4: Reference Table for Table 5.3 indicating the Density ranges adopted and followed in identification of various wards.
Table 5.5: Percentage Distribution of in‐migration and outmigration in RMC
Table 5‐6 Revised Population of wards after population allocation
Table 5‐7: Existing Population and Projected Natural Growth of slums in RMC Area
Table 5‐8: Revised Population Allocation and Density of Slums
Table 5‐9: Final Projected population of areas with no. of households and Population Densities.
Table 5‐10:Final Population and population density of wards (including slums)
Table 5‐12: Income Wise Built‐up area
Table 5‐13: Income Wise Distribution of households
Table 5‐14: Income Wise Built‐up area
Table 5‐15: Rental Housing Area Wise Distribution
Table 5‐16: Income Wise Distribution of Plots and in Group Housing and Plotted Housing
Table 5‐17: Affordable Housing Area Allocation in Phase 1
Table 5.18: Affordable Housing Area Allocation in Phase 2

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. xii
CONTENTS

Table 5.19: Proposed FAR area Wise


Table 5‐20: Condition of few slums in RMC
Table 5.21: Projected increase in production for existing industries and relative freight increase by 2030
Table 5.22: Projected production and raw material consumption by industries by 2030
Table 5.23: Freight calculations for existing and proposed industries by 2030
Table 5.24: Projected trip generation for zones based on household size
Table 5.25: Region wise population, household income and vehicle ownership projection for growth factor calculation
Table 5.26: Growth factor calculation for various zones
Table 5.27: Trips generated in various zones as per Household and growth factor method
Table 5.28: Goals based on issues for traffic and transportation in Rourkela
Table 5.29: Proposed New Road Links
Table 5.30: Proposed bridges
Table 5.31: Projected no. of trips generated for 2021 and 2031
Table 5.32: Projected V/C for 2021
Table 5.33: Projected V/C for 2031
Table 5.34: Proposed bus routes
Table 5,35: Proposed Bicycle tracks in Rourkela
Table 5.36: interventions required for pedestrian friendly streets in Rourkela
Table 5.37: proposals for at grade/grade separated pedestrian crossings
Table 5.38: Proposals for road improvements

i. Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
CONTENTS
Table 5.39: Water Requirement for the year 2021
Table 5.39b: Water Requirement for the year 2031
Table 5.40: Water Requirement for each Zone Group
Table 5.41: Treatment Deficit for each Zone Group
Table 5.42: Distribution Deficit and Reservoir Capacity Estimation for each Zone
Table 5.43: Sewerage load calculation
Table 5.44: Sewerage Treatment plant capacities and area required
Table 5.45: Community toilets
Table 5.46 gives the existing length of drains for every ward. The highlighted rows indicate that have low drain lengths.
Table 5.46: Ward wise drain lengths
Table 5.47: Sample residential waste generation calculation
Table 5.48: Residential waste generation calculation and composition
Table 5.49: Sample commercial waste generation calculation
Table 5.50: Commercial waste generation calculation and composition
Table 5.50 shows the waste composition for commercial waste collectively for the planning area.
Table 5.51 shows the above calculations only for the municipal area. Similarly the calculations are done for other areas.
Table 5.51: Sample commercial waste generation calculation
Table 5.53: Waste loading for door to door collection and community vats 2011
Table 5.54: Waste loading for door to door collection and community vats 2021
Table 5.55: Waste loading for door to door collection and community vats 2031

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. xiv
CONTENTS

Table 5.56: Equipments required ( municipal area)


Table 5.57: Equipments required (Block area)
Table 5.58 represents the community vats required in the Block areas for every 10 years.
Table 5.58: Equipments required (Block area)
Table 5.59 gives the waste generation of waste other than household waste with the volumes with respect to the municipal area
Table 5.59: Miscellaneous waste generation (Municipal area)
Table 5.60: Miscellaneous waste generation (Municipal area)
Table 5.61: Equipments required ( Municipal area)
Table 5.61 shows the equipments required in a municipal area. Some points to be noted are
Table 5.62: Equipments required (Block area)
Table 5.63 shows the final inventory of the equipments required in a municipal area and lock areas.
Table 5.63: Inventory of Equipments
Table 5.64: total inert waste generation
Table 5.65: Total Organic waste generation
Table 5.66: Required number of Educational Institutes
Table 5.67: Proposed number of Educational Institutes
Table 5.68: Proposed Educational Institutes
Table 5.69: Required number of beds in General Hospitals
Table 5.70: proposed health Care Centers
Table 5.71: Number of Crematorium required

i. Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
CONTENTS
Table 5.72: List of trees that can be used for green buffer depending on properties to absorb the impurities
Table 5.73: Ash utilization
TABLE 6.1 : LAND USES PERMITTED/PROHIBITED IN DIFFERENT USE ZONES
Table 7.1 Funding Mechanism Selection Criteria
Table 7.2 Affordable Housing in Public Private Partnership
Table 7.3 AFFORDABLE HOUSING IN PARTNERSHIP: 2021
Table 7.4 AFFORDABLE HOUSING IN PARTNERSHIP: 2031
Table 7.5 Total Cost Estimation
Table 7.6 Cost recovery‐ Transportation
Table 7.7 Cost recovery‐Water Supply
Table 7.8 Cost recovery‐solid waste management
Table 7.9 Cost recovery –Sewerage and drainage

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. xvi
CHAP
PTER 1: INT
TRODU
UCTIO
ON
1.1 HISTTORY

1.2 PLA
ANNING AREA
A

1.3 VISION

1.4 CHA
ALLENGES

1.5 COM
MPREHENSIV
VE DEVELOPM
MENT PLAN FO
OR ROURKELA
A

1.6 THEE PROCESS OFF COMPREHENSIVE DEVELLOPMENT PLA


AN
FORR ROURKELA

1.7 DEV
VELOPMENT CONCEPT
C FOR
R PREPARATION OF ROUR
RKELA
COM
MPREHENSIV
VE DEVELOPM
MENT PLAN

1.8 GOA
ALS OF COMP
PREHENSIVE DEVELOPMEN
NT PLAN

1.9 OBJJECTIVES

1.10 APP
PROACH
CH
HAPTE
ER 2: R
REGIO
ONAL CONT
TEXT
2.1 REGION
NAL SETTING
G

2.2 LOOKIN
NG BACK
2.3 RIVER A
AND RAW M
MATERIAL IN
NFLUENCEIN
N DEVELOPM
MENT
2.4 POPULAATION GROW
WTH
2.5 MAJOR POLICY DEC
CISIONS

2.6 PLANNING SYNTHEESIS


CHAPTER 3: EX
XISTIN
NG CONDITIION ANALY
YSIS
3.1
1 DEMOGR
RAPHIC CHA
ARACTERISTTICS

3.2
2 ECONOM
MIC CHARAC
CTERISTICS
3.3
3 HOUSEHOLD SURVEEY RESULTS
3.4
4 EXISTING
G LAND‐USEE AND DEVEELOPMENT
3.5
5 COMMERCIAL USES

3.6
6 INDUSTR
RIAL USES

3.7
7 PUBLIC A
AND SEMI P
PUBLIC USESS

8 RECREATTIONAL AND
3.8 D GREEN USSES

3.9
9 INFRASTTRUCTURE D
DEVELOPMEENT

3.1
10 LAND VA
ALUE ANALY
YSIS

3.1
11 SWOT AN
NALYSIS
CH
HAPTE
ER 4: S
SYNTH
HESIS
S AND
HO
OLDING CAPPACIT
TY SCE
ENAR
RIOS

1 FUTURE ASSUMPTIO
4.1 ONS OF ROU
URKELA

4.2
2 UNDERSTTANDING GROWTH
G

4.3
3 CONCEPTT OF ROURK
KELA COMP
PREHENSIVEE DEVELOPM
MENT
PLAN
CHAP
PTER 5: RO
OURKE
ELA CDP
C PR
ROPO
OSALS
S
5.1 THE
T LAND‐U
USE PLAN
5.2 MIXED
M LAND
D‐USE
5.3 RESIDENTIA
R L PLAN
5.4 TRAFFIC
T AND
D TRANSPO
ORTATION
5.5 PHYSICAL
P IN
NFTASTRUCTTURE
5.6 SEWERAGE
S
5.7 STROM
S WATTER DRAINA
AGE
5.8 SOLID
S WASTTE MANAGEEMENT
5.9 EDUCATION
E
5.10 HEALTH
H CAR
RE FACILITIEES
5.11 CREMATION
C N AND GRAV
VEYARD
5.12 OPEN
O SPACEES
5.13 ENVIRONME
E ENT
5.14 ASSESSMEN
A T OF MUNIC
CIPAL FINAN
NCIAL HEALLTH
CHA
APTER
R 6: ZO
ONING
G REG
GULAT
TION
AND
D DEVE
ELOPMMENTT CODE
6.1 USE ZONEES AND USEE PREMISES DESIGNATEED

6.2 ZONING REGULATIO


R NS
6.3 DEFINITIO
ONS OF LAN
ND‐USE PREM
MISES/ ACTTIVITIES

6.4 ZONING REGULATIO


R N TABLE

6.5 SUB DIVISSION OF REG


GULATIONSS
CH
HAPTER 7: DEVE
ELOPMMENT AND
FU
UNDIN
NG ST
TRATEEGIES
7.1 DEVELO
OPMENT AN
ND FUNDING
G STRATEGIIES

7.2 BROAD
D STRAGIES FOR DEVELO
OPEMENT IN ROURKELLA
7.3 URBAN
N GOVERNANCE REFORMS

7.4 SMARTT CITY SCHEM


MES
1
INTRODU
UCTION

1.1 HISTTORY Pandit Jawaharlal Nehru, the t first Primee Minister of India
visualized Indiaa as an industriaalized nation for which iron and
d steel
Rourkela is aan important co
ommercial centeer of Orissa Statte. It has
a huge iron n and steel maanufacturing baase. Besides, th here are was the basic requirement. He H set up a steeel plant here to
o make
many units producing sp ponge iron, cem ment, refractories etc. India self‐reliaant in iron and
d steel. It was considered thee best
Rourkela Steeel Plant (RSP),, a unit of SAILL is a one of the largest place for steel plant in spite of
o being a hilly area and surrounded
by dense foressts.
Figure 1.1: Rourke
ela Steel
l In accordancee with a notifiication, the Go
overnment of Orissa
acquired an area of about 80
0 square miles around Rourkeela for
the Steel Plantt.

A private Gerrman undertakiing called KRUPP and DEMAG G Co.


came forwardd to provide financial and teechnical help fo or the
proposed steeel plant at Rou
urkela. The tech hnical experts of the
company advissed the Govt. o
of India as well as
a the Govt. of Orissa
steel manuffacturing facilitiees in India. There are many smmall scale
for acquiring m
more of land andd an attempt was made to fulfil their
industries inn Rourkela cateering to the neeeds of RSP an nd other
large indusstrial units. The literary meaning m of ‘R
Rourkela’ suggestions. AAs a result a fu
urther area of 32
3 square kilommetres
according to o the languagee of ‘Sadri’ is ““Your Home”. IIt is also was acquired out of thirty‐o one revenue villages. Almost 13,000
1
learnt that a tribal commu unity called ‘Raulia’ had been living at people comprrising 2,424 fam milies had to lo
oose their dweellings.
the village since times immmemorial. They w were tantriks an
nd village
Later 11,000 acres of land waas acquired out of thirty‐one reevenue
was known n as Rourkela.. The Bengal‐N Nagpur Railwaay (BNR)
Company co onstructed thee Howrah Nagp pur railway, which ran villages for th
he construction
n of Mandira Dam.
D More land was
through Ro ourkela and so ome merchantts, started setttling at acquired for tthe purpose of constructing railway
r lines to Hatia
Rourkela with business mo otive. The erstw while revenue vvillage of and Barsuan. Construction of Bondamunda Railway junction
Rourkela is nnow popularly kknown as old Ro ourkela.

1 Draft Proposal:: Rourkela Comp


prehensive Deve
elopment Plan 2
2031 for Rourkela
a Planning Area
a (RPA)
1
INTRODUCTION

required further acquisition of land; as a matter of fact, further planning area stretches over an area of 259.18 sq. km. with a total
20,000 people had to leave their homesteads. population of 2.59 Lakh (Census, 2001).

Rourkela town with an area of 195 sq.km and population of 0.64


Rourkela Steel Plant, Fertilizer Plant, Fertilizer Township, Steel
million, has been the nerve center for trade and commerce for
Township and different sectors were constructed on the areas so
Figure 1.2: Rourkela Planning Area
acquired by the Govt. of Orissa. A Marshalling yard and a railway
junction were established at Bondamunda are the land acquired
by the Govt.

The people who lost their home steads were resettled in


resettlement localities like Jalda, Jhirpani and Bondamunda. The
Govt. land beyond the river Koel was distributed among the
people who lost their land for the purpose of the steel plant.
Thousands of technical personnel from West Germany came to
Rourkela to extend their technical assistance. Different
companies all over the country with contractors and labourers
flocked to Rourkela and were engaged in constructing the steel
plant. Consequently there arose a rush of workers and business
community.
the Orissa State. Rourkela Development Authority is looking after
the execution of town planning schemes and also looking after
the development control aspects of Rourkela Planning Area. As
1.2 PLANNING AREA such two functionaries i.e. RDA and Rourkela Municipality under
the administrative control of the Government are responsible for
Rourkela Development Planning Area comprises of Rourkela Steel overall Development of Rourkela Planning Area.
Plant, Steel Township, Civil Township and 52 villages. The total

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 2
1
INTRODUCTION

The total Rourkela Development Planning Area cover 104 Mouzas Figure 1.3: Rourkela CDP Vision
and out of which 52 units/ Mouzas in Rourkela Steel and civil
township and 52 Mouzas in the surrounding. The area extends
over 259.18 Sq Km of which the Civil Township area is 22.73 Sq.
Km. constituting of 8.76 % and Steel Township area 20.98 Sq. Km
and rural area of 183.49 Sq. Km. constituting of 71 % of total
Planning Area for Rourkela. Reserve forests lie on the north and
south of the Planning area and comprises of 11.37 Sq. Km.
constitute of 4.39 % of the total Planning Area.

1.3 VISION

Base on the reconnaissance survey, observation and interview


with local community some of the emerging issues of the vision of
the Rourkela CDP are:

1.3.1 BALANCED COMMUNITY DEVELOPMENT 1.3.2 COMMUNITY AND SERVICE ORIENTED TOWN

The concept of CDP is to have more balanced community, in


Rourkela is known as a “safe and friendly community.” The Town
terms of tribal and social development along with the sustainable
has excellent vegetation, landscape and open spaces. Rourkela
industrial development. The Rourkela Planning Area will
will benefit from after organizing Industries functionally. Major
strengthen its cultural and social base by providing local
issues reflect that Rourkela will further developed its “Industrial
employment opportunities and inclusion of the tribal population
town character” and also improve the livelihood of the tribal
in the process of economic growth.
community.

3 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
1
INTRODUCTION
1.3.3 FULFILLMENT OF COMMUNITY GOALS 1.4.3 PROVIDING COMMUNITY SERVICES

Some of the goals of the community are for Rourkela to retain its Another challenge for the CDP is to provide the level of
exceptional value and its well maintained and friendly character; community service expected by Rourkela residents and to
to strengthen the commercial and industrial base; to expand respond to the needs and desires of a tribal population.
developed parks and ecological reserves along the Bhramani,
Sankha and Koel rivers; to further landscape and improve the
appearance of the main roads, streets and residential 1.5 COMPREHENSIVE DEVELOPMENT PLAN FOR
neighbourhoods; and to enhance community spirit and
ROURKELA
involvement.
A comprehensive plan is an official public document approved by
a State Government of Orissa as a policy guide to decision about
1.4 CHALLENGES
the physical development of the community. As far as definition
is concerned “Comprehensive Development Plan is a general plan
1.4.1 BALANCING DEVELOPMENT
is the official statement of a municipal legislative body which sets
The Town has expressed a desire to balance Industrial growth forth its major policies concerning desirable future physical
with other forms of development, to enable it to be as self‐ development”. It defines the various zones for the purposes of
sustaining as possible. One of the main challenges for Rourkela development and indicates the manner in which, the land in each
will be to accomplish this goal within the context of a potentially zone is proposed to be used and the stages by which physical
high population growth rate and subsequently increasing the development shall be carried out. The Plan looks beyond the
demand for shelter, trade and commerce, social and physical
foreground of pressing current issues to the perspective of
infrastructure, recreational areas and transportation.
problems and possibilities 20 to 30 years in the future.
1.4.2 UNITING COMMUNITY MEMBERS
Apart from three major content of Plan i.e. the private uses of
The Town is striving to build a united community, integrating land, community facilities and circulation the other subject covers
migrated professionals, Industrial worker and tribal communities. under the plan are utilities, civic design, and special uses of land
unique to the locality. Comprehensive Development plan usually

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 4
1
INTRODUCTION

collect background information on the population, economy, be carried out; and serve as a basic pattern of framework within
existing land‐use, assumptions and community goals. which the Zonal Development Plans (ZDP) of the various zones
may be prepared.
Comprehensive Development Plan will be written document to
guide and regulate development proposals in a well designed and
planned manner, which are implementable, financially feasible, Figure 1.4: CDP Procedures
politically recognizable, socially acceptable and physically
sustainable. It is a prescription for placement of appropriate
functions at appropriate locations for appropriate population in
appropriate time frame to achieve all round development of the
RDA.

Chapter‐III, clause9, of Orissa Development Authorities Act, 1982


described about the preparation of Comprehensive Development
Plan (DCP). As per the Act, civic survey should be carried out and
prepare a CDP for the area or the part thereof as the case may be.
In the present case Town and Country Planning Organization,
New Delhi is comprehended the task of preparation of Rourkela
Comprehensive Development Plan (RCDP) for Rourkela The CDP may provide for any other matter which is necessary for
Development Authority. the proper development of the area covered by such plan and for
the health, comfort, convenience and general betterment of the
The Act defines CDP as “Comprehensive development Plan shall
present and future inhabitants of the development area. Every
define the various zones into which the land covered by the CDP
CDP shall be submitted by the Rourkela Development Authority to
may be divided for the purposes of development and indicate the
the State Government for approval and the State Government, in
manner in which, the land in each zone is proposed to be use
consultation with the Director, may either approve the plan
(whether by the carrying out thereon of development or
without modifications or with, such modifications as it may
otherwise) and the stages by which any such development shall

5 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
1
INTRODUCTION
consider necessary, or reject the CDP with direction to the
Authority to prepare a fresh development Plan. A CDP is an Figure 1.5: CDP Approval Procedures
official public document adopted by a local government as a
policy guide to decisions about the physical development of the
town. It indicates in a general way how the government want the
town to develop in the next 20 to 30 years.

Act also discussed about the essential ingredients of CDP like

a) Comprehensive,
b) General and
c) Long range perspective

a) Comprehensive: means that the plan encompasses all


geographical parts of the town and all functional elements
Based on the Orissa Development Authorities Act, 1982,
which bear on physical development.
Comprehensive Development Plan of Rourkela should be:
b) General: means that the plan summarizes policies and
proposals and does not indicate specific locations or • An expression of the values of the community and their vision
detailed regulations. of the area’s future;
c) Long range perspective: means that the plan looks beyond • A documentation of development goals, objectives, policies
the foreground of pressing current issues to the and criteria for planning urban growth;
perspective of problems and possibilities 20 to 30 years in • A clearly stated strategy for growth and change that will serve
as a framework for identifying, programming and managing
the future.
key projects to implement the strategy by both the public and
private sectors;

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 6
1
INTRODUCTION

• A flexible development instrument able to be adjusted for 1.6 THE PROCESS OF COMPREHENSIVE
changing conditions over time;
DEVELOPMENT PLAN FOR ROURKELA
• A decision‐making tool whereby proposals for land‐use can be
evaluated on a day‐to‐day basis in the context of the area’s A Planning process has four basic states: a statement of goals and
development goals;
objectives, basic research, plan preparation and plan
• A document readily comprehensible to the area’s
implementation.
administration, the general public, community leaders and
potential investors in services or real estate; and The first Stages: The first stages, a general statement of
• A framework to devise land use regulations, ordinances and
community goals and objective, allows a planning agency to
regulatory instruments that make up the tools to implement
the plan. express the general values and goals of the citizens in regards to
the future development. Through such a statement, a consensus
of future development policy may be formed. Because it indicates
Following Comprehensive Development Plan’s Components were broad objectives and how they can be realized, it provides a focus
considered as per the Act. for the formulation of Comprehensive Development Plan.
• Land Use/ Growth Management The Second Stages: The second stage is the collation and analysis
• Housing and Neighbourhoods of basic studies including mapping. The analysis should reveal the
• Transportation community’s needs and problems, and examine the community
• Infrastructure
objectives.
• Community Facilities
• Open Space/ Recreation The Third Stages: Once the goals and objectives have been sated
• Economic Development and the research accomplished, it sets the stage for CDP
• Natural Resources/ Environment
formulation. The CDP tries to indicate how private and public
action can achieve certain community goals and policies in the
next 20 years. A plan synthesizes the available information and
organizes it in various ways to meet specific problems. A plan is
not a rigid design for the future; it suggests solutions to specific

7 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
1
INTRODUCTION
current problems and to those future problems that can be The Fourth Stages: If a plan is viewed as a directive for action, its
foreseen. It is a program for action and a guide to future success depends upon the way it is implemented. One way a plan
development. For it to be effective, the community must carry it can be put into operation is by public action. Private action is also
out, not in 20 years, but continuously. important in effectuating the plan. The plan can mould private
development in two ways:

• By regulations, such as subdivision regulations and zoning


ordinances, requiring minimum standards of
Figure 1.6: CDP Stages development; and
• By influence on private citizens to develop their land in
accordance with broad community objectives for benefit
of whole community.

The planning process for preparation of Rourkela CDP stats with


the close liaising with the Rourkela Development Authority and
Town and Country Planning Organization, New Delhi and key
stakeholders as well as senior technical and government local
officials and elected people’s representatives responsible for the
management of urban activities within the Rourkela Planning
Area (RPA). The process includes the following four discreet but
overlapping tasks:

• Preparation of Development Concept for preparation of


Rourkela Comprehensive Development Plan
• Outreach, Visioning and Community Assessment
• Comprehensive Plan Development
• CDP Refinement

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 8
1
INTRODUCTION

1.7 DEVELOPMENT CONCEPT FOR PREPARATION OF survey techniques and stakeholder interview regarding the
ROURKELA COMPREHENSIVE DEVELOPMENT following subjects:

PLAN • Industrial Survey


• Housing Survey
First of all reconance survey was conducted in order to have • Land‐use Survey
spatial and functional understanding of existing conditions • Household Survey
pertaining to all aspects of activities in the Rourkela Planning Area • Land‐Value survey
and future growth dynamic and design challenges are assessed • Tourist Survey
through stakeholder local area technical expert interactions. After • Heritage building Inventory Survey
this TCPO has determined the goals and objectives for performing • Parking Survey
basic research, mapping and analysis to evaluate the community’s • Household Trip Information Survey
present environment and its potentials for growth and economic • Origin and Destination survey for Passengers
• Origin and Destination Survey for goods
development.
• Traffic Volume Survey
1.7.1 DATA AND MAPPING ASSESSMENT • Speed and Delay Survey
• Open Space Survey
An expert team from TCPO evaluated the adequacy of • Building Material Stores Survey
appropriate documentation, and other mapped and tabular data, • Squatters Survey
for the performance of the land‐use and transportation planning • Future planned or proposed departmental projects.
activity. A detail data gaps inventory were identified and • Transportation systems (current or proposed)
recommended additional data requirement base on the • Existing regulatory procedures and ordinances
• Economic aspects and public and private sector initiatives (in
functional integration of Rourkela town and different community
process or contemplated)
participations. A joint team TCPO along with RDA collected
• Central Government, State or Local housing policies
primary and secondary data/ information on existing conditions • Existing administrative and government structures
and trends with the help of Participatory Rapid Appraisal (PRA) • Current environmental issues, concerns and conditions
pertinent to growth patterns.

9 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
1
INTRODUCTION
1.7.2 PRIMARY DATA SURVEY existing land‐uses map in the Rourkela Planning area is an
important outgrowth of the cadastral level information. It shows
In addition to the secondary data collection, primary data were
the current use of each parcel of land, usually divided into such
collected by conducting Participatory Rapid Appraisal (PRA)
categories as residential commercial, industrial, agricultural,
Survey and various Questionnaire based comprehensive surveys
public, semi‐public, etc. In addition, it also show the present area
including, land‐use surveys, transportation surveys and household
of the use in detail. After preparation of digital base map by
surveys.
ORSAC, TCPO upgraded the base map by undertaking an area‐
1.7.3 MAPPING wide on‐site survey of existing land‐use and Participatory Rapid
Appraisal Map to support the Comprehensive Development
Any planning exercise requires accurate base maps tailored to the Planning process. This PRA map and primary data helped in
need of the community and planning. A base map indicates such realizing the ground realities as well as understanding the public’s
existing features as the street system, railroads, rivers, parks or perception about the growth and associated problems of the RPA.
other community facilities. This map is the foundation for all
subsequent maps to be utilized throughout the planning process. Along with digital base map, digital slope analysis map (Contours
interval 20 metres) showing the topography of the Rourkela
In the current exercise a base map of Rourkela was prepared by Planning Area are prepared by TCPO with the help of Survey of
Orissa Space Applications Centre (ORSAC), Bhubaneswar, along India Toposheet No 73 B15 & 16 and superimposed on the
with TCPO and RDA officials. The Digital Base Map of Rourkela Rourkela base map over GIS format. The Slope analysis map is
generated on Geographic Information System through high studied to analyze land characteristics which influence present
resolution satellite data and cadastral information of Rourkela and future development for Rourkela Planning Area. The degree
Planning Area. The processes involved with digitization and of buildable slope, the existence of sub‐soil proper for building
georeferencing of cadastral maps, extraction of information from and the existence of flood plains are investigated before a land‐
satellite images and generation of Rourkela Planning area use plan is proposed.
datasets in the appropriate GIS Format. All these technical
operations have been undertaken in standardized procedures as
per the UDPFI and ORSAC Technical Manual 2009. As a result

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 10
1
INTRODUCTION

1.7.4 OUTREACH, VISIONING AND COMMUNITY ASSESSMENT 1.7.5 COMPREHENSIVE DEVELOPMENT PLAN PREPARTATION

In order to provide a context for long‐term planning, it was critical Long term development scenarios were prepared that reflected
to understand how the public perceived both positive values and potential growth related to projected population in the context of
negative characteristics of their existing urban area and what the stated vision for the RPA. These considered a range of
aspirations they had for the future of the area over a period of alternative policies, concepts, and strategies for land‐use, growth
the next twenty years. As an initial assessment of these views the management, transportation, and other community facility
TCPO interviewed stakeholders, decision makers and leaders of investments. After review and discussion with the Stakeholder
the community who represented a wide spectrum of local workshop a Development potential was selected for sustainable
interests in the process of development of RPA. These interviews development as the basis for the Comprehensive Development
were documented, analyzed and prioritized to find out the key Plan.
issues for sustainable development of Roukela Planning Area and
RDA development policies were considered regarding preparation
its community. The outcome of the interviews was presented and
of a Draft Comprehensive Development Plan included.
discussed in the various Stakeholderf workshops held during the
process. • Land Use Patterns/ Proposed Land Use Plan
• Growth Management Strategies
On the basis of these insights, a Vision Concept design the
• Regional linkages
aspirations of the community for all key aspects of Rourkela • Integrated Transportation, Roadway, Network and Movement
international and tribal community and its activities and a Systems
visualized the concentric zone of development within the desired • Community and neighbourhood based Infrastructure and
physical structure of the 2031 Greater Rourkela. The similar Utility facilities Systems – water, sewer, storm water, electric
vision document was presented and approved in the context for power, telecommunications, etc.
developing the Comprehensive Development Plan for Rourkela. • Natural Resource/ Open Space/ Rural Area Protection
• Environmental Issues
• Other Community Facilities
• Economic Development Opportunities

11 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
1
INTRODUCTION
The Draft CDP was prepared and a draft final report document 1.9 OBJECTIVES
including, conceptual details, proposed land‐use maps,
compatibility of different land‐uses and supporting infrastructure, Rourkela Comprehensive Development Plan ‐2031 has been
heritage conservation, environmental protection were presented prepared with the following objectives:
to the Stakeholder workshop for their review, comments and
o Within the framework of broad policies for the development of
approval as the basis for the preparation of the final report.
Orissa, Sundergarh district and taking into consideration the
proposed strengthening of the road and rail infrastructure and
1.8 GOALS OF COMPREHENSIVE DEVELOPMENT the development pressures due to the creation and development
PLAN of various industrial activities in the adjoining area, Lathikata,
Karlakhaman, Brahmanitaranga, Padampur, Kumarmunda,
Based on the reconance survey and various interviewed Teliposh etc., prepare a Comprehensive Development Plan for
conducted in Feb, 2009 the goals of the Comprehensive Rourkela 2031 for:
Development Plan of Rourkela is analysed, self observed and
public reviewed process are also adopted to develop goals of ƒ Achieving integrated development of Rourkela Planning
Comprehensive Development Plan and given below more or less Area and its environs
on the order of priority. These goals will also provide the ƒ Accommodating future growth of population up to the
foundation for the Comprehensive Development Plan Concept year 2031.
which follows. ƒ Recognizing, emphasizing and responding to the key issues
identified as community priorities.
• Preserve and enhance natural resources
• Improve baseline information o To promote employment generating activities such as industrial
• Improve local, religious and eco tourism impression work opportunities, offices spaces, institutions, commercial
• Improve Infrastructure Facilities centres, IT parks etc at places which are well suited for such
• Minimize Impacts of development on environment activities and provide a conducive environment for people to
• Protect ethnic and cultural resources work and enjoy good quality of life.
• Provide Recreation Opportunities and green reserves
• Efficient transportation plan o Present CDP is based on sustainability concept through balancing
the current and future needs of the community; the environment

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 12
1
INTRODUCTION

and the economy to provide quality of life for today and o Review key planning issues, policies and forces acting within the
tomorrow’s communities. Planning Area and develop a coordinated response.

1.10 APPROACH o Detail elaboration on identifying the opportunities, constraints


and thrust areas.
In order to achieve these objectives, the planning team,
comprising of Town Planners and Urban Managers from Town o Identify issues of priority to the local community and work with
and Country Planning Organization, New Delhi; Orissa Town them to developing practical solutions to these within the context
Planning Department, Bhubaneswar, Rourkela Development of the regional framework
Authorities, Rourkela and Orissa Space Application Centers,
Bhubaneswar; evolved and worked together to incorporat in o Create a sound and comprehensive strategic planning framework
Rourkela CDP. The formulation of CDP would be based on the to allow delivery of the vision and concept generated through
following approaches: community goal and objectives

o The CDP shall be in conformity with the provision of ODA Act o Prepare Transport Network Plan including the networks required
1982 for linking the Rourkela with other neighbouring settlements. This
includes:‐
o The hinterland of CDP area will be studied for potentials of
regional resource in the context of Industrial development in o To compile and collate all primary and secondary data
relation with environmental, ecological and conservation on traffic volume, speed and delay, road network and
measures travel characteristics of Rourkela Planning Area (RPA)
and ascertain the trends.
o Defining different functional zones and specific use of land in
each zone o To determine urban road hierarchy based on traffic
volume and road network characteristics and develop
o By understanding the existing conditions, constraints/ physical typical cross sections to be implemented in a phased
social and economic needs and their short falls and fixes up manner.
sectoral development priorities.

13 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
1
INTRODUCTION
o To review environment friendly transport system o Preparation of CDP will be through a participatory
technologies and evolve a public transport system for approach.
RPA.
o Prepare necessary report and drawings, explaining the
o To evolve micro‐level regional network of cycle and proposals contained in the Plan.
cycle‐rickshaw tracks along identified travel corridors.

o Based upon the system design to identify locations for


grade separation, subways and access control
strategies.

o Prepare a Concept Plan for city level Landscape


Structure

o Formulate Zoning Regulations, which may be useful


for the preparation of the detailed sector or local level
plans.

o Phasing of initiative/ strategies in different time


periods with their prioritizations.

o Broad development strategies are to be translated


into implementable medium term and short term
planning proposals.

o Creating and educating the gospel of development


benefits through awareness campaign, media
publicity, workshop and seminars.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 14
1
INTRODUCTION

FIGURE 1.7: CONCEPTUL APPROACH OF ROURKELA COMPREHENSIVE DEVELOPMENT PLAN

SUSTAINABLE ECONOMIC
DEVELOPMENT THROUGH
PLANNING STANDARDED PROMOTION OF INDUSTRIES AND
BASED ON UDPFI ALLIED ACTIVITIES
GUIDELINES AND DELHI
MASTER PLAN
PROTECTION AND
ENHANCEMENT OF
ENVIRONMENT

DEVELOPMENT
OF DIGITAL PRUDENT USE OF
DATA BASE NATURAL RESOURCES

GOALS IDENTIFICATION OF
& PROBLEMS AND ROURKELA
OBJECTIVES COMPREHENSIVE
OPPORTUNITIES DEVELOPMENT PLAN

SOCIAL COHESION
GENERATION AND INCLUSION OF
OF CDP TRIBAL POPULATION
CONCEPT

INTEGRATION OF
SOCIAL STANDARDED INDUSTRIAL COMMUNITY
BASED ON TRIBAL AND LOCAL TRIBAL
DEVELOPMENT GUIDELINES COMMUNITY
OF MINISTRY OF SOCIAL
JUSTICS

COMMUNITY INVOLVEMENT STAKEHOLDER INVOLMENT

15 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
1
INTRODUCTION

16 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
1
INTRODUCTION

17 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
2
REGIONAL CONTEXT
Figure 2.2: Regional Linkages of RPA
2.1 REGIONAL SETTING

2.1.1 LOCATION AND LINKAGES

The Rourkela Planning area is located at 22o – 12’ N Latitude and


84o – 54’ East Longitude. Most of the northern boundary is
formed by the Koel River flowing from the east and meeting with
west flowing Sankh River just at the north‐west corner of
Rourkela Steel Township and flows down southward as Brahmani
River, dividing the Planning Area into three parts. The Brahmani
River takes its course southwards through the region which

AIRPORT Figure 2.3: Site for Airport

Figure 2.1: Location of


Rourkela Planning Area

17 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
2
REGIONAL CONTEXT
borders in the South‐West and Saranda forest in the South and 300 miles West of Kolkata and well connected with the rest of the
vast agricultural land in the East. country by rail and road network. National Highway 23 passes
through the city connecting Ranchi, capital city of Jharkhand in
Rourkela town is connected by the Howrah‐Bombay line nearly
North and Angul, Cuttack and Bhubaneswar in South. Rourkela
town is also connected by State Highway with Sambalpur,
Raigarh, toward South West and Jamshedpur toward North East.
The airport is located in Rourkela town which was constructed by
the Airport Authority in the year 1964. But presently only Central
Government and State Government helicopters and small aircraft
are flying but not on regular basis. The SAIL has taken over this
Aerodrome in the year 1991. Apart from this the nearest Airport
is located at Ranchi (222 Kms).

2.1.2 CLIMATE

The temperature of Rourkela varies between 46.3o C during


summer (April‐ July) to 7o C during winter (November to January).
The humidity is high in the dry months. The wind flows in
summer from south west with a speed of 35‐40 km / hr and in
winter season from north east with a speed of 18‐24 Km hr. The
annual average rainfall is 128.8 cm.

2.1.3 PHYSIOGRAPHY

Physiographically this region is uneven and mostly covered by low


hills from north‐west and south east directions and interspersed
Figure 2.4: Annual Rainfall and Temperature by narrow valleys in between. The region is gradually sloping

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 18
2
REGIONAL CONTEXT

down from the north‐east and north‐west direction towards 2) Aqualfs‐Aquepts: The area closer to the river has Aqualfs‐
Sankh‐Koel and Brahmani basin which divides the region into Aquepts soil
three parts. Sankh‐Koel Basin is formed by the Sankh River from 3) Ustalfs‐Ochrepts‐Orthents: The area on upper khaddar i.e. area
the west and the Koel River from the east meeting just at the in between river flood plain and hills has Ustalfs‐Ochrepts‐
north‐west corner of Rourkela Steel Township and flows down Orthents soil.
southward as Brahmani River, dividing the region into three parts.
The river Brahmani has taken its course southwards through the
region with broad meanders. The region immediately along the Location of Rourkela is one of the important potential in itself as
banks is plain gradually raising in height towards the periphery. it is surrounded by major capital cities and District head quarter
like Kolkata (529 Kms), Bhubaneswar (476 Kms), Ranchi (222 Kms)
The region is covered by low hills and the intruding spurs of the and Sundargarh (107 Kms) which act as a market centre and
Chhotanagpur plateau. The average height of the region is above gateway to the national and international market. These cities
600 meters. Hills are covered with open and reserved forests. are the industrial, cultural and religious centers. Apart from this
Rourkela is in close proximity to the Other than these cities there
2.1.4 GEOLOGY are other

Major part of the region is covered by the Gangpur Group • Jamshedpur and Durgapur are industrial hubs.
(volcanic) of the Middle Proterozoic period over‐laid by recent • Kharagpur (309 Kms) International famous technical
alluvium in the middle part in an east west direction. Southern educational centre.
side of the region has unclassified gneisses including Singhbhum • Cuttack (309 Kms) and Sambalapur (173 Kms) traditional,
Granite (Archaean) and Iron Ore Group (volcanic) of Lower cultural and international famous commercial hub.
Proterozoic period. • Simplipal National Park, Ramnabayan Sancturary and
Bhitarkanika National Park are the ecological reserves.
2.1.5 SOIL • Mandira Dam and Hirakund Dam increased the potential of
the region in terms of self sufficiency in electricity and water.
The region has three types of soil i.e.

1) Ustalfs‐Ochrepts: Hills covered by forest has Ustalfs‐Ochrepts


soil.

19 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
2
REGIONAL CONTEXT
Figure 2.5: Regional Physical Potential of RPA

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 20
2
REGIONAL CONTEXT

Figure 2.6: Regional Cultural Potential of RPA

21 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
2
REGIONAL CONTEXT
2.1.6 LAND UTILISATION 2.2 LOOKING BACK
The area has three distinct types of land utilization pattern. These
2.2.1 INDUSTRIAL TOWNSHIP
are: The planned integrated industrial township of Rourkela and
civil township and villages areas. The residential, commercial,
recreational, institutional and other urban use areas have also Rourkela and its adjacent areas are rich in iron ores, manganese,
been developed in large parts of the Steel township in the form of
dolomite and limestone’s, the basic materials for production of
sectors. The remaining area of the township is more or less
unplanned and only after the first systematic study for the iron and steel. Considering Rourkela to be best place for a steel
development of the civil Township of Rourkela was undertaken by plant, the survey work was completed in the year 1954. The
the Town Planning Organization, Orissa, during 1982 through infrastructure work of the plant was accomplished in between
preparation of ‘Master Plan for Rourkela Civil Township’. The
1955 and 1960. Almost thirty‐two villages were alienated and the
approach of the 1982 Master Plan for Rourkela Civil Township is
more of an area specific and detailed sectoral plan for the people of the villages were resettled. The Republic of Germany
composite area. Figure 2.7: Rourkela Steel Plant

The agricultural fields exist in an interspersed manner with rural


settlements in other parts of Rourkela Planning Area. Agriculture
is well developed as the soil is fertile. Plantation has also been
done in some pockets. One such relatively large pocket of
Reserved forest also exists at a hillocks and undulating
landscape.

2.1.7 VISUAL APPRAISAL

Though the area appears to be almost nondescript in its visual


appearance, a proper
visual environment can be created in the existing township and its
planned extensions with
the help of the water bodies, plantations, and through well
landscaped built environment.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 22
2
REGIONAL CONTEXT

extended technical knowhow for the construction of the steel revamped the process of supply of raw materials, new oxygen
plant and the plant was a joint venture of the Government of plant, improved techniques in blast furnaces, selling of dolomite
India and Germany. The initial production limit of one million plant, Cast house slag glandular plant, supply of raw materials,
tones of steel per annum was raised to 1.8 million tones in the Sintering plant and coal handling plants etc.
subsequent years. The internationally reputed firms like the
KRUPP, DEMAG, G.H.H. Sag, Scholomen, SIEMENS and VOEST Similarly with the implementation of some sophisticated systems
ALPINE etc. supplied different machines and machinery parts to in the second phase of modernization Rourkela Steel Plant could
the plant at the beginning stage. It could also establish itself as Figure 2.8: Natural Potential for Riverfront development
one of the premier industries of the world under the system of
basic oxygen converter.

The extension work of the plant was over by the year 1968. A
circular welding pipe plant and special plate plant were set up in
the seventies for production of different ready‐made materials.
To avoid scarcity of power supply the plant set up a captive power
plant with a capacity of 120 MW. The power plant is able to cater
the requirement of power supply from the year 1986.

The modernization of Rourkela steel plant was begun in the


month of August 1988 with a view to producing qualitative
materials and establishing its importance in the world market.
The process of modernization entailed an expenditure outlay of
Rs. 4500/‐ cores. Some nine main packages including some
ancillary packages were executed at the first phase. This phase get the status of a modern industrial unit in the world.

23 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
2
REGIONAL CONTEXT

The materials being produced from the Steel Plant are steel 2.4 POPULATION GROWTH
ingots, iron sheets, ultra thin plates, electric steel plates, cold
Industrial potential of Rourkela town led to sudden spurt of
rolled coils, hot rolled coils, tin plates and different kinds of pipes
population increase after establishment of Steel Plant.
etc. The by‐products of the plant are fertilizer “Sona”, bitumen Population of Civil Township was less than 4000 persons in 1951
and benjol etc. but by the year 1961 the population had increased to 35,000
persons. Since then the population has increased to 2,59,553
persons in 2001. This registers an annual growth rate of 16.04 %
2.3 RIVER AND RAW MATERIAL INFLUENCE IN which is more than urban population increase in Orissa State. If
DEVELOPMENT compared with growth rate of population during the last decade
Rourkela registered 69.99% of growth rate where as growth rate
The location of Rourkela on the confluence of Sankha and Koel of urban population in the State is 30.28 % for the same period.
Rivers is also consider holy spot and a small temple called The main factor responsible for growth of the town is that the
‘Vedvyas’ enhances its religious potential. The availability of availability of employment opportunity and benefit of
small hills covered with dense forest and pleasant climate and agglomeration economics which make Rourkela an economically
rich mineral deposits gives ample scope to develop as an vibrant town and attracts people from hinterland.
international business centre and sustainable industrial hub.
Towards the southern part of the Planning Region which is
roughly along the Brahmani river valley would undoubtedly
provide good locations for the development of many subsidiary 2.5 MAJOR POLICY DECISIONS
industries connected with the Rourkela Steel Plant as well as
other steel‐based industries. In addition to the metallurgical and One of the major policy decision is considering steel and civil
metal‐based industries a number of chemical industries would township of Rourkela as the core of the larger Rourkela Planning
also grow to make a complex of industries centred around the Area (RPA) has been stated and the necessity of planning and
Steel plant. Among these, fertilizers, styrene, polystyrene, soda development the Steel and civil township with a sound industrial
ash and industries based on coke oven by products would base and employment in information technology sector with
naturally be located near the steel plants, while other industries
regulatory measures in the intermediate tribal and rural areas has
such as refractories and ceramics would find location where clay
resources are found. been explained.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 24
2
REGIONAL CONTEXT

The other major policies are stated here Rourkela will continue to possibility because of the lack of resources and the low capacity
be a major industrial centre. The present industrial complex has of the people to pay rent, at least the minimum community
little room for expansion. Therefore, new sites of adequate size facilities and services and reasonable means of communication
within RPA must be found to locate the Industrial Areas which will in a way remove congestion from the area.
have to be essentially in Rourkela in order to be one of the
To meet the large deficit in housing, a programme of
international competitor in manufacturing of Steel. Adequate
development has to be launched in a big way. The present slim
housing must be made available related to these industrial
dwellers will be provided for in tenements. There will be an
activities within reasonable distances.
increasing number of houses built for industrial employees and
It would be undesirable to increase the proportion of industrial developed land will be made available for both low income and
employment in the occupational structure of the city. What is higher income people. To counteract against squatting in slum, it
required is a balance economic base for which purpose it would is proposed to earmark reasonable areas in different zones for
be necessary to encourage the development of Information the low income group people who migrate to throughout the year
technologies industries. from shrouding areas. Considering their economic condition,
they should be permitted to construct very cheap houses on a
Because of its location, Rourkela will be a major educational,
proper layout with all the necessary reservations of sites, and the
industrial and ICT, Business, commercial and distribution centre
minimum of municipal services provided by public agencies.
and with the growth of population there would be a
proportionate increase in the people employed in trade and The low and middle income groups have resorted to unauthorized
commerce which would provide the necessary diversity to the house construction in the absence of developed land within their
economy. The land requirements for this increasing growth are means. Recognizing this and also a matter of major policy, CDP of
provided in Rourkela for the proposed Comprehensive Rourkela has earmarked about 11000 acres of land all around the
Development Plan. present built up area which will be sufficient for the growth of
Rourkela according to the CDP for the next 20 years or so. Steps
There is densely concentration of population in the civil township
are also being taken to develop land for industry, commerce,
which is also closely built up. Since large scale development
residential uses and community facilities. All this land will remain
options and reconstruction is ruled out as an immediate

25 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
2
REGIONAL CONTEXT
under public ownership and developed plots or undeveloped land 2.6 PLANNING SYNTHESIS
will be leased out to individuals and co‐operative societies on an
equitable basis, so that the benefit of planned growth accrues to One of the major principles is that in order to secure balanced
the common man and the Government can also have a share of development and minimizes frictions, decentralization of places
the future rise in the price of such land. The ownership of land by of employment and their right relationship with residential areas
Government makes planning and the implementation of plans in necessary.
easer and is imperative if slum clearance, redevelopment and With this objective, the RPA has been divided into four planning
subsidized housing and provision of community facilities zones which are self‐contained in the matter of employment,
according to accepted standards have to be undertaken, as, residential places, recreational areas, shopping and other
indeed, they must be in Rourkela in a determined way.
requirements. These are functional units reflecting their own
These are the planning policies on which Rourkela CDP is based. pattern of development and land use, having certain individual
These decisions have been arrived at by the Rourkela Planning physical characteristics, and social and cultural values. While the
Authority as a result of the physical and socio‐economic studies special area (part of civil area) is at present a chaotic mix up of
conducted in preparing the CDP. In translating these broad incompatible land uses, and lacking in compactness and social
policies into physical form, certain desirable planning principles cohesion. The plan has allocated land for industry, commerce,
have been adopted, which would be workable in the Rourkela living, play and other major types of urban land‐use in the most
situation. Applying certain space standards for allocation to the appropriate location for each use and inter‐related to each other
various land uses, a land use pattern was evolved, which is a so as to produce orderliness and smooth functioning.
synthesis of the planning principles, to arrive at a comprehensive A city is a living organism. To create conditions conducive to
development plan best suited for present needs and the future healthy social living, the hierarchy of city structure is built from
growth of the industrial town, Rourkela. the bottom upwards. The housing cluster is built round the
nursery school and the tot‐lot. The primary school, the high
school the community centre and the district centre are the order
of the functional tiers around which the community structure is

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 26
2
REGIONAL CONTEXT

built up. The major educational, recreational cultural and civic should be efficient to provide for adequate internal circulation
centres will provide the integrating and unifying common and municipal services. Through‐traffic should not be permitted
interests. Only in a healthy environment like for the common to penetrate into residential areas. Adequate areas must be
man can become varied, rich and satisfying in the future smart earmarked within close proximity for community facilities like
city of Odisha State. schools, parks, playgrounds, health centres, shopping and other
services. The residential areas should be protected from the
While guiding development in new areas along desirable lines
invasion of non‐residential uses and should be free from smoke,
those areas that already have a healthy, organic pattern must be
noise, odour and other nuisances.
conserved by protecting them from encroachment of undesirable
and conflicting land uses. There are certain slum areas (like Slum The new sites to house public and semi public land uses are so
areas of Unit 32, 49, 47, 44 and 41 and Construction Colony/ Basti located that they have adequate housing nearby, directly
and Laxmi Palli) which must be rehabilitated for improving accessible from the major traffic arteries, and must be well served
environmental hygiene and by reconstructing certain by the public transport system.
deteriorated pockets which will open up areas for providing open
To secure further decentralization of employment, planned
spaces and community facilities. Demolition of unusable
industrial district are located in right relationship with residential
buildings and making a new and improved layout may be resorted
areas of Kuarmunda, Kalunga and Lathikata. These industries are
to in the redevelopment areas. The identification of the areas as
provided with enough water and power and well served with
“conservation”, “rehabilitation” and “redevelopment”, is to be
means of communication like major highways and railroad for
done as a result of physical and socio‐economic surveys. These
efficient movement of goods and workers. Just as residential
steps are necessary to preserve and enlarge the total capacity of
areas are protected from the harmful effects of industries, they in
existing housing. Concentrating on new housing without taking
their turn should be free from non‐industrial and other conflicting
these steps to improve the existing ones and protecting new the
land uses and should have high design and desirable performance
developments.
standards.
Residential densities in the special area have to be rationalized by
The existing commercial area of Special Planning Area must be
eliminating disparities. In developing areas the layout pattern
made more functional with adequate off‐street parking and

27 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
2
REGIONAL CONTEXT
loading and unloading facilities and by traffic regulations. To of residential densities. These zonal parks are for the higher
avoid a ribbon pattern of commercial development and to serve secondary school age group and for adults. The local parks are for
the large increasing population, several district shopping centres primary school age children and should be within walking
have been proposed so as to be within easy reach of each zone. distance. Places of historical interest, natural beauty spots,
These have composite retail and commercial areas with service existing orchard and fruit gardens have to be developed and
industries, flatted factories and government offices to provide interconnected by green linkages and smaller local parks
employment centres. As already stated, there would be other penetrating through residential and work areas. Certain natural
shopping at lower levels to cater for the day to day needs of the features like the river front and the ridge will have to be
people. developed, together with other regional parks to provide active
recreation to the people of the whole area.
Self‐ contained zones and decentralization of employment
centres are necessary if traffic is not in increase to such an extent Similarly, other community facilities like schools, colleges
at the urban core that in the years to come, it would completely hospitals etc. should be provided and rationally distributed in the
paralyse city life necessitating large investment on costly new RPA according to the proposed pattern of residential densities. In
transportation lines. Thus, the more rational and functional land order to avoid huge conurbation of concrete and built areas green
use pattern proposed, together with a coordinated approach to served areas are provided in order to prevent the over spilling or
the traffic problem will result I an improvement of the circulation dominating urban form. This will preserve land and environment
system. Off‐street parking and terminal facilities, grade under urban green, forest, parks, bio‐reserves, horticulture and
separation at rail level crossings improvements of intersections floriculture.
and provision of integrated fright complex, zonal level ring road,
Harmonious growth and orderly functioning are the first steps in
widening some of the existing roads express cycle tracks and a
evolving an attractive smart city. But what will stamp it as a
system of highways linking up RPA more effectively with the
beautiful city is its pleasing architecture and green reserves. This
regional area are necessary to handle the increasing traffic.
should not be confined to monumental civic and cultural centres
A system of linked open spaces and zonal parks has been worked but should pervade the design of all public and private buildings.
out for the entire urban area of RPA related to proposed pattern Modern industrial buildings in attractively landscaped grounds,

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 28
2
REGIONAL CONTEXT

pleasing shopping centres, simple and beautifully designed As the district level, the district administration is headed by the
schools and homes and well laid parks can go a long way to raise Deputy Commissioner (DC), who is the head of the
the city above the humdrum of brick and mortar put together. administration. The DC is the executive head as well as judicial
Well designed and clean streets and street furniture, with head of the district and is aided by a number of officers such as an
minimum of poles, wires and signs will add to the general sense Additional Deputy Commissioner, Sub‐Divisional Officers of Civil
of attractiveness and spaciousness. If these things are kept in Sub‐Divisions and Additional Assistant Commissioners to assist in
mind, symbolize the life and aspiration of the people who will live district administration.
there in the coming decades.
The Deputy Commissioner is over all in‐charge of the
administration. The DC performs triple functions of the Deputy
Commissioner, the District Magistrate as well as the Collector. As
2.6.1 STATE AND LOCAL GOVERNMENT
the District Magistrate, the DC is responsible for maintaining the
ADMINISTRATIVE STRUCTURE RELATED TO
law and order situation; as the Collector and Chief Revenue
URBAN PLANNING AND DEVELOPMENT
Officer of the district responsible for revenue collection and
The Governor is the head of the State of Odisha and the Chief recovery; and as the executive head, in coordinating
Minister is the head of the State Government, assisted by a team developmental activities under various administrative
of cabinet ministers. Different ministers have the responsibility of programmes.
the different departments dealing with Housing and Urban
DC in Sundernagar among other duties relates to the
Development. the departments of Housing and Urban
management of local issues and has specific responsibility for the
Development is headed by the Commissioner‐cum‐secretary
enforcement of the building and land use regulations that have
under whom is the Director of Municipal Administration,
been issued by the RDA in Rourkela.
additional Secretary, Joint secretary, Deputy Secretary and Under
Secretary. Urban planning and development for the state is the
responsibility of the Principal Secretary for Urban Development
based in Bhubaneswar.

29 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
2
REGIONAL CONTEXT
Table 2.1 : District Administrative Profile – Sundernagar

District Sundernagar
District Sundernagar ( 107 Km from
Headquarters Rourkela)
17 Block Balisankara, Bargaon, Bisra,
Bonaigarh, Gurundia, Hemgiri,
Koida, Kuanramunda, Kutra,
Lathikata, Lephripara, Nuagaon

Rourkela Area Notified committee, Rourkela Municipal Council,


Village Panchayats come under the command of the DC,
Sundernagar

Figure 2.9: Existing Administrative Structure of Rourkela Planning Area

Deputy Commissioner
of Sundernagar

Rourkela Area Rourkela Village


Notified Municipal Panchayats
committee Council

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 30
3
EXISTING CONDITION ANALYSIS

3.1 DEMOGRAPHIC CHARACTERISTICS economic development projects.

3.1.1 GROWTH AND DISTRIBUTION OF POPULATION In broader sense the town of Rourkela was actually counted from
decade of 1950 to 1960. Though Rourkela declared as urban area
The city of Rourkela has a broad division of Steel Township and way back in the 1931 after the census, but the development of
Civil Township which leads to variety of mix of population from Rourkela took place after announcement of Public Sector
regions across the country. Also, there is a sizeable amount of Integrated Steel Plant at Rourkela in the year 1954. After this
announcement sizeable number of population from various parts
tribal population. All other demographic characteristics of
of the Odisha and India as well coming here. After the
Rourkela Urban Agglomeration has been studied and analyzed establishment of the Steel Plant and formal start of production
from the census data and primary survey (household) as well as it from Plant in the year 1959 large flow of migrated population
is determined to plan for education, health care stimulus and from various parts of the country took place till 1970’s. Apart

Figure 3.1:

Figure 3.2:

31 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
from this sizeable numbers of foreign nationals have also been 3.1.2 AGE COMPOSITION
coming to Rourkela for Steel Plant maintenance, Production and
modernization related work from time to time. Hence, Industrial Figure 3.3:
potential of Rourkela town led to sudden spurt of population
increase after establishment of Steel Plant. Population of
Rourkela Planning Area (RPA) was 4,91,691 persons in 1991 but
by the year 2001 the population had increased to 5,75,585
persons. Since then the population has increased to – 6,45,877
persons in 2011. This registers an annual growth rate of 1.57 %
which is more than urban population increase in Orissa State. If
compared with growth rate of population during the last decade
Rourkela registered 12.21% of growth rate where as growth rate
of urban population in the State is 30.28 % for the same period.
The main factor responsible for growth of the town is that the
availability of employment opportunity and benefit of
agglomeration economics which make Rourkela an economically
vibrant town and attracts people from hinterland.

Table 3.1 : Population for the Rourkela Planning Area


AREA Civil Steel BLOCKS
POPULATOION Township Township LATHIKATHA KUARMUNDA BISRA TOTAL A detailed account of age‐sex composition of Rourkela’s
Area population is based upon the Socio‐ Economic primary survey
1991 178329 193341 78396 37274 4351 491691 under taken by the RDA during 2010 and census 1991. As per the
2001 224987 206693 81677 56479 5749 575585
census 1991, children up to 15 years of age constituted 30.74 per
2011 273040 213360 85207 67416 6854 645877
cent of the total population, whereas the working age group of
15‐60 years accounted for 65.39 per cent. Within this age group,
the relatively younger set of people between the ages of 15 and
40 years constituted as much as 45.93 per cent. Only 3.87 per
cent of the population consisted of old persons above the age of

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 32
3
EXISTING CONDITION ANALYSIS

60. The predominance of working age groups in the population is 3.1.3 SEX RATIO
characteristic of a new town, which is growing rapidly due to
work opportunities in various sectors of economy. However, as The sex ratio of the population in the Rourkela Planning Area in
per the past data of census in 1991, it was found that as 2001 was 881 females per 1000 males. But if analyzed further it is
compared to the 2010 primary survey, children below the age of found that rural sex ratio is 939 females per 1000 males and
15 had increased from 30.74 per cent to 31.8 per cent of the urban is only 871. According to the primary survey 2010, it was
population, the working age group between 15 and 60 years had revealed that the sex ratio had decreased to 835, indicating to the
shrunk to 60.66 per cent from 65.39 per cent and persons above fact that more number of working males are migrating leaving
the age of 60 had increased from 3.87 per cent to 7.4 per cent. behind their families.
This trend points out that age composition of Rourkela is getting
Figure 3.4:
3.1.4 LITERACY RATE

The literacy rate as per the 2001 census works out to be 71.35 per
cent, more than the corresponding Orissa state figure for urban
population, which was 63.08 per cent. One of the
reasons for this higer literacy rate is that Rourkela has attracted a
large number of migrants, mostly literates for employment. Male
literacy rate for RPA is 77.64 which is more than the female
literacy i.e. 64.20%. The literacy rate in urban area is 73.88 per
cent as compared to only 56.63 per cent in rural area. This may be
due to less accessibility in rural area to education facilities socially
or financially. As per the primary survey literacy rate is even
increased from 71.35 in 2001 to 81.64 per cent in 2010. Education
facilities have been further developed in Rourkela which has
contributed to the enhancement of literacy and general
education standards in Rourkela.
more stabilized with time and a large number of retired persons
are getting settled in Rourkela.

33 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
3.1.5 HOUSEHOLD SIZE 3.2.2 SECTOR WISE DISTRIBUTION OF WORKERS

As per 2010 primary survey, the average household size of In 2001, a major segment of workers in the Rourkela Planning
Rourkela works out to 4.2. The survey further reveals that nearly Area comprised of Service and transportation sector which
70 per cent of the households have a household size of 4 to 6 constituted 91.57 per cent of total workers. Another 6.41 per cent
persons. Out of the remaining, about 4.25 per cent have more were in primary activities and only 1.72 percent in Manufacturing
than 6 persons per household and more than 25 per cent have and industry or secondary sector. When compared to rural area
less than 3 persons per household. the share of primary sector increased to 35.28 percent and
secondary sector is only 1.47. The service sector still dominates
with 63.25 percent. In urban area only 0.85 percent persons are
3.2 ECONOMIC CHARACTERISTICS engaged in primary activities and in industrial sector is 1.86
percent and 97.29 percent of workers are engaged in service
3.2.1 WORKER FORCE PARTICIPATION RATE (WFPR) sector

As per the 2001 Census, 29.37 per cent of the population of 3.2.3 HUMAN DEVELOPMENT INDEX
Rourkela Planning Area are employed. Work force participation
rate in rural area is more i.e. 34.26 per cent than urban area i.e. The Human Development Index (HDI) is a composite statistic of
28.55 per cent. This is mainly due to less income of the family in life expectancy , education, and income indices to rank countries
rural area forced more member of the family to work. This fact is into four tiers of Human development.
more evident when analysed male/ female workforce
participation rate in both urban and rural area. As far as male Human Development index is given by:
WFPR is concerned it is more or less same in urban area 47.06 per
cent and rural area i.e. 47.85, however, female WFPR is only 7.33 HDI =( LEI x EI x II ) 1/3
per cent in urban area and 19.05 per cent in rural area. As per
Where HDI = Human Development Index
primary survey in 2010, the figure had increased to 34.90 percent
for the Rourkela Planning Area, which is a reflection of the LEI = life expectancy index (consider life expectancy)
growing economic opportunities in the region
EI = Education index (considers mean and expected years of
schooling)

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 34
3
EXISTING CONDITION ANALYSIS

II = income index (considers Gross net, income at PPP per capita ) GDI takes in to account not only the average or general level of
well ‐ being and wealth within a given country, but focuses also
Observation
on how this wealth and well being is distributed between
Rourkela has done reasonably well in terms of education different groups within society
indicators, but there is scope of improvement in income and
Higher the gender inequality, lower is the GDI.
health indices, though the numbers are ahead of the state’s
statistics. Table 3.3 : comparative GDI Indices

HDI values are highly influenced by development indicators in GDI


industrial and mining areas, because improved trade is followed Rourkela 0.659
by improved per capita income, which is turn is followed by Odisha 0.546
improved literacy. India 0.590

Table 3.2 : Comparative HDI Indices


3.2.5 ISSUES
Education Health Income HDI
index index index Rourkela’s position seems to fairly good in terms of GDI with
Rourkela 0.74 0.692 0.618 0.681 respect to state and national level. Since Rourkela’s GDI value is
Odisha 0.723 0.468 0.545 0.570 high, it implies more equality between the genders. This can
India 0.459 0.722 0.515 0.547 definitely be seen as a positive point.
(Source: Calculated from RDA, 2001 data [projected] and
Household data, 2013) ƒ Infant mortality rate has increased over the decade, which
directly influences health index of HDI in the form of life
3.2.4 GENDER DEVELOPMENT INDEX expectancy at birth. There is need to reduce infant
While HDI is a simple indicator of basic attainments with respect mortality rate and maternal mortality rate.
to human development, GDI uses the same parameters, but aims ƒ A school dropout rate of about 14.01% is seen in the
at capturing the gender dimension of human development. blocks, which should be reduced for a better reflection in

35 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
education index of HDI, because although enrolment often involved in Agriculture. 72 % population are non‐working
nears 100 % but discontinuation of education continues. less number of female population are working.
• Huge gap exists between male and female working
GENDER INEQUILITY = HDI – GDI
population. Vocational training centers should be provided
for women who aim to promote employment of women in
3.2.6 OCCUPATION STRUCTURE industry as semiskilled workers by increasing their
participation in skill training facilities. A few numbers of
a) Civil Township
people are involved in agricultural works among marginal
• Majority of the working population is male, which implies and mail workers. 72% population is working and 28 %
less participation of female in workforce population. Those population is non‐working.
workers who had worked for the major part of the c) RPA Blocks
reference period of one year (i.e. 6 months or more) are
termed as Main Workers. Those workers who had not ƒ Majority of the workforce from the blocks is constituted by
worked for the major part of the reference period of one the male population (average: about 75 %). This indirectly
year (i.e. 6 months or more) are termed as Marginal also portrays the reasons for migratory population also
Workers. (Definition Sources: Census of India). being male ‐ oriented and hence directly points out the
• Majority or workers in Rourkela UA are main workers reason for the constantly low sex‐ration over the decades.
which is a positive attribute, a less percentage being ƒ About 72% (average) indulge in occupational activities as
marginal. main workers, whereas about 28 % are involved as
marginal workers. Though the percentage of marginal
b) Steel Township workers is quite low as compared to that of the main
• In industrial ‐township most of the working population are workers, however, this ratio is quite high as compared to
main workers. Main workers are 93 % & marginal workers an other urban agglomeration in general. This might be
are 7 % small number of main & marginal workers are due to the fact that steel plant and its allied industries are
slowly reaching a point of saturation as of in terms of

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 36
3
EXISTING CONDITION ANALYSIS

employment generation and hence, the reduced job b) Age wise Dependency Ratio
opportunities and involvement of people into other options
[ No. of people aged > 60/No. of people aged (18‐60) ] x 100=
of economy generation.
{142/742} x 100 = 19%
ƒ The percentage split – up for the different blocks (see fig.
below) and the type of economic activity composing the 3.3.2 ISSUES
main workers and marginal workers also clearly supports
the hypothetical proposition in the aforementioned point. • Dependency ratio in Rourkela is 69 % which means for every
10 working adults, there are 6.9 people that need to be
supported, be it through social security , childcare health,
social security & education. Few workers are supporting too
3.3 HOUSEHOLD SURVEY RESULTS
many people, aged dependency ratio is lesser than child
3.3.1 DEPENDENCY RATIO dependency ratio. High dependency ratio will put strain on
education, health services, food supplies , availability of
This indicator give insight into the amount of people of non – accommodation, and lack of available jobs in the future.
working age compared to the number of those of working age. • These problems can be solved by reducing primary school
[ { No. of people aged (0‐17) & > 60 }/ { NO. of people aged (18‐ dropouts. Programs can be introduced like Sarva Shiksha
60) } ] x 100= {[ 370+142)/742} x 100 = 69% Abhiyan (SSA), which will focus on reducing primary schools
dropouts as well as improving quality of student learning.
a) Child Dependency ratio Through family planning, raising the retirement age,
introducing self‐help group to give jobs to women
[ No. of people aged (0‐17) / No. of people aged (18‐60)] x 100
dependency ration can be decreased.
={370/742} x 100 = 49% • 59% of total population are in 18 to 60 years age group.
Lesser population are in more than 60 years age group.
• Constrictive Population Pyramid.
• Low birth rates.

37 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS

• Slow population growth. Table 3.4: Comparative Sex‐Ratio of Rourkela, Sundargarh,


• Large number of economically active population. Odisha and India.
• Large number of migrated population for job opportunities Rourkela Sundergarh Odisha India
Sex 880 957 972 933
• Most of the population is migrated population i.e. on an (Source: NIC, 2011 data)
average 53%. Most of them are migrated from district.
• No huge difference between male & female population. On • GDI of Rourkela is high, but sex ratio is low. This probably
an average, there are 906 female per 1000 male population is because of the fact that GDI focuses on how this wealth
(considering the municipality limits, industrial township and and well‐being is distributed between different groups
the three blocks of Kuarmunda, Lathikatha and Bisra.) within society, whereas sex ratio gives us the statistical
value of number of females per 1000 males. Similar
• 67% population are General. More number of ST population
situation is faced with United Arab Emirates.
than SC & OBC. Less number of population are post
graduated. • There is high difference between male and female literacy
levels, which also gets reflected in this anomaly. This
• 35% population are students. Less number of non‐working
difference is most prominent in the Basti areas.
population.
• Most of the population earns less than Rs. 2501 per month. 3.3.3 VARIATIONS IN POPULATION DENSITY
Only 5% population earn more than Rs. 25000 per month.
• Both HDI and GDI are High, but sex ratio is abnormally low • Population density is most in ward 20 of municipality but
• Sex ratio of Rourkela is quite low in comparison to district, SC/ST population is least in it.
state and national levels. Rourkela has a sex ratio of 880 • ST is mostly the tribes here who have moved to periphery
females per 1000 males, which is quite less. Rourkela, from due to pressure in the centrals.
the beginning, has been a city formed by migrated population • It is near to ring road, so good accessibility, hence Land
Hence, No. of male population staying here without family price has gone up.
for job reasons is huge.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 38
3
EXISTING CONDITION ANALYSIS

• Ward 4 has least density because it is an area with larger • The most fundamentally serious consequence of
land holdings, well to do families and huge plot area ( 400‐ female illiteracy is in the field of health, hygiene and
450 sqm from HH survey with 60% above open space) birth control.
• Certain issues and possible solutions came to the forefront • Wives and mothers are also often responsible for
as a result of the above analysis: safeguarding the health and welfare of their families
ƒ Population Densities of Municipal Wards but if they are illiterate, they can’t understand public
ƒ Need for re‐densification of ward wise population health literature about basic sanitation, how to source
ƒ Move towards “compact city” concept clean water, how to keep disease at bay, and so on.
ƒ Promote realization of multifamily dwelling in • Leads to the spread of illness, infection, and a high,
single family lots. mortality rate, domestic drudgery and servitude.
• It must be aimed to achieve productive employment for
all, including women, marginalized and young people.
3.4 EXISTING LAND USE AND DEVELOPMENT IN
• Only 17% of the total workforce constitutes of women,
ROURKELA TOWN
hence there is scope for improving women employment,
and involving them in activities like HH industries, also
giving benefits for women participation. This can also 3.4.1 PAST PLANNING EFFORTS
encourage people to live with families here, which will
improve the sex ratio. Based on German planning, one of the most advanced Steel Plant
• 15% of the workers are marginal, which can be aimed to of the world at that time was constructed in Rourkela from mid
be reduced. 1950’s. In 1954 the process of acquisition of land required for the
steel plant and the New Township were started. In 1955 site
3.3.4 WOMEN ILLITERACY planning of the Rourkela Steel Plant and township were prepared
based on German concept of planning and engineering principles.
• Percentages of illiterate women are higher than those In 1959 the first blast furnace of Rourkela Steel Plant was
of illiterate men. inaugurated in the presence of the then President of India, Dr.
Rajendra Prasad. By 1961 the construction activities were

39 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
completed. Again in 1980s the plant was modernized to compete Organization, Orissa, during 1982 through preparation of ‘Master
with international market. Plan for Rourkela Civil Township’.

During Tenth Five Year Plan under ‘National Urban Information


System (NUIS) Scheme’ Rourkela and its region with an area of
188.60 Sq. Km. for 1:2000 and 785.85 Sq. Km. for 1: 10000 scales
have been identified for mapping with the help of Satellite and
Aerial Photographs to meet the requirement of digital base maps
for towns.

The first systematic study for the development of the civil


Township of Rourkela was undertaken by the Town Planning

Figure 3.6: German Concept Town Planning for Steel Township

3.4.2 EXISTING LAND‐USE

In an Urban area the Land‐use always remains flexible. Frequent


changes in the land use take place due to fluctuating economy
variations in the market price of land, changes in the economic
pattern of the people, and political decisions. The frequency and
Figure 3.5: Master Plan of Civil Township the extent of such changes, however, very much depend upon the

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 40
3
EXISTING CONDITION ANALYSIS

actions and interactions of the various factors involved and no development of town. Its future size, pattern and direction of
single factor can be held responsible for changes in the urban growth, form, etc., are determined through the process of land
Land‐use pattern. However, if the factors influencing the urban use planning, which provides a definite guideline and roadmap for
land‐use are left to themselves without any control, the ultimate the future development of the planned area.
product results in the shape of confused Land‐use pattern. Hence
it is always desirable, in the interest of the overall welfare of the Table 3.5: Existing Land use of Rourkela Planning Area.
community, to impose certain restrictions in order to avoid
haphazard growth and to create desirable and healthy Sl. Land Use Area Area in
No. (in Sq. percentage
environment. These restrictions in the field of Planning are Km)
termed as Zoning Regulations, through which control is affected. 1 Residential 39.11 15.09
2 Commercial 1.40 0.54
3 Industrial 21.45 8.28
4 Recreational 2.81 1.08
5 Public and Semi Public 10.13 3.91
6 Transportation 11.76 4.53
7 Agricultural/ vacant/ 112.28 43.32
waste land
Forest 16.11 6.22
8 Water bodies /wet land 24.26 9.36
9 others 19.87 7.67
Total 259.18 100
Source : ORSAC Existing Land-use – 2010.

In order to asses actual needs of Land areas for various uses and
also to suggest means for proper functional integration of various
use zones, it is first necessary to study the existing land‐use
pattern. Hence, the Land uses were divided into 9 categories in
Figure 3.7: Existing Land‐use the following way:
Land use planning for a town is a process through which attempts
are made to make use of land in the best possible way for

41 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
The present physical extent of the Steel Township concept is special area. In Civil Township appears to be utter lack of
planned by the Germans as a neighbourhood concept and organised open spaces.
transportation is planned according to topography and on grid
Apart from Steel Township and civil township area Rourkela
pattern and community facilities are provided based on
Development Planning Area also comprises 52 villages which is
population density and planning distance norms. The Steel
characterized by very low density and tribal rehabilitated
Township and Steel Plant are connected by a ring road to cater
settlement at the time of construction of Steel Plant and Steel
the high speed and high volume of traffic. The availability of
Township. Hence, the area south of Steel Plant and Fertilizer
employment opportunity result Rourkela is a fast growing town.
Plant and in the North of river Sankh and west of river Brahmani
Its development during last one decade indicates that the pace of
having mostly tribal or adivasi population which was considered
development is more than what was expected.
as most backward and therefore a priority area for development.
But majority of the Adivasi Population had no share in economic
growth of the region. These areas are dominated by agriculture
The Civil Township is a narrow wedge between the Steel Plant
and forest land‐use.
and the Steel Township. There was a sudden spurt of population
increase in the Civil Township area after the establishment of the There appears to be no proper inter‐relationship between the
Steel Plant. Functional need of Steel Township and Steel Plant various uses. Commercial residential and public uses have
was responsible to some extent for contributing secondary and emerged simultaneously in a mixed form and there exists no
tertiary personnel necessary. Thus it can be seen that the Civil distinct identity for any use‐zone. In a nutshell, it can safely be
Township area consists of a narrow band and disconnected said that the existing land use pattern is haphazard and
sectors and truncating the Steel and Fertilizer Plants on the one uncontrolled. At no stage if its development, there appeared to
side and the Steel Township on the other. This has resulted in have been made any conscious effort for guiding the
sporadic development in Civil Township and thus problem of development on planed basis excepting Civil township which is
haphazard construction, sub‐standard dwellings and acute also an area specific approach and not the comprehensive
conjunction are the major issues and should required to be as a approach.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 42
3
EXISTING CONDITION ANALYSIS

In the Northern area of Shankh River developments are mostly the density is more than 30700 persons per Sq. Km. and in the
restricted along the roads and lanes, the rear portions remaining rural area the residential area is less than the 12000 persons per
vacant in the shape of undeveloped lands. Apart from the Sq. Km.
confused and mixed development of the various uses and also
Thus it appears that there is a marked contrast between the
insanitary environment, placements of the facades or the
various areas so far as the degree and intensity of development is
buildings are most unsatisfactory. Many new industries have
concerned. The residential areas in the Civil township are
come up along the roads without any uniformity in the eastern
characterised by overcrowding, congestion, dilapidation, lack of
part of Bhramni River.
adequate approaches and community facilities. As already
A detail analysis of land development based on the latest satellite indicated earlier one of the most important feature that emerges
images indicates that total land of approximately 146.93 Sq. Kms. from the study of the residential areas is that the development
have been put to different land uses or not unhabitable (eg. are concentrated mostly along the roads and lanes.
Water bodies, reserved forest, erosion land etc) by the year 2010
There exist still vast stretched of open lands which would be
and approximately 112.28 Sq. Kms land is under agriculture or
utilised for providing essential community facilities like parks and
other uses and not build‐up. Hence only 112.28 area of land is
open spaces, which are utterly lacking. The need, therefore, is to
available for development.
re‐organise residential areas with the least dislocation and
disturbance and to aim at such residential densities on the basis
3.4.3 RESIDENTIAL USES of neighbourhood principles, which may infuse better living
conditions.
Existing residential areas occupy approximately 39.11 Sq. Kms.
areas of land constituting 15.09 percent of Rourkela Planning
Area. The gross residential density workout to 21098 persons
a) Housing
per Sq. Km. The density in the different parts of town varies
greatly from place to place and in certain pockets such as Steel Rourkela being a primarily industrial township has a typical
Township the gross residential density is more than 15000 characteristic feature that of a cosmopolitan character developed
persons per Sq. Km. Among the residential area in Civil Township

43 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
since the steel plant project’s establishment. Yet, the existence of to the housing challenge. Also, Homelessness is a major
the original inhabitants of the region and their residential challenge due to the slum existence and their expansion
locations, typology and style, their housing condition and their due to migration.
development over the years cannot be overlooked because they 3. Dichotomy: is various housing Pockets: this adds to the din
add to the diversity to the city as in the peri‐urban areas and since there is a strong requirement of matching up the
fringes and also gives a character to the place that is much steel township area and the non‐steel township area with
overlooked not only in the socio‐economic status but also in the the similar privileges.
housing scenario as a whole in Rourkela.
All this has resulted in a diverse yet haphazard growth which is
Rourkela has a very diverse and mixed housing system. Even after continuously building pressure on the urban land and the land
possessing a well planned steel township and an equally prices that are soaring. The direction has mainly been in the
dominant municipal and civilian area which is supported with north‐south direction and the east, though the west has not been
three distinct (parts) Blocks in its outer fringes, yet the diversity exploited yet here are traces of some upcoming development.
even exists in its micro scale level too, for instance even the block
b) Household Number Information
regions have a mixed housing system consisting of not only the
tribal characteristics but also the typical village housing character The household No. information is an important criterion to
which is much under the influence of expanding urbanization. determine various other facets linked within the urban
agglomeration and therefore it is necessary to assimilate the
The existing status of housing in Rourkela is governed by three
same and decide the contribution of each in forming the total No.
major factors:
of households.
1. Rapid Urbanization:‐ More inherent migration due to job
c) Rourkela Urban Agglomeration
opportunities and advanced urban development (though
at a small level) and the increase in population is adding to The Rourkela Municipality and the Steel Township have an
the housing demand. almost equal contribution for the No. of households to the city as
2. Socio‐Economic Diversity and its Influences:‐ The wide being 45385 and 44684, while Bisra has the minimum
variety of social and economic status of the society adds

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 44
3
EXISTING CONDITION ANALYSIS

contribution to the same 1346 only hence it is most sparsely subsequently. Also, all the wards have suffered a drastic increase
populated. This adds to the fact of maximum density in the centre in the No. of households in a span of 10 years which gives a clear
of the city and then sparse population break at he fringes. The idea of the rapid urbanization and construction of new houses
major share of the entire household distribution entails from the whatever their condition or style be.
Rourkela Municijpal Area and the Steel Township as being 37%
and 36% subsequently followed by Lathikatha as 14%, e) Ward wise Population for Civil Township (Comparison)
Kuarmunda as 12% and Bisra Block as 1% of the total No. of
Households. Table 3.7: Total No. of Household Comparison‐Ward wise
(Rourkela Municipality)
Table 3.6: No. of Households in Rourkela Urban Agglomeration
WARDS 2001( No. of 2011(No. of
Rourkela Municipality 46385 Households) Households)
Steel Township 44684 Rourkela(M)‐Ward No. 1 1116 1756
Kuarmunda Block 14479 Rourkela(M)‐Ward No. 2 1183 1454
Lathikata Block 17003 Rourkela(M)‐Ward No. 3 1583 3329
Bisra Block 1346 Rourkela(M)‐Ward No. 4 2185 2467
Rourkela Urban 123897 Rourkela(M)‐Ward No. 5 1492 2183
Agglomeration Rourkela(M)‐Ward No. 6 2035 2534
(Source: Census of India 2011) Rourkela(M)‐Ward No. 7 2482 1807
Rourkela(M)‐Ward No. 8 1730 2631
Rourkela(M)‐Ward No. 9 1599 2340
d) Household Break‐up for wards (Civil Township) Rourkela(M)‐Ward No. 1825 2586
10
Rourkela(M)‐Ward No. 1293 1391
Following information depicts the decadal increase in the No. of
11
households in the ward area of Rourkela Municipal Area.
Rourkela(M)‐Ward No. 2131 2341
Therefore the maximum No. of households are constituted in 12
ward NO. 3 and ward NO. 33 followed by ward No. 13 Rourkela(M)‐Ward No. 1970 3056

45 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
13 Rourkela(M)‐Ward No. 1279 1670
Rourkela(M)‐Ward No. 932 1683 28
14 Rourkela(M)‐Ward No. 1312 1563
Rourkela(M)‐Ward No. 961 1029 29
15 Rourkela(M)‐Ward No. 1354 1564
Rourkela(M)‐Ward No. 1277 1967 30
16 Rourkela(M)‐Ward No. 1697 2503
Rourkela(M)‐Ward No. 838 1191 31
17 Rourkela(M)‐Ward No. 3423 2676
Rourkela(M)‐Ward No. 1263 962 32
18 Rourkela(M)‐Ward No. 3415
Rourkela(M)‐Ward No. 1242 1288 33
19 (Source: Census of India 2011)
Rourkela(M)‐Ward No. 1048 1762
20 f) Household Break‐up for Blocks
Rourkela(M)‐Ward No. 710 993
21
Following information depicts the No. of households in the
Rourkela(M)‐Ward No. 850 866
22 various block regions under the Rourkela Urban Agglomeration.
Rourkela(M)‐Ward No. 1119 1183 We can gather that for the maximum distribution of No. of
23 households can be found in kuarmunda region followed by
Rourkela(M)‐Ward No. 1128 1659 Lathikatha and Bisra. The Kuarmunda region has Birmitrapur and
24 Brahamnai Tarang contributing to the No. of households while
Rourkela(M)‐Ward No. 1066 1203 Lathikatha is comprised of Lathikatha, Raghunathpalli and
25
Tangarapali. Brahamani Tarang has maximum No. of households
Rourkela(M)‐Ward No. 727 885
out of all the block regions i.e 11918 households.
26
Rourkela(M)‐Ward No. 1535 1461
27

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 46
3
EXISTING CONDITION ANALYSIS

Table3.8: Block wise Distribution of Households chances to grow and face rapid urbanization and growth.
Biramitrapur(P) 2561 Also, negative growth has been observed in ward 7.
Brahmani 11918 • It must be noted that wards 9, 10, 11, 13 and 20 have
Tarang comparatively a higher proportion of density distribution,
Bisra(P) 1346 therefore there is a lesser chance for future housing
Lathikata 4409
development at these locations.
Raghunathapali 8983
Tangarapali 3611 • Also, wards 1, 2, 4, 12 and 17 have a little scope for
(Source: Census of India 2011) housing development and increase.
• Wards 23, 24, 25 and 26 have a low density but no scope
g) Residential Density for future housing projects since they are governed by
railway quarters’ inhabitation that is all a controlled stock
The residential density distribution gives an idea of the areas under the railways.
under congestion and areas which are under utilized for land. It
gives an idea how and in what areas there is more intensity and
scope for development and wherein the control is required. 3.4.4 MAJOR SOCIO‐ECONOMIC CHARACTERISTICS

• Congestion persists in RMC as per the households The socio‐economic characteristics as recorded and analysed
distributed over a smaller area as compared to Steel based on the on‐site primary survey gives the idea of the various
Township and the blocks. back‐up factors which govern the current housing scenario in the
• Underutilized land in Kuarmunda and Lathikatha. urban agglomeration. These may be broadly categorized in the
• Ward 33 is a new constitution and overtook the household following categories:‐
increase of ward 32 as being derived from there so more a) Social characteristics:‐ these are the social characteristics
development can be projposed. Also, wards associated with the housing scenario. The various areas
1,3,8,13,14,16,20,31,33 have seen a recent sharp increase under consideration here are as follows:‐
and developmental change. Therefore, there are more I. Settlement Distribution

47 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
II. Household Size III. Relation of Household Income and No. of Stories.
III. Ownership Pattern
Each Category can be discussed in detail as follows in the
IV. Age of Housing Stock
subsequent sections.
V. Housing Stock Condition:‐
a. Based on building status a) Settlement Distribution
b. Based on Building material typology used
b) Housing Building Characteristics:‐ These are those factors Mostly Rourkela has plotted development therefore there is a
which define the physical characteristics of the housing scope to bring in more apartments and increase the density and
scenario and there subsequent affects. The various area provide for thus new housing, the FAR can be increased and new
under consideration here are as follows:‐ apartments can be added thus, also there is a scope to increase
I. Building materials used: the height.
a. Roof Material
b) Household Size Distribution
b. Wall Material
c. Floor Material
II. Repair and maintainance • Mostly 4‐5 is the household sizes as it varies,
III. Abutting Road Width Size therefore the average can be taken as 4.5
IV. No. of Habitable Rooms • Lathikatha, Bisra and Kuramunda have larger
V. No. of Stories household sizes as compared to RMC and Steel
VI. Plot Area Township, probably due to smaller and nuclear
c) Housing and Economic Characteristics:‐These are the families preferred in the central region. Therefore,
factors the influence of housing over economy and the there is a chance of increasing housing demand
influence of economy over housing sector as a vice versa. due to nuclear family formation and this has to be
The various areas under consideration in this field are:‐ catered to.
I. Land Price Analysis
II. Income Wise Household Distribution

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 48
3
EXISTING CONDITION ANALYSIS

c) Ownership Pattern: developed therefore the age is not as old as 15 years


even for some housing.
• Mostly wards 4, 29, 32, 33 have a lower proportion of
Ownership Pattern gives us the information from
old housing which is >30 yrs., which means that they
which we can determine the majority type of housing
have started developing lately therefore no need to
prevailing in terms of government housing/rental
develop housing stock here.
housing/private housing/office quarters etc.
• Wards 25, 26,27,28,29 are primarily railway
Table 3.9: No. of Houses(Area wise) and their Age
quarters, therefore the ownership pattern.
Category
• Wards 5, 14, 15, 22, 32, 33 show rented
Area Name Age When Built
ownership is proportionately equivalent to the 1‐5 5‐15 15‐30 >30 Total
owned ownership. Therefore there are chances years Years Years Years No.
of the people buying more houses in the same Rourkela 34 51 70 88 244
area. Municipality
SAIL 8 22 31 45 106
Lathikatha 2 5 10 15 32
d) Age of The Housing Stock Block
Bisra Block 2 3 4 3 12
It is important to determine the age of the housing stock as it Kuarmunda 12 12 7 14 45
aids us in understanding and determining the deficit housing Block
stock. Also, the housing age is important to know which area Total 58 93 122 165 439
needs concern and attention in terms of development and (Source: Primary Survey)
thus in the planning strategy.
e) Housing Condition
• Mostly RMC region has the housing as of 15 years and
The housing condition helps us to determine the typology of
above years of age. In Kuarmunda the region is being
housing stock already existing and will help us further the

49 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
housing need dependant on whether what percentage of
good, dilapidated or average housing is available in all the ii) Based on Material Typology
areas and even in the wards of the RMC area. The housing • Lathikatha, Bisra have a higher percentage of
condition was recorded based on two categories: based on kutchha which can be serviced and upgraded.
building status and based on material typology. The results
are recorded as follows.
f) Building Materials Used
i) Based On Building Status
• Roof:‐ mostly RCC, thatch has been seen in
• Least No. of dilapidated and bad conditioned
Block regions i,e Lathikatha especially since
houses are present in the Steel Township and
being primarily a tribal region. Therefore, the
Kuarmunda region.
RCC proportion is lesser as compared to
• Also RMC and Lathikatha’s housing stock needs
asbestos, tile etc.
considerable improvement.
• Wall:‐ Maximum proportion is that of brick
Area Name Condition
Goo Avg Ba Dilapidate Tota whereas cement and mud wall form an almost
d . d d l equal proportion. Also, RMC, even having
Rourkela 87 88 45 24 244 slums has roof materials as asbestos and wall
Municipalit material is brick I,e slums can be upgraded.
y • Floor:‐is mostly cement, mud, mostly the
SAIL 52 41 10 3 106 higher income groups are using marble and
Lathikatha 12 6 10 4 32
mosaic. In the RMC areas therefore much more
Block
Bisra Block 3 6 2 1 12 experimentation in RMC as compared to Steel
Kuarmunda 20 14 9 2 45 Township and the blocks.
Block
Total 174 155 76 34 439
(Source: Primary Survey)

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 50
3
EXISTING CONDITION ANALYSIS

g) Repair & Maintenance possessing 4 habitable rooms on an average, ie. 33% as


percentage distribution of the various categories, followed by
Housing stock’s repair and maintenance is most overlooked in
3 rooms, 2 rooms and 1 room subsequently.
Bisra and RMS region therefore, we need to focus more on
maintenance of the existing stock apart from new j) No. of Stories
construction.
• Highest No. of stories can be seen in RMC then
h) Abutting Road Width Size Steel Township narea and the least No. of
stories can be observed in the blocks.
The Abutting road helps to define the FAR and the building
Therefore, Kuarmunda is undergoing a
bye laws and till what extent are they being followed and thus
developmental change and apartments are
what precautions need to be taken in the development
mostly coming in Kuarmunda region especially.
strategies in the given areas. It was observed that in Bisra
Block all roads are with width less than 5m and the range for k) Plot Area
all the other areas in the Rourkela Urban Agglomeration are
maximum for road widths being< 5m ie. Ranging from 78% to • Rourkela Steel Township has fixed plot sizes
62 % the other category of road widths for all areas is the and cannot be changed.
range from 5 to 10 m. Only the RMC shows a trace of housing • The plot area ranges from <50 m2 to 1500 m2
having abutting road widths in the range from 10 to 15 m. • The most prominent sizes are 101‐250 m2

i) No. of Habitable Rooms l) Built‐Up Area‐Area Wise

RMC has the tendency of maximum No. of habitable rooms as • Most of the housing occupies a ground
a distribution pattern even as high as 9 although Steel coverage of >75 m2 thus violating the
Township has a limited No. as being a maximum of 7 No. of maximum ground coverage allowed here.
habitable rooms. Although, the entire Rourkela Urban • Maximum violation can be seen in the RMC
Agglomeration has the maximum tendency for the housing area and minimum in Steel Township.
• Hence, there should be check on such issues.
51 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
m) Land Price Analysis Daily Market 22000 27500
Nala Road 20000 27000
• Land price in Daily market and Civil Township is Panposh 2500 10000
the highest but no scope for development in Civil Township 25000 37000
daily market. Vedvyas Area 1250 6300
• Panposh Vedvyas and Kuarmunda the land Bondhamunda 5000 12500
availability is there also prices are lower. These Jagda 5000 12500
areas on development can be put through Jhirpani 2500 7500
Koelnagar 12500 17500
some incentives to attract buyers etc.
Shaktinagar 7500 12500
• Jagda , Jhirpani, Shaktinagar have scope for Fertilizer Township 2500 7500
group housing but initially for HIG which can Lathikata 750 3000
over time slowly trickle down to the lower Kuarmunda 1250 4000
income groups as per development. Kalunga 1350 3800
• Fertilizer Township: Housing stock needs large Bisra 1000 3800
scale updating and land needs to be broken for (source: Primary Survey)
market as land price is low but this is a
n) Income Wise Distribution
challenge since most of it belongs to the SAIL.

Table 3.10: Land Price/sq. m Details


• Kuarmunda and Lathikata have large
Area Name Land Price/ sq m proportions of EWS and LIG due to lesser
Lower Limit Upper Limit development in those areas, though it is
Chhend Colony 12500 18000 changing.
Basnati Colony 13000 20000 • Also, HIG and MIG is concentrated more in
Power House Road 20000 25000 RMC and Steel Township.
Kachery Road 15000 20000
Bisra Dahar Road 18000 20000

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 52
3
EXISTING CONDITION ANALYSIS

Table 3.11: Monthly Income Distribution as per •


Kuarmunda: majorly new upcoming
Income Bars apartments.
Category Monthly family income 3.4.5 HOUSING MOBILITY
at the time of
registration a) Duration of stay at present address
EWS Up to Rs. 7500/‐ P.M.
LIG From Rs. 7501/‐ to Rs. • RMC and Steel Township people have been
15000/‐ P.M. staying for more than 20 years. But in Steel
MIG From Rs. 15001/‐ to Rs. township it is population living for > 30 years is
25000/‐ P.M. comparatively less as compared to RMC.
HIG Above Rs. 25000/‐ P.M. • In all the 3 blocks Lathikatha and Bisra people
(Source: Odisha State Housing Board) in majority have been living for more than 30
years.
o) Relation of Income and the No. of Stories In Kuarmunda the percentage of people living for > 30 years is
• In RMC: higher the income, higher the No. of quite low as compared to the percentage of people living for 10‐
stories. 20 years. Therefore, it can be
• In Steel Township: LIG and MIG is given 2‐3 • observed that there is some recent
Stories housing while the other income groups development occurring in the region.
are given Plotted Housing.
• In overall Agglomeration: LIG living in 2 storey b) Future stay at present location
houses has large no. of household sizes in the
• Uncertainty and lifetime can be observed more
built unit whereas the HIG living in 2 Stories has
in Lathikatha and Kuarmunda due to tribal
a smaller proportion of household size as due
population primarily and people new people
to higher storey in this case indicating added
setting there permanently.
luxury.

53 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS

• Least uncertainty exists in the Steel Township Block


area therefore people shall be moving even out Bisra Block 75 25
even in Bisra region. Kuarmunda 23 35
Block
(Source: Primary Survey)
c) Willingness to Relocate
Table 3.13: Location Preference and preference
• More percentage of people would like to for Type of Property Purchase Area Wise
relocate themselves in Steel Township area as
Area name Where to What type of
compared to others, also in Bisra. buy new property
• It is much higher in Steel Township and property Plotte Apts./Flat
Kuarmunda as compared to Bisra where they d s
would likely prefer to move to rented type of Rourkela Civil 68 44
ownership. Municipalit Township,
y Chhend,
Other city,
Figure 3.12: Percentage Distribution of Basanti
Willingness to Relocate Area Wise Colony,
Area name Relocation Vedvyaas,
Willingness to Willingness Panposh.
relocate(in %) for new Steel Other City, 56 36
purchase(in Township Koel nagar,
%) Chhend,
Rourkela 50 40 South
Municipality Odisha,
Steel 82 55 Another
Township State
Lathikatha 33 20 Lathikatha Jalda, 7 4

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 54
3
EXISTING CONDITION ANALYSIS

Block Hathibandh • Overall the proportion of the tendency to buy plotted


a, Another
property is higher i.e 62% over 38% in the entire Rourkela
City, within
Rourkela especially in Bisra Block and Kuarmunda Block.
Urban city.
• Therefore, for development of apartments has to be
Bisra Block Urban Area, 4 1
Chhend. induced in a lucrative way while inducing some incentives
Kuarmund Urban Area, 3 1
etc. to improve on the condition.
a Block Chhend.
Total ( 138 86
Rourkela)
(Source: Primary Survey) d) Location Preference

• Location Preference (as per different areas):


• Maximum location preference given to various areas for Highest location preference by Rourkela Urban
mobility by the people is especially chhend colony, Civil
Agglomeration is to “Infrastructure”. That is the
Township even Basanti colony, also they are now opening
opportunities to relocate even at Panposh or Vedvyaas. people if they would want to relocate themselves
• While Steel Township has maximum tendency to either go would give first preference to infrastructure then
to Chhend or koel Nagar or even would like to move out of nearness to workplace, followed by
the district and state.
transportation facilities available, next would be
• In the blocks, the people would like to move to a more
urban area or even would prefer areas like the facilities to market, and the least they would
Kaluga/Vedvyaas where urban privileges are developed. prefer is recreation (taken as for Rourkela as for
location preference based on the rating system).

55 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
Tribal Settlement: The maximum preference the
residents shall give is to infrastructure facilities
• Location Preference ( as per type of household):
and then nearness to transportation apart from
Apartments: The residents if want to relocate
nearness to their workplace.
themselves shall give maximum preference to
transportation facilities apart from recreation and e) Location Preference (as per income classification)
infrastructure.
EWS: The residents would prefer the location best in terms of
Plotted: The residents would give maximum
being near to workplace and the least they would prefer is near
preference to infrastructure facilities apart from
re‐creational areas, reason being the first interest is to save on
transportation facilities and nearness to
travelling to workplace and finding a job.
workplace.
Slums: The residents would give maximum LIG: The residents would prefer the location best in terms of

preference to nearness to infrastructure and having better infrastructure facilities, as even if they can afford to

apart from that they would prefer nearness to travel a little further distance, they severely lack in normal living

workplace. conditions.

Quarters: The maximum preference the residents


Lower MIG: The residents would prefer the location best in being
shall give to their housing location shall be to
located near to workplace since their workplace is an important
infrastructure and then recreation facilities and
criteria to save on travelling.
nexto to nearness to workplace.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 56
3
EXISTING CONDITION ANALYSIS

Higher MIG: The residents would prefer the location best in terms Table 3.14: Public Sector Housing Schemes
of having better infrastructure facilities in order to have a better
CHP‐I Category Cost Size Period Land
paid to from cost
living condition though their demand is higher as compared to the RDA which
handed
lower categories. over the
allottees
(years)
HIG: The residents would prefer the location best in terms of E.W.S. 9862 30×20 25 2130
LIG 22080 25×40 25 4730
having better infrastructure facilities and their demand is much MIG 61016 60×40 25 17016
CHP‐II LIG‐I 23000 15×30 20 1035
more than the lower categories in terms of standard of EWS 20000 15×30 20 1035
LIG 45000 25×40 19 3060
MIG 90000 50×30 19 6900
infrastructure. CHP‐II,PH‐I(S.F.) MIG 187850 32×60 19 8832
HIG 284250 40×60 19 11040
CHP‐II,PH‐II(S.F.) MIG 226852 50×30 19 6900
f) Public Sector Housing Schemes taken up by Rourkela HIG 397530 60×47 19 12972
CHP‐II,PH‐II(HIG DUPLEX) HIG 423612 52×31 16 7415
Development Authority CHP‐II,PH‐III C3L‐I 60000 35×31 13 1047
C3L 110000 35×20 13 2147
C3M 230000 50×31 13 7130
Housing schemes taken by RDA were meant for every income House Site, CHP‐I EWS 3547 35×20 25 2485
LIG 7650 30×50 25 7095
groups. The housing schemes were developed in phases. Site MIG 17016 60×40 25 17016
HIG 24815 70×50 25 28815
and services schemes were also implemented. The cost was House S2M 34440 50×30 13 6900
Site(S2M/S2H/GM/KB),CHP‐
being paid to RDA depending upon plot and the category of II
S2H 55104 60×40 13 11040
Durgapur Foot Hill Housing EWS 9011 19×28 29 2447
the size of the Dwelling Units. Some were self financed and Project(Stage‐I)
LIG 19368 25×40 29 4600
others were financed by HUDCO. Durgapur Foot Hill Housing EWS 9270 20×30 28 2760
Project(Stage‐II)
LIG 19751 25×40 28 4600
MIG 48004 40×60 27 11040
(Source: Rourkela Development Authority)

57 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
Chend LIG I‐ LIG I‐ 258. 1994
Housing 128,LIG 128,LIG 57
Table 3.15: Various Schemes undertaken by Rourkela Project, II‐ II‐ Lac
Development Authority Stage‐ 387,MIG‐ 387,MIG‐
II(HUDCO) 189 189
Name of the No. of No. of Proje Rema Year of Chend MIG‐ MIG‐ Self 1992
housing/site Units units ct rks Comple Housing 55,HIG‐ 55,HIG‐ Fina
and services Construc Allotted Cost tion Project, 32 32 nce
scheme ted Stage‐
D.F.H. LIG‐ LIG‐ 32.1 1979 II,Phase‐
Housing 138,EWS 138,EWS 8 Lac I(S.F.)
scheme, ‐92 ‐92 Site & MIG‐ MIG‐ Self Vaca 1994
Stage‐I Services 180,HIG‐ 179,HIG‐ Fina nt‐1
D.F.H. EWS‐ EWS‐ 57.4 1980 scheme, 73 72 nce
Housing 54,LIG‐ 54,LIG‐ 6 Lac Stage‐
scheme, 166,MIG‐ 166,MIG‐ II,Phase‐I
Stage‐II 110,HIG‐ 110,HIG‐ Chend MIG‐ MIG‐ Self 1995
1 1 Housing 90,HIG‐ 90,HIG‐ Fina
Chend EWS‐ EWS‐ 84.3 Vaca 1985 Project, 52 52 nce
Housing 96,LIG‐ 95,LIG‐ 6 Lac nt‐1 Stage‐
Project, 230,MIG‐ 230,MIG‐ II,Phase‐
Stage‐ 84 84 II(S.F.)
I(HUDCO) Jawaharnaga LIG‐ LIG‐ 130. Vaca 1996
Site & EWS‐ EWS‐ HUD 1985 r Housing 144,MIG‐ 143,MIG‐ 19 nt‐2
Services 187,LIG‐ 187,LIG‐ CO Scheme, 60 59 Lac
scheme, 124,MIG‐ 124,MIG‐ LOA Stage‐
Stage‐ 61,HIG‐ 61,HIG‐ N I(HUDCO)
I(IDSMT) 28 28 Jawaharnaga LIG‐ LIG‐ 75.0 1996
Composite EWS‐ EWS‐ 142. Vaca 1992 r Housing 40,MIG‐ 40,MIG‐ 1 Lac
Housing 48,LIG‐ 48,LIG‐ 23 nt‐1 Scheme, 24 24
Scheme, 256,MIG‐ 255,MIG‐ Lac Stage‐
Sundargarh 105 105 II(HUDCO)

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 58
3
EXISTING CONDITION ANALYSIS

g) Details of Houses Constructed by Odisha State Housing Board


(Basanti and Chhend Colony)
Site & MIG(A)‐ MIG(A)‐ Vaca 1997
Services 56 55 nt‐1 Odisha State Housing Board (OSHB) was also involved in providing
Scheme, housing facilities. The schemes were developed in phases in Basanti and
Gopabandhu Chhend colony. In some cases plots were being developed and handed
nagar, Chend
over to the users.
Site & MIG(B)‐ MIG(B)‐ 1997
Services 40 40 Table 3. 16: Houses Constructed by OSHB
Scheme, Ba Nam HI HI HI HI M MI M LIG LIG‐ LI E SCR S T
Gopabandhu sa e of G‐ G‐ G‐ G‐ I G‐II IG I G W H o
nti the A( B( A B G ‐ S O t
nagar, Chend Co com D) D) ‐ II P al
Plotted Commer Commer 2001 lo plete I
ny d
Scheme near cial‐ cial‐
sche
Jagat Janani 6,Reside 6,Reside me
Market, CHP‐ ntial‐12 ntial‐12 Boar 56 8 1
d 8
i Phas 11 0
Duplex HD‐111 HD‐111 1998 e‐I 6
Houses Boar 7 53 15 7 2
d 0 3 8
under CHP‐II Phas 3
Gopabandhu EWS‐ EWS‐ Vaca 2000 e‐II
nagar 244,LIG‐ 154,LIG‐ nt‐ HUD 10 23 92 3
CO, 4 3
Housing 150,MIG‐ 146,MIG‐ 188 Phas 6
Scheme, 160 160 e‐I
HUD 7 10 80 70 1
Stage‐III CO, 2 6
Site & LIG‐53, LIG‐52, Vaca 2006 Phas 0
Services MIG‐147, MIG‐143, nt‐10 e‐II
HUD 2 43 30 21 5
Scheme, HIG‐74 HIG‐71 CO, 7 4 4 6
Gopabandhu Phas 9 1
nagar, e‐III
HUD 40 29 14 4
Housing CO, 8 8 8
(Source: Rourkela Development Authority) Phas 6

59 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
e‐IV he
HUD 3 60 6 m
CO, 5 0 e
Phas 1
e‐V Gran 34 38 61 43 4 43 32 17 316 2 99 27 60 5
80 80 8 d 6 2 4 9 53 1 1 1
Devp 0 Total 1 4 1
. 4
Plots (Source: Rourkela Development Authority)
30 30 3
MIG 0
EWS 20 2 i) Details of Plot Distribution by HUDCO in Koelnagar
Flats 0 0
0
Developed plots were being sold under HUDCO. Majority of the
Sub 53 32 11 72 15 60 2
Total 9 25 4 3 plots were meant for MIG category and minimal for HiG category.
7
6
So basically it was initiated in order to cater the need of middle
class society. Partly it was funded by HUDCO and the rest were self
Ch Chhe 68 62 26 1
he nd 8 7 0 financed. MIG and HIG category could only afford the self financed
nd Phas 3 schemes. MiG‐I and LIG were excluded from self financed schemes.
Co e ‐I 5
lo
ny Table 3.17: Details of Plot distribution by HUDCO
Chhe 316 2 12 8 Blocks HIG MIG‐II MIG‐I LIG Total
nd 1 2
Phas 4 1 A 300 276 576
e –II B 24 260 124 408
Chhe 61 43 31 8
C 50 227 360 100 737
nd 6 3 1
Phas 0 D 6 343 80 429
e ‐III Total 56 600 1000 500 2150
Sub 61 43 38 62 316 2 26 12 2
Total 6 1 8 1 7 6 (Source: Odisha State Housing Board)
4 6
6 j) Details of Plot Distribution Under Self‐Finance Schemes in Koel
O Chhe 34 38 7 Nagar
ng nd 2
oi Phas
ng e ‐III
sc

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 60
3
EXISTING CONDITION ANALYSIS

The sizes of the plot and the plinth were different for each category Table 3.20: No. of Quarters in Railway Colonies
of income group. The size meant for LIG category were very less as
compared to the HIG category. Type Total Occupied Plots Vacant Plots
I 420 381 39
Table 3.18: Details of Plot Distribution under Self‐Finance Scheme in II 377 377
Koel Nagar III 17 16 1
IV 19 19
Blocks HIG MIG‐II MIG‐I LIG Total V 1 1
A 29 75 104 Total 834 794 40
B (Source: Indian Railways Colony, Rourkela)
C 3 3
D 6 6 Charges are being paid by the dwellers, depending upon the
Total 38 75 113 category of quarters they are occupying. Maximum charges are
(Source: Odisha State Housing Board) applicable for type V category varying from Rs. 608 to Rs. 1822/‐ for
plinth size varying from 150‐350 sq. mtr. For type I having plinth
Table 3.19: Plot Area, Size and Plinth area data area varying fron 25‐35 sq. mtr., Rs. 43/‐ to Rs. 70/‐ is to be paid.

Type Plot Area(Sqm.) Size(Sqm.) Plinth Area Table 3.21: License fee details
(Sqm.)
LIG 90 7.5×12 28.74 Type Plinth Area (Sqm.) Rate for License Fee
MIG‐I 140 10×14 36.64 (Rs/‐)
MIG‐II 200 10×20 64.25 I <25 43
HIG 360 16×23 93.54 25‐30 53
(Source: Odisha State Housing Board) 30‐35 64
>35 70
k) Details of Quarters in Railway Colonies II <45 85
45‐50 98
Quarters maintained by Railways were of five categories(I‐V). Type I
50‐55 108
has the maximum number of quarters, followed by type II. Type III, >55 118
IV and V are very minimal in numbers. Some of the quarters are left III <60 150
vacant ( type I category), leading to unauthorized ownership. 60‐65 162

61 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
65‐70 173 C 2217 1828 406
>70 187 D 428 338 81
IV <80 222 Others (If any) 4137(Cheap 909 2187
80‐90 247 Type)
90‐100 274 Total 24391 19776 5027
100‐120 323 (Source: Steel Authority of India Limited)
>120 409
V <150 608 Table 3.23: No. of Quarters details
150‐200 762
200‐250 1076 Type of Quarters No. of Quarters
250‐300 1230 Cheap Type (CH) 3747
300‐350 1522 IR 1524
>350 1822 I BR‐LT 12727
(Source: Indian Railways Colony, Rourkela) IBR‐HT 2278
II BR‐LT 953
l) Details of Sail Quarters II BR‐HT 1258
III BR‐LT 45
In case of SAIL, there are five categories of quarters (Type A‐D) and III BR‐HT 330
the rest comes under Cheap category. Maximum number of EX‐HOSTEL 105
quarters are in Type A. Maximum number of employees are EX FLAT 696
occupying type A quarters. SOB 111
SPL 58
Table 3.22: Sail Quarters details Total 23732
(Source: Steel Authority of India Limited)
Type of No. of Quarters No. of Allotted to
Quarters Employees others • The total number of DU’s under SAIL is around 24900,
allotted including all categories. The rent is directly deducted
Company from the employee’s salary and the amount varies
Quarters according to the Dwelling’s typology, but the amount
A 14250 11358 1879
is very minimal.
B 3089 2565 474

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 62
3
EXISTING CONDITION ANALYSIS

• Charges for infrastructure like electricity have to be them is to have better infrastructure facilities and also developable
paid by the employers, except water supply. land available at cheap cost, along the Highways.
• The houses were being constructed around 60’s, so
Table 3.24: Category of projects undertaken by Private Developers
some of them are in bad conditions.
• The maintenance charges are being barred by SAIL, Area Type of projects Rating Reasons
but for expansion of the units, dwellers are Rajgangpur Apartments 1 Centrally
themselves responsible. Because of the development located
in technology, need for manual power is decreasing. Behind Air Strip Dulex 1 Better
Hence less number of employees are being recruited, location for
Duplex
because of which some of the quarters are vacant and
Civil Township Plotted 1 High demand
in degrading conditions.
Hou8ses, by HIG people
• In order to cope up with situation, ex employees are Apartments
being provided the houses for a temporary period of Jagda Apartments 2 Cheap land
12 months and can be renewed for another year also. price
But subsequent amount of rent is to be paid by them.
• The vacant houses are also being encroached illegally.
Court cases are still going on to occupy it again. Also
some of them, are rally in dilapidated conditions, and • The most favorable type of projects preferred by the
hence need to be demolished. developers are apartments, plotted houses and duplex.
• The target groups are mostly MIG and HIG, with some
3.4.6 PRIVATE HOUSING percentage for LIG people. Those locations are being chosen
which are centrally located and easily accessible.
a) Developer’s Location Choice ( Brahmani Developers)
• Also hinterlands are being considered for developments due to
Private developers are working in Rourkela in order to cater the rapid urbanization.
need of housing demand mainly for HIG and MIG category and upto • Civil town‐ship has the highest land value in terms of residential
some extent for LIG category. Major criteria for choosing land by development, followed by Basanti colony and then Chhend

63 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
colony. 3BHK apartments are mostly preferred by the 3.4.8 Existing Housing Typologies
developers.
The majority of planned commercial or residential developments
Table 3.25: Land price variation as per Brahamani Developers are publicly developed areas within the RPA. These are located in
Area Land price(Lac per decimal) the form of Steel Townships, resettlement colonies like Jalda and
Civil Township 12 to 15 Jhirpani and Chikamati model steel village and some of the civil
Chhend Colony 5 township development like Basanti Colony, Chhend Colony and
Basanti Colony 7 to 8
some of the privately developed like Koelnagar Housing Complex
(Source: Brahamani Developers)
Employee Housing: 24500 houses of different categories and
Table 3.26: Dwelling Units Details ( to be constructed)
3716 shops spreading over 19 sectors in the form of mid‐rise high
Category of DUs No. of DUs Built Target Buyers
density (275 persons per hectare) apartments/ flats and large
2 BHK 8 LIG
3 BHK 36 MIG bungalows are located mainly in Steel Township with well
4 BHK 4 HIG planned residential colonies and wide roads (350 Kms of pucca
(Source: Brahamani Developers) roads), adequate civic amenities and the built areas, open spaces
and other public amenities. Employee housing is also constructed
by the public sector (the railways, police, etc.) which is in the form
3.4.7 Housing and Neighbourhoods of housing colonies with two‐to‐three story apartments. All the
main roads of the sectors are connected to the ring road
The role of a city in its regional hierarchy is an important factor in
spreading over 16 Kms within the Steel Township.
determining the demand for a particular housing type, tenure and
real estate prices. Increasing urbanization and escalating demand High Density Apartments provided by the private sector – 75.1%
of the land under residential land use affects both the density of in Civil Township. The most preferred housing type is
the existing and future residential areas and can generate the apartments, followed by row housing and plotted development.
emergence of large scale informal and unauthorized settlements. The housing mix of many housing projects ranges from 2‐3
bedroom apartments with reserved parking, catering to the
demand of small, middle and upper–middle income families.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 64
3
EXISTING CONDITION ANALYSIS

A large proportion of land in Steel Township, which is the most The slum population total to 1,14,980 (2011) with 26,994
preferred location for housing, is held on lease by the Rourkela households. Nearly 43% of the total population of the town
Steel Plant Company. A very limited amount of this land is comprises of the slums. The slums in the city are scattered all
permitted by the Company under its tenancy or lease programme around the city and increasing over time. The slum area are
to be utilized by private developers. Therefore most of the private facing difficulties due to deficiency in various infrastructure
housing developments in the RPA are outside the Steel Township. facilities like roads, water supply, drainage, street lighting, solid
waste management etc. Municipality is taking up a number of
As the main causative factor for the growth of the two
slum improvement and poverty alleviation programs with
suburban extensions of Steel and Civil Townships on the north
assistance from State and Central Governments. Few to mention
and south of Durgapur Hills, currently, a real estate boom is
are SJSRY, NSDP, RAY, IHSDP, ILCS etc. The data collected
taking place in east and west areas such as Chhend colony,
through primary survey and secondary source suggest that the
koelnagar. Even beyond the Brahmani River, kalunga and
situation in RPA can be improved with few planning
Gopapali areas private apartment development is picking up at
interventions.
a faster rate.
3.4.9 SLUMS
In Civil Township some of the public housing by Odisha State
Housing Board provided/ constructed several plots and flats a) Slums Under Rourkela Municipality Area
(2.8%) as a part of the State Government initiative to address
There are 100 notified and 15 un‐notified slums under Rourkela
the housing shortage in RPA. Many of these dwelling units arc Municipality area. The notified slum cover a population of 1,07,793
ill‐maintained and are in need of some reconstruction/ whereas the unnoticed slum population is 11,187. Thus total slum
renovation measures. population is 1,18,980.

Squatter Settlements/ Basties: A significant section of the Figure 5.63: Map showing the location of Slums in Rourkela
population employed in the formal and informal sector did not Municipality Area……..
have access to housing due to unaffordable prices or due to
the requirements for receiving home loans, finds refuge in
squatter settlements. RPA has total 114 numbers of slum areas.

65 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
(Note: The red dots in the map shows the location of the pockets of 24 Brundaban Complex 5 Authorized 364
slums as identified. Map is out of scale and is only for reference and 25 Kharia Bahal 5 Authorized 1283
it is the image production of the original map) 26 ITI Shantinagar 6 Authorized 1049
27 Netaji Nagar 6 Authorized 645
Table 2.27: List of Slums 28 Vysa Nagar 6 Authorized 390
29 Pakistan Colony 6 Authorized 479
Sl. No. Name Of The Slums Ward Ownership Population 30 FCI Colony 6 Authorized 773
No. 31 Labour Tenanment 6 Authorized 1118
1 Pradhanpali 1 Owned 631 32 Jail Gate 6 Authorized 649
2 Bandhposh 1 Owned 831 33 Keshari Nagar 6 Authorized 394
3 Tisco Area 1 Owned 571 34 Trinath Nagar 6 Authorized 510
4 Kissan Tola 1 Owned 1446 35 Ambedkar Nagar 7 Authorized 2338
5 Chhend Basti 1 Owned 960 36 Durgapur Jhumpuki 7 Authorized 444
6 Khadia Tolli‐1 1 Owned 376 37 DAV Akhandalmani 7 Authorized 657
7 Banki Basti 1 Owned 439 Colony
8 Tulsitola 1 Owned 550 38 Basanti Colony 8 Authorized 547
9 Kalinga Vihar‐II 1 Owned 567 39 Haripur 7 Authorized 1434
10 Khadia Tolli ‐II 1 Owned 310 40 Krustha Ashram 7 Authorized 615
11 Bangla Tolli 2 Authorized 1471 41 Rly Gate Basti 8 Authorized 517
12 Panposh Basti 2 Authorized 1355 42 Malgodown Road 9 Authorized 4143
13 Tunguri Tolla 2 Authorized 753 43 Malgodown 9 Authorized 917
14 Deogoan 3 Authorized 4513 Durgapur
15 Balughat 2 Authorized 1480 44 Malgodown Goods 9 Authorized 577
16 Rooptola 3 Authorized 2817 Shed
17 Mani Colony 4 Authorized 736 45 Nehrupalli 9 Authorized 529
18 Mantolla 4 Authorized 283 46 Malgodown 9 Authorized 566
19 Santinagar/Panitanki 4 Authorized 212 Durgapur Basti
20 Gadha Tola 4 Authorized 280 47 Malgodown Road 9 Authorized 919
21 Gangadharpalli 5 Authorized 1878 48 Malgodown 10 Authorized 623
22 Rajiv Basti 5 Authorized 372 Durgapur
23 Gajapatipalli 5 Authorized 348 Kumbharpara

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 66
3
EXISTING CONDITION ANALYSIS

49 Madhusudanpalli 10 Authorized 605 Orampara Upper


50 Malgodown 10 Authorized 3378 74 Orampara National Authorized 1727
Jhumpudi Club to Hari Pradhan
51 M.S. Palli (A) 11 Authorized 3378 colony
52 M.S. Palli (B) 11 Authorized 1355 75 Plantsite Janata Authorized 1756
53 M.S. Palli (C ) 11 Authorized 562 Niwas Galli
54 Water Filter House 11 Authorized 1313 76 Pkabtsute Rout Para Authorized 1910
55 Gopabandhupalli 11 Authorized 2964 77 Sarala Market Authorized 986
56 Indiranagar‐I 12 Authorized 531 78 Glomour Market Authorized 1234
57 Indiranagar‐II 12 Authorized 412 79 Mit basti Azad Authorized 1266
58 Rly Colony I 12 Authorized 683 mahalla to Mehru
59 Rly Colony II 12 Authorized 583 house
60 Timber Colony I 13 Authorized 4583 80 Islam Nagar Authorized 2258
61 Timber Colony II 13 Authorized 1224 81 Ganjam Basti Authorized 1587
62 Bangali basti 13 Authorized 618 mahulpali
63 Tintan Basti 13 Authorized 2290 82 G.T. Lane to Traffic Authorized 281
64 Old Stn. Road 14 Authorized 421 Gate
65 Bisra Road to Gandhi 14 Authorized 1049 83 Shiv mandir area to Authorized 529
Road Delux Gali
66 PWD Jhumpudi 14 Authorized 2003 84 Diesel Chowk Authorized 834
Bihari Basti to 85 Barkani Basti Authorized 356
Belabagan 86 E Sector Authorized 1064
67 Lalbuilding 15 Authorized 1018 Gandhinagar
Telgupara 87 BOgda Basti Authorized 1160
68 Daily Market 15 Authorized 1428 88 Chudi Basti Authorized 1399
69 Old Out Stn. Road Authorized 505 89 Nepali Basti Authorized 2208
70 Birjapalli Authorized 1701 90 Sarada Palli Authorized 921
71 Maa Kalyani Authorized 1037 91 Adarsh D Cabin Authorized 680
Jhumpudi 92 C Sector Jhumpudi Authorized 429
72 Kunbharpara Authorized 1183 93 Gundichapalli‐I Authorized 611
73 Khariapara to Authorized 1523 94 Guala Khatal Authorized 664

67 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
95 Gundichapalli‐II Authorized 378 b) Slums under Sail Land
96 Sector A Jhumpudi Authorized 291
97 Sector B Filter House Authorized 406 The unauthorized slums have mushroomed under Rourkela Steel
98 Koel Nagar B & C Authorized 555 Plant (RSP) lands, constituting a population of around 1.25 Lac
Block people. No such steps are being taken to rehabilitate them.
99 Koel Nagar A & D Authorized 297
Block (Note: The Blue dots in the map shows the location of the pockets
100 Shaktinagar Encroached 1597 of slums as encroachment. Map is out of scale and is only for
101 Kantajhar Encroached 1332 reference and it is the image production of the original map)
102 Giridharipara Encroached 536
103 Utkalpalli Encroached 440 c) Slum Housing Project under Municipality
104 Bank Col. Back Slum Encroached 665
105 Nayabazar market Encroached 690 i) Ray Housing Project
Leprosy Colony
106 Nandapara Encroached 998 Around 38 acres of land has been acquired under RAY scheme
107 Bagbudi Basti Encroached 754 near Railway colony and Basanti colony. Another proposals
108 Bagbudi Basti ( A ) Encroached 1074 include an area of 108 acres near Chhend area. The
109 Bagbudi Basti (B ) Encroached 738 beneficiaries include the BPL and APL population. G+3 storied
110 Bagbudi Basti (C ) Encroached 611 structures is to be build under this scheme.
111 Bagbudi Basti (D ) Encroached 487
112 Kalyani Nagar Encroached 395 Even after a year of its implementation, there has been little
113 Haripur Basti Encroached 382 progress in the Centre‐sponsored Rajiv Awas Yojana (RAY) in
114 Siva Basti, Baghudi Encroached 488 Rourkela. This comes at a time when the State Government is
Basti ( E ) all set to bring a new legislation to rehabilitate unauthorized
115 Subaadra Basti ( Hill Encroached ‐ slum dwellers.
Top)
Total Total 1,16,400 The contentious land issues plaguing the unauthorized slums in
(Source: Rourkela Municipality) Rourkela municipal limits and the industrial township of
Rourkela Steel Plant (RSP) neither the RAY nor the proposed
Odisha Property Rights to Slum Dwellers and Prevention of New

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 68
3
EXISTING CONDITION ANALYSIS

Slums Bill would be of much help to remove the slums. The RAY development with a healthy and enabling urban environment by
for a slum‐free Rourkela is apparently lagging behind due to providing adequate shelter and basic infrastructure facilities to the
lack of clarity on the percentage of cost sharing by the State slum dwellers of the identified urban areas.
Government and beneficiaries and unavailability of adequate
unds from the Centre.

Rourkela Municipality accounts for over 1.30 Lac Table 3.28: PROGRESS OF ONGOING SCHEMES UNDER IHSDP (Rs. In Lacs)
S Implemen Name of Date DUs Proje Amount Released Expendit Physical
slum population spread over RSP, South Eastern
l ting Slums of ct Centr Stat Tot ure progress
Railway (SER) and State Government Lands. Another . Agency Sancti Cost. al e al ending
1.25 Lac are residing in the industrial township N on by Shar Sha October‐
located entirely on the RSP land. o CSC e re 2009(Rs.
. In Lacs)
According to the Rourkela municipal vice‐chairman, 1 2 3 4 5 6 7 8 9 10 11
RAY would only be implemented in slums that are 1 Rourkela IHSDP 09.01. 124 209. 75.92 9.49 85. 102.2 86 DW
under the municipal limits. This means a sizeable Municipal Scheme for 2008 65 41 starts,
population of over 1.25 Lac in the industrial ity Town of Roof level‐
township would be left out. Rourkela 10, Plinth‐
Municipalit 36, Iintel‐
Rehabilitating slums requires direct intervention of y 26,Comple
ted‐17
the State and Central Governments, which seems
(Source: Rourkela Municipality)
unlikely at the moment. Neither the RSP nor the SER is keen to
cede even an inch of land to ‘illegal occupants’. Table 3.29: No. of DUs under IHSDP
Sl. No. Area No. of DU’s under
d) Integrated Housing Scheme Development Plan (IHSDP) IHSDP
1 Chhend Basti 31
The IHSDP scheme is meant for having an integrated approach in
2 Bandposh Area 38
ameliorating the conditions of the urban slum dwellers, which do 3 Khariabhal Basti 21
not possess adequate shelter and reside in dilapidated conditions. 4 Kissantrola Basti 34
The basic objective of the scheme is to strive for holistic slum Total 124

69 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
(Source: Rourkela Municipality) e) Community Welfare Society

Distribution of DU’s in various areas of Rourkela Municipality Community Welfare Society (CWS) dedicated to the alleviation of
suffering of the marginalized and the poor in our society is a
IHSDP scheme in Rourkela has been initiated from the year 2008, registered Philanthropic organization sponsored by Seva‐Sadan
and has already been implemented in some areas like Chhend Basti, Social Institute, Rourkela, Odisha.
Kissantola, Banposh area and Kharibhal Basti. The components for
assistance under the scheme will include all slum The group focused on providing and improving civic amenities and
improvement/upgradation/relocation projects including up infrastructure for slum dwellers. The help and co‐operation of local
gradation/ new construction of houses and infrastructural facilities residents have been forthcoming. Gopobandhupalli slum was
like water supply and sewerage. Cost of land for such projects will adopted as a role model in improving life and living condition of
not be provided under the programme and has to be borne by the slum dwellers.
State Government.
In its initial years the group took up the following programmes:
Minimum Floor Area of dwelling Unit Drinking water project, Roads and drainages, Creches, Dispensary
and health camps, Mobile clinic, Schools, Vocational training
Not less than 25 Sq. meter area and preferably two room centers, Seva craft, Youth centers, A housing schemes for low‐
accommodation plus kitchen and toilet should be constructed. income group.
Beneficiary Contribution At present CWS is engaged in developmental activities in 60 slums
Housing should not be provided free to the beneficiaries by the in Rourkela with a population of 80,000. The additional activities
State Government. A minimum of 12% beneficiary contribution are: tailoring and art , Spoken English, Self help groups(SHG), CWS
should be stipulated, which in the case of SC/ST/BC/PH and other hospital, Women empowerment‐Leadership and capacity building,
weaker sections shall be 10%. Rehabilitation of illicit liquor sellers, Awareness programmes on
various social issues, income generating activities and National
Ceiling Cost for Dwelling Unit integration.

It will be @ Rs. 80,000/‐per unit for cities other than those covered
under the JNNURM Scheme. This ceiling cost will, however, be
reviewed after one year.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 70
3
EXISTING CONDITION ANALYSIS

f) Slum Housing Schemes In Blocks 8000/‐, after


roof
Table 3.30: IAY and Mokudia Blocks Fund Allocation Data casting/roof
IAY and Mokudia Blocks’ Fund Allocation Data laying8500/‐
Allotment in Allotment Area )Total
2012‐13 Style 48,500/‐
Mokudia 53 Total Kuarmunda (Along with
IAY 311 48,500/‐ work order
(Along with 22,000/‐,
work order after lintel
22,000/‐,after level 8000/‐
lintel level ,after roof
8000/‐, after casting /roof
roof casting laying 8500/‐)
/roof Mokudia 43 out of Total Bisra
laying8500/‐) 257 grant 48,500/‐
Total given (Along with
48,500/‐ IAY Provided in work order
(Along with all 15 Gram 22,000/‐,after
work order Panchayats lintel level
22,000/, after 8000/‐, after
lintel level roof
8000/‐, after casting/roof
roof casting laying8500/‐
/roof laying )Total
8500/‐) 48,500/‐
Mokudia ‐‐ Total Lathikatha (Along with
IAY 41 48,500/‐ work order
(Along with 22,000/‐,
work order after lintel
22,000/‐,after level 8000/‐
lintel level ,after roof

71 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
casting /roof Table 3.31: Scheme Beneficiary Survey Result
laying 8500/‐)
(Source: Individual Block Development office) Sample Previous House
No. Vs. Scheme/Amou Type of area Type Material
area nt of (
g) Scheme Beneficiary Survey Result (Blocks and Model Villages) location Housi Floor/wall/r
ng oof)
The Beneficiary Survey was done with the purpose to directly 1/Kuarmu IAY/Rs.48,500 In Village Kutch Mud/Mud/S
gather the information from the beneficiaries of the various nda /‐ Premises a traw
housing schemes, that is on what basis they were benefitted from 2/Kuarmu IAY/Rs.48,500 Rural Kutch Mud/Mud/S
nda /‐ Outskirts a traw
the respective scheme and how, and their previous conditions of
3/Kuarmu FRA/Rs. ‐‐‐‐ Rural Kutch Mud/Mud/S
housing or infrastructure. Based on this the Judgment was made if
nda Outskirts a traw
their selection was worthwhile or not by the government and 4/Kuarmu IAY/Rs.48,500 In Village Kutch Mud/Mud/S
whether the respective scheme has been implemented adequately nda /‐ Premises a traw
in the respective areas and for its purpose. Also, the Survey was to 6/Bisra Mokudia/ Rs. In Village Kutch Mud/Mud/S
determine what additional facilities have been provided or been 48,500/‐ Premises a traw
added through the scheme. A total of 14 samples were taken from 7/Bisra IAY/Rs.48,500 Rural Kutch Mud/Mud/S
the various areas 4 from Kuarmunda Block, 3 from Bisra, 3 From /‐ Outskirts a traw
8/Bisra IAY/Rs.48,500 Rural Kutch Mud/Mud/S
Lathikatha and 3 From Model villages. The results as we found that
/‐ Outskirts a traw
most up‐gradation has been from Kutccha to semi pucca or Pucaa.
9/Lathikat Mokudia/ Rs. Rural Kutch Mud/Mud/S
54% of the beneficiary were moved from the village outskirts, the ha 48,500/‐ Outskirts a traw
others were improved in the village premises and the rest were 10/Lathik IAY/Rs.48,500 Rural Kutch Mud/Mud/S
improved from being dilapidated houses in the village outskirts. atha /‐ Outskirts a traw
Almost all of them initially had housing of kutcha materials, i.e, mud 11/Lathik Mokudia/ Rs. Rural Kutch Mud/Mud/S
(for Floor), mud (for wall), Straw (for roof). atha 48,500/‐ Outskirts a traw
12/Model SAIL provided Rural Kutch Mud/Mud/S
Village Outskirts/Di a traw
splaced
13/Model SAIL provided Rural Kutch Mud/Mud/S

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 72
3
EXISTING CONDITION ANALYSIS

Village Outskirts/Di a traw In Se Mud/B Y Pit N Y Y Y Okay


splaced Vill mi‐ rick/Til ba
14/Model SAIL provided Rural Kutch Mud/Mud/S age Puc e si
Village Outskirts/Di a traw Pre ca n
splaced mis
( Source: Scheme Beneficiary Survey) es
In Se Mud/B Y Pit N Okay
Table 3.32: Satisfaction survey for provision of new houses Vill mi‐ rick/RC ba
through schemes age Puc C si
New House through Facilities Satisfaction Bene Pre ca n
Scheme Provided ficiar mis
y es
Selec In Puc Mud/B Y Se Y Y Y Y Okay
tion Vill ca rick/RC pti
Typ Typ Materi San Ty Smo G New Trans (pers age C c
e of e al itar pe kele ov type pare onal Pre Ta
Are of (floor/ y ss t. prov nt obser mis nk
a Ho wall/ro toil Chul Ai idee vatio es
usi of) et ha d d n) In Se Mud/B N ‐ N Y Y Y Okay
ng Vill mi‐ rick/Til
In Se Mud/B N ‐ N Y Y Y Okay age Puc e
Vill mi‐ rick/RC Pre ca
age Puc C mis
Pre ca es
mis In Se Mud/B Y ‐ N Y Y Y Okay
es Vill mi‐ rick/RC
In Puc Mud/B N ‐ N Y Y Y Okay age Puc C
Vill ca rick/Til Pre ca
age e mis
Pre es
mis In Puc Mud/B Y Pit Y Y Y Y Okay
es Vill ca rick/RC ba

73 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
age C si mis
Pre n es
mis (Source: Scheme Beneficiary Survey)
es
In Se Mud/B N ‐ Y Y Y Y Okay 3.4.10 SNAPSHOT OF PRESENT HOUSING CONDITION
Vill mi‐ rick/RC
age Puc C a) Housing under RDA schemes
Pre ca
mis These houses were built over various schemes under Rourkela
es Development Authority. They are in detonating conditions, which
In Se Mud/B Y Pit Y Y Y Y Okay depicts very awful situations, bothe for the users and the viewers.
Vill mi‐ rick/RC ba Also the surroundings are ill maintained. In some of the schemes,
age Puc C si services were being provided. Some of the flats are being vacant
Pre ca n and required serious revival.
mis
es Railways Quarters
In Puc Mud/B Y Se Y Y Y N Okay
Vill ca rick/RC pti It is meant for railway employees only. Minimal rent is being
age C c charged for the quarters, based on the plinth level. Vacant plots are
Pre Ta
being encroached, which has lead to many illegal settlements over
mis nk
es the years. Also the surroundings are not maintained, like garbage
In Se Mud/B N ‐ N Y N N Okay being thrown along the road side, water being leaked from the taps,
Vill mi‐ rick/Til and sparsely located street lights. Some of the quarters are vacant,
age Puc e and also in bad conditions.
Pre ca
mis Civil Township
es
In Se Mud/B N ‐ N Y N N Okay Due to strategic locations, land price is very high and mostly
Vill mi‐ rick/Til occupied by HIG and MIG people. This township majorly includes
age Puc e plotted houses, apartments, etc. Also this area is one of the major
Pre ca

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 74
3
EXISTING CONDITION ANALYSIS

preferred locations by the developer, because of the high demand infrastructures which come under site and services scheme, instead
from the buyers. Dwelling units are being bought by the rich people of core houses. LIG, MIG and HIG are the target buyer groups.
for future investments. Also the area includes aesthetically Because of the minimal charge, HIG and MIG people have bought
designed buildings, depicting modern architecture styles. There are properties here, and being sold at higher prices. Hence for the
some issues related to this area, like for LIG and EWS group, no needy people like LIG, there is scarcity of houses and plots. Some of
housing schemes are being provided. The corner plots are occupied the buyers give their houses in rent, to earn extra benefit. The
by EWS leading to shanty settlements. plantation is done to keep the environment healthy. Small
children’s park situated inside the colony is an excellent one to be
SAIL Quarters enjoyed very nicely. The authority has tried to maintain clean and
These are being maintained by SAIL. The houses were being healthy environment or the public.
constructed around 60’s. Therefore looks very old and no more Blocks
housing construction is being proposed now. They look very
monotonous with minor changes in typology of the quarters. Later The various blocks include Kuarmunda, Lathikata and Bisra Block.
duplex quarters have also been constructed, mainly for the higher
officials. Some of the quarters are vacant and in degrading Kuarmunda has a wide variety of rural and urban type of
conditions. The vacant houses are also being encroached illegally, population. There is a diversity of the dwelling units indabited by
court cases are still going on to gain the ownership. Also some of the tribal, since mostly a tribal inhabited area. Some of the land is
them are in dilapidated conditions, and hence need to be being encroached by the factories. Housing is generally of mud and
demolished. thatch houses in rural settlements and brick and cement concrete
concentrated only in the Kuarmunda main area. Lack of physical
Chhend infrastructure in the area is one of the major issue. Interior Tribal
Development Agency is being involved in the development of the
It is a largest housing colony in Asia consists of six phases and also tribal areas, yet huge investment required. The residents depend on
under expansion. The houses are built by different authorities such forest produce, primarily.
as Rourkela Development Authority ( two phases), Odisha State
Housing Board (HUDUCO) (three phases), Odisha Co‐operative Lathikatha is basically inhabited by tribal settlements. Though they
Housing Authority (one phase).Core houses are being provided to might lack basic awareness and facilities, they have a sense of
the public. Presently, plots are being sold incorporated with cleanliness. The houses are mud houses with thatched roofs in

75 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
many villages and tribal settlements except in the main village of B: Congestion in Households
lathikatha wherein some existence of pucca houses are there.
Entire rural settlement has scattered development. Derived from Congestion Factor ( % of no. of Households) i.e no. of
households requiring a separate dwelling unit on account of
Model Village are being maintained by RSP under Corporate Social congestion, congestion evaluated from being dependant on various
Responsibility (CSR). Basic infrastructures facilities are being different types of socio‐economic factors.
provided to them, along with education, health etc. to provide
them a better living environment. The inhabitants of these villages C: Obsolescence in Households
are mostly tribal people. Chikatmati is one of those villages which Derived from Obsolescence Factor ( % of no. of households), i. e a
depict its own success story. But still there are some lacunas here, non‐serviceable factor for houses with age greater than 35 or 40
in terms of sanitation, water, etc. years and with also houses with age greater than 80 years
3.4.11 HOUSING STOCK AND SHORTAGE CALCULATIONS considering them for dilapidation.

The housing need has been calculated using the urban housing D: Up gradation of Kutcha Houses
need model as used for the evaluation of urban housing shortage Required and possible for any dwelling units taken as a number.
from the “ Report of Technical Group: 11th Five Year Plan”
Following the similar patter the housing Need for Rourkela was
Total Current Urban Housing Shortage/Need= A+B+C+D calculated for both the Roukela Municipal area and the Steel
Where:‐ Township separately, as due to the dichotomy existing as prevalent
in the city and also to understand the pattern for it by computing
A: Excess Households acceptable over housing stock the housing shortage in both the types of areas. The following table
shows the various results:
Acceptable housing includes:‐
Table 3.33: Housing Shortage
Pucca/Permanent
Individual 2001 2011
Semi‐Pucca/ Semi‐Permanent, and Housing Stock RMC Steel RMC Steel
Value under Township Township
Serviceable Kutcha various

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 76
3
EXISTING CONDITION ANALYSIS

categories • The congestion and obsolescence in the housing stock


A ( excess 4994 1794 6260 1850 and the households is more in RMC as compared to the
households Steel Township housing.
over
• The up gradable Kutchha has increased in RMC over the
acceptable
Housing years as compared to the data computed for 2001 i. e
Stock) the kutchha houses that need up gradation in RMC
B ( Congestion 1772 385 2150 376 increased by 17.8% from 2001 to 2011 while it only
in increased by 1025% in the Steel Township Area for the
Households) same period.
Congestion 3.15% 0.80% 3.15% 0.80%
Factor 3.4.12 CONCLUSION AND ISSUES
C ( 2216 649 2690 634
Obsolescence 1. Homelessness:
in It is a considerable issue which may a major threat on
Households)
housing condition in future due to increasing no. of
Obsolescence 3.94% 1.35% 3.94% 1.35%
Factor households. Also, there is a need for control on
D ( Up 286 318 337 322 encroachment and illegal use of plots and housing
gradation of stock especially in the public sector housing by in‐
Kutcha)
migrants.
Total Housing 9268 3146 11,437 3182
Shortage 2. Dichotomy:
As observed there exists a considerable dichotomy
between various housing sectors which creates further
Inferences:
issues of non‐management of housing stock due to which
• The Rourkela Municipal Area has a continuous and
growth opportunities are limited.
rapid demand for the housing need as compared to the
steel township area.
3. Housing demand:
• The R.M.C. area has a much larger need for housing as
compared to the steel township area.

77 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
Focus has to be laid on the municipal areas due to the Apart from Steel Township both in Civil Township and rural areas
current rising demand and new ventures established to commercial area is mainly located in the form of street shopping
deal with the same. along the Highways and internal roads. Apart from some of the
4. Plotted Housing demand: planned commercial area in Civil Township there is no hierarchical
Due to scarcity of land there is a dire need to switch to commercial centres. The market is also not up to the standard
high rise housing in selective areas and subsequently and extreme insanitary conditions prevail within it. Street
propagate it through various means, this is to increase shopping which constitute majority of the shopping areas is not
density to accommodate the households in a controlled desirable form to view point of traffic circulation, loading and
built environment. unloading, safe movement of pedestrians etc. It has, therefore,
5. Housing Stock: been felt necessary to provide commercial areas on the proposed
More attention has to be paid to repair and maintenance CDP in a compact manner and distribute them in such a way that
and even up gradation of housing stock in all areas viz. all the areas could be served conveniently. One important
RMC, Steel township and even the blocks. feature of the street shopping along the National and State
highways is the existence of wooden cabins on either side in
between the permanent building and the road. These wooden
cabins mostly deal in tea stall, pan shop, daily use material and
3.5 COMMERCIAL USES
grocery, stationary, toys and other articles attractive to the Locals
The existing commercial areas occupy approximately 1.40 Sq. Kms and highway commuters. From the functional point of view
of land constituting 0.54 percent of the total Rourkela Planning wooden cabin market catering to the local population which is a
Area. Steel township have well organised hierarchical commercial need they are suitably located but still, in view of the problems
centres i.e. neighbourhood market to cater day to day need of the that they create for the traffic and also the ugly appearance they
neighbourhood, then next higher level is the Sector market with project, it is desirable to discontinue cabin shopping along the
some additional marketing facilities and the last is the Township Highways and relocate them in a organised shopping along the
level Market centre to serve the town level need of Steel highways with proper parking areas.
township.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 78
3
EXISTING CONDITION ANALYSIS

3.5.1 INFORMAL SECTOR 3.6 INDUSTRIAL USES


In Civil Township, informal sector activities are predominantly Industrially Rourkela occupies a very significant place not only in
located along the three north‐south main roads. Along these the region but also in the State Orissa. Other than Steel Plant
commercial corridors, a variety of temporary shops/ sheds can be there are other large, small and household Industrial units. The
seen along the roads and the formal shops are hidden behind this existing Industrial areas occupy 21.45 Sq. Kms of land constituting
stream of hawkers. Majority of the formal shops are workshops 8.28 percent of the total Rourkela Planning Area. Rourkela
Planning Area has 1295 industrial and service units out of which
and automobile repair shops and the informal shops sells
640 is only located in Steel Township area. In terms of type of
perishable goods like fruits and vegetables.
industries Rourkela have metallurgical and metal based industries
The informal shops/ vendors have encroached into the right‐of‐ along with chemical, fertilizers, styrene, polystyrene etc. Before
1990 only 233 numbers of industrial units were located in
way of the roads and are causing traffic congestion. Informal
Rourkela Planning Area and upto 2001 near about 648 industrial
shops can also be seen along the National Highway‐23 near units were added and through primary survey it was revealed that
Lathikata, Jalda, Panposh and Kuarmunda. NH‐23 is quite wide nearly 414 industrial units further added. This shows that during
and therefore these shops do not seem to pose a similar problem. the 1991‐2001 decade maximum number of industrial units
But in due time, when the number of vehicles on the road will added and during the current decade it shows a decline trend.
increase, the present informal shops will surely affect the
There is no distinct industrial use‐zone in rural areas and civil
unobstructed movement of traffic. Kalunga and Brahmanitrang
township and even in the steel township the problems of location
have a mix of industrial, commercial and residential of industries is rising. The classification of Industries is proposed
establishments and all existing industrial establishments are a to be simplified with prohibited category and non‐prohibited
result of violating the existing norms. The villages also have a category subjected to proposals regarding specific category of
predominance of informal markets in the absence of any industries permitted in different use zones. Further, all planned
designated commercial infrastructure. Even Steel Township also industrial areas are designated under a single land‐use category
has informal shops along the authorized commercial and namely industry. The standards prescribed by the State Pollution
Control Board would have to be met by all industrial units, in
residential land uses but their proportion is relatively less
addition to specific conditions in terms of number of workers and
compared to formal retail outlets. power load in specified categories. Industries listed under

79 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
prohibited category shall not be permitted. The existing industrial In order to retain and continue offering quality education and
units under prohibited category need to relocate in planned catering to its resident, Rourkela need an Engineering and
industrial estates. Medical College of national importance in order to make the
knowledge hub city. Even SAIL, RSP, L&T, OCL can contribute
towards setting up higher education opportunities in Greater
3.7 PUBLIC AND SEMI PUBLIC USES Rourkela or Rourkela Planning Area.

Public and Semi Public uses occupy 10.13 Sq. Kms of land
constituting 3.91 percent of the total Rourkela Planning Area.
Being one of the important National level industrial centre
3.7.1 Religious uses
number of government and semi government offices located in
Since ancient time Vedavyas which is in the other side of Panposh
Rourkela namely, Rourkela Development Authority, Rourkela
& River Brahmani is famous mythologically. It is also called as the
Municipality, Zilla Parishads, BPUT, Industries and Chamber of
second sangam as the confluence of two rivers named as Sankha
Commerce, NGOs, Chief Medical Office, RGH, RSP Town
and Koel with hidden river Saraswati creates Brahmani here. It is
Engineering Department, PHED, WESCO, Regional Transport
a mythological believe that the great epic “The Mahabharat” was
Authority.
written by Maharshi Vyash at this place. The river Brahamani is
created from this sangam. The said name of the river is perhaps
Apart from offices Rourkela is well know education centre of
due to the birth place of Maharshi Vedavyash. During the later
Odisha State, particularly engineering and technical education.
part of nineteenth century a big festival was organized by then
Rourkela has 23 High School, 45 Colleges including six engineering
Jamindar of Kuanramunda on the eve of SHIVRATRI or JAGAR
colleges and fifteen Industrial Training Institute (ITI) namely
which still in existence and organized in the month of March.
Rourkela Institute of Technology, SKDAV Polytechnic for women,
National Institute of Technology, Padmanava College of
Another famour temple is Hanuman Vatika named after one of
Engineering, Purushottam Institute of Engineering and
the highest statue of Hanuman. Inaugurated in the year 1994 by
Technology , Brahmani Industrial Training Center, Chhend ITC,
the then Chief Minister of Orissa, Biju Patnaik. Here a statue of
Bon Bosco VTI etc. Rourkela also have two universities namely
Hanuman is constructed with the height of 75 feet. There are also
Biju Patnaik University of Technology (BPUT) and Metropolitan
a number of temples named as Bata Managla, Binayak,
University.
Vaishnodevi, Sarala, Dwadash Linga, Siva, Santoshi Maa, Maa

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 80
3
EXISTING CONDITION ANALYSIS

Laxmi etc constructed here for the devotees. Because of beauty of the Durgapur Hill facing towards Rourkela Steel Plant. As like as
scenario and green area, number of general visitors came to this Jammu, Vaishnodevi Temple here also Bhairabanath Temple
place every day here. Number of annual devotional programmes situated near Vaishnodevi Temple on the Hill. During Annual
organised at this place which includes foundation day programme Navaratri Festival hundreds of devotees visit this place apart from
on 23rd February, Shivaratri, Rathayatra etc. Hanuman Vatika daily visit. The main temples start fully functioning from the year
Trust Board manages this place within a sprawling campus of area 2003.
surrounding of 13 acres. A large Kalyan Mandap is also here for Due to it’s location with a cave where the Vaishnodevi Shrine
various social functions like marriage , Bratostaba,Ekoishia etc . located, this place attracts many devotees to visit the place.
Every Day a lot of devotees from Rourkela and outside visit this Managed by a Vaishnodevi Temple Trust, this place has variety of
place. Prasad in food packets are available here for devotees and facility and arrangements for visitors and devotees for smooth ad
tourists on payment. hassle free visit to this place. This facility includes water and
sanitation facility and light facility during night time. For its green
Gayatri Temple situated on the foot hills of Durgapur Hill range and scenic location visitors also attracted to come to this place.
near the Ring Rod side at Sector – 2, Gayatri Temple is a very From this temple corridor one can have a bird eye view of
famous for variety of cause. Established by World Gaytri Family Rourkela Township which is otherwise not possible. On the top of
situated at Haridwar, Uttarakhand, Devi Gayatri Worshipped the Hill the Temple of Goddess Durga is opened for devotees in
here. This place is well connected with road transport from 2007. During Durga Puja in spring and autumn season Navaratri
Rourkela Main Bus Stand and Railway station. One can visit this Festival celebrated with full vigour
place from Indira Gandhi park chowk of ring road. The temple is
around 50 meter distance from the said chowk. Situated in a lush Apart from this there are other temple and religious places in
green and scenic environment on the foothill. One cane came Rourkela Planning Area namely Ahirabandha Temple, Laxmi
here for mediation and mental peace other than religious activity. Narayana, Jagannath Temple and Maa Bhagabati Mandir,
A lot of spiritual and devotional programme took place at this
place throughout the year here like Yagnya, Namasankirtan etc.
Apart from this people can hire the temple premises for various
purpose like Marriage and Thread ceremony etc. 3.8 RECREATIONAL AND GREENS USES

Vaishnodevi Temple at Rourkela is the replica of Original Temple Excluding Steel Township the Rourkela Planning Area utterly lacks
of Vaishnodevi of Jammu (Trikuta Hills) and is situated on the top organised parks and open spaces. Total there are 42 numbers of

81 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
open spaces occupy 2.81 Sq. Kms. of areas which is 1.08 percent market area. Created and developed for public particularly those
of total Rourkela Planning Area. Out of 42 numbers of open who are visiting to Sector – 5 Market. This park is attractive for
spaces 14 are town level and 8 are community level and only 20 it’s monument eased with the wheel of Konark concept. This park
are neighbourhood level. Some of the famous parks and has also facility of sitting with flower saplings etc. for recreation.
recreation places in Rourkela are: Other than above in number of places, Rourkela Steel Plant has
developed fitness paths and Small Park for the public at large.
Sanjeevani Park: Maintained and developed by civil township
Indira Gandhi Park : One of the biggest park of its kind for public residents association. The said Park is located in front of L block of
purpose in Steel Township is Indira Gandhi Park (IG Park) Civil Township.
developed and maintained by SAIL, Rourkela Steel Plant. The
location of the said park is adjacent to Ring Road and Main road Uditnagar Municipality Park: Maintained by Rourkela
leads to Traffic Chowk from Sector – 2 and Sector – 4 respectively. Municipality Authority, this was one of the oldest and crowded
Within the area of sprawling 50 acres of land, there are number children park of Rourkela. It is conveniently located behind
of facilities entertainment for public such as given below. Uditnagar Govt. U.P School and Rourkela Municipality Library
• A Zoo having number of animals and birds including Bear.
• Self propelled Boating Facility within the lack Agricultural and barren lands
• Doll Museum having dolls from different countries.
• Toy Train facility round the lake. Agricultural and barren lands occupy 112.28 S. Kms of land
• Rose gardens consists of variety of Rose. constituting 43.32 percent of the total Rourkela Planning Area.
• Fish Aquarium consists of varieties of colour fishes
Most of the agricultural land is located in south of Steel and
• Musical Water fountain.
Fertilizer Plants and towards the east of Bhramni River and north
Jubilee Park (Deer Park): The park is built up on the Silver Jubilee of Shankh River.
celebration of Rourkela Steel Plant and located to Sector 8
adjacent to Ring Road leads to Sector – 14. Adjacent to this park a
Mruga Vihar (Deer Park) is also developed where flock of Deer are
available for public view.
Ispat Central Place & Park: Developed by SAIL, RSP, the said park
is opened for public on 1st January 2010 inside the Sector ‐5, VIP

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 82
3
EXISTING CONDITION ANALYSIS

3.9 INFRASTRUCTURE DEVELOPMENT Situation Analysis Access to Water Supply It is observed from the
primary survey that 17% of non slum and 31% of slum population
3.9.1 Water Supply depend on public stand post where as 41% of non slum properties
and only 8% of slum properties have piped water connection.
Hindustan Steel Ltd has constructed the Mandira Dam on the There is a high level of dependence on open well and tube well
river Sankha nearly 15 miles from the Plant area. This has
(41%) in the slum area. However due to low water table the open
facilitated the availability of water to the Steel Plant all around
wells and 60% of the tube wells go dry during the summer season.
the year by the construction of a pickup dam at Jarkara. The
Hindustan Steel Ltd. at present makes available 3 million gallons Water Supply Service Indicators The water supply coverage is
of water per day for the water works at Tarkura for Civil
about 35% where in there are 14,437 direct piped water supply
Township. To serve this area, a pumping station at Panposh close
to the Circuit house is located. For steel township total water connections. The physical coverage is also quite low. As against
supply is 13.70 million gallons through River Koel and Brahamani 630 km road length the water network is available in about 220
and Mandira Dam. Thus total water supply is 16.70 million km only. Majority population depends upon some 431 public
gallons per day. Hence total population of Steel Township and taps, 1132 hand pumps, open wells & tanker supply. The town
Civil Township is 706196 persons and water available is only 10.77 has adequate water with treatment capacity of 79 MLD. NRW is
litters per day per persons. Now as per the norms of UDPFI
33%. The citizens get water supply at an average of 2.8 hours a
Guidelines (i.e 150 lpcd) total water required at present is
233.01million gallons per day for urban areas. Thus short fall is day.
216.31 million gallons per day for only urban area.
3.9.2 Power Supply
Rural areas for drinking water are depended on 882 tube wells.
Thus as per the Existing population of rural area near about 135
Electricity is available from Hirakund Power supply and a series of
persons is depend upon one tube well and about 26 number of
electric transmission lines run in the vicinity of the area. Total
households. Hence if rural population also included for piped
power supply available for the Rourkela Planning Area is 466 KV,
water supply total requirement for the rural area is 39.25 million
however, as per the UDPFI Guidelines norms (i.e. 11 KV electric
gallons per day per person. Hence total shortfall for Rourkela
sub‐station for population of 15000 persons recommended) with
Planning Area is 255.56 million gallons per day.

83 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
total population of RPA as 825157 persons the electricity demand other part of the ring road is Civil Township. The Steel Township
is 605 KV. Hence, 139 KV is shortfall. roads are also maintained by the RSP authority.

3.9.3 Transportation

a) Road Ananlysis

Towards the end of 1946 most of existing roads of Sundargarh


District were constructed. National Highway number NH‐23 is
passing through Rourkela which runs from Chas‐Ranchi‐Rourkela‐
Talcher‐Banarpal‐ Junction with National Highway No. 42. About
30 Kms of this highway passes through in and around Rourkela.
Though the finalization of the project is awaited but the planning
for four lane of this highway is under consideration. One more
National Highway i.e. NH‐213 which runs from Rajamunda to
Ranikoili in Jaipur District in Sundargarh District also have some
impact on development of Rourkela.
Figure 3.8:
Other than this the State Highway No‐10 which runs from
Rourkela to Sambalpur is another good road used in a large way
particularly after its renovation and up gradation in 1995. There
are number of other departmental roads in and around Rourkela As far as connectivity of roads with settlements Figure shows that
stretched in different parts. many parts of RPA are not connected by proper roads. Nearly all
of Kuarmunda zone are not connected by major urban roads.
The Steel city consists of two parts i.e. Steel Township and Civil Killinga, Jhartarang, Dandiapali etc in Kulunga Zone and Kansar,
Township. While the ring road constructed by Rourkela Steel Kanrsuan, Sunaparbat, Asurchhapal and Tepatoli settlement in
Plant Authority which has surrounded the Steel Township the Lathikata Zone are not connected by major roads. Some parts of
settlement even not being connected by earthen road like

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 84
3
EXISTING CONDITION ANALYSIS

Lodashar, Teliposh, Hatibandha, sunaparbat. However, all Rourkela constructed by Rourkela Development Authority caters
settlements are connected by footpath and cart track. various demands of Bus services to different parts of the States.
Other than New Bus stand, there are number of ticket booking

Figure 3.9: Figure 3.10:

counters in different parts of Rourkela Town for the public to


i) Bus services book tickets for destinations.

There are number of daily Bus Services from Rourkela to different The long distance Bus Services to and from Rourkela is one of the
parts of Odisha and few are also from Rourkela to neighbouring most excellent services in transportation Industry of Odisha.
State like Chhattisgarh and Jharkhand. There are number of There are number of Luxury Private Buses are plying from
Town buses are plying daily in the city. The new Bus Terminus at Rourkela towards various destination of Odisha and neighbouring

85 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
States. These buses are starting from Rourkela New Bus Terminus In Steel Township these roads are generally of 45.0 metres wide
at Bisra Chowk. The night coach buses ply via Sector – 2, right of way and in Civil Township these road varies from 30
Ambagan Chowk, Sector 7/17 Chowk, Chhend Chowk on ring road meters to 24 metres and in some places even less. In rural area
then proceed to Panposh Chowk junction through Uditnagar these roads are non metalled road with no concept of hierarchy.
Chowk on Main Road. From Panposh Chowk buses running via
Sambalpur proceed towards Vedvyas chowk, kalunga, kansbahal (iv) Secondary Collector Roads: These are intra sectoral roads for
and so on SH – 10 and buses running via Talcher move towards movement within the sectors and providing approaches to
Deogaon, Rangoli Chowk (Fertiliser Township), Lathikata, various properties. In Steel Township these roads are generally of
Chandiposh and so on NH‐23. Most of these luxury buses have 24 to 30 metres wide right of way, however in civil township it
advance ticket booking counters at various places of Rourkela varies from 24 metres to 15 metres or even less. In rural area
Township like, Sector – 2, Sector ‐7, chowk, Chhend chowk, these roads does not exist.
Uditnagar, STI Chowk, ITI Chowk, Panposh Chowk, Rangeela
Chowk etc.
c) Traffic Volume Characteristics

b) Hierarchy of Roads Sites for traffic volume survey have been selected by an
resonance survey, observation study undertaken by TCPO and
(i) Arterial Road: National and State Highways are acting as BDA official the same is discussed in detail with different
arterial roads in Rourkela and these are the external roads
Stakeholder and departments of Rourkela and also depending
providing regional linkages to Rourkela. These roads also form the
arterial network for Rourkela as they pass through the city. upon the existing traffic estimates on important connecting roads
inside RDA area, the following table and location indicates eleven
(ii) Sub Arterial Roads: Ring Road is sub arterial road and act as a sites for traffic volume survey.
major internal road of the township, which are planned to cater
to the bulk of the intra‐city movement between Steel Township
and Steel Plant but now it also taking the load of Civil Township.

(iii) Main Collector Road: These are other internal roads providing
access to various sectors from the work centres developed so far.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 86
3
EXISTING CONDITION ANALYSIS

Figure 3.11: Location of Traffic Volume Survey undertaken

87 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
Table 3.34: Sites where Traffic Volume survey undertaken. SITE LOCATION DIRECTION TO
VEDVYASH HATIBARI
SITE LOCATION DIRECTION TO BIRAMITRAPUR VEDVYASH
A MADHUSUDAN SQUARE RSP.GATE DAILY MARKET BISHRA(BANDHA
RSP.GATE BISRA MARKET E MUNDA) BANDHA MUNDA BISRA
BISRA CHAWK RLY. STATION LOCOSHED BANDHA MUNDA
BISRA CHAWK DAILY MARKET BISHRA BANDHA MUNDA
RLY STATION RSP. GATE RKL BANDHA MUNDA
DAILY MARKET BISRA CHAWK RKL BISHRA
BISRA CHAWK RSP GATE BANDHA MUNDA LOCOSHED
DAILY MARKET RLY STATION BISHRA RKL
DAILY MARKET BISRA CHOWK BANDHA MUNDA RKL
DAILY MARKET RSP. GATE LOCOSHED RKL
RLY STATION DAILY MARKET BANDHA MUNDA BISHRA
RLY STATION BISHRA ROAD RKL LOCOSHED
RSP. GATE RLY STATION F LATHIKATA LATHIKATA PANPOSH
B SEC.19 I.G.H I.G PARK PANPOSH LATHIKATA
SEC.2 RSP. CHANDIPOSH LATHIKATA
SEC.2 IG. PARK G HOCKY SQUARE PANPOSH LATHIKATA
RSP. SEC.2 HANUMAN VATIKA PANPOSH
I.G PARK IGH. LATHIKATA HANUMAN VATIKA
RSP. IGH. LATHIKATA PANPOSH
IG. PARK SEC.2 PANPOSH HANUMAN VATIKA
C CHHEND RSP. SEC.5 H HANUMAN VATIKA CHHEND UDIT NAGAR
CHHEND RSP. RSP CHHEND
SECTORS CHHEND UDIT NAGAR CHHEND
RSP. CHHEND RSP CIVIL TOWNSHIP
CHHEND SECTORS CIVIL TOWNSHIP CHHEND
SECTORS RSP. CHHEND CIVIL TOWNSHIP
D KUARAMUNDA BIRAMITRAPUR HATIBARI CHHEND RSP
VEDVYASH BIRAMITRAPUR CIVIL TOWNSHIP RSP

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 88
3
EXISTING CONDITION ANALYSIS

SITE LOCATION DIRECTION TO the city increases. This is the reflection of increasing number of
I KALUNGA KALUNGA BELDHI workers commuting from neighbouring areas to workplaces in
BELDHI KALUNGA
Rourkela City. The traffic surveys have also revealed that
KALUNGA BALABDA
J KONARK TALKIES R.S.P SEC‐2 personalized motor vehicles (i.e. cars and scooters) have a
KONARK TALKIES BASANTI significant share (40 to 50 per cent) in the traffic volume. This
SEC‐21 SEC‐2 high use of personalized modes suggest that a more integrated
SEC‐2 RSP inter‐city public transport system may be required to reduce the
SEC‐5 RSP
burden of personalized vehicles on transport infrastructure of
SEC‐2 SEC‐21
BASANTI KONARK TALKIES Rourkela City and other neighbouring urban areas. At present
RSP SEC‐5 about 550 commuting auto services and buses operating in
K PANPOSH BRIDGE RKL TOWN VEDVYAS Rourkela. Metro Rail is also carrying large number of passengers.
PANPOSH VEDVYAS As regard the goods movements, transportation survey has
VEDVYAS RKL TOWN
revealed that there is a high inflow of building material to
RKL TOWN VEDVYAS
LATHIKATA VEDVYAS Rourkela and a high outflow of industrial goods from Rourkela.
VEDVYAS PANPOSH The analysis of the travel demand matrix by distance of travel
PANPOSH LATHIKATA indicates that nearly 75 per cent of the demand is concentrated
for a travel distance of less than 3 km. Only about 4.6 per cent of
The traffic volume survey, on eleven identified junctions in RPA the trips are for a distance of more than 10 km. More than 91%
had been conducted on hourly basis. In all the eleven sites the trips are made for work, education and shopping purposes. More
comprehensive survey of 24 Hrs in a day , on hourly basis, has than 91% trips are made for work, education and shopping
been conducted. It is observed that 80 per cent of the traffic falls purposes. Personal trips are further classified by the mode of
along the National and State Highways corridor, thus exhibiting a travel and it has been found that walk trips are higher which is
strong relationship with its regions. The traffic volume studies due to high intra sectoral movement. Since commuter trips are
also reveal that higher volumes of traffic enter the city in the significant, the use of bus transport and 2‐wheelers find the next
morning hours whereas in the evening hours the traffic leaving

89 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
place in mode usage hierarchy. The cars are also having significant d) Parking
share in individual’s movement.
In a city becomes a crucial instrument, which determines the
Table 3.35: Distribution of Persons Trips by Trip Length congestion levels on the roads, since inadequate provision of
Distribution Distance Class Number of % parking spaces will shift the demand on to the roads. The
of Person (in Kms) Trips standing vehicles on the roads will be hindrance to moving traffic,
Trips by as they will reduce the effective carriageway width. Night parking
Trip Length is now over spilling on to this service and internal street network
(Internal of the residential sectors. These service informal industries are
Movement) posing heavy demands on the roads, as the vehicle/ employee
1 Less than 1 Km 290,11 60.10 ratios are high. As a consequence, the locations of such industries
2 1‐3 Kms 3,143 6.51 need to be re‐examined and the measures for satisfying parking
3 3‐5 Kms 7,540 15.62 demands identified. In the commercial areas the turnover is high.
4 5‐10 Kms 6,338 13.13 In view of this mounting parking accumulation, there is a need of
5 Above 10 Kms 2,239 4.64 reviewing the existing parking policies for further development.
Total 4,82,71 100.00
Source: Primary survey
e) Railways
Table3.36: Distribution of Person Trips by Mode of Travel
Rourkela Railway junction is situated in Howrah‐Mumbai line
Distribution of Person Trips by %
under South –Eatern Railway. Apart from Rourkela Station the
Mode of Travel
other stations in Sundargarh District are Bondamunda,
Car 12.9 Rajgangpur, Kalunga, Kansbahal, etc. The Steel City is well
Two‐wheeler 29.2 connected through Railway from Howrah & Mumbai. Apart from
Bus Transport 12.5 this the city is directly connected with Delhi, Chennai, Bangalore,
Walk 45.4 Ahmedadad, Ranchi, Dhanbad and Pune too. Many goods train
Others 100 also pass through Rourkela every day. From Rourkela junction
Total one more line goes to Biramitrapur where two from
Source : Primary Survey Bondamunda. One more line goes from Bimalagarh to Kiriburu.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 90
3
EXISTING CONDITION ANALYSIS

changes in its physical structure and if proper care is not taken to


f) Airport upgrade the transportation system in a conforming manner, the
quality of life in the city may deteriorate at a rapid rate. The
After inception of Rourkela Steel Plant, the Government of India weaknesses of the transportation system of Rourkela are
build an Air Strip at Rourkela in 1960’s and till 1991 it was under becoming too apparent. These need to be recognized and
Government control. In 1991 the management and control of this obviated in the preparation of the CDP through a rational
Air strip was transferred to Steel Authority of India, Rourkela Steel integration of land uses and transportation system.
Plant. As per the license agreement of Director General of Civil
Aviation (DGCA) Government of India, Rourkela Air Strip comes
under Private License category. Time to time some of the 3.9.4 TELECOMMUNICATION
important dignitaries and VVIPs boarding flights are landing here
but so far the regular flight has not flying from this air strip for Under Bharat Sanchar Nigam Limited, the National
public conveyance. The dialogue with Ministry of Civil Aviation, Telecommunication Organization Rourkela Telecom District
Government of India is going on for using it for public purpose, functioning with its head quarter at Rourkela. This telecom
especially when many low cost operators are operating from district covers the entire Sundargarh District with number of
small towns. Now this Airport is being used by some private exchanges at various places. The Head Quarter of Rourkela
company and industrialists for private use by paying the required Telecommunication District is located alongside of Ring Road near
charges. Sector – 21 and adjacent to Rourkela Head Post Office. Rourkela
Telecom District provides almost all facilities like internet, mobile
In the year 2007 – 2008 a small air operator company named as etc to its customers. Apart from this many private players like
SKY AIRWAYS operated chattered flight from this base to Reliance, Airtel, Tata Indicom, Vodafone, Aircell are operating in
Bhubaneswar via Barbil for few days only. Recently number of the Rourkela.
discussions are already held with Deccan Charters for public air
services. For the future development of Rourkela it is necessary 3.9.5 POST AND TELEGRAPH
to make Airport operational for public.
After the division of Bharat Sanchar Nigam Limited as a
Inadequacies in the provision of urban infrastructure, particularly corporation the Head Post Office at Rourkela directly functioning
transport, have been the root cause of degradation in the quality under Senior Superintendent of Post based at Sundargarh (District
of life in urban areas. Rourkela is presently experiencing rapid Head Quarter) Recently the Sector – 4 Sub Post Office as well as

91 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
Sub Post Office of Uditnagar, Rourkela ‐12 upgraded to MUKHYA 3.10.1 Residential land use
DAK GHAR category. The telegraphy office is working at Sector –
6, Telephone Bhawan and another at head quarter of BSNL at
Doorsanchar Bhawan. The Land values for residential land use vary from Rs 6.88 per sqft.– Rs
918 per sqft (Graph1).

It is evident from the Graph 1 that the land values for rural mouzas are
3.10 LAND VALUE ANALYSIS
considerably lower as compared to the land values for urban mouzas.
Land value survey for the Rourkela Development Authority area a) Range of land values :
has been carried out by surveyors. The market value ,
government rate as well as the rental value for land use
categories like residential , commercial , industrial and In urban mouzas : Rs 11.01 per sqft – Rs 918 per sqft (Figure)
agricultural have been compiled from the survey reports . As it is evident from graph 2 ,we can apprehend that all mouzas
Comparative tables have been generated to assess the price value except Unit – 51, Unit‐ 52 , Unit ‐31 and Unit ‐32 have land values
of lands under different categories. more than Rs 100 per sqft . These low prices of the land in these
ƒ The land value survey show that in residential area the four urban mouzas maybe attributed to the fact that these wards
value varies from 100 to 12000 Rupees per sq.ft. in Urban lie further away from the main hustle bustle of the city and also
mouzas in Government rate the ring road . Further, these are the areas which have most of
ƒ In Rural mouzas, the land rate is within Rs.100 per sq.ft. the land being used for agriculture activity but has also
ƒ In the steel plant area, the commercial & industrial land experienced a shift from rural to urban with coming up of some
value in government and market rate is above Rs. 100 per famous and renowned institutes like the College of Arts and
sq. ft. Science and Technology and also has railway stations ( R.S ) like
Dumerta R.S. , Bondamunda R.S.
The Agricultural land value in government rate varies from Rs.100
– Rs.800 in urban mouzas and less than 100 rupees in rural
mouzas.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 92
3
EXISTING CONDITION ANALYSIS

Figure 3.12 : Land values of Residential land use. In urban mouzas / wards

93 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS

Figure 3.13 : Land values of Residential land use in rural mouzas / wards

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 94
3
EXISTING CONDITION ANALYSIS

Hence, it may be expected that land prices in these areas along with values ( in cases when they are not equal ) ranges from
other areas of Rourkela Rs 2.29 per sqft – to ‐ Rs 320 per sqft.

city , shall increase with the growth of the town, as every city has the
• However, in the case of Mahaliapalli located in the western part
tendency to grow outwards with the enhancement of connectivity and
of Rourkela city towards the periphery, the government land
accessibility.
value is higher ( by Rs 16.04 per sqft ) than the market value.
Hence , land prices in these 4 urban mouzas may rise significantly if new • Generally, government rates for allotment of lands is less than
roads along with proper infrastructure is developed connecting the their corresponding rates in the market, to ensure quick
railway stations to the main city . Thus, allowing the stations to come disposal of land in the market through allotment by draw of lots
closer to the main city. to public or sometimes to the highest bidders by auction.
However, sometimes due to very high market rates of property
• In rural mouzas : Rs 6.88 per sqft – Rs 323 per sqft / land due to over‐speculation, a phase comes when the market
property rates tend to fall due to excessive supply of land and
In rural mouzas , the land value is below Rs 100 per sqft except in the
limited purchasing power. In such cases, the market value falls
Panposh mouza and Brahminitaranga mouza.
and the pre‐existing government rates become higher than the
Though these two wards are not close to the main German planned city new market rates. This further results in the non disposal of
but still these areas have undergone a large scale development with the government land at high rates. Thereafter, government reduces
coming up of institutes like Rourkela Institute of Technology ( RIT ) and the land rates by some percentage and further to ensure the
some refractory industries in Brahminitaranga ; and National Institute disposal of land.
of Technology, Rourkela ( NIT ) in Panposh.
• The difference is comparatively lower in rural mouzas than in
urban mouzas. This is so because in urban areas , the supply of
land is limited as compared to the demand for the same, hence
b) Market Values v/s Government values
the land value tends to lie on the higher side of the range.
Whereas in the rural areas, the demand for land is lower when
• In general, the market value of residential land uses is higher compared to its supply hence the land value tends to lie on the
than or equal to ( i.e the difference between the two values is 0 lower side of the price range .
) the government value and the difference between the two

95 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS

c) Categories of Mouzas as per Land Value • Te government value of residential land use , we can see that
the all of the rural mouzas fall under the category of very low
land value ( upto Rs 50 per sqft ) whereas majority of the urban
Table 1 shows the categorization of wards / mouzas as per the varying
mouzas have low land value . Also, the government land value
land values of residential land use.
of no urban mouza exceeds Rs 600 per sqft.
• The market value of residential land use , we can see that
nearly all ( except Panposh and Bartoli) rural mouzas fall under
the category of very low land value whereas majority of the
urban mouzas have medium land value.

Table 3.37 : Categorization as per land values Table 3.38 : Categorization as per land values

Category Land Value ( in


Land Value ( in Rs Category
Rs per sqft )
per sqft )

Very low land value upto Rs 25 Very low land value upto Rs 200

Low Land value 25‐50 Low Land value 200‐400

Medium land value 50‐75 Medium land value 400‐600

High land value 75‐100 High land value 600‐800

Very high land value more than 100 Very high land value more than 800

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 96
3
EXISTING CONDITION ANALYSIS

However, the variation of land value within the rural


mouzas. Hence, for the rural mouzas, we use another
d) Average value of residential land
range of categories and analyse the same.

• The market value of residential land use , we can • Total number of wards / mouzas in Rourkela = 104
see that nearly all ( except Unit‐31, Unit ‐32, Unit‐ • Total number of urban wards / mouzas in Rourkela = 52
51 and Unit ‐52) urban mouzas fall under the • Total number of wards / mouzas in Rourkela = 52
category of very high land value whereas majority
of the rural mouzas have low land value and the Market Value Government Value
rural mouzas at the extreme periphery ( Lathikata ,
Killinga , etc ) , further away from the main city, Total Market value in Rourkela = Rs Total government value in Rourkela = Rs
26,032.61/sqft 17,711.44/sqft
have very low land value. Also, Panposh and
Average Market value in Rourkela = Rs Average government value in Rourkela = Rs
Bartoli, although are rural mouzas , still have very 250.32/sqft 170.30/sqft
high land value ( reason as explained earlier )
Total Market value in urban mouzas = Rs Total government value in urban mouzas = Rs
23,545.67/sqft 16,075.67/sqft

• The government value of residential land use , we Average Market value in urban mouzas = Rs Average government value in urban mouzas = Rs
452.80/sqft 309.15/sqft
can see that the all of the rural mouzas fall under
Total Market value in rural mouzas = Rs Total government value in rural mouzas = Rs
the category of very low land value ( upto Rs 50 2,486.94/sqft 1,635.77/sqft
per sqft ) and low land value whereas majority of Average Market value in rural mouzas = Rs Average government value in rural mouzas = Rs
the urban mouzas have very high land value . Also, 47.82/sqft 31.46/sqft

the category of respective mouzas is usually the


same as it was for market value but for some there
is a downfall in category from ( say ) low land value
to very low land value ( Kuarmunda , Karlakhaman
, etc ).

97 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
3.10.2 Agriculture land use All the mouzas have market land values more than Rs 100 per sqft
whereas a few mouzas ( Unit 50, Unit‐51, Unit 52 and Unit‐ 31 )
The land values for agriculture land use vary from Rs 4.59 per have government land values less than than Rs 100 per sqft
sqft.– Rs 688.7 per sqft .
• In rural mouzas : Rs 4.59 per sqft – Rs 82.64 per sqft
It is evident from the Graph 4 that the land values for rural
mouzas are considerably lower as compared to the land values Thus, from This we can conclude that in rural mouzas , the land
for urban mouzas. value is below Rs 100 per sqft

Agriculture land in and around urban areas has higher price than b) Market Values v/s Government values
the agriculture land in rural areas and this is mainly due to the
expanding nature of urban areas to accommodate ever increasing
• In general, the market value of agriculture land use is
population, which results in the conversion of agriculture lands
higher than or equal to ( i.e the difference between the
around urban areas into different land uses ( commercial,
two values is 0 ) the government value and the difference
residential, public‐semi public , etc ) with the passage of time.
between the two values ( in cases when they are not
Hence , the expected appreciation of such lands around urban
equal ) ranges from Rs 2.3 per sqft – to ‐ Rs 275.5 per
areas is much more than their possible appreciation if located
sqft.
nearby or in a rural area.

Therefore, keeping in view the future development potential of • Generally, government rates for allotment of lands is less
agriculture land around urban areas, the rates of such lands is than their corresponding rates in the market, to ensure
higher than those around urban areas. quick disposal of land in the market through allotment by
draw of lots to public or sometimes to the highest bidders
a) Range of land values : by auction. However, sometimes due to very high market
rates of property / land due to over‐speculation, a phase
• In urban mouzas : Rs 80 per sqft – Rs 688.7 per sqft comes when the market property rates tend to fall due to
excessive supply of land and limited purchasing power. In

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 98
3
EXISTING CONDITION ANALYSIS

Figure 3.14 : Land values of Agriculture land use in urban mouzas / wards

99 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS

Figure 3.15: Land values of Agriculture land use in rural mouzas / wards

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 100
3
EXISTING CONDITION ANALYSIS

such cases, the market value falls and the pre‐existing • The government value of residential land use , we can see
government rates become higher than the new market that the
rates. These further results in the non disposal of Table 3.39 : Categorization as per land values
government land at high rates. Thereafter, government
reduces the land rates by some percentage and further to
ensure the disposal of land. Land Value
Category
( in Rs per sqft )

• The difference is comparatively lower in rural mouzas than Very low land value upto 25
in urban mouzas. This is so because in urban areas, the Low Land value 25‐50
supply of land is limited as compared to the demand for
Medium land value 50‐75
the same, hence the land value tends to lie on the higher
side of the range. Whereas in the rural areas, the demand High land value 75‐100
for land is lower when compared to its supply hence the Very high land value more than 100
land value tends to lie on the lower side of the price
range. Table 3.40 : Categorization as per land values
c) Categories of Mouzas as per Land Value
Land Value
Category
( in Rs per sqft )
Table 3 shows the categorization of wards / mouzas as per the
varying land values of residential land use. Very low land value upto 150

• The market value of agriculture land use , we can conclude Low Land value 150‐300
that the majority of the rural mouzas fall under the Medium land value 300‐450
category of very low land value whereas majority of the
urban mouzas have medium land value. High land value 450‐600
Very high land value 600 and above

101 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS
majority of the rural mouzas fall under the category of value whereas majority of the rural mouzas have low land
very value and the rural mouzas at the extreme periphery
low land value ( upto Rs 150 per sqft ) whereas majority (Lathikata , Killinga , etc ) , further away from the main
of the urban mouzas have low land value. city, have very low land value.

Hence, for the rural mouzas, we use another range of categories


• The government value of residential land use , we can see
(Table 3.40) and analyse the same
that nearly all rural mouzas fall under the category of very
Market Value Government Value low land value ( upto Rs 25 per sqft ) whereas nearly all
urban mouzas ( except Unit‐31, Unit‐32, Unit‐51, Unit‐52 )
Total Market value in Rourkela Total government value in have very high land value . Also, the category of
= Rs 17,595.68/sqft Rourkela = Rs 11,635.5/sqft respective mouzas is usually the same as it was for market
Average Market value in Average government value in value but for some there is a downfall in category from
Rourkela = Rs 169.19/sqft Rourkela = Rs 111.88/sqft (say ) low land value to very low land value (Kuarmunda
Total Market value in urban Total government value in ,Balanda , etc).
mouzas = Rs16,003.9/sqft urban mouzas = Rs
10,591.6/sqft
Average Market value in urban Average government value in d) Average value of agriculture land
mouzas = Rs 307.77/sqft urban mouzas = Rs 203.68/sqft
Total Market value in rural Total government value in rural
mouzas = Rs 1591.78/sqft mouzas = Rs 1043.9/sqft • Total number of wards / mouzas in Rourkela = 104
Average Market value in rural Average government value in • Total number of urban wards / mouzas in Rourkela = 52
mouzas = Rs 30.61/sqft rural mouzas = Rs 20.1/sqft
• Total number of wards / mouzas in Rourkela = 52
• The market value of agriculture land use , we can see that
nearly all ( except Unit‐31, Unit ‐32, Unit‐51 and Unit ‐52)
urban mouzas fall under the category of very high land

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 102
3
EXISTING CONDITION ANALYSIS

e) Agriculture v/s Residential land use • Soil Character is conducive for non residential activity.
• Availability of Building materials in the vicinity.
• Availability of mines & improved access to mines quarry.
From graph 7 , we can conclude that the land values of the • The mythological hotspot like Vedvyas.
residential land use is always higher than the agriculture land use.

This is so because initially, with the expansion of cities and towns


the agriculture land is converted into residential land. For this, the
agriculture land is divided into smaller plots for housing , etc
purposes with infrastructure facilities of roads, sewerage system,
drainage system, water pipelines, lighting, etc. Hence, at the end ,
only about 50% or so portion of the agriculture land is utilized for
actual housing plots. In addition, the cost of infrastructure
development has to be shared by all the residential plot holders
proportionately. Thus , cost of residential land is per unit area is
always more than the cost of agriculture land.

Figure 3.8:
3.11 SWOT ANALYSIS
3.11.1 Strength
Figure 3.16: SWOT Analysis through primary opinion poll

• Available of River Bramhani / Koel / Sankha. 3.11.2 Weakness


• Industrial city will create more jobs.
• Cosmopolitan Character socially healthy and peacefull o Pollution in terms of Air, Water, Noise.
society. o Sizeable Land under the possession of R.S.P./ Railway/
Forest.

103 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
3
EXISTING CONDITION ANALYSIS

• Encroachment on vacant land. 3.11.4 Threat


• Exhaustive use of Bramhani Bridge by increasing no of
vehicle (the only life line of Rourkela.) • Maoist problem.
• Lack of sewerage & drainage system. • Extinct of aquatic life in water bodies due to water
• Over exploitation of water in river Bramhani. pollution.
• Lack of super specialty Hospital for attending critical • Extinct of the flora & fauna due to atmospheric pollution.
disease. • Exponential increase of vehicle without increasing the
• Lack of city Level Park, an amusement avenue for capacity of roads.
children. • Large scale deforestation in the name of development.
• Reducing ground water and siltation of dams problem • Nearness to state boundary gives rise to crime.
of water will rise in future • Contamination of soil and thus ground water.

3.11.3 Opportunity

• Availability of Employment opportunity


• Linkages available to metros like Bombay, Calcutta,
Capital cities like BBSR & Ranchi.
• Benefits of agglomeration of economic in the region
• Scope of establishment of commercial & residential
activities.
• Scope of industrial growth.
• Establishment of B.P.U.T./ Medical collage / N.I.T. /
RIMS & other private engineering colleges attract
educational aspirants to this city.
• Scope for promotion to greeneries & sanctuaries on the
available space like Durgapur hills, River Banks &
Vedvyas surroundings.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 104
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

4.1 FUTURE ASSUMPTIONS OF ROURKELA experience higher levels of population growth and economic
development.
What is expected in the future for Rourkela? What will influence
the community’s growth and development? A high growth rate is 4.1.3 POPULATION PROJECTION
anticipated, though community and environmental consideration
might be increased and the same will put forth the challenges to In reference to the existing annual growth rate of population the
plan the region in a sustainable manner. It is expected that the Rourkela Planning region is expected to increase population at
town’s role as an Industrial centre will continue to influence annual growth rate between 6.9 to 10.0 percent during 2011 ‐
community and economic growth. An increase in migrating 2031. Consequently, the region may reach a population of about
population will have a heavy impact on the provision of housing 21 lakhs persons by the year 2031 (with 1.2% induce growth rate).
and community services. Proposed CDP will take have effective measures during the course
of implementation that Civil Township will be decongested and
4.1.1 ROLE WILL CONTINUE some of the activities will be shifted to rural areas. CDP will also
maintained the same density in Steel township area, however, in
Rourkela will continue to serve as a Industrial base for India and rural density will going to be higher and at par with Steel
region and functionally the Iron and Steel Industry is expected to Township.
continue to influence the planning concept of the region. As a
result, most development within the community will be for 4.1.4 WORKFORCE PROJECTION
Industrial purposes. It is expected that Rourkela will also become
attractive to working population and new migrants due to its It is expected over all development of the region will lead to
growing industrial activities and pleasant climate. increase in Workforce participation rate from 29.37 per cent in
2001 to 35 percent in 2031. This is because organised and plan
development of Rourkela Planning Area will attract more support
industries and service industries which will going to create more
4.1.2 GROWTH INFLUENCED BY REGIONAL TRENDS tertiary sector jobs. In rural area also the workforce participation
rate will be higher as more construction and other lower jobs will
Rourkela Steel Plant and its regional resources will continue to be be available in the region.
affected by growth and development patterns within the
Rourkela – Bonaigarh Region. If this region experiences high
population and economic growth, Rourkela Planning area will also

105 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
4
SY
YNTHESIS
S AND HOL
LDING CAP
PACITY SC
CENARIOS
S
4
4.1.5 TRIBAL P
POPULATION training centre and will also crreate there plaace of livelihood
through pride. No o displacementt of tribal villages will take plaace
TThe area around
d Rourkela town
n is having mosstly tribal populaation andd efforts will bee made so thatt majority will add
a their share in
aand was most backward and majority
m of them had no share in n the thee process of devvelopment and economic
e growtth

Figure 4.1: Tribes of Rourkelaa


4.2
2 UNDERSTTANDING GRO
OWTH
Figure 4.2:
Growth of Rourkeela
Thee rapid grow wth of the
Rou urkela Planningg Area (RPA),
Odisha has resulteed in acute
defficiencies and in nequities in
thee distribution of the
phyysical and social
infrrastructure required to
suppport the existing population.
Thee current goveerning structure is
fraggmented and therefore no ot equipped to
cooordinate and implement th he developmen nt of
infrrastructure and provision of services to the RPPA. The lack of an
eeconomic grow wth of the R Rourkela Planning Region. The
adeequate public trransit system ass well as the phhysical constrainnts
rrehabilitation programmes
p arre described b by these triballs as
hass further imped ded the balanceed developmen nt of areas of the
‘forced eviction’’. This infact leead to increase focus on issuess like
Rou urkela as an integrated urban aarea. Further unplanned
u growwth
ppoverty alleviatiion, tribal land‐use right, mitigaation of the imp
pacts
is ccurrently taking place in bettween the planned Residenttial
oof Industrial deevelopment, asssistance to vuln nerable groupss and
commplex and Indu ustrial area of SSteel Township
p and around the
ooverall improvement in the quality of life of trribal population n. To
villaages or resettleement colonies llike Kumarkupa,, Latikata etc.
eevolve the conccept of Rourkelaa CDP is a challenge to mergee two
ddifferent culturres i.e. the p people of Steeel Plant and ttribal
ppopulation. CD DP will focus on n the creation of low job skilll and

T
Town and Counttry Planning Org
ganisation (TCPO
O), Ministry of Urban
U Development, Governmen
nt of India. 10
06
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

4.2.1 SUSCEPTIBILITY TO CHANGE ANALYSIS development, parts of these stable low density areas have the
potential to be redeveloped. Redevelopment areas include
The existing land use pattern in RPA has evolved as a result of existing residential areas in farmhouse replaced by multi‐family
various factors, such as the physical characteristics of land, the mid‐rise apartments. This category also includes land occupied by
availability of other resources (capital, labour etc.) and the slum or substandard housing which required redevelopment with
location of the urban areas in relation to other derives of provision of basic amenities.
economic development such as transport, industry and trade.
Land‐use is also subject to a range of policy decisions at different
levels of Government affecting, how and where, the land can be c) Low Potential
used for development and the administrative measures
implementing those policies. Given the pressure on land in urban This category includes low and medium density developed land
areas is intense, devising the most effective use of the available that is located in stable neighborhoods but has the potential for
land becomes a critical requirement of a successful partial redensification i.e. farmlands and horticulture land.
Comprehensive Development Plan implementation. In order to
assess development potential in the RPA certain areas have been d) Forest Land
categorized based on their potential to accept the projected
increases in urban population. In the Rourkela, there is a significant proportion of protected
forest land and other types of the forest, the same will be
considered for protection of environmental conditions of the city.
a) High Potential
e) Tribal Land
This category includes vacant, pasture, and agricultural land
within the Rourkela limits potentially available for residential, The Chotanagpur Tenancy Act, 1908 was enacted with prime
commercial, public and semi‐ public and other facilities. objective of preventing sale and transfer of tribal land to a non‐
tribal use because the land is a major livelihood resource of tribal
b) Medium Potential people. Parcels of tribal land are scattered all over the Rourkela,
with the predominance in the villages. At many places the tribal
This includes the land for high‐end, low‐ density housing in stable lands are so predominant that they hinder contiguous urban
neighborhoods. Due to more recent adjacent higher density development. A special strategy for tribal lands needs to be

107 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS
formulated so that the interests of the tribal folk are safeguarded • Residential development types and their potential for
and their land integrated with future development of the higher absorption
Rourkela. • Redensification of housing areas developed at lower
densities in selected sections of the city
4.2.2 POPULATION HOLDING CAPACITY AND ALTERNATIVE • Existing employment area/centres
GROWTH SCENARIOS • Increase in the transportation network capacity
• Expanded, improved and rationalized infrastructure‐
In order to assess potential development, a study of land capacity physical and social
of the Rourkela was undertaken. The holding capacity of an area
was calculated, taking the following factors into account:
4.3 CONCEPT OF ROURKELA COMPREHENSIVE
DEVELOPMENT PLAN

4.3.1 WATERSHED APPROACH FOR COMPREHENSIVE


DEVELOPMENT PLANNING FOR ROURKELA PLANNING
AREA

Undulating topography of Rourkela leads to focus on the most


important issues for managing urban water supply, wastewater & storm
water is required to viewed in an integrative manner by looking at
Rourkela Planning areas as watersheds. Such perspectives incorporate
issues such as pollution of water resources, surface run‐off, rainwater
harvesting from urban structures, etc. It also includes the perspective of
Rourkela cities as ‘metabolic units’ that can be defined in terms of
inputs/outputs and material balance as well as life cycle cost.

Figure 4.3: Development Concept of Rourkela

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 108
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

Figure 4.4: Sustainable Land‐use development concept on which Proposed CDP of Rourkela prepared.

109 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS
a) Watershed Approach The contour analysis is done for delineating the watershed
boundary and areas most affected by the rainwater and surface
Watershed is defined as a geohydrological unit drawing water to a
water. The watershed boundary would provide the area that
common point by a system of drains. All lands on earth are part of one
watershed or the other. Watershed is thus the land and water area, would serve the population with surface water.
which contributes runoff to a common point. In other words watershed
c) Calculation for Rain Water Harvesting
is a topographically delineated area draining into a single channel.
Watershed is considered as a biological, physical, economic and social Population of Rourkela = 2.59 lakh
system too.
Average annual rainfall of Rourkela = 128.8 cm = 1.288 metres.
A watershed is a flexible approach is a flexible framework for managing
water resource quality and quantity within specific drainage areas, or Arae of watershed = 1854931.16 Ha
watersheds. This approach includes stakeholder involvement &
management actions supported by sound science & appropriate Total volume of water through rainfall = 185493 x 1.288 ha.metre
technology. The watershed planning process works within this
(1 hectare metre = 1,00,00,000 litres)
framework by using a series of cooperative, alternative steps to
characterize existing conditions, identify & prioritize problems, define = 238914.984 Hectare meter
management objectives, develop protection or remediation strategies,
and implement & adapt selected actions as necessary. The outcomes of = 2389149840000 litres
this approach are documented or referenced in a watershed plan. A
watershed plan is a strategy that provides assessment and management Run‐off coefficient would be taken to be 70‐95%
information for a geographically defined watershed, including the
Taking 70% as the lowest range,
analysis, actions, participants, & resources related to developing &
implementing the plan. Then, total annual surface water available would be = 70% of
2389149840000
b) Contour Analysis and Identification of Watershed
Boundary = 1672404888000 litres

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 110
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

Total per capita per day availability = 1672404888000 / 25900000 is marked by the inundation caused by high flow, or overflow of
x 365 = 1772 LPCD whereas norms stipulated 135 LPCD. water in an established watercourse, such as a river, stream, or
drainage ditch; or ponds of water at or near the point where the
d) Flood Management rainfall took place.
A flood is a duration type event. A flood can strike anywhere
The recurrence of the extreme precipitation that results in floods without warning, occurs when a large volume of rain falls within a
or droughts is a normal component of natural climate variability. short time.
The adverse effects of floods and droughts often entail far‐
reaching socio‐economic and environmental implications, and f) Urban Floods
may include loss of life and property; mass migration of people The un‐even distribution of rain fall coupled with haphazard
and animals; environmental degradation; and shortages of food, urbanization, encroaching upon and filling up natural drainage
energy, water and other basic needs. channels and urban lakes to use the high‐value urban land for buildings
are the primary causes responsible for flooding in urban areas.
e) Flood The urban area is paved with roads, etc and the discharge of heavy rain
A Flood is an event marked by the accumulation of excess of can’t be absorbed into the ground due to drainage constraints leads to
water (or mud) on land that is usually normally dry and this event
flooding of streets, underpasses, low lying areas and storm drains.

Heavy rainfall results in huge amount of rainfall flowing on the


paved surfaces of an urban area which ultimately gets impounded
in to low lying areas raising the water level of the area. This event
is aggravated when a main drain or a river passing through the
area over‐flows or breaches. Figure shows the interaction
between land and water.

g) Flooding in Rourkela Planning Area

Rourkela town, is located within Odisha State and is a part of


Figure 4.5: Land and Water Relationship Sundergarh District. Rourkela town with an area of 195 Sq.Km

111 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)

Figure : Interaction between land and water.


4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS
and population of 0.64 million, is characterised as an uneven h) Relation between urbanization and water‐ logging
physiographic region which is mostly covered by low hills from
north‐west and south east directions and interspersed by narrow With the rapid urbanization and pressure to accommodate the
valleys in between. The region has two rivers, namely Koel (flowing ever increasing population, more materials like wood, land,
from east to west) and Sankha (flowing from west to east) which meet water, food, etc is required.
together and give rise to the river Brahmini . These three rivers divide
the Rourkela region into three parts. Rourkela, an important Greediness for more and more resources lead to deforestation;
commercial centre of Odisha State, has a huge iron and steel construction of buildings and roads without considering the
manufacturing base. It has numerous industries ranging from light‐
counters or slopes; over grazing; excess cultivation; soil erosion,
industry to heavy‐industry dedicated to producing sponge iron, cement,
etc disturbs the natural flow of water and aggravate the chances
refractories, etc. The Rourkela Steel plant (RSP), a unit of Steel
Authority of India Ltd. and a German company is the main centre of of flooding in urban areas.
industrial activity. With the coming up of the RSP, Germans built
colonies around the steel plant in a planned manner on a grid iron • Deforestation, for instance, near the rivers/catchment of
pattern. This planned development was followed up by the unplanned cities are used to make rooms for settlements, roads and
development in a haphazard manner which ignored the natural farmlands due to which soil is quickly lost to drains. This
contours and drainage pattern. Housing came up on the path of natural raises the drain bed causing overflow and in turn urban
drainage pattern, agriculture changed the natural course of water body flooding.
in order to irrigate their fields and increase the yield at the cost of • Disturbing the natural drainage pattern created by the
increasing the chance of recurring floods.
storm water drains to let their flood waters pass freely
being tress‐passed for developmental purposes result in
As a result , with every heavy rainfall, water gets accumulated in the
low lying area, some of which have been developed as ponds (mainly obstruction of water flow and thus contribute to the
for pisciculture) , drowning the roads and forest land incapable of immensity of floods.
absorbing all the extra amount of water resulting in floods.
• Further adding to the problem, urbanization also brings with
Map shows the waterlogged areas in the town of Rourkela. Hence,
urban floods in Rourkela are the result of water accumulation occurring itself large scale paving of surfaces which results in decreased
due to the inability of rainfall to escape through its natural route ground absorption and increase in the speed and amount of
(natural topography and drainage pattern) and disruption of the natural
flow of the water bodies as a result of unplanned development. surface flow. The water rushes down suddenly into the streams

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 112
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

Figure 4.6: Relationship between Road and Water logging areas

113 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
4
SY
YNTHESIS
S AND HOL
LDING CAP
PACITY SC
CENARIOS
S
ffrom their catchm
ment areas leadin
ng to a sudden risse in water level and
a urb
banization leadss to developed catchments and in the event of
fflash floods. heaavy/ high inteensity rainfall there is higher runoff whiich
increases the flood
d peaks from 1.8
1 to 8 times and flood volum
mes
TA
ABLE : Factors co
ontributing to urb
ban flooding.
• Unplanneed urbanization iis the key causal ffactor leading to
urban flooding. Various kinds of depression n and low lying areas
near or arround the cities w
which earlier acteed as cushions annd
flood absorbers are gradually filled up and built upon due to
urbanizattion pressure. Thiis results in inadeequate channel
capacity causing
c urban floooding.
Table be
elow tabulates some of these factors contribu uting
to urbann flooding. Thhe main aim so o as to be ablle to
mitigate floods shall always be planned developm ment
which is in accordance with the naturral drainage patttern
and topoography, and aalso taking intoo account that even
nature has
h a thresholld capacity ( ccarrying capaciity ).
Hence, exploitation o of the nature and the naatural
geographhy and envvironment relentlessly in an
unsustainable manner iss ultimately a path of destruction.

i) Need forr flood control m


measures

It may appear as a mere extra aamount of watter which ultimately


d off or percolates into the soil, but to many it is a
ggets either dried
hhazard which brings along with itself destrucction of househ holds,
lack of food, loss of lives, etc.
up to 6 times. Con nsequently, floo
oding occurs veery quickly due to
AAs per National Disaster Management Autho ority, India ‐ Urban
U fastter flow times, ssometimes in a matter of minu
utes.
fflooding is significantly diffferent from rural floodingg as

T
Town and Counttry Planning Org
ganisation (TCPO
O), Ministry of Urban
U Development, Governmen
nt of India. 11
14
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

• Urban areas are centres of economic activities with vital transport of finished and semi‐finished goods from within the
infrastructure which needs to be protected 24x7. In most town to various places of the town and outside the town. Like all
of the cities, damage to vital infrastructure has a bearing urban areas Rourkela is also in constant interaction with areas
not only locally but could even have global implications. within the region and outside the region, beyond the state
• They are also densely populated and people living in boundaries as well.
vulnerable areas, both rich and poor, suffer due to Hence, to ensure that this interaction and the economy remains
flooding. unaffected from the floods, which sometimes lead to disruption
• Sometimes it results in loss of life, damage to property of transport routes, we need to minimise if not totally eliminate
and disruptions in transport and power ‐ bringing life to a the risk of flooding of the town.
grinding halt, causing untold misery and hardships.
• Even the secondary effects of possible epidemics and
exposure to infection takes further toll in terms of loss of 4.3.2 STRATEGIES FOR URBAN FLOOD
livelihood, human suffering, and, in extreme cases, loss of MANAGEMENT
life. Therefore, management of urban flooding has to be
accorded top priority. a) Traditional methods
The traditional flood management techniques used to mitigate
Problems associated with urban floods range from relatively and minimise the extent of devastation caused by floods are
localised incidents to major incidents, resulting in cities being listed below:
inundated from a few hours to several days. Therefore, the • Reduce runoff by providing permeable pavements (Figure
impact can also be widespread, including temporary relocation of below) , restoring forest cover / encouraging aforestation ,
people, damage to civic amenities, deterioration of water quality artificial recharging ( using rain water harvesting at home,
and risk of epidemics. soak pits , etc )

j) Need for flood control measures in Rourkela

Rourkela, being an important commercial centre of Odisha state


is constantly in the process of production and transport –
transport of raw materials from within the region and outside the
region to various industries within the town and finally the

115 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
4
SY
YNTHESIS
S AND HOL
LDING CAP
PACITY SC
CENARIOS
S

(c)
(a)

(b)

Figure
e 4.7 : (a),(b) EExamples of permeable pavem
ments used ; (c) Design details for
f permeable pavements

T
Town and Counttry Planning Org
ganisation (TCPO
O), Ministry of Urban
U Development, Governmen
nt of India. 11
16
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

• Policies to encourage water harvesting structures (example,


• Storage of runoff (wetlands, reservoirs); compulsory water harvesting structure in order to get
occupancy certificate).
• Capacity enhancement of rivers (bypass channels, channel
deepening or widening); • Proper disposal of solid waste ( eg : plastics ) to avoid clogging .
• Separation of rivers and populations (land use controls , dikes,
• Soak pit at the periphery of individual plot to allow for water
flood proofing, zoning, house raising);
recharging .
• Emergency management during floods (flood warnings,
emergency works to raise or strengthen dikes, flood proofing, • Dual pipeline systems to be incorporated in each household to
minimize the rare resource of water from getting wasted. In this
evacuation); and
system , one pipeline provides the saline groundwater to be
• Flood recovery (counseling, compensation or insurance). used for bathing and toilet purposes, while the other pipeline
provides sweet water for cooking and drinking purposes.

b) Strategies for flood management in Rourkela • Dual pipeline system – where one pipeline carrying waste
Development Authority or Local Boby water from kitchen can be reused for gardening purposes while
The role played by the government in flood management shall be the other pipeline carries waste water from toilets and
defining certain norms and policies in the comprehensive development bathrooms to be treated at a treatment plant.
plan and proposal of some strategies to mitigate the floods.
• Proposing new channels to manage the excessive surface run ‐
The government is able to frame policies which deal with off water and enhance the groundwater table by providing
soak pits at 200 m interval within the channel.
• Maintaining the city’s drainage system (based on rainfall
pattern, size of culverts, etc).
In Rourkela, at the foot of all the reserved forest areas (Figure
below), new channels are being proposed so that the water
from the high altitude can be incorporated in these channels. At
the same time, it allows for the water to flow in a regulated

117 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

4.8

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 118
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

manner rather than entering the inhabitable area. Also, these c) Strategies for flood management in Rourkela by the
channels shall be equipped with soak pits at a regular interval of citizens
200m so as to allow the water to percolate down to the ground • Reduce runoff by providing permeable pavements
and enhance the groundwater table. • Restoring forest cover/ encouraging afforestation
• Artificial recharging (using rain water harvesting at home, soak
• Providing channels to maintain the natural flow of water. In
many agricultural areas the natural flow of rivers has been pits, etc)
disturbed to create a canal for irrigation purposes. This has led • Soak pit at the periphery of individual plot to allow for water
to water logging and has disturbed the natural environment of recharging.
the area. 4.3.3 FLOOD MANAGEMENT MEASURES
It has been proposed that in order to avoid this water logging
a) Before flooding:
we restore the natural flow of the river body by providing a
channel in the direction of natural flow. By Concerned Authorities: An apex organization shall be in charge of
looking after drainage system of the town which shall be governed by
• Widening of culverts. Culverts and their width need to be professionals and under the administration of RDA/Local authorities.
checked at all places wherever they are provided in the present Flood control Department shall install wireless stations, one central
in order to ensure smooth flow of water. Also, some new control room connected with other city control systems of various
culverts have been proposed either in accordance with the departments.
proposed new channel or to maintain the natural flow.
It shall also ensure the arrangement of flood materials like empty
• Proposed forest cover. Forest cover has been proposed in areas cement bags, Stone, Ballies, Boats, Life Buoy, Boat Trolley, Boat Engine,
where no new channels can be provided due to the intensive Trucks, Life Jackets, Pumps, silt excavator machine.
development in existence, especially in the urban mouzas.
The bench mark for alarming flood situation in the town shall be fixed.
The Warning level is and danger level shall also be determined.
• Interconnecting ponds in the path of natural drainage system:
Various ponds that have been created for agriculture purposes
by blocking the natural flow have been interlinked with the
proposed channels.

119 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

4.9
B. By Individual: ‐ Flood insurance policy for house should be procured.
Have a

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 120
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

4.10

121 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

4.11:

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 122
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

4.12:

123 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS
disaster plan and prepare a disaster supplies kit for your home and car. • Plugging of breaches,
Include a first aid
kit, canned food, bottled water, battery‐operated radio, flashlight, • Protection and emergency repairs of Public transport system
protective clothing and etc.
written instructions on how to turn off electricity, gas, and water.
• Pumping out water from ponds, low lying areas

b) During flooding:
These include the on site measures which require highest degree of ii) By Individual: ‐

efficiency and promptness. • Use sandbags or pillows or rugs to fill the airspace of a door
during rising flooding,

i) Rourkela Development Authority • Put the expensive things, electronic appliances, food and drinks

• Prioritizing evacuation needs, upstairs or as high as possible,

• Identification of evacuation sites, • Switch off the power supply ,

• Management of evacuations during un‐expected flooding, • Move to a safe and higher ground quickly.

• Shelter management plan, • Be cautious at night, because it’s harder to see flood dangers.

• Evacuation support plan, • If told to evacuate, do so immediately.

• Search and rescue of people and live stock, • Avoid areas subject to sudden flooding like low spots or already

• Setting up of Communications system, wireless system, control flooded areas.

rooms, • Do not attempt to drive through a flooded road. The depth of

• Health operation and first aid. the water is not obvious and the road may be washed away.

• Immediate relief measures like supply of food, water, essential • Kids should never play around high water, storm drains or

commodities, viaducts.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 124
4
SYNTHESIS AND HOLDING CAPACITY SCENARIOS

• Keep listening to the latest news and announcements from the heavy downpours and heavy discharge. Rourkela has and is suffering
police or local flood management team and obey instructions from floods in the present. Though the scale of flooding may not be
being given and cooperate and keep patience. large but it isn’t as small as the ones which can be ignored. Post German
planning, the development in Rourkela happened in a haphazard
manner leading to floods in many areas of the town. The flooding has
iii) Flood measures after cessation of floods:
several impacts /effects on human‐lives, animals, trees, plantations,
eco‐system of the area. If not taken seriously, it may cause a great set
• Restoration of power installation, public assets like road, back to the ecosystem and the human – system.
railways, bridges, sewerage and water supply schemes and
drains, merchandise and shopping areas, industries / factory The preventive measures like improvement of drainage efficiency ( by

equipments, public building, etc. providing soak pits ), construction of flood–protection structures (
Storm water drains at the bottom of the reserved forest situated at high
• Demarcation of land lines & removal of overlapping sand/silt
altitude ) , increasing areas around the city to serve as retention basins (
layer of flooded area need to be done.
proposed green cover and buffer zone ) , adopting rain water harvesting
• System of post‐monsoon surveys needs to be done and
system, water recharging of channels, etc are some of the preventive
corrective measures are adopted in time bound manner to
measures to curb urban flooding.
avoid flooding in future.
• Always boil drinking water.
• Electrical equipment should be checked and dried before used.

Mindless urbanization, encroaching upon and filling up natural drainage


channels and urban lakes and water bodies to use the high‐value urban
land for buildings, illegal colonies and industries, increase in paved area,

125 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL

promoting balanced spatial development through the planned


5.1 THE LAND USE PLAN dispersal of both population and economic activities and the
equitable provision of public services to all communities of
A land use plan is a graphic and written analysis of a desirable and Rourkela.
feasible pattern, or alternative patterns. It gives the general
location, character, extent and the relationship of future land The CDP seeks to achieve the stated concept for the future of the
uses at specified times, as far ahead as it is reasonable to foresee. RPA (refer Chapter 4). It reflects the policies for different
Similarly, Comprehensive Development Plan of Rourkela was development components that, if implemented over a period of
design by considering the history created by the Honourable next 20 years, will result in significant improvement and
Pandit Jawaharlal Nehru to have world class Industrial Township benefiting all the existing and future inhabitants of the urban
at Rourkela. Subsequently, unorganised growth undertaken in area. The main elements comprise the planned use of land,
Civil Township due to the rich potential of Rourkela in terms of improvements in the supply and quality of housing, movement
economic opportunities and so the high migration rate. Even and transportation systems to serve the projected population and
today Steel Plant of Rourkela is producing best steel and provide access to serve the diverse economic opportunities; the
competing in the international market but over a large period of upgrading of utilities and service infrastructure including water
time there has been no town planning exercise were undertaken. supply the management of solid waste; the development of
As a result of this the expansion areas of Rourkela (Kumarmunda, adequate waterborne sewerage systems, the drainage of surface
Lathikata, Birsa, Kalunga) are lacking basic urban facilities’ and water as well as the wide‐spread provision of public amenities
haphazard growth with nearly no development control. The and social services including parks, open spaces, recreation
original and current concentration of both employment facilities and community services. Other important issues that
opportunities and private sector investment in physical and social are death with in the plan include environmental sustainability,
infrastructure in the Steel Township, has resulted in a situation economic initiatives, and the urgent need to create effective
whereby public amenities and services are concentrated in the administrative structures to manage urban growth over the next
heart of the city. The result is that while the residents of the Steel twenty years. While the Comprehensive Development Plan is for
Township are well served, and have low quality of life and the use of land within the RPA, the selected development
inadequate provision of services and infrastructure in the rest of scenario and projected population estimates will identify
the Rourkela Planning Area. The present CDP is designed to additional development pressure on the areas of Kalunga,
bridge the gap between well service and under serviced areas by Kumarmunda, Lathikata, Birsa. However, virgin land towards the
utilizing the land within the RPA in the most effective way and north of River Koel will be the potential land for further or future

127 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
development and expansion of Rourkela town. The physical residential, commercial, industrial, public‐semi‐public, green and
planning interventions recommended in the CDP would need to recreational, public health, welfare, and all the other fields in
be supported by a legislative framework to facilitate which Rourkela community needs exist and is satisfied by proper
implementation of its policies. use of the resources of the RPA.

Land‐use Planning is approached with the multiple‐purpose


5.1.1 LAND‐USE PROPOSED ON SUSTAINABILITY GOALS concept and with the aim of maximum net benefits based on full
consideration of alternative plans for meeting existing and
Sustainable development is a concept for resource management anticipated needs. This means that, from the start of planning, full
that aims to meet human needs with minimal environmental weight is given to watershed management, municipal and
impact so that these needs can be met not only in the present, industrial water supply, hydroelectric power, pollution
but in the indefinite future. The challenge of providing sustainable abatement, fish and wildlife, and recreation, as well as to flood
development becomes even more challenging as RPA occupied by control, irrigation, and navigation to the extent of their
one of the international community and local tribal community. importance in the particular areas of RPA. While implementation
Hence, how to keep balance in Land‐use design elements and It should assure joint coordinated action of all interested
include the tribal community in the process of development? stakeholder, Town Planning Department and other Odisha State
government authorities and Rourkela Development Authority on
Answer to the above question is achieved by integrating an effective cooperative basis.
economic, social and ecological development in innovative
sustainable way by adopting watershed approach for treating These are the three interdependent and mutually reinforcing
problems and issues of existing land‐use design. aspects of sustainable development and the following
sustainability‐ goals of the Rourkela Comprehensive Development
The main elements Like land, water, air, forest, community, Plan have been broadly classified under these categories:
habitat, biodiversity, ecology, mobility, connectivity, creative
economy, etc, in a Rourkela Comprehensive Development Plan a) Community Development
have a strong relationship with the its regional and local Land‐
uses. RCDP is comprehensive and well coordinated, covering the • To build the capacity of the decision makers — people
conservation, development, and utilization of the natural responsible for com‐munity planning and development for
resources of the RPA region and seeking to meet the needs of futuristic and sustainable development approach.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 128
5
ROURKELA CDP PROPOSAL

• To engage the community in the decision‐making process • To promote use of public transport, better technology in
and inculcate a feeling of ownership for any intervention industries and renewable non‐polluting sources of energy like
in the RPA. CNG, etc., for reducing air pollution.
• To build the capacity of the community through
educational and health inputs to generate a more 5.1.2 LAND‐USE GOALS
productive work force in future.
• A functionally efficient, equitably served and aesthetically
b) Economic Development beautiful RPA area.

• To increase the fiscal capacity of the local bodies by • Future development accommodated in sustainable
encouraging them to generate their own resources. manner in a way that compatible with the character of
• To diversify the economic base of the RPA and provide existing development and protection of valuable and
more employment opportunities by establishing sensitive natural resources.
employment/ IT activity centers across the RPA.
• To improve access to employment opportunities by • A clear demarcation of a range of land‐uses in the RPA,
providing better regional and intra‐city connectivity. taking into account, and if necessary modifying, current
uses in existing areas and backed by regulator and
c) Ecological Development economic instruments that ensure panned
implementation in areas identified in this Comprehensive
• To achieve environmental equilibrium by preserving and Development Plan.
conserving all natural resources like water and air for
environmental sustainability • The establishment of activity centres and planned use of
• To identify eco‐sensitive and no‐development zones along adjoining land that minimizes need to travel to the existing
the river edge, hills, reserved forest etc., to preserve the congested central core of civil township.
pristine natural heritage of the RPA.
• To optimally utilize developable land in order to develop a • The planned equitable distribution and reservation of
compact city and reduce urban sprawl. land‐uses to provide convenient access to citizens of all
ages and income groups and that are adequately served
by a local road network.

129 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
Figure 5.1: Compatibility Land‐use for Recreational
• The orderly management of industrial goods and services
traffic for efficient accessibility of utilities and functions.

5.1.3 LAND‐USE DEGREE OF COMPATIBILITY

a) Optimum Multiple Land Uses

Primary Survey of intrinsic suitability’s for residential, Industrial,


commercial, public and semi‐public, urban forestry and
recreational land‐uses revealed that the relative values for each
RPA and for the basis within each of the specified land‐uses. But
we have taken not to optimize for singe, but for multiple
compatible land‐uses. Towards this end a matrix was developed
with all prospective land‐uses on each coordinate. Each land‐use
was then tested against all others to determine compatibility,
incompatibility and two intervening degrees.
Yet, in another example, an area that proffered an opportunity
From this it was possible to re‐examine the single optimum and for industrial as dominant land‐use could also support
determine the degree of compatibility with other prospective commercial, public and semi‐public, green land‐uses and avoided
land‐uses. Thus, for example, an area that had been shown to in contact with residential and lunges spaces in the RPA.
have high potential for forestry would also be compatible with
recreation, including wildlife management. Within it there might Adjacent to the matrix on inter compatibility is another that seeks
well be opportunities for limited industrial land‐uses in particular to identify the resources necessary for prospective land‐uses.
– while the whole area could be managed for water management Productive soils for horticulture, recreational, traditional, flat land
objectives. and water for urban locations, and so on. The final matrix is
devoted to the consequences of the operation of these land‐uses.
Where there is industrial waste dumping area, there will be acid
soil drainage; Residential with sewage, industry with atmospheric

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 130
5
ROURKELA CDP PROPOSAL

pollution. The sum of these, in principle, allows one to consider


the inter compatibility of land‐uses, the natural determinants for
their occurrence and the consequences of their operation.
Figure 5.3: Compatibility Land‐use for Residential
When the results of the matrix are applied, the maximum
potential conjunction of coexisting and compatible land uses is
revealed. In every case the dominant or codominants are
associated with minor compatible land‐uses.

Figure 5.2: Compatibility Land‐use for Industries

131 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
Figure 5.4: Compatibility Land‐use for Recreational neighbourhoods to each other in the geographic area
involved. Within these, each land‐uses are related to
traffic movements and traffic flows, which in turn are
adjusted to natural features in the selection of routes.
There are design implications here since the functional
positioning of parts relative to three‐dimensional
outcomes is encompassed. Thus functional arrangements
of land‐use and transportation are ultimately
complemented by visual and perceptual end results.

• In the Facilities and Services Plan, certainly, design takes


into consideration the location and the planning of public
and semi‐public land‐uses, open green spaces, and the
utility pattern. It exists relative to the hierarchy of service
areas for these various services and facilities. Further, it
also design by considering the reflex action of private
5.1.4 DESIGN WITHIN ELEMENTS OF A COMPREHENSIVE PLAN development activity and building which follows public
demand and actions for example‐ locating a new school,
Urban design considers matters of space organization, or undersity or hospitals. There are facets of design in
commodity and efficiency, while at the same time seeking an appraising the priming action of governmental decisions
aesthetic outcome. These are considered while preparation of for development of RPA.
RCDP with alternatives within design. • In the Transportation Plan, the landuse design considers
the location potential and mobility pattern in relation with
The elements of any comprehensive plan contain design terminal facilities, Industrial or other land‐use islands
implications: which are articulated by traffic. The freeways of
industrial traffic and residential traffic movement by
• In the Land‐use Plan, which is scale‐giving based on future identification of four new Ring Roads (Kumarmunda,
economic and population analysis, it exists by relating Civil kalunga, lathikata and Bisra areas) in combination of
and Steel township sectors, communities, and existing Steel Township Ring Road. And also connecting

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 132
5
ROURKE
ELA CDP P
PROPOSAL
L

with each other with various opttions of freewaay traffic Figure 5.5: Perccentage of Propo
osed Land‐use of RPA 2031
moveements.

• Rourrkela Compreheensive Plans forr implementatio on is also


consider the scope and
a nature, of a public works p program;
within the fiscal alllocations of th hese is an outcome of
physsical ends. Sim milarly, regulatory measuress which
presume to implem ment preconceivved ideas of RP PA forms
estabblished the design standards. In addition, theere are a
number of governm mental incentivee measures such h as exist
in ho
ousing laws, in renewal aids, in n demonstration grants,
and sso forth, which have simply built into the urbaan design
outpput. While generral standards arre specified in th
hese CDP
howeever, detail prooject feasibilityy and approved building
regulation of Rou urkela and ap pproval of Co ompetent
authority (Rourkela Development A Authority).
Table 5.1: Proposed Laand‐use 2031

Figure 5.6: Prop


posed Land‐use ffor 2031

133 Draft Proposal:: Rourkela Comp


prehensive Deve
elopment Plan 2
2031 for Rourkela
a Planning Area
a (RPA)
5
ROURKELA CDP PROPOSAL

Kept blank for proposed map of


rourkela

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 134
5
ROURKELA CDP PROPOSAL

5.2 MIXED LAND USE 3. In case of new developments planned mixed residential and
non‐residential activity should be introduced to non expansion
In relation with the price of land and its strategic location context and of slum area like in Information Technology park in Bisra and
situation, where in a number of residential areas, commercial activity Industrial Estate in Kalunga, local tourism hub at Ved Vyas
has already intruded, formulation of a balanced policy of mixed use complex.
considering its environmental impact and socio‐economic need of
society is of utmost public importance.
5.3 RESIDENTIAL PLAN
On a single premises or in an area, mixed residential and non‐residential
activity will provide affordable pricesing solution to non expansion of 5.3.1 HOUSING DEMAND
slum and propagation of informal economic activities and thus give
employment to large masses. It seems to be suiting to the present The future housing demand in Rourkela is generated by a no. of
socio‐economic needs of major section of the society, it reduces the factors. The main factors being:‐
transportation need considerably, however, in certain condition it may
have quite an adverse effect on the environment. This is recommended 1. Housing shortage: it includes both the qualitative ( based
to be dealt in the following manner: on factors such as congestion factor, obsolescence factor
etc.) and the quantitative housing shortage.
1. In the central old built up areas of Civil Township, which 2. The natural growth of population
actually have a tradition of mixed land use i.e. residential and
3. Migratory population due to the development of the
non‐residential activity on the same residential premises should
secondary and tertiary sector.
be dealt differently than other areas.
2. Non‐residential activity on residential premises should be The Future housing demand is projected in two phases for a
permitted selectively, carefully taking into consideration its span of 20 years, i.e. for two decades respectively: up till 2021
community need, provision for traffic and parking which would
and up till 2031.
be generated and also the environmental impact like in
Lathikata, Kalunga industrial area and kumarmunda tribal area Table 5.2: Total Housing Demand (Based on Housing
and some of the integrated transport hud and near railway Shortage and Future Housing requirement)
station of Rourkela.
Area Muni SA BLOCKS Total

135 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
s cipal IL Rourkela Housin 9 76 44
Area Ar Urban g
ea Agglome require
ration ment in
LATHIK KUARM BIS 2031
ATHA UNDA RA (Source: Status Report and Calculations)
Total A(no 1239 31 9021 4806 64 30049
Housin s.) 6 80 6 A= Current Housing Backlog (No’s)
g B=Future Requirement (No’s) (B1+B2a)
Shortag B1= New Household Formation (No’s)
e in B2= Demolition due to Obsolescence
2011 H= Total Housing Requirement (No’s) (A+B)
Future B1 1158 14 784 2430 24
Housin (nos. 5 82 6
g ) 5.3.2 NEW POPULATION ALLOCATION AND DENSITY
Require B2 % 5.68 2. 3.8 3.68 4.1
ment in 44 8
DISTRIBUTION
2021 B2 3886 11 734 540 54
a) Population Allocation and Distribution (excluding Slums)
no. 46
B=B1 1547 26 1518 2970 30 22887
The following are the parameters considered while deciding
+B2 1 28 0
Future B1 1190 14 784 2430 24 on the population allocation in different areas and thus their
housing (nos. 0 82 6 subsequent distribution:
Require )
ment in B2 % 3.29 2. 3.56 3.11 3.8 • The area required for housing shortage has been
2031 1 6 considered to be subsequently absorbed in the already
B2 2192 98 674 450 52
existing residential areas with time.
no. 6
B=B1 1409 24 1458 2880 29 21196 • It has been observed that there will be in‐migration of
+B2 2 68 8 new migratory population in the RMC area and
Total 4195 82 11997 10656 12 74132

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 136
5
ROURKELA CDP PROPOSAL

outmigration from the RMC area as part of natural 15 5212 31 168


growth. 16 8382 41 204
17 4968 55 90
• Also, it has been observed that there will be no
18 4281 60 71
outmigration from the blocks since the areas are the 19 6136 19 315
new specks of development and new development 20 9462 13 720
opportunities. Therefore, only in‐migration shall occur 21 5247 10 512
as an expansion of the residential area of the Rourkela 22 4530 10 470
23 4803 196 24
Agglomeration.
24 7316 189 39
25 5053 230 22
Table 5.3: Existing Ward vise Population and Density 26 3590 134 27
(excluding Slums) 27 6174 111 55
Ward no. 2011 Total Ward Density (no. of 28 7611 108 71
Population Areas in persons/Ha) 29 7185 58 125
including Ha 30 8467 309 27
Slums 31 10453 124 84
1 7876 317 25 32 12034 115 105
2 6356 131 49 33 14711 144 102
3 14443 95 153 (Source: Rourkela Municipality)
4 11518 162 71
5 9213 53 175 Table 5.4: Reference Table for Table 5.3 indicating the
6 10716 232 46 Density ranges adopted and followed in identification of
7 7682 52 148
various wards.
8 11582 54 215
9 10435 22 477 Criteria
10 10590 26 411 RANGE DENSITY (PERSONS/HA)
11 7586 17 453 HIGH >400
12 9852 73 134 MEDIUM 150‐400
13 13659 63 216 LOW 50‐150
14 7586 26 291 MINIMUM <50

137 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
1,2,4,5,28,32,33 5% 4%‐5%
9,10,11,19,20,21,22 15% 0.5%‐1.5%
• The density is fixed as 150 persons/ha Rest other wards 10% 2%‐3%
(As per UDPFI Guidelines the maximum density allowed). (Source: Extended projections)
• Therefore development shall be allowed in wards • Population Moving out in 2021 to other blocks from
1,2,4,6,12,17,18,23,24,25,26,27,28,30,31. RMC=12012=2658hh
• Wards 1,2,4,5,28,32,33 are the most preferred locations, hence • Population Moving out in 2031 to other blocks from
the larger percentage of in‐migration is likely to happen. RMC=19743=3803hh
• Congested wards such as 9,10,11,19,20,21,22 will have higher
outmigration percentage as land available for further Table 5‐6 Revised Population of wards after population
development is very less. allocation
• FAR has been observed as being 1.5 in RMC area, and shall be S.No. 2011 Uptil 2021 Uptil 2031
Population exl. Natural Natural
allowed to remain the same in the highly dense wards of RMC
Slums Growth exl. Growth exl.
to control the further growth. slums Slums
Ward nos. 10 to 15, 19‐22 and 31 shall fall under this category. 1 1195 1362 9231
• Whereas in wards nos. 7,8,9,16,17,18,23, to 27 FAR will be 2 2777 3166 3562
allowed 1.75 due to new chances of development in and 3 5633 13089 13891
around these areas. 4 10007 11408 12834
• Also Ward nos. 1 to 6,32,33,28,29,30 will have an FAR of 2 to 5 4968 5664 6371
6 4709 5368 6039
2.5 as high density development is likely to be induced due to
7 2194 2501 2814
the new proposal of roads in and nearby these areas.
8 9412 10730 12071
9 3890 4435 4989
Table 5.5: Percentage Distribution of in‐migration and 10 5984 6822 7674
outmigration in RMC 11 1392 1587 1785
Ward nos. % of natural % of total in‐ 12 7643 8713 9802
growth migration in RMC 13 4944 5636 6341
migrating out distributed in 14 4113 4689 5275
form RMC these wards. 15 2261 2578 2900

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 138
5
ROURKELA CDP PROPOSAL

16 2938 3349 3768 8 from ward 7 in 2021 and 3654 people are likely to move from
17 4968 5664 6371 ward 10 and 11 to ward 12 in 2021 and 962 in 2031.
18 2554 2912 3276 • Due to unavailability of land in nearby wards, and also
19 4380 4993 5617 availability of Govt. land in Ward 3, the excess population of
20 5332 6078 6838
Ward no. 13,20 and 16 shall be rehabilitated in Ward 1 and 3.
21 1723 1964 2210
That is, 6667 persons in 2021 and 7698 in 2031 and affordable
22 2133 2432 2736
23 2549 2906 3269 housing shall be provided for them.
24 1628 1856 2088 • Limit has been taken as 330 persons/ha. The yellow marked
25 3280 3739 4207 wards in the table 5.5 is an identification of wards exceeding
26 2601 2965 3336 this limit.
27 4625 5273 5932 • The In‐Situ development and upgradation of shall be done in
28 7611 8677 9761 the rest of the wards.
29 7185 8191 9215
30 5538 6313 7102
Table 5‐7: Existing Population and Projected Natural Growth
31 8122 9259 10416
32 6107 6962 7832 of slums in RMC Area
33 14711 16771 18867 SLUMS
Total 188052 218420 Wa Popula Popula Popula Popula Popula Popula
rd tion tion tion tion tion tion
Nos 2011 Density 2021 Density 2031 Density
b) Slum Population Allocation (Including Decongestion) . 2011 2021 2031
1 6681 274 7616 313 8568 352
• On observing of a congestion in ward 3 and a lower density in 2 3579 117 4080 134 4590 150
the nearby ward 2, there is likely to be a shift of certain 3 8810 628 10043 716 11299 806
percentage of slum population of 4966 people in 2021 and 694 4 1511 73 1723 83 1938 94
people in 2031 are likely to move from Ward 3 to Ward 2. 5 4245 133 4839 152 5444 171
6 6007 158 6848 180 7704 203
• Similar condition has been observed in Ward 7 and 8 and Wards
7 5488 595 6256 679 7038 763
10,11 and 12 therefore, 2937 people are likely to move to ward 8 2170 76 2474 87 2783 98
9 6545 270 7461 308 8394 346

139 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
10 4606 627 5251 714 5907 804 1 7616 313 8568 352
11 6194 371 7061 423 7944 476 2 9046 296 10250 336
12 2209 122 2518 139 2833 156 3 5077 362 5638 402
13 8715 486 9935 553 11177 623 4 1723 83 1938 94
14 3473 262 3959 299 4454 336 5 4839 152 5444 171
15 2951 193 3364 220 3785 248 6 6848 180 7704 203
16 5444 453 6206 516 6982 580 7 3319 360 4070 441
17 0 0 0 8 5411 190 5751 202
18 1727 226 1969 258 2215 290 9 7461 308 8394 346
19 1756 283 2002 322 2252 363 10 2646 360 3008 409
20 4130 239 4708 272 5297 306 11 6012 360 6227 373
21 3524 472 4017 538 4520 605 12 6172 340 7449 410
22 2397 193 2733 219 3074 247 13 6462 360 3707 207
23 2254 100 2570 114 2891 128 14 3959 299 4454 336
24 5688 229 6484 261 7295 293 15 3364 220 3785 248
25 1773 70 2021 79 2274 89 16 4331 360 2937 244
26 989 65 1127 74 1268 83 17 0 0 0 0
27 1549 73 1766 84 1987 94 18 1969 258 2215 290
28 0 0 0 19 2002 322 2252 363
29 0 0 0 20 4708 272 5297 306
30 2929 129 3332 147 3756 165 21 2689 360 1659 222
31 2331 121 2657 137 2990 155 22 2733 220 3075 247
32 5927 391 6755 446 7601 502 23 2570 114 2891 128
33 0 0 0 24 6484 261 7295 293
(Source: Rourkela Municipality and extended projections) 25 2021 79 2274 89
26 1127 74 1268 83
Table 5‐8: Revised Population Allocation and Density of Slums 27 1766 84 1987 94
Ward Slum Density Slum Density 28 0 0 0 0
Nos. Population Fixed at Population Fixed at 29 0 0 0 0
till 2021 360 pph till 2031 400 pph 30 3339 147 3756 165
31 2657 137 2989 155

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 140
5
ROURKELA CDP PROPOSAL

32 6757 446 7602 502 8520 17 2041 8873 19 21.25 9819 21 24


33 0 0 0 0 7 00 7 72 0 58
Total 12108 140562 3 0 7
(Source: Extended projections) RMC
2730 61 83.24 3131 69 95.47 3589 80 109.4
c) Final Population and Density of Wards and Blocks 40 39 60 60 82 35 4
8 2 9
(Source: Extended projections and calculations)
Taking into account the population growth and the migratory
population and the subsequent distribution the following is the
Table 5‐10:Final Population and population density of wards
final population projection and its distribution in the various (including slums)
wards and areas and their densities as projected and aimed in W 2011 W 2011 2021 2021 2031 2031
two phase development that is until 2021 and until 2031. ar Total ard Densit Total Densit Total Densit
d Popul Ar y ( No. Popul y ( No. Popul y ( No.
Table 5‐9: Final Projected population of areas with no. of No ation ea of ation of ation of
households and Population Densities. . includ s person includ person includ person
2011 2021 2031 ing in s/ha) ing s/ha) ing s/ha)
Popu H. Popul Popu H. Popul Popu H. Popul Slums Ha Slums Slums
latio H. ation latio H. ation latio H. ation 1 7876 31 25 8978 28 17799 56
n Densi n Densi n Densi 7
ty ty ty 2 6356 13 49 12212 93 13812 105
perso perso perso 1
ns/Ha ns/Ha ns/Ha 3 14443 95 153 18166 191 19529 206
BISRA 4 11518 16 71 13131 81 14772 91
6854 13 10.46 1071 23 16.36 1320 29 15.94 2
46 9 70 4 14 5 9213 53 175 10503 198 11815 223
KUARMUNDA 6 10716 23 46 12216 53 13743 59
6741 14 43 8760 19 56 1017 23 65 2
6 47 5 47 30 31 7 7682 52 148 5820 112 6884 132
9 0 0 8 11582 54 215 16141 299 17822 330
LATHIKATA 9 10435 22 477 11896 541 13383 608

141 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
10 10590 26 411 9468 364 10682 411 5
11 7586 17 453 7599 447 8012 471 33 14711 14 102 16771 116 18867 131
12 9852 73 134 14885 204 17251 236 4
13 13659 63 216 12098 192 10048 159 (Source: Extended projections and calculations)
14 7586 26 291 8648 333 9729 374
15 5212 31 168 5942 192 6685 216 5.3.3 DISTRIBUTION OF HOUSEHOLDS ACCORDING TO
16 8382 41 204 7680 187 6705 164 INCOME GROUPS AND LAND AREA REQUIREMENT
17 4968 55 90 5664 103 6371 116
18 4281 60 71 4881 81 5491 92
Taking into considering the income wise population projection
19 6136 19 315 6995 368 7869 414
20 9462 13 720 10786 830 12135 933 in future and the existing percentage distribution as per income
21 5247 10 512 4653 465 3869 387 groups in different areas as taken from primary survey, the
22 4530 10 470 5165 517 5811 581 various percentage distributions in the different areas with
23 4803 19 24 5476 28 6160 31 respect to income groups has been decided. The areas have
6 been calculated accordingly. The distribution of households
24 7316 18 39 8340 44 9383 50 and area allocation has been done in two phases:
9 Phase1: 2011‐2021 and phase2: 2021‐2031
25 5053 23 22 5760 25 6481 28
0
a) Phase 1
26 3590 13 27 4092 31 4604 34
4
27 6174 11 55 7039 63 7919 71 Table 5‐11: Income Wise Distribution of households
1 Area H.H H.H No. EWS LIG MIG HIG
28 7611 10 71 8677 80 9761 90 . . of percen percen percen percen
8 201 202 hh tage tage tage tage
29 7185 58 125 8191 141 9215 159 1 1 for
30 8467 30 27 9652 31 10858 35 ph
9 ase
31 10453 12 84 11916 96 13405 108 I
4 Bisra 134 237 10 7.5 29.05 47.85 15.6
32 12034 11 105 13719 119 15434 134 6 0 24

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 142
5
ROURKELA CDP PROPOSAL

Lathika 170 197 27 28.8 32.9 20.835 17.465 pha


ta 03 20 17 se
Kuarm 144 194 49 20.75 33.42 29.33 16.5 II
unda 79 70 91 Bisra 237 291 544 7.5 29.05 47.85 15.6
RMC 613 696 82 17.95 36.4 23.1 22.015 0 4
98 02 04 Lathika 197 215 186 28.8 32.9 20.835 17.465
(Source: Primary Survey and Extended projections) ta 20 87 7
Kuarm 194 233 384 20.75 33.42 29.33 16.5
unda 70 10 0
RMC 696 803 107 17.95 36.4 23.1 22.015
Table 5‐12: Income Wise Built‐up area
02 59 57
Area BU area for BU BU BU Total area
(Source: Primary Survey and Extended projections)
EWS(sq.mt area area area (Ha)
r.) for for for
LIG MIG HIG Table 5‐14: Income Wise Built‐up area
Bisra 2688 19336 41649 15974 7.96 Area BU area for BU BU BU Total
Lathikata 27387 58103 48117 47452 18.11 EWS(sq.mtr. area area area area
Kuarmun 36247 10841 12442 14638 41.55 ) for LIG for for HIG (Ha)
da 9 8 6 MIG
RMC 51542 19410 16115 18061 58.74126. Bisra 1428 10272 22126 8486 4.23
7 5 1 36 Lathikatha 18819 39926 33064 32607 12.4
126.36 Kuarmund 27888 83416 95733 11262 31.97
(Source: Calculations based on Table 5.11) a 7
RMC 67581 25451 21130 23681 77.02
1 5 5
b) Phase 2
125.6
6
Table 5‐13: Income Wise Distribution of households (Source: Calculations based on Table 5.13)
Area H.H H.H No. EWS LIG MIG HIG
. . of percen percen percen percen
202 203 hh tage tage tage tage
1 1 for

143 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
5.3.4 SECTOR WISE PROPOSALS
Table 5‐15: Rental Housing Area Wise Distribution
A total area of 126.36 ha and 125.66 ha is required for the Area Total area Rental Housing
residential out of which:‐ required (ha) Percentage
• Area required in the RMC area will be accommodated Bisra 12.19 15%
Lathikatha 30.51 20%
in the wards except for the affordable housing
Kuarmunda 73.52 25%
schemes.
RMC 135.76 30%
• Area required in blocks has been selected according to (Source: Primary Survey and calculations based on Table 5.12
land suitability analysis. and 5.14)
The population densities achieved and the FAR for blocks and RMC area b) Private Housing
has been specified earlier.
• In Rourkela Urban Agglomeration, a large percentage of private
Allocation of industrial sousing will be done by the industries coming up housing has been observed due to lack of the availability of
but while calculating the area the migratory population has been taken government land and a larger portion of land being under the
into account SAIL authority.
Due to lack of government land availability government housing has not • As per the trend and the population allocation, it will be
been provided and govt. Land is only provided for affordable housing. observed that the percentage distribution of private housing
shall be 60 % in RMC, 58 % in Kuarmunda, 40 % in Lathikatha,
a) Rental Housing and 85 % in Bisra.
• The residential areas for private housing in Rourkela
• A higher percentage of rental housing has been observed in
Municipality shall be the expansion of residential areas within
Kuarmunda and Municipality areas due to presence of
the wards whereas new area shall be allocated in the block due
industries and hence increases in floating population.
to availability of land.
• Percentage of rental housing in the different wards has been
• The investment in private housing helps in improving the
mentioned previously in the status report in chapter 5
housing stock of city in qualitative as well as quantitative terms.
subsequently. According to the primary survey the percentage
of rental housing in different areas are as follows:‐

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 144
5
ROURKELA CDP PROPOSAL

c) Housing Schemes and in good condition and they have space to


accommodate the future natural growth.
• 10 % of the future housing cab be taken up by the • Except for wards 13, 16, 21 rest all others will under
development authority and can be a profitable venture. go in‐Situ development.
• Area acquired in the first phase is in Kuarmunda towards • Under RAY majority of the notified slums have
the rear side due to low price of land. already been given security of tenure and in‐situ
• In phase 2 area demarcated for housing schemes is in development by RAY is likely to happen.
Lathikatha as the land value is not expected to rise much • 10 % of the future housing requirement shall be
even after phase1. allocated for affordable housing. For the
• Since the area requirement for 2nd phase is comparable to rehabilitated population affordable housing shall be
1st phase hence proposal for 10% Govt. housing we have provided in 2 phases in ward 1 and 3 and details are
considered similar to the previous phase. as follows:

Table 5‐16: Income Wise Distribution of Plots and in Group Table 5‐17: Affordable Housing Area Allocation in
Housing and Plotted Housing Phase 1
Type Area No. of EWS LIG MIG HIG 1st Phase
(Ha) Plots/DUs Ward 3 @ 1333 HH’s
Plotted 5 340 plots 25% 30% 25% 20% Plotted @ 60% i.e. 800 Group @ 40% i.e. 533
Housing d.u’s d.u’s
Group 7.56 652 DU’s 15% 25% 25% 35% Category Area in Category Area in
Housing sq.m. sq.m.
(Note: Above are proposed percentages) Area req. by 7000 Area req. by 5984
EWS @ 35 % EWS @ 35 %
of total d.u’s of total d.u’s
d) Housing Schemes for Slums and 25 sq.m and 32 sq.m
Area req. by 9600 Area req. by 8000
• Majority of the slums require slum up gradation LIG @ 30 % LIG @ 30 %
of total d.u’s of total d.u’s
rather than rehabilitation, as the houses are pucca
and 40 sq.m and 50 sq.m

145 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
area area sq.m. sq.m.
Area req. by 16800 Area req. by 14025 Area req. by 8075 Area req. by 6912
lover MIG @ lover MIG @ EWS @ 35 % EWS @ 35 %
35 % of total 35 % of total of total d.u’s of total d.u’s
d.u’s and d.u’s and and 25 sq.m and 32 sq.m
60sq.m area 75sq.m area Area req. by 11080 Area req. by 9250
Req. Total 33400 Req. Total 28009 LIG @ 30 % LIG @ 30 %
residential residential of total d.u’s of total d.u’s
Area Area and 40 sq.m and 50 sq.m
Total Plot 47714 Total Plot 18673 area area
Area Area Area req. by 19380 Area req. by 16200
Required in Required in lover MIG @ lover MIG @
sq.m (if 70% sq.m (if 1.5 35 % of total 35 % of total
taken by FAR) d.u’s and d.u’s and
hsg.) 60sq.m area 75sq.m area
Total Area 66387 Req. Total 38535 Req. Total 32362
Required (in residential residential
sq.m) Area Area
Total Area 6.63 Total Plot 55050 Total Plot 17979
Required (in Area Area
hectares) Required in Required in
(Note: Above are proposal calculations) sq.m (if 70% sq.m (if 1.5
taken by FAR)
hsg.)
Total Area 73029
Table 5.18: Affordable Housing Area Allocation in
Required (in
Phase 2 sq.m)
2nd Phase Total Area 7.30
Ward 1 @ 1540 HH’s Required (in
Plotted @ 60% i.e. 924 Group @ 40% i.e. 616 hectares)
d.u’s d.u’s (Note: Above are proposal calculations)
Category Area in Category Area in

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 146
5
ROURKELA CDP PROPOSAL

The project cost for affordable housing for phase 1 is 7428.6 lakhs out areas are will undergo further development with an average
of which central assistance is 667 lakhs. FAR.
• Kuarmunda Block has plenty of land available and lies in the
The project cost for affordable housing for phase 2 is 8574.8 lakhs out
direction of growth, hence medium to high density
of which central assistance is 770 lakhs.
development is likely to be observed here.
5.3.5 STRATEGIES AND POLICIES FOR DEVELOPMENT • Lathikata Block comprises of more tribal population and Bisra
may have group housing due to proposal of tertiary sector
The present housing scenario of Rourkela Urban Agglomeration industries in this area, hence FAR has been kept low to average.
suggests the prominence of haphazard development in most areas and
absence of planning strategies. Some critical changes need to be done b) Restricted Development
regarding the density allocation of the area depending on the growth
Ward Nos. 10,11,12,13,14,15,19,20,21,22,31 are found to be highly
direction and existing infrastructure facilities. The further development
congested wards with a density greater than 300 pph. Hence,
control regulations have been mentioned in detail in chapter no. 21.
instead of increasing the FAR it has to be restricted to 1.5 (as
Development management and Finance.
observed in this area).
a) Re‐Densification of low density areas
Table 5.19: Proposed FAR area Wise
Rourkela Urban Agglomeration has varied land densities throughout its
Areas FAR
area, hence the high and the low density areas need to be adequately
RMC(Ward nos. 1.5
re‐densified for more suitable utilization of available land resources. 10,11,12,13,14,15,19,20,21,22,31)
The moderately dense areas are major upcoming areas of growth which RMC (Ward nos. 1.75
can be analyzed and properly planned out. 7,8,9,16,17,18,23,24,25,26,27)
RMC (Wards 1,2,3,4,5,6,32,33,28,29,30) 2‐2.5
• Ward nos. 1,2,3,4,5,6,32,33,28,29, and 30 are extremely low Kuarmunda block 1.5‐2
dense areas and new transport corridor will be coming up in Lathikata Block 1.2‐1.5
these areas Hence these areas are likely to undergo high Bisra Block 1.2‐1.5
density development. (Note: Above is proposal calculations)
• Ward nos. 7,8,9,16,17,18,23,24,25,26, and 27 have moderate
density and are under constant growth process. Hence these

147 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
Slum densities shall be restricted at 330 pph in 2011 (as per IHSDP), .
360 pph in 2021 and 400 pph till 2031. Malgo 10 EWS Dilapi Mud, Well Open No
down dated Brick, Defe
c) Up gradation of Housing Quality Road Asbe catio
stos n
It has been observed in Rourkela Urban Agglomeration that the Railwa 13 EWS Avera Mud, Com Open No
quantitative housing shortage is much less as compared to the y ge Asbe munit Defe
qualitative shortage. Therefore, it is of ardent need to improve the Colony stos y Tap catio
housing condition to cater to the qualitative shortage. n
Islam 21 LIG Dilapi Mud, Com Open No
• Upgradation of the Private housing stock can be done Nagar dated Brick, munit Defe
through incentives as well as imposition of the Asbe y Tap catio
stos n
development charges, which shall act like a penalization.
Chudi 24 LIG Good Cem Com Open No
• Schemes such as IAY and MoKudia would help in improving Basti ent, munit Defe
the quality of housing stock in rural areas and blocks. Brick, y Tap catio
• RAY has undertaken 115 slums in the RMC area for in‐situ RCC n
upgradation and has already provided security of tenure to Pradh 1 LIG Good Cem Munic Pit Yes
many. Apart from in‐situ upgradation a certain portion of anpalli ent, ipality Latri
the slum population shall be rehabilitated and affordable Brick, ne
RCC
housing shall be introduced.
Kissan 2 MIG Good Cem Munic Septi Not
• Majority of the slums face the problem of lack of proper tola ent, ipality c Pro
infrastructure hence provision of infrastructure will form a Brick, tank per
major part of slum development. Asbe
stos
Table 5‐20: Condition of few slums in RMC Balugh 3 LIG Avera Mud, Tube Open No
at ge Brick, Well Defe
Name W Cate Housi Mate Water Sanit Drai
Basti Asbe catio
of the ar gory ng rials Suppl ation nag
stos n
slum d Condi used y e
Madh 11 LIG Bad Mud, Com Pit No
no tion

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 148
5
ROURKELA CDP PROPOSAL

usuda Brick, munit Latri a) Trend line projection for vehicles:


n Palli Tiles y Tap ne
Basti Linear and exponential trends were extrapolated based on the vehicular
(Source: Primary Survey) growth data for the past 10 years(source: RTO). The linear projections
reflect a more realistic trend. However in case of trucks and heavy
goods transport vehicles, the previous years’ data shows sharp peaks
and dips. This was due to exceptional circumstances around 2008‐2009
5.4 TRAFFIC AND TRANSPORTATION
when the number of trucks registered dipped astronomically. Linear
Traffic and Transportation remains one of the biggest challenges in regression technique cannot be employed here to get a correct picture
Rourkela. Being an industrial city, it withnesses large volumes of of no of trucks in the future. Hence, freight projections were carried out
incoming and outgoing freight traffic. The city which was planned in the taking into account the projected increase in production of major
1950s is unable to cope up with the massive increase in vehicular traffic industries and the proposals for setting up new industries in the area.
seen in recent times. Congestion in central areas due to encroachments
b) Projections for freight vehicles:
and on street parking were also identified as major causes of concern.
Table 5.21: Projected increase in production for existing industries and
5.4.1 Projections relative freight increase by 2030
Sl. Name Expa Prese Futur Truc No. of Trucks
Traffic and vehicular projections were carried out for various aspects.
No nsion nt e ks Pres Truck Pro Pr
The various categories under which projections were carried out were; . Produ Produ Pres ent s j. oj.
ction ction ent
1. Trend line Projections of Vehicles.
Per Per Per Per Futur Per Pe
2. Freight Projections based on increase in production by existing Year year Year Day e/yr Mo r
industries and additional freight due to new proposed nth Da
industries. y
3. Trip Rate Forecasting based on Household size. 1 Shakti No 300 300 Railways Used
4. Trip Rate Forecasting based on Growth Factor Model Rail Ton Ton
Infra
Ltd.
2 Hindus Yes 1 Lac 1.4 625 21 8750 729 29
tan Ton Lac 0

149 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
Aqua Ton ments
(Bottli Pvt.
ng) Ltd.
3 Charc No 360 360 23 0 23 2 1 10 Orica No 25200 25200 157 5 1575 131 5
hika Ton Ton Minin Ton Ton 5
Enterp g
rise Servic
4 Bajran No 18000 18000 112 4 1125 94 4 e
g Bali Ton Ton 5 11 SAIL Yes 2 4.5 Railways used
Rolling Mton Mton
Mill Total 62
5 Royal Yes 180 400 11 0.04 25.0 0.0 2. 113
Weave Ton Ton 0 8 00 (source: Primary survey)
rs
Indust Table 5.22: Projected production and raw material consumption by
rial industries by 2030
Estate
6 Adhun Yes 0.45 1 168 17 5437 135 54 Raw material Production Total/year Daily Assuming
ik Mton 75 5 9 consumption tons freight(tons) 70% by
Metall tons trains, no
iks of trucks
7 Chario Yes 40000 52000 250 8 3250 271 11 9777440 6695800 16473240 54910.8 2402.3
t Ton Ton 0 (Source: Primary survey)
Ceme
nt Table 5.23: Freight calculations for existing and proposed industries by
Factor 2030
y
8 IDL No 30000 30000 187 6 1875 156 6 Trucks per day Assumptions
Ton Ton 5 industr market Passing Assuming 30% growth for
9 Tara No 800 800 50 0 50 4 0 y s by RKL markets
Equip Ton Ton on NH Assuming 15% growth for
23 passing by trucks

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 150
5
ROURKELA CDP PROPOSAL

present 63 13 242 No of trips generated in each zone was projected on the basis of
Future 50 4 36 projected population increase by 2021 and 2031. It was assumed that
growth the no of trips as per household size will follow the current trend.
of
existing Table 5.24: Projected trip generation for zones based on household size
Total 113 17 278 408
projecte Total no of trips generated
d Year RMC SAIL Lathikata Kuarmunda Bisra
New 2402 2011 260551 194393 71839 61175 5687
industri 2021 306306 206586 83319 73567 7478
es 2031 355593 212844 86631 83834 8509
Total 2810 Trucks per
projecte day
d d) Trip rate forecasting by econometric model
Space No. of Total
for 1 trucks The growth factor depends on the explanatory variable such as
truck population(P) of the zone, average house hold income(I), average
Space Truck parking 12m×4 2810 13488 vehicle ownership(V).
required m 0
for Loading/unloading/other Extra 53952 The growth factor for a particular year is calculated by dividing the
logistics facilities 40% of parameters of population, income and average vehicle ownership in the
hub parking design year (or the year for projections) by the present scenario of the
space
population, income and vehicle ownership.
Total(sq.m 18883
.) 2 Table 5.25: Region wise population, household income and vehicle
ownership projection for growth factor calculation
c) Trip rate forecasting based on household size
Region Municipal SAIL Bisra Kuarmun Lathikat Toatal
wise ity da ha
populati
on

151 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
2011 273040 21336 6854 67416 85207 645877 The growth rate of income is based on the predictions made by the
0 Global McKinsey Institute stating the growth of income in the next 2
2021 325172 22002 7959 78353 88737 720248 decades to be of the order of 5.8% in urban areas and 3.6% in the rural
7 areas.
2031 378725 22669 9064 89290 92267 796040
4 The growth factor was estimated separately for each zone on the basis
Region Municipal SAIL Bisra Kuarmun Lathikat Total of the growth factor formula mentioned above.
wise ity da ha
househo Table 5.26: Growth factor calculation for various zones
ld
income Zone Municipa SAIL Bisra Kuarmu Lathikat Remarks
2012 20500 28500 1450 19500 19300 102300 lity nda ha
0 Growt 3.21 2.09 2.49 1.72 2.11 Based
2021 40921.5 42808 2312 21397 29126.6 157373 h on rate
0 .1 factor of
2031 71913 75229 3293 30475.5 41484 252031 for increase
0 .5 2021 in
Growth 5.80% 5.80% 3.60 3.60% 3.60% registere
rate of % d
income vehicles
2012 Municipal SAIL Bisra Kuarmun Lathikat Total after
ity da ha discardi
2021 4460.4 3175. 4638. 2836.8 2890.8 18000 ng 10%
2 6 under
2031 6690.6 4762. 6957. 4255.2 4336.2 27000 disposed
8 9 vehicles
8920.8 6350. 9277. 5673.6 5781.6 36000 Growt 7.94 4.54 4.85 3.33 3.75 Based
4 2 h on rate
(Source: population projections, development plan Rourkela 2031, factor of
global Mckinsey report, RTO) for increase
2031 in

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 152
5
ROURKELA CDP PROPOSAL

registere Table 5.27: Trips generated in various zones as per Household and
d growth factor method
vehicles
after
discardi
ng 10% Total no of trips generated by household and growth factor method
under Year RMC SAIL Lathikata Kuarmund Bisra
disposed a
vehicles Met HH GFM HH GFM HH GF HH GF HH GF
No. of 260551 194393 5687 61175 71839 No of hod M M M
trips househo 2011 260 260 194 194 718 718 611 611 56 56
produc lds X the 551 551 393 393 39 39 75 75 87 87
ed avg. no. 2021 305 268 206 198 833 736 735 622 74 58
of trips 306 913 586 452 19 29 67 25 78 28
per 2031 355 281 212 203 866 753 838 632 85 59
househo 593 241 844 214 31 24 34 13 09 62
ld
No. of 268913.0 198452. 5828. 62225.0 73358.3 No. of
trips 2 90 75 3 7 trips Household size method and growth factor/econometric model give us
produc attracte the projected number of trips generated in various zones. However, the
ed d X g.f data generated from household size method seems more reliable as in
2021
Indian socioeconomic scenario, the number of trips may not be directly
No. of 281241.1 203214. 5962. 63213.7 74532.8 No. of
proportional to increase in income levels.
trips 7 06 90 9 9 trips
produc attracte
5.4.1 PROPOSALS TO IMPROVE TRAFFIC AND
ed d X g.f
2031 TRANSPORTATION IN ROURKELA

Based on the issue identified after studying the existing situation in


Rourkela, the following thematic goals were framed. Each of the goals
will lead to suitable interventions to resolve the identified issues in
traffic and transportation in the city.

153 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
Table 5.28: Goals based on issues for traffic and transportation in corridor.
Rourkela 3 Parking Providing sufficient parking
areas in the central zone to
Sl. No. ISSUES GOALS ensure removal of
1 Connectivity and A) To ensure unauthorized on street
strengthening of connectivity across parking.
existing road network all zones in 4 Intersections Improvements in rotary
Rourkela geometries and design,
encompassing the exploring the option of
new upcoming signalization to ensure
industrial and smooth flow of traffic.
residential areas as 5 Cyclists Provision of bicycle lanes
proposed in the on important spines to
development plan. ensure segregation of
B) Increasing slow and fast moving
connectivity across traffic and ensure safety
the rivers to for cyclists.
reduce load on 6 Pedestrians Ensure a pedestrian
existing bridge and friendly and safe
stimulate growth environment with
of new areas along encroachment free
Transportation footpaths, foot over
spines. bridges etc.
C) Widening of roads, 7 Traffic Management Ensure smooth and safe
road improvement traffic flow with minimum
schemes. disruptions and delays,
2 Freight Creating a well defined especially in the central
freight corridor that has zone.
minimal conflict points 8 Public transport Enhance usage of public
with regular passenger transport, bus services
traffic. A logistics hub is to proposed and Para transit
be planned along this services to be

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 154
5
ROURKELA CDP PROPOSAL

strengthened to
Kuarmu
nda
a) Proposals for new links 3 Link 2 to 3.7 1.02 2.68 Pvt.+for
Kuarmu est
New links have been proposed to increase the connectivity across the nda
rivers specially to cater to the proposed development on the western north
and southern sides on the city. The proposed links will prove to be industri
stimulants for future growth. The proposed roads may be categorized al estate
as: 4 Sh 10 to 1.47 1.47 ‐ Private
river
1. Dedicated freight corridor 5 Link 4 to 8.1 ‐ 8.1 Private
2. Major link roads and feeder roads Brahma
ni river
Efforts have been made to make use of the existing roads by new
improving and extending them in order to minimize cost of bridge
to
construction and land acquisition.
Chend
colony
Table 5.29: Proposed New Road Links
6 Kalunga 6.81 1.46 5.35 Private
Sl. New Total Improvemen New portion Land gurundi
N Link length t Length(kilom ownersh a road
o. (kilomet Length(kilom eter) ip to
er) eter) Brahma
1 SH 10 to 3.8 2.4 1.4 Private ni
Kalunga 7 Link 6 to 3.02 3.02 ‐ Private
Gurundi SH 10
a road 8 Jeerpani 3.42 1.52 1.9 Private
2 Kalunga 8.37 7.2 1.1 Pvt.+for to Bisra
Gurundi est block
a road 9 Link 8 to 2.46 2.46 ‐ Private

155 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
jagda The total length of the freight corridor is 24.11 km out of which around
10 Hatiban 6.85 4.2 2.65 Private 17 km are already existing and need to be improved.
da‐
kansar‐ c) Proposals for new bridges
Suidihi
11 Chhend 5.30 5.30 ‐ Sail+priv The presence of 3 rivers and several railway lines in and around the city
colony ate are barriers to smooth traffic flow across the city. Connectivity across
to river the rivers is enhanced by proposing 4 new bridges. To reduce delay in
12 Frieght 24.11 16.89 7.22 Private traffic and ensure greater safety Rail over bridges have been proposed
corridor at crucial junctions.
13 Link 2.85 2.85 ‐ Sail
road to Table 5.30: Proposed bridges
NH 23
14 Link 6 to 3.22 3.22 ‐ Private Sl. No. Bridge location Category
Link 7 1 Bridge over Brahmani ‐
river near Chend
colony(f)
b) Proposal for dedicated freight corridor 2 Bridge over Brahmani ‐
river near Lathikatha
A dedicated freight corridor is proposed for Rourkela city with the
3 Bridge over river Sankha ‐
prime intention of segregating the freight and passenger traffic. This is at Kuarmunda(e)
necessary to ensure smooth flow of traffic in the city along with safety 4 New bridge at Vedvyas ‐
considerations. replacing existing bridge
5 Rail over bridge on Rail overbridge
The proposed freight corridor is an extension of the NH 23. It extends Kalunga gurundia
towards the south west and south zones crossing the proposed road(a) on proposed
industrial areas near Kalunga and Kansar. The freight traffic will be map
diverted into this dedicated corridor from NH 23‐SH 10 intersection 6 Rail over bridge on link Rail overbridge
near Vedvyas itself. A toll may be charged for the proposed freight 1(d) on proposed map
7 Rail over bridge on link Rail overbridge
corridor for its construction and maintenance and also as a disincentive
7 (b) on proposed map
for regular passenger vehicles to use this route.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 156
5
ROURKELA CDP PROPOSAL

near proposed logistics


hub
8 Rail over bridge on link Rail overbridge e) Parking provision for central areas
5 (c ) on proposed map
near Chend colony To resolve the issue of unauthorized parking on Kachery road‐
Madhusudan marg stretch, a parking management strategy has been
worked out. It is proposed to accommodate the vehicles in two large
d) Proposal for Logistics hub parking lots located between the Ring road and Mehtab road. The roads
connecting Ring road and Kachery road will be open to traffic but will be
A logistics hub is proposed to ensure smooth flow of freight traffic to
designated no parking zones.
and from the city. The logistics hub is proposed to be located on the
new Freight corridor near Ved Vyas. The site is ideal as it is bounded by Parking space provided for:
SH 10, proposed freight corridor and railway line.
1. Car parking space for: 50 cars: 1500 sq.m
Facilities to be provided in logistics hub include: 2. Two wheeler parking space for: 120 two wheelrs: 1100 sq.m
3. Bicycle parking space for:27 bicycles: 45 sq.m
o Warehousing & Storages
o Truck Terminal with loading/unloading bays Parking problem can be partially resolved by discouraging people from
o Auto Workshops & Showrooms using their personal vehicles. This can be achieved by encouraging the
o Recreational Zone use of public transport. Paid parking facility can be a factor that will
o Green Open Areas discourage use of personal vehicles. Also, in the commercial areas
o Commercial Establishments to support the Logistics Park which face major parking crunch, any future building or expansion
o Business Center& Office Space for various Service Providers & permission should be given to only if the building plans provide for
Agents parking provision within their own premises.
o Hotels, Dormitories& Restaurants for the Drivers and support
staff f) Widening of existing roads based on projected V/C ratios
o Fuel Station
i) Daily trips projection
o Weigh Bridge
On the basis of the origin‐ destination survey, the number of
trips generated from the specific zones was estimated. With

157 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
reference to the population composition by 2021 and 2031, and • Firstly, the major links connecting the five zones were identified
in consonance with the growth direction of the residences and from the initial survey on traffic volume count.
the industrial zones, the future trips generated were forecasted • The future traffic forecasting depended on the growth factor
and estimated. Apart from trend line increase in traffic that was obtained. While calculating the new V/C ratios, the
movement, additional movement along certain stretches linking growth factor was reduced by a certain percentage assuming a
new growth directions such as Kuarmunda, Kalunga, and Bisra certain share of population to shift towards the public
were identified and instilled into the calculations. The numbers transport.
in red indicate the same. • It was observed from the household survey results, 25% and
considering the current modal split of 17% work trips by public
Table 5.31: Projected no. of trips generated for 2021 and 2031
transport, 8% minimum shift of passengers towards public
TOTAL NO OF TRIPS GENERATED transport can be estimated.
Year RM C Steel Lathikata Kuarmunda Bisra • Eliminating the 8% shift towards public transport, the growth
Township factor estimated earlier was applied. The growth factor applied
2011 260551 194393 71839 61175 5687 is 12 % in the RMC region. Growth factor is only 6% in the SAIL.
2021 305306 206586 83319 73567 7478
2021(addl.) ‐ ‐ 5400 3900 ‐ Table 5.32: Projected V/C for 2021
2021 Total 305306 206586 88719 77467 7478
Road To Exis V Proj Assu Gro Proj
2031 355593 212844 86631 83834 8509
Link ting / ecte mptio wt ecte
2031(addl.) ‐ ‐ 9000 6500 4000
vol C d ns h d
2031 Total 355593 212844 95631 90334 12509
um Volu Fac V/C
e me tor 202
202 1
ii) Estimation of new V/C Ratios
1
The Volume Capacity ratios for major roads linking different RMC Panpo Udit 700 0. 784 Certai 12 0.71
sh Nag 6 n% %
zones and the roads carrying major traffic demand were thus
Road ar 4 shift
estimated from the total trips generated from each zone. Ring Chh 510 0. 571. to 12 0.52
Road end 4 2 public %
Methodology
7 transp

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 158
5
ROURKELA CDP PROPOSAL

Mahta Dail 242 0. 271. ort 12 0.25 KUAR Panpo Wes 135 1. 155 (‐8%) 15 1.41
b y 2 04 syste % MUND sh t 0 2 2.5 %
Road Mar 2 m A Road‐ 3
ket (8%) Kalung
Kache Rail 700 0. 784 12 0.71 SH 10
ry way 6 % A
Road Stati 4
on Table 5.33: Projected V/C for 2031
Bonda ‐ 825 0. 924 (‐8%) 12 0.84
mund 7 %
Road To Exis V Proj Assu Gro Proj
a 5
Link ting / ecte mptio wt ecte
Ring Traf 132 1. 147 (‐8%) 12 1.34
vol C d ns h d
Road fic 0 1 8.4 %
um Volu Fac V/C
Cho 9
e me tor 202
wk 202 1
to
1
Bisr
RMC Panpo Udit 700 0. 878. Certai 12 0.8
a
sh Nag 6 08 n% %
Cho
Road ar 4 shift
wk
Ring Chh 510 0. 639. to 12 0.58
SAIL Ring Ispa 120 1. 127 ‐ 6% 1.16 public
Road end 4 7 %
Road t 0 0 2
7 transp
towar Mar 9
Mahta Dail 242 0. 303. ort 12 0.28
ds ket
b y 2 56 syste %
Ispat
Road Mar 2 m
Marke
ket (8%)
t
Kache Rail 700 0. 878. 12 0.8
LATHI Deoga Lath 350 0. 752. (‐8%) 15 0.68
ry way 6 08 %
KATA on‐ ikat 3 5 %
Road Stati 4
NH23 a
on
BISRA Jeerpa ‐ 330 0. 412. (‐8%) 25 0.38
Bonda ‐ 825 0. 103 (‐8%) 12 0.94
ni 3 5 %

159 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
mund 7 4.88 % Observations
a 5 1. Three links have been identified which currently are beyond
Ring Traf 132 1. 165 (‐8%) 12 1.51 the capacity and require to be widened immediately. The
Road fic 0 1 5.81 % roads are:‐
Cho 9
i) Ring Road from Traffic Chowk to Bisra Chowk.
wk
to ii) Ring Road towards Ispat market needs to be
Bisr cleared of encroachments.
a iii) The link towards the west, Panposh‐Kalung, SH 10A
Cho 2. It is observed that most V/C’s can sustain the traffic flow
wk until 2021.
SAIL Ring Ispa 120 1. 131 ‐ 3% 1.19 3. The roads that need to be widened by 2031 are:‐
Road t 0 0 0.16
i) The road connecting to Bondamunda
towar Mar 9
ds ket ii) Panposh to Uditnagar link (decongest if possible)
Ispat 4. Shift of daily Market will provide land for widening of
Marke Kachery Road.
t 5. As an immediate solution, illegal on‐street parking needs to
LATHI Deoga Lath 350 0. 775. (‐8%) 8% 0.7 be removed and better traffic management and provision
KATA on‐ ikat 3 075 of parking space will reduce congestion.
NH23 a
BISRA Jeerpa ‐ 330 0. 453. (‐8%) 35 0.41 g) Proposals for improving rotaries and intersections
ni 3 7 %
KUAR Panpo Wes 135 1. 170 (‐5%) 10 1.55 As we already know, Rourkela has rotaries at most intersections
MUND sh t 0 2 7.75 % and only 3 signaled intersections. The functioning of the
A Road‐ 3
rotaries is questionable with the increase in traffic volume over
Kalung
the years. The issue is concerning if the rotary capacities will be
SH 10
A able to handle the increasing volume of traffic.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 160
5
ROURKELA CDP PROPOSAL

Rotaries are meant to: utilization of the available roadway space. However
they can cause conflicts in management of traffic
1. Reduce delay, improve safety and solve other
during off‐peak hours.
operational problems.
2. Resolve delays (in case they exist) through The design of the rotaries was analyzed on the basis of the
modification of the contraindicating factors. fundamental formula applied for calculating the capacity (Q) of
3. Efficiently service traffic with decreased delay and the rotaries.
greater efficiency than traffic signals.

A roundabout should be considered as a logical


Qw = 280w[1+e/w]1‐p/3]/1+w/l
intersection choice if it satisfies the above. Also it has to
be taken into consideration that traffic volumes entering Where, w is the weaving width, e is the average entry and exit
the roundabout are nearly balanced on all legs and where width, l is the length of weaving, and p is the proportion of the
there are a high number of left turning vehicles. weaving traffic to the non‐weaving traffic
h) Traffic Signals are meant to: P=b+c/a+b+c+d
1. Can be applied in case of high speed traffic. Where a,b,c,d are the different weaving traffics along a weaving
2. Cause unnecessary delay. The need to provide a section
minimum green time to each movement in every cycle
creates time intervals in which no vehicles are entering OBSERVATIONS:
the intersection. This can be tackled by provision of
• Thus, the rotaries which are functioning beyond their
critical timing for two or more movements. Yet, there
current capacity were identified to be the Traffic Chowk,
is an issue concerning the delay due to lost time.
Bisra Chowk and DAV Chowk. Traffic Chowk and Bisra
3. Left turns that take place from shared lanes impede
Chowk grossly exceed the current capacity limits of the
the other movements in the shared lanes
intersections during the evening peaks.
unnecessarily. This results in a very inefficient

161 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
A few identified intersections were analyzed specifically to • Explore possibility of converting roundabout into an elliptical
comprehend the other major issues that concerned the form and reduce size of central Island.
functioning of these intersections. • Shifting of the present bus stop to Gandhi road.
• Peak hour traffic to be managed by combination of signal and
rotary.

i) BISRA CHOWK ii) TRAFFIC CHOWK

ISSUES ISSUES

• Conflict points‐leading to queuing in the weaving section. • Delay in traffic due to movement of traffic towards Railway
• High pedestrian and cyclist volume. Station.
• High motorized two‐wheeler volume. • Speed Delay survey indicated high approach speed of 60 kmph.
• Problem of sight distance and visibility. • Uneven Traffic movement. High traffic volumes along certain
• Calculated capacity of rotary very less compared to present stretches. Uneven intersection turning volumes.(Traffic Chowk
requirements. to Bisra Chowk)
• Presence of Bus Stand very close to the intersection. • Intermixing of slow and fast moving traffic.
• High pedestrian Volume.
SOLUTIONS
• Failure of rotary capacity at peak hours.
• Creation of Splitter Islands to enhance the direction of the
SOLUTIONS
traffic.
• Separation of Pedestrian and Cyclists to enhance traffic • Signalisation proposed to manage delays due to high traffic
movement and avoid congestion. volumes along one stretch at all times(peak and off‐peak).
• Provision of foot over bridge and cyclists track. • Pedestrian footpath required.
• Eliminating cyclist’s traffic from mainstream traffic due to • Bicycle Lane proposed.
construction of dedicated cycle tracks will reduce the
congestion.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 162
5
ROURKELA CDP PROPOSAL

iii) PANPOSH CHOWK iv) HANUMAN VATIKA CHOWK

The Panposh Chowk is in compliance with the parameters and is within The Hanuman Vatika Chowk satisfies all parameters considered in
the range of the requirements. Also, the passenger traffic is expected to rotary design. The high accident rate and the staggered geometry of the
reduce due to new dedicated freight corridor. rotary needs to be addressed.

ISSUES ISSUES

• Large volume of heavy vehicles entering and moving out of the • Very less stopping sight distance is present for vehicles to
city. reduce speed. This leads to over speeding of vehicles at the
• Congestion due to presence of auto stand and bus stand at the intersection.
intersection. • Approach speed not monitored to attain the circulatory speed.
• Delay in traffic service along Panposh‐Uditnagar directions. (20‐25 km/hr.)
• Delay can be attributed to tentative reduction in the effective • Absence of proper circulatory roadway geometry.
road width due to presence of auto stand and bus stand.
SOLUTIONS
SOLUTIONS
• Requirement for traffic calming techniques, splitter islands at
• Remove encroachments. the approach/entry such as provision of traffic Islands to reduce
• Shift the Bus Stand and Auto Stand to a more appropriate speeds.
location. • Central Island of rotary can be increased to improve the
• Widening of the entry and exit points moving towards Kalunga circulatory geometry, on the basis of the formula.
so as to make it 2‐ lane from single lane.
v) ISPAT CHOWK
• New Freight corridors shall divert freight to the new proposed
route. The rotary shall cater to only passenger traffic. • The Ispat Chowk satisfies all parameters considered in rotary
design for the current traffic volume.
• Speed Delay survey indicated average speed of 60 kmph.

163 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
• Diverse land use around the Chowk, i.e, market, community • The traffic volumes at this intersection have been calculated to
halls, exhibition space, IGH, warrant pedestrian movement plus be around 946 PCU/HR (survey conducted at 12.00 noon).
para‐transit. Conflicting movements due to diverse activities. • The V/C Ratio of the road connecting Panposh to Uditnagar is
• There is a need for signalization of this particular intersection in 0.86.
order to control over speeding and convert the unwarranted • The requirement at this intersection is that of appropriate
waiting time due to conflicts into a systematic red time. Traffic management to channelize the vehicle flow towards the
upcoming flyover by using splitter islands.
vi) DAV CHOWK
viii) STI CHOWK
• The Speed Delay survey indicated an average speed of 60 kmph.
The DAV Chowk is also tagged as an accident prone area. • The Off‐ centered intersection geometry is responsible for
• DAV Chowk exceeds traffic capacity during peak hours. chaotic movement of traffic along the various legs.
• The presence of educational institutions amounts to a high • Presently, the traffic volume was counted to be 1012 PCU/HR
pedestrian volume and cyclists volume which is a main concern and a delay in traffic movement at the intersection was
for safety. observed.
• High truck volume moving towards industrial Estate in the • The V/C Ratio along the main road is 0.92, which is high and
evening. calls for immediate need.
• Need for Signalization to tackle high speeds. • There is a need for removal of encroachment along the street
to enhance the effective right of way.
vii) UDIT NAGAR
• Provision of a Pavement and a Zebra crossing to allow easy and
• A traffic count survey highlighted a delay in traffic movement at unrestricted movement of traffic.
the intersection. • Absence of sufficient space for a rotary and the waiting time
• Also, the existing traffic volume at this intersection is very high. due to conflicts calls for the provision of a Traffic Signal.
• The lack of sufficient space for proposal of a rotary therefore 16.2.8 Proposal for strengthening public transport in Rourkela
triggers the need for installation of traffic signals to manage
traffic. As per our study around 55% of Rourkela population presently refrains
• Presently, the road has a one way traffic. from using public transport. Private buses ply on a few routes. However
they are not very comfortable and the frequency is not sufficient to

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 164
5
ROURKELA CDP PROPOSAL

cater to the needs of the people. A bus transit system may be ix) Proposal for bicycle lanes/Non Motorized tracks(NMT)
introduced in the city keeping in minds the various origins and
destinations that have been assessed by primary survey. Bicycle lanes are necessary to segregate the slow moving traffic from
the fast moving traffic. This will ensure smooth traffic flow at
Table 5.34: Proposed bus routes intersections and also ensure safety of cyclists on busy roads.
Promoting of walking and cycling infrastructure helps shift short trips(1‐
S No. Proposed bus route Total length(km) 4 Km trips) to walk or non‐motorized modes, thus bringing down
1 Bisra Chowk to 8.69
private car dependency.
Bandamunda
2 Bisra Chowk to 20.38 NMT Lanes are meant for Bicycles, Cycle‐Rickshaws, Hand pushcarts,
Lathikath
Hawker carts, animal drawn carts, etc. Non motorized vehicles are the
3 Bisra Chowk to 30.50
Chikatmati second most vulnerable group of road users and therefore must be
4 Bisra Chowk to Kalunga‐ 14.78 clearly segregated from faster moving motorized traffic, especially on
Jeerpani Roads designed for high speed traffic.
5 Bisra Chowk to Chhend 11.10
colony 5.4.2 GUIDELINES FOR NON MOTORIZED TRACKS
6 Bisra Chowk to sectors 9.65
• The NMV lane should be constructed with smooth‐finished
cement concrete or Asphalt in order to ensure a low
A new bus terminus is proposed in the Chikatmati area to cater the maintenance and smooth riding surface. In the absence of this,
requirement of growth of city towards western side. cyclists will tend to move into the motorized vehicle lanes
which may be more comfortable.
The auto rickshaw service needs to be developed further in the internal
• Minimum Dimension of NMV Track is 2.5 M.
areas so as to provide feeder service towards the bus stops.
• NMV Lanes or Tracks should be located on both sides of the
Encouragement of use of public transport is necessary to reduce the
street.
vehicular traffic and congestion on Rourkela roads. Major industries
(Source: Street Design Guidelines, UTTIPEC, Delhi Development
such as SAIL, Adhunic metallics etc should be encouraged to run and
Authority, 2010)
expand their bus services for employees to ensure the people need not
use their personal vehicles for work trips.

165 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
Bicycle tracks have been planned keeping in mind the profile of the 3 Panposh Hockey 0.55k 120/hr Fast moving Low
users. Most of the cyclists are people from low income group who Chowk Chowk ms heavy priori
reside in the slums such as Tika nagar. Naya bazaar Basti, Malgodam freight ty
traffic
basti etc. For them cycling is a cheap, affordable and convenient mode
4 Traffic Aambaga 2.2 308/hr Fast moving High
of travel to work. The bicycle tracks have been planned in such a way
tower n square kms traffic priori
that access to the abovementioned residential areas becomes easy and Chowk ty
safe for the cyclists. 5 Bisra Doorsanc 1.1 285/hr Access to High
Chowk har kms naya bazaar priori
Priority for phase wise provision of cycle/NM tracks has been decided bhawan basti , fast ty
based on the peak cyclist volume per hour as per primary survey. moving
traffic
The routes in high priority category should be equipped with cycle 6 Madhusu Uditnaga 2.4km 152/hr Intermixing Low
tracks immediately. The high and low priority tracks are to be executed dan r chowk s of priori
by 2021. It is proposed that by 2031 all major and arterial roads should Chowk fast/slow/m ty
be equipped with well designed cycle tracks. oving traffic

Table 5,35: Proposed Bicycle tracks in Rourkela

S.N From To distan Peak remarks Priori


o. ce volume ty 5.4.3 Proposals for pedestrian movement
cyclists/h
our Planning for pedestrian movement in the city requires a four point
1 Hanuman Bisra 3.3 1400/hr For access to High approach.
vatika Chowk kms south zone priori
Chowk via saran ty The main aims of planning for pedestrian movement are to provide an
Chowk environment which is safe, comfortable and convenient for pedestrians.
2 Bisra Tika 3.6 223/hr Access to High Ensuring Climatic comfort and universal accessibility are other requisite
Chock nagar kms tikanahar priori features for street design for pedestrians.
towards and nearby ty
bondamu slum areas
nda

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 166
5
ROURKELA CDP PROPOSAL

a) Guidelines for pedestrian friendly streets Chowk


5 Madhusudan marg ITI road
• Provide adequate Street Lighting for pedestrians and bicycles. near Daily market
• Create commercial/hawking zones at regular intervals to
encourage walkability, increase street activity and provide Table 5.37: proposals for at grade/grade separated pedestrian
safety. crossings
• Provision of pavements on all major streets on both sides of the S No Location Action Peak
road pedestrian
• Provision of shaded pavements and walkways to ensure volume
1 Bisra Chowk Foot over bridge 236/hr
pedestrian comfort.
2 Traffic Chowk Signalsation+zebra 468/hr
• Use of High albedo (diffuse reflectivity) materials for paving crossing
reduces urban heat island effect. 3 Panposh Foot over bridge 376/hr
• Pavement edge buildings with overhangs and arcades to Chowk
provide weather protection to pedestrians. 4 In front of Foot over bridge Tourist
• Provision of at grade crossings, foot over bridges as applicable. Hanuman attraction
vatika
• Provision of dustbins, signages and other street furniture.
5 Ispat Chowk Signalsation+Zebra 1368/hr
crossing
Table 5.36: interventions required for pedestrian friendly
streets in Rourkela b) Proposals for road improvement
S no Removal of Construction of
encroachment from footpath
Table 5.38: Proposals for road improvements
pavements
S No Kucha roads to be Length
1 Panposh Chowk to Ring road stretch
hockey Chowk stretch near traffic Chowk improved
1 Stretch from 5.84km
2 Jail road to DAV Jail road
Chowk Koelnagar to Jeerpani
2 Airport to 5.16km
3 Ring road near Ispat STI Chowk road
Chowk Pradhanpalli
3 Bondamunda to 6.18km
4 Ring road near bisra Kaalinga vihar road

167 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
fertilizer town around the Koel and Brahmani rivers have continued and can continue
sail boundary to serve this purpose. After the selection of such a source, the
4 Road to Vaishno Devi 1.5km next step is to construct intake works to collect it and carry it up
Temple to the treatment plants.
5 Balanda to Pitamahal 1km
2) Treatment: At the treatment plants, this water is treated. Types
dam road
6 Ghogar Chowk to 5km of treatment processes directly depend on the impurities in
Ghogar Baba Temple water at the source and the quality of water required by the
road consumers. After the water is treated, it is stored in a clear
7 Mandira Chowk to 4km water reservoir, from where it will be distributed to the
Mandira dam road consumers.
8 Dalet Chowk to 10km 3) Distribution: The distribution system will also depend on the
Khandadhar road‐
elevation of the clear water reservoir and the elevation of the
10km
distribution area. In low level areas water will directly flow
under gravitational force, but for high level areas, elevated
tanks or pumping will be required.

5.5 PHYSICAL INFRASTRUCTURE b) Certain Design Decisions

5.5.1 WATER SUPPLY • A dual system or combined gravity and pumping system shall be
adopted for the distribution. Since the city of Rourkela has a
a) The Water Supply System moderately undulating terrain, the terrain elevation can be
strategically used in locating the UGTs and OHTs, such that the
Provision of Water Supply requires concern at three different levels, water can flow in the mains under gravity. In cases where this
which form the essential components of the water supply system. They force proves insufficient, pumping can be resorted to.
are Supply, Treatment and Distribution.
• A dead end system shall be adopted for the distribution, which
1) Supply: The most important thing under the water supply is suitable for an irregular shaped city like Rourkela.
system is the selection of a source of water, which should be
reliable and have minimum number of impurities. In Rourkela,

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 168
5
ROURKELA CDP PROPOSAL

7) Similarly, the demand estimation for the year 2031 is systematically


shown in the subsequent table (Table 5.39b).
c) Demand Estimation
Table 5.39: Water Requirement for the year 2021
i) Water Requirement for the year 2021 and the year 2031
Zon Location Slum Slum Non‐ Non‐ Total
1) The demand estimation for 2021 is systematically shown in the table es Populat Water Slum Slum Water
(Table 5.39). ion Require Populat Water Require
ment (in ion Require ment (in
2) Firstly, in the ‘Location’ column, the different municipal wards and MLD) ment (in MLD)
panchayat blocks are grouped based on whichever of the sex zones consideri MLD) consideri
they fall into. ng 135 consideri ng 10%
lcpd ng 225 as
3) Secondly, in the ‘ Slum Population’ column, the projected slum lcpd unavoida
populations are mentioned for sach location. Similarly the ‘Non‐Slum ble losses
Population’ column has been populated. 1 Kuarmu 0 0 87605 19.71112 21.68223
nda 5 75
4)Thirdly, in the ‘Slum Water Requirement’ column, the water demand Total 0 0 87605 19.71112 21.68
for each location is computed considering 135 lcpd. Similarly the ‘Non‐ 5
Slum Water Requirement’ column has been populated considering 225 2 Ward 1 7616 1.02816 1362 0.30645 1.468071
Ward 2 4080 0.5508 3166 0.71235 1.389465
lcpd. These water requirements have been shown in MLD units.
Ward 3 10043 1.355805 13089 2.945025 4.730913
5) Finally, in the ‘Total Water Requirement’ column, the ‘Slum Water Ward 4 1723 0.232605 11408 2.5668 3.079345
Requirement’ and ‘Non‐Slum Water Requirement’ has been added; and 5
Ward 5 4839 0.653265 5664 1.2744 2.120431
an additional 10% of this sum, is added over and above (10% is assumed
5
to be unavoidable water losses) to get the final figures shown in this Ward 6 6848 0.92448 5368 1.2078 2.345508
column. Ward 6755 0.911925 6962 1.56645 2.726212
32 5
6) The totals have been shown for all the data, at zonal levels; and also Ward 0 0 16771 3.773475 4.150822
a grand total at the city level. 33 5

169 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
Total 41904 5.65704 63790 14.35275 22.01 Total 70014 9.45189 75083 16.89367 28.98
3 Ward 7 6356 0.85806 2501 0.562725 1.562863 5
5 4 Ward 2570 0.34695 2906 0.65385 1.10088
Ward 8 2474 0.33399 10730 2.41425 3.023064 23
Ward 9 7461 1.007235 4435 0.997875 2.205621 Ward 6484 0.87534 1856 0.4176 1.422234
Ward 5251 0.708885 6822 1.53495 2.468218 24
10 5 Ward 2021 0.272835 3739 0.841275 1.225521
Ward 7061 0.953235 1587 0.357075 1.441341 25
11 Ward 1127 0.152145 2965 0.667125 0.901197
Ward 2518 0.33993 8713 1.960425 2.530390 26
12 5 Ward 1766 0.23841 5273 1.186425 1.567318
Ward 9935 1.341225 5636 1.2681 2.870257 27 5
13 5 Ward 2657 0.358695 9259 2.083275 2.686167
Ward 3959 0.534465 4689 1.055025 1.748439 31
14 Total 16625 2.244375 25998 5.84955 8.90
Ward 3364 0.45414 2578 0.58005 1.137609 5 Ward 0 0 8677 1.952325 2.147557
15 28 5
Ward 6206 0.83781 3349 0.753525 1.750468 Ward 0 0 8191 1.842975 2.027272
16 5 29 5
Ward 0 0 5664 1.2744 1.40184 Ward 3332 0.44982 6313 1.420425 2.057269
17 30 5
Ward 1969 0.265815 2912 0.6552 1.013116 Bisra 0 0 10719 2.411775 2.652952
18 5 5
Ward 2002 0.27027 4993 1.123425 1.533064 Total 3332 0.44982 33900 7.6275 8.89
19 5 6 Lathikat 0 0 88737 19.96582 21.96240
Ward 4708 0.63558 6078 1.36755 2.203443 a 5 75
20 Total 0 0 88737 19.96582 21.96
Ward 4017 0.542295 1964 0.4419 1.082614 5
21 5 Grand 131875 17.80 375113 84.40 112.42
Ward 2733 0.368955 2432 0.5472 1.007770 Total
22 5

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 170
5
ROURKELA CDP PROPOSAL

3 Ward 7 7038 0.95013 2814 0.63315 1.741608


Ward 8 2783 0.375705 12071 2.715975 3.400848
Table 5.39b: Water Requirement for the year 2031 Ward 9 8394 1.13319 4989 1.122525 2.481286
5
Zon Location Slum Slum Non‐ Non‐ Total Ward 5907 0.797445 7674 1.72665 2.776504
es Populat Water Slum Slum Water 10 5
ion Require Populat Water Require Ward 7944 1.07244 1785 0.401625 1.621471
ment (in ion Require ment (in 11 5
MLD) ment (in MLD) Ward 2833 0.382455 9802 2.20545 2.846695
consideri MLD) consideri 12 5
ng 135 consideri ng 10%
Ward 11177 1.508895 6341 1.426725 3.229182
lcpd ng 225 as
13
lcpd unavoida
Ward 4454 0.60129 5275 1.186875 1.966981
ble losses
14 5
1 Kuarmu 0 0 101730 22.88925 25.17817
Ward 3785 0.510975 2900 0.6525 1.279822
nda 5
15 5
Total 0 0 101730 22.88925 25.18
Ward 6982 0.94257 3768 0.8478 1.969407
2 Ward 1 8568 1.15668 9231 2.076975 3.557020
16
5
Ward 0 0 6371 1.433475 1.576822
Ward 2 4590 0.61965 3562 0.80145 1.56321
17 5
Ward 3 11299 1.525365 13891 3.125475 5.115924
Ward 2215 0.299025 3276 0.7371 1.139737
Ward 4 1938 0.26163 12834 2.88765 3.464208 18 5
Ward 5 5444 0.73494 6371 1.433475 2.385256 Ward 2252 0.30402 5617 1.263825 1.724629
5 19 5
Ward 6 7704 1.04004 6039 1.358775 2.638696 Ward 5297 0.715095 6838 1.53855 2.479009
5 20 5
Ward 7601 1.026135 7832 1.7622 3.067168 Ward 4520 0.6102 2210 0.49725 1.218195
32 5 21
Ward 0 0 18867 4.245075 4.669582 Ward 3074 0.41499 2736 0.6156 1.133649
33 5 22
Total 47144 6.36444 78627 17.69107 26.46 Total 78655 10.61842 84467 19.00507 32.59
5

171 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
5 5
4 Ward 2891 0.390285 3269 0.735525 1.238391
23 ii) Grouping of Zones for Computing the Treatment Deficit
Ward 7295 0.984825 2088 0.4698 1.600087
24 5 Zones 1,2,3,4 and 6 have been grouped since the existing treatment
Ward 2274 0.30699 4207 0.946575 1.378921 plants are placed centrally for this group of zones. Also, these set of
25 5 treatment plants taken together are of high treatment capacities.
Ward 1268 0.17118 3336 0.7506 1.013958
26 On the other hand, zone 5 forms a separate group since it has a
Ward 1987 0.268245 5932 1.3347 1.763239 separate set of treatment plants, of comparatively smaller treatment
27 5 capacities; considering the size of this zone.
Ward 2990 0.40365 10416 2.3436 3.021975
31 Table 5.40: Water Requirement for each Zone Group
Total 18705 2.525175 29248 6.5808 10.02
5 Ward 0 0 9761 2.196225 2.415847 Zone Group Zone Water Water
28 5 Requirement (in Requirement (in
Ward 0 0 9215 2.073375 2.280712 MLD) for 2021 MLD) for 2031
29 5 1,2,3,4,6, Zone‐1 21.68 25.18
Ward 3756 0.50706 7102 1.59795 2.315511 Zone‐2 22.01 26.46
30 Zone‐3 28.98 32.59
Bisra 0 0 10444 2.3499 2.58489 Zone‐4 8.90 10.02
Total 3756 0.50706 36522 8.21745 9.60 Zone‐6 21.96 24.30
6 Lathikat 0 0 98190 22.09275 24.30202 Total 103.54 118.54
a 5 5 Zone‐5 8.89 9.60
Total 0 0 98190 22.09275 24.30 Total 8.89 9.60
Grand 148260 20.02 428784 96.48 128.14
Total

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 172
5
ROURKELA CDP PROPOSAL

d) Proposal Formulation ii) Distribution Deficit Computation and the Proposal of Reservoirs

1) Treatment Deficit Computation and the Proposal of The deficit in terms of water distribution capacity dictates the
Treatment Plants requirements of reservoirs in the future. Hence, this has been
computed accordingly. Each of the six zones have been considered
The deficit in terms of water treatment capacity dictates the separately, and an estimation of the reservoir capacities has been
requirements of treatment plants in the future. Hence, this has been arrived at.
computed accordingly. Based on the locations of existing water
treatment plants, and the zone groups decided. It is assumed that water shall be pumped four times from the UGTs to
the OHTs. Since the construction of a UGT is more economical than that
Table 5.41: Treatment Deficit for each Zone Group of an OHT, the UGTs of higher capacities shall be constructed, and
water shall be pumped to the UGTs four times in a 24hr cycle.
Zone Present Water Treatme Water Treatme
Therefore, the UGTs shall have a capacity to retain 75% of the total
Group Treatme Requireme nt Deficit Requireme nt Deficit
nt nt (in MLD) (in MLD) nt (in MLD) (in MLD) water demand, and the OHTs shall retain the remaining 25%. Once the
Capacity for 2021 for 2021 for 2031 for 2031 water in the OHTs is about to get exhausted, it can be refilled from the
(in MLD) UGTs.
1,2,3,4, 73 103.54 30.54 118.54 45.54
6 The UGTs shall be designed considering the water requirement in the
5 7.05 8.89 1.84 9.60 2.55 year 2031, but shall be constructed in Phase‐1 itself. The OHTs shall be
constructed in two phases, as seen in the table (Table 5.42).

Based on the above data, the treatment plants are proposed as follows. Table 5.42: Distribution Deficit and Reservoir Capacity Estimation for
each Zone
1) For Zone Group 1,2,3,4 and 6‐30.54 MLD Treatment Plant in
Phase 1‐ 45.54‐ 30.54 = 15 MLD Treatment Plant in Phase 2 Zo Present Water Distributi No of Water Distributi Capacity of No of
n Distrib Requir on Deficit 1‐MLD Require on Deficit UGT (in 1‐MLD
2) For Zone 5 – 2.55 MLD Treatment Plant in Phase 1 itself, since e ution ement (in MLD) OHT in ment (in (in MLD) MLD) in OHT in
Capacit (in for 2021 Phase‐ MLD) for for 2031 Phase‐1 Phase‐
constructing two treatment plants for such small capacities in
y (in MLD) 1 2031 considering 2
phase is not economically feasible. MLD) for consid 75% consid

173 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
2021 ering storage ering This is also backed by the fact that the sewage from the septic tanks is a
25% 25%
storage storage cause of environmental pollution. The sewage is directly deposited into
1 1.12 21.68 20.56 3 25.18 24.06 18.04 3 the rivers or vacant lands without any kind of treatment that has led to
2 12.08 22.01 9.93 1 26.46 14.38 10.79 3
3 4.75 28.98 24.23 4 32.59 27.84 20.88 4 unsanitary conditions in those areas.
4 1.3 8.90 7.60 2 10.02 8.72 6.54 2
5 2.37 8.89 6.52 2 9.60 7.23 5.42 1
6 0 21.96 21.96 4 24.30 24.30 18.23 2
a) Objectives

• To provide sanitation system to all areas specially the rural


5.6 SEWERAGE areas
• To provide sewer system to the existing which are devoid of
5.6.1 INTRODUCTION sewerage system
• Formulation of sanitation system for all newly developing areas
The existing sewerage system in Rourkela is not so well developed given by 2031
that ,most of the city is served by Septic tanks instead of a proper water • To eradicate open defecation and pollution of water bodies by
carriage system. Only the Steel plant Township is served by a well laid the existing system
underground sewerage system and a sewage treatment plant located in
Sector‐16. b) Proposals

But even this sewage system is inadequate and is being revamped to • Provision of sewerage systems in polluting areas specially in the
accommodate the raising population of the steel township. The central area
panchayat areas are highly dependent on community toilets and septic • Provision of septic tanks or other sanitation measures in areas
tanks. However people lacking the facilities of the community toilets where sewer system is absent
are resorting to open defecation in these hinterlands. • Curtailment of open defecation in the rural areas and slums by
provision of community toilets.
Given the present conditions of the Planning area with the municipality
• Provision of community toilets in the Slums, market and
dominated by septic tanks, the panchayat areas and the slums resorting
commercial areas.
to open defecation there is a need for a proper water carriage sewage
• Creating awareness and education programs amongst slums
system.
and rural areas the importance of a sewerage system

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 174
5
ROURKELA CDP PROPOSAL

• Setting up of agencies for maintenance of public toilets and • Zone 3 consisting of wards 23,24,25,26,27 and 31
sludge cleaning services in the municipal area. • Zone 4 consisting of the Lathikata Block
• Zone 5 consisting of Kuarmunda block
c) Considerations
The areas that fall under the first phasing are the following:‐
Proposed Map shows the areas that face pollution risks and the general
contour pattern of the planning area. This map is a base over which the • The central area covering wards (most of zone1)
phasing has been formulated. • The western area covering wards(most of zone 1)
• Zone 2
i) General considerations
These areas are in the first phase of zoning because they are facing
• The sewer system adopted is a partially separate system where threat of pollution due to contamination of the river water by the
there may be mixing of rainwater and sewerage when the self sewerage from the septic tanks.
cleansing velocity is not reached.
• Also a partially separate system is suitable due to the fact that The areas under the second phasing are as follows:‐
open drains are present in the city of Rourkela which can cater
• Ward 1 and Zone 3 in the municipal area
to the runoff from the streets.
• Lathikata Block area
• The main sewer lines may, as far as possible, be laid along the
contour lines to curtail costs on pumping. These areas are under phase two because of an expected population
• Pumping stations may be provided where ever required i.e. in raise due to the growth of the city and also due to the existing
places of up slopes. population status.

d) Phasing Areas in the third phase are the Kuarmunda block. It is the last phasing
because after the proposal of industries in this block there is to be an
Proposed Map shows the phasing of Sewerage system. The planning
expected population raise. But this raise will not be sufficient to cater to
area is divided into five zones namely,
a water carriage system till the end of the period from 2021 to 2031.
• Zone 1 consisting of wards 1,2,3,4,5,6,7,8,9,10,11,
12,13,14,15,16,17,18,19,20,21,22,32,33
• Zone 2 consisting of wards 28,29,30 and Bisra Block

175 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
e) Sewerage Load Calculation Zone 0 0 88737 15.97266 92267 16.60806
‐4
The sewerage load is calculated ad per the phasing and the Zone 0 0 0 0 89290 16.0722
corresponding population. The sewage load per capita is considered to ‐5
be 80 percent of the water intake capacity per person. This gives the
per capita sewage waste generation to be 0.8×225 lit = 180 lpcd. Also
Table 5.44: Sewerage Treatment plant capacities and area required
the slums are excluded from the calculations owing to the dense nature
of their structure which cannot support a water carriage system. Zone STP CAPACITY (IN MLD) Area
2011 2021 2031 required
Total population served by 2021 = 280026 (acres)
Sewerage = 0.8×225×280026 = 50.4 MLD
Zone‐1 21 24 26 3.3
Total population served by 2031= 392416
Zone‐2 4 6 6.5 0.83
Sewerage = 0.8×225×392416 = 70.63 MLD
Zone‐3 ‐ 6 6 0.76
The area required for a 26 MLD plant is 13400 sqm approximately = 3.3
Zone‐4 ‐ 16 17 2.16
acres
Zone‐5 ‐ ‐ 16 2.03
Similarly the area required for 6.5 MLD, 6 MLD, 17 MLD and 16 MLD
sewage treatment plants are 3350 sqm, 3092.3 sqm, 8761.5sqm and
8246.15 sqm respectively. f) Location of sewage treatment plants

Table 5.43: Sewerage load calculation The following are the general criteria for location of an STP:‐

Zone Pop in Sewage Pop in Sewage Pop in Sewage • Low lying land with moderate slope are favourable (for gravity
2011 generate 2021 generate 2031 generate flow)
d (in d (in d (in
• Non flooding area i.e. not a flood plain
MLD) MLD) MLD)
Zone 11477 20.65914 12998 23.3964 14218 25.59348 • Nearness to water body
‐1 3 0 6 • Preferably away from existing intake points
Zone 20334 3.66012 31676 5.70168 35164 6.32952 • Preferably away from habitable areas
‐2 • Must not be in or near areas of ecological importance
Zone 0 0 29633 5.33394 33509 6.03162
• Connectivity with transport system
‐3

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 176
5
ROURKELA CDP PROPOSAL

• With regard to the above criteria’s the Sewage Treatment 5.7 STORM WATER DRAINAGE
plants have been located in the planning area.
• With regard to the above criteria’s the Sewage Treatment 5.7.1 INTRODUCTION
plants have been located in the planning area.
The existing storm water drainage system in Rourkela is well laid
g) Community Toilets out overall. The water is ultimately drained into the River Brahmani
and River Koel. Besides the river there are many reservoirs and
The community toilets are an important part of sanitation tributaries of the main river that serve as catchments to the drain
management in case of slums and for the Economically Weaker system. With increasing urbanization and population there is more
Sections in the Panchayat block areas. The calculation has been hardscape coming into the city which means more runoff which has
done by assuming that for every 20 households we require one to be drained properly. Hence there is a necessity for a proper
toilet. Each toilet block is assumed to contain 10 toilets. drainage system.

Table 5.45: Community toilets But it may be worthy to note that the existing system has good
coverage except in the wards 1, 9 and 24 as indicated by the status
AREA 2011 No. of 2021 No. of 2031 No. of
commun commun commun report. But still there are complaints of water stagnation in many
ity ity ity areas which is a result of lack of maintenance. The steel township is
toilets toilets toilets extensively covered by a properly designed drain network unlike
required required required the municipality. The municipality has a major portion of open
(2011) (2021) (2031) drains except along main roads and important commercial areas
Slums 1156 1156 1251 1251 1338 1338 where there are closed drains. Some wards like 4,5,6,24,28,29 and
02 08 84
30 face issues of water stagnation.
Lathikat 4430 443 4614 461 4797 480
ha 8 3 9 In some places, like Panposh, the drains are also being used as a
Kuarmun 2427 242 2820 282 3214 321
dump for discharges from septic tanks. They are clogged with solid
da 0 7 4
waste and in core commercial areas are used as an extension of the
Bisra 617 7 716 8 816 9
Toilet 180 200 215 road.
Blocks

177 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
a) Objectives Table 5.46: Ward wise drain lengths

• To prevent water stagnation in the municipal and block Name of Ward Length of Drain in Area in (sq.km)
areas km(pucca)
1 7 3.17
• To cover all the existing open drains into closed ones
2 9 1.31
• To revamp the existing drainage system
3 8.5 0.95
• To integrate the existing drainage system with new
4 4.6 1.62
proposals
5 9.5 0.53
b) Proposals 6 8 2.32
7 22.5 0.52
• Construction of drains along pukka roads that lack the same 8 2.97 0.54
• Maintenance of the existing drains (wards 9 26.45 0.22
5,4,33,20,22,16,18,12,27,30 and 25) 10 8.5 0.26
• Proposal for rain water harvesting to reduce load on the 11 18.67 0.17
drainage system 12 20.77 0.73
• The drains discharge into the existing natural catchment areas. 13 18.52 0.63
14 7 0.26
• Conversion of open drains into closed drains so that
15 4.39 0.31
maintenance cost is reduced
16 3.74 0.41
• New developments must have closed drains preferably
17 2.726 0.55
• The catchment areas must be monitored for pollution levels
18 2.908 0.6
i) Areas Requiring New Construction 19 5.05 0.19
20 3.02 0.13
Table 5.46 gives the existing length of drains for every ward. The 21 2.555 0.1
highlighted rows indicate that have low drain lengths. 22 3.03 0.1
23 3.78 1.96
24 2.37 1.89
25 4.76 2.3

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 178
5
ROURKELA CDP PROPOSAL

26 3.32 1.34 iii) Areas requiring maintenance


27 4.56 1.11
All wards in general lack maintenance in terms of drains. The areas
28 3.085 1.08
requiring maintenance are those that have no collection system and
29 2.44 0.58
thus face problems of choked drains. The wards of focus are 1, 32, 16,
30 12.4 3.09
18, 10, 12, 20 and 27. The Lathikata block and Bisra block require
31 12.43 1.24
maintenance for their existing drains too.
32 34.45 1.15
33 36.06 1.44 5.8 SOLID WASTE MANAGEMENT
Total 437.359 32.8
5.8.1 INTRODUCTION

The areas requiring new drains are the ones that have kutcha roads The solid waste management system is not up to the mark in the city of
which do not support drains and areas having no drains despite the Rourkela. The existing collection system is insufficient to cater to the
presence of a pukka road. Wards having no drains are the following:‐ existing population and hence there is a requirement for upgradation of
the system. The existing modes of collection comprise of door to door
• Wards 1,4,6,8,17,18,24,28,29 and 30 collection in some wards and community bins in the panchayat areas
• Lathikata block and northern part of Kuarmunda and slums. However these are still insufficient and have resulted in road
side dumping and incineration. There is also no waste segregation
ii) Areas requiring increase of capacity
which indicates lack of awareness among the people and the
The areas requiring increase of capacity are the ones that have a proper Municipality. In the Steel Township there is a door to door collection
solid waste collection system but yet face water stagnation issues. system accompanied by community bins in the common spaces like the
These are wards are 1, 32, 16, 18, 10, 12, 20 and 27. The Kuarmunda commercial and recreational areas.
block may require an increase in its capacity due to the proposal of
The existing collection system efficiency is only about 89% leading to a
industries. This increases the hardscape and may lead to new
back log of 24 MT of waste which is not collected, of which 6.81 MT is
settlements which consequently increase the runoff from these areas.
accounted by the residential waste only. This is accompanied by a lack
of disposal system i.e. a landfill or functioning compost plant (Even
though there is a compost plant in the city it is shut down due to

179 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
allegations of pollution). Despite many proposals for a landfill there is • Hospital bio medical waste is to be processed by the hospital
still no proper landfill site that has been identified. itself and then safely disposed

Thus overall the city requires sufficient community bins for the slum 5.8.4. WASTE GENERATION
areas, door to door collection system for all households and proper
disposal mechanisms for the waste accrued. The new system must cater This section deals with the calculation of waste generated in all the
not only to the back log but also the expected increase in the areas of Rourkela city that is the Rourkela Municipality Area, the steel
population. township areas and the blocks. For ease of calculation the section has
been further sub divided into two with respect to the type of waste
5.8.2 OBJECTIVES generated i.e. residential and other waste.

• To propose an integrated solid waste management system that a) Residential Waste generation
will have maximum collection efficiency and waste disposal
with minimum adverse effects on the environment The residential waste refers to the waste that is generated from the
• Provision of a collection system to all the areas both existing households. This section of waste generation is for complete planning
and developing area including the Steel Township. The following assumptions are made
• To eradicate road side and open land dumping for the calculations:‐

5.8.3 PROPOSALS • There is a 0.87% increase in waste generation every year


• Collection efficiency is only 70%
• Provision of community vat collection or door to door collection
So for 1st year i.e. 2011 waste generation per capita is assumed to be
with a nominal charge for the same in all the areas
0.35 Kg per day.(2011)
• Community cleaning
• Segregation of waste at household level(HIG and MIG) by For the next 10 year i.e. till 2021 waste generation is given by the
provision of 3types of bins (organic, recyclable and non following calculation
compostable). This reduces the load on the landfill site
• Waste segregation areas for sorting of waste from the 2011‐2021=0.35×(1+0.0087)¹⁰=0.382 Kg per capita
slums/community vat
So waste generated for 10 years =(0.35+0.382)/2=0.365 Kg per capita
(2011‐2021)

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 180
5
ROURKELA CDP PROPOSAL

For next 10 years i.e.2021 to 2031 waste generation is given by 6 9 2.5 9.1 19
2031 323940 0.38 1532.9 30791 47200738 472007.3
2021‐2031=0.365×(1+0.0087)¹⁰=0.3980 Kg per capita 18 27 2.5 4.9 85
(Reference: Municipal Solid waste management for Patna, MCP
So waste generated for 10 years = (0.365+0.398)/2=0.382 Kg per capita
dissertation: Chandan Kumar)
(2021‐2031)
Table 5.48: Residential waste generation calculation and composition
Per capita waste generated for 11 years (including 2011) is taken into
account. AREA Waste Organi Construction( Recyclable( Non
produc c 33.9%) 5.3%) compostabl
Waste per capita for 11 years=11×365×0.366=1469.49 Kg ed (43.6% e(17.2)
)
Waste per capita for next 11 years (2021‐ Munici 88708 38676 300721.21 47015.41 152578.31
2031)=11×365×0.3818=1532.927 Kg pal 3.20 8.28
Area
The above per capita for 10 years is multiplied with the average of the SAIL 66082 28811 224019.43 35023.69 113661.77
population to get the final waste generated. Area 4.27 9.38
Lathika 26653 11621 90356.19 14126.48 45844.44
Table 5.47 shows the above calculations only for the municipal area. tha 7.44 0.32
Similarly the calculations are done for other areas. Table 5.47 shows the Kuarm 23559 10271 79866.80 12486.55 40522.38
waste composition for residential waste. unda 5.24 9.54
Bisra 23931. 10434. 8112.71 1268.36 4116.18
Table 5.47: Sample residential waste generation calculation 29 04
Total 20739 90425 703076.3 109920.5 356723.1
MUNICIP populati Per Per Avg Waste Waste 71.5 1.6
AL AREA on capit capita pop generated (in MT) So total waste that goes to landfill is
a per waste (in kg)
day (for 10 =356723.1+(0.3×904251.6)=627998.6 MT (30 percent of organic waste
(in yrs) produced is assumed to be going to the Land fill site)
kg)
2011 273040 0.35
2021 291885 0.36 1469.4 28246 41507581 415075.8

181 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
b) Commercial Waste generation Waste per capita for next 11 years (2021‐
2031)=11×365×3.278=13161.17 Kg
The commercial waste consists of the waste from markets and
commercial shops. The following are the assumptions made: The above per capita for 10 years is multiplied with the average of the
population to get the final waste generated.
• Each shop produces 3 kg of waste
• There is an increase of 0.87% increase in the waste generated Table 5.49 shows the above calculations only for the municipal area.
by each shop Similarly the calculations are done for other areas.

So for 1st year i.e. 2011 waste generation per capita is assumed to be 3 Table 5.49: Sample commercial waste generation calculation
Kg per shop.(2011)
MUN To Waste/s Per Av Peris Peris Wa oth Other
For the next 10 year i.e. till 2021 waste generation is given by the ICIPA tal hop/da sho g habl hable ste ers shop
L no y p no e shop (in (66 waste
following calculation
AREA of was of shop wast MT .5%
2011‐2021=3×(1+0.0087)¹⁰=3 Kg per shop sh te sh s e ) )
op (in op (33.5
So waste generated for 10 years =(3+3.271)/2=3.136 Kg per shop (2011‐ s kg) s %)
2021) (10
yrs)
For next 10 years i.e.2021 to 2031 waste generation is given by 2011 82
00
2021‐2031=3.136×(1+0.0087)¹⁰=3.42 Kg per shop 2021 97 3.136 125 89 3009 3788 378 597 75210
65 91.0 83 8170. 88. 3 846.1
So waste generated for 10 years = (3.136+3.42)/2=3.278 Kg per shop 4 6 1 7
(2021‐2031) 2031 11 3.278 131 10 3541 4659 465 702 92501
37 61.1 56 8635. 98. 8 769.8
Per capita waste generated for 11 years (including 2011) is taken into 3 7 9 9 6 1
account.

Waste per capita for 11 years=11×365×3.136=12591.04 Kg

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 182
5
ROURKELA CDP PROPOSAL

Table 5.50: Commercial waste generation calculation and composition • Municipal waste is 75% whose composition is further

Source Waste Organic Recyclable Non So for 1st year i.e. 2011 waste generation per capita is assumed to be
produced compostable 1.5 Kg (2011)
Perishable 91471.49 61285.90 21953.16 8232.43
goods For the next 10 year i.e. till 2021 waste generation is given by the
Others 181577.73 19973.55 99867.75 61736.43 following calculation
Total 273049.22 81259.45 121820.91 69968.86
2011‐2021=1.5×(1+0.0087)¹⁰=1.636 Kg per capita

Table 5.50 shows the waste composition for commercial waste So waste generated for 10 years =(1.5+1.6362)/2=1.568 Kg per capita
collectively for the planning area. (2011‐2021)

So total waste that goes to landfill is For next 10 years i.e.2021 to 2031 waste generation is given by
=69968.86+(0.3×81259.5)=94346.70 MT (30 percent of organic waste)
2021‐2031=1.568×(1+0.0087)¹⁰=1.71 Kg per capita
c) Miscellaneous Waste generation
So waste generated for 10 years = (1.568+1.71)/2=1.64 Kg per capita
The miscellaneous waste includes the medical waste and the hotel (2021‐2031)
waste. Only the municipal waste of the medical waste is taken into
Per capita waste generated for 11 years (including 2011) is taken into
consideration.
account.
The following are the assumptions made for Medical waste:‐
Waste per capita for 11 years=11×365×1.568=6295.52 Kg
• Waste per patient is 1.5 Kg per day
Waste per capita for next 11 years (2021‐2031)=11×365×1.64=6624.75
• The number of beds in the hospital indicates population to be
Kg
catered
• An increase of 0.87% in the waste generation is expected over The above per capita for 10 years is multiplied with the average of the
the years population to get the final waste generated.
• Bio medical waste is 25% that is to be treated by the hospital
itself within its premises

183 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
Table 5.51 shows the above calculations only for the municipal area. Medic 15582.7 3895. 7012.22 2804.89 1051.83
Similarly the calculations are done for other areas. al 0 68
Organic Recyclable Non
Table 5.51: Sample commercial waste generation calculation (75%) (10%) compostable
(15%)
MUNI No of Per Per Av Total In Biome Munic Hotels 10781.0 ‐‐ 8085.8085 1078.1078 1617.1617
CIPAL beds capita pati g waste MT dical ipal 78
Area (all waste(k ent be waste waste( So total waste that goes to landfill is =
hospi g)/day wast ds (25%) 75%) 1617.16+1051.83+30%(7012.22+8085.8)=7198.4 MT (30 percent of
tals) e(in
organic waste)
kg)(
10 So total waste going to Land fill is 729543.7 MT
yrs)
2011 345 5.8.5 Waste Collection
2021 584 1.568 629 46 29242 292 731.0 2193.
5.52 4.5 69.04 4.26 6726 20178 a) Proposals
2031 648 1.65 662 61 40808 408 1020. 3060.
4.75 6 46 0.84 2115 6345 • A door to door collection system that will serve to collect waste
The following considerations are considered for Hotel waste:‐ from every household by charging a nominal fee
• Segregation of waste at the household level by provision of two
• Per capita waste generation is 0.5 Kg per day
bins: Blue bin for inorganic waste and green bin for organic
• An increase of 0.87% in the waste generation is expected over
waste
the years
• Proposals for transfer stations for the segregation of waste
Thus the final waste generation is given by Table 5.52 from the community bins. Segregation reduces the load on the
land fill as well as the transportation system which transfers the
Table 5.52: Miscellaneous waste generation calculation waste to the landfills.
Sourc Waste Bio Municipal waste(75%) • Generation of employment by hiring labour for segregation of
e produce medic Organic(6 Recyclable(2 Non waste and generation of revenue by sale of the recyclable
d al 0%) 4%) compostable( waste.
(25%) 9%)

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 184
5
ROURKELA CDP PROPOSAL

b) Equipments required for collection )


1 0.4 1.3 12 18 0.9 0.3 3
The following are the equipments required for the collection of waste:‐ 2 1.0 0.7 6 19 1.5 0.4 3
3 2.0 1.8 16 20 1.9 0.8 7
• Push carts 4 3.5 0.3 3 21 0.6 0.7 6
• Tricycles 5 1.7 0.8 8 22 0.7 0.5 4
• Motorized vehicles 6 1.6 1.2 11 23 0.9 0.5 4
• Vats (different capacities) 7 0.8 1.1 10 24 0.6 1.1 10
• Tippers(different capacities) 8 3.3 0.4 4 25 1.1 0.4 3
9 1.4 1.3 12 26 0.9 0.2 2
• Man power
10 2.1 0.9 8 27 1.6 0.3 3
c) Equipments required for residential waste collection 11 0.5 1.2 11 28 2.7 0.0 0
12 2.7 0.4 4 29 2.5 0.0 0
Table 5.53 represents the ward wise requirement of community Vats 13 1.7 1.7 15 30 1.9 0.6 5
for the municipal area for the years 2011, 2021 and 2031. The loading 14 1.4 0.7 6 31 2.8 0.5 4
for door to door collection for every ward is also depicted in the same. 15 0.8 0.6 5 32 2.1 1.2 11
16 1.0 1.1 10 33 5.1 0.0 0
The following are to be noted:‐ 17 1.7 0.0 0 Tota 55.7 23.1 205
l
• Community vats are for the slum areas exclusively
• The capacity of the vats are 1.5 times the actual requirement
Table 5.54: Waste loading for door to door collection and
Table 5.53: Waste loading for door to door collection and community vats 2021
community vats 2011
WA Non Slu Commu WA Non Slum Commu
WA Non Slu Commu WA Non Slum Commu RD slu m nity RD slum waste( nity
RD slu m nity RD slum waste( nity m was Vats(37 waste( MT) Vats(37
m was Vats(37 waste( MT) Vats(37 was te 5L) MT) 5L)
was te 5L) MT) 5L) te (MT
te (MT (MT )
(MT ) )

185 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
1 0.5 1.5 14 18 1.1 0.4 4 2 1.4 0.9 8 19 2.1 0.5 4
2 1.2 0.8 7 19 1.8 0.4 4 3 5.3 2.3 20 20 2.6 1.1 9
3 4.8 2.0 18 20 2.2 0.9 8 4 4.9 0.4 3 21 0.8 0.9 8
4 4.2 0.3 3 21 0.7 0.8 7 5 2.4 1.1 10 22 1.0 0.6 5
5 2.1 1.0 9 22 0.9 0.5 5 6 2.3 1.5 14 23 1.2 0.6 5
6 2.0 1.4 12 23 1.1 0.5 5 7 1.1 1.4 13 24 0.8 1.5 13
7 0.9 1.3 11 24 0.7 1.3 12 8 4.6 0.6 5 25 1.6 0.5 4
8 3.9 0.5 4 25 1.4 0.4 4 9 1.9 1.7 15 26 1.3 0.3 2
9 1.6 1.5 13 26 1.1 0.2 2 10 2.9 1.2 11 27 2.3 0.4 4
10 2.5 1.1 9 27 1.9 0.4 3 11 0.7 1.6 14 28 3.7 0.0 0
11 0.6 1.4 13 28 3.2 0.0 0 12 3.7 0.6 5 29 3.5 0.0 0
12 3.2 0.5 4 29 3.0 0.0 0 13 2.4 2.2 20 30 2.7 0.8 7
13 2.1 2.0 18 30 2.3 0.7 6 14 2.0 0.9 8 31 4.0 0.6 5
14 1.7 0.8 7 31 3.4 0.5 5 15 1.1 0.8 7 32 3.0 1.5 14
15 0.9 0.7 6 32 2.5 1.4 12 16 1.4 1.4 12 33 7.2 0.0 0
16 1.2 1.2 11 33 6.1 0.0 0 17 2.4 0.0 0 Tota 83.0 29.7 264
17 2.1 0.0 0 Tota 68.8 26.4 234 l
l Total no of community vats required is 205 for 2011, 234 for 2021
and 264 for 2031.

Table 5.55: Waste loading for door to door collection and For door to door collection system there is requirement for push
community vats 2031 carts, tricycles, motorized vehicles and tippers. The following are
the assumptions made for the calculation of the respective
WA Non Slu Commu WA Non Slum Commu
equipments for residential waste:‐
RD slu m nity RD slum waste( nity
m was Vats(37 waste( MT) Vats(37
• Push carts may be used in dense wards. Tricycles in
was te 5L) MT) 5L)
moderately dense wards and motorized vehicles for less
te (MT
(MT ) dense wards
) • Tipper capacity is 5 cum and assuming 4 trips in a day.
1 3.5 1.7 15 18 1.2 0.4 4 Hence volume taken per day = 20 cum

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 186
5
ROURKELA CDP PROPOSAL

• Waste per vat = 300 L per day = 0.3 cum Vehicles required =61.5/20=3 vehicles
• Every push cart can cater to 150 households per day, every
Waste generated by Vats for year 2021=234×0.3 cum = 66.400 cum
tricycle 250 households per day and every motorized
vehicle 400 households per day Vehicles required =66.6/20=4 vehicles

The number of equipments required is obtained by dividing the total Waste generated by Vats for year 2031=264×0.3 cum =71.4 cum
number of households catered by the gross figures assumed above. E.g.
10325/150=69. The gross figures are indicated in Table 5.56. Vehicles required =71.4/20=4 vehicles

Table 5.56: Equipments required ( municipal area) BLOCK AREAS:‐

MUNICIPA Wards Total HH catered Nos Nos The following are the assumptions for block area calculations:‐
Nos
L AREA catered 2011 2021 2031 requir requi req
EQUIPME ed(201 red(2 uir • The community cats cater to the EWS people of the blocks only
NTS 1) 021) ed( • Every push cart caters to 100 households, every tricycle to 200
203 households and every Motored vehicle to 350 household
1) • Capacity of each tipper is 2.5 Cum. Assuming 4 trips per day. Per
Push carts 1,4,6,7,15,16, 10325 13385 15496 69 89 103 day waste collection=2.5×4=10 Cum
(150 HH ) 18,23,24,25,2
8,30
Tricycles 2,3,5,9,10,12, 17249 19422 21496 69 78 86 Table 5.57: Equipments required (Block area)
Ye BISRA LATHIKATA KUARMUNDA
(250 HH) 14,17,19,21,2 ar EW Non Comm EWS No Comm EW Non Comm
6,31,32,33 S EWS( unity waste( n unity S EWS( unity
Motored 9,11,13,20,22 7783 7933 7851 19 20 20 was MT) Vats(37 MT) EW Vats(37 was MT) Vats(37
te 5L) S 5L) te 5L)
vehicle ,27,29 (M (M (M
(400 HH ) T) T) T)
Tippers(va 205vats 222 vats 238 3 4 4 20 0.1 2.18 1 8.86 14. 79 4.8 15.10 43
11 2 31 5
ts) vats 20 0.1 3.39 2 9.23 14. 82 6.3 19.63 56
21 9 91 1
20 0.2 4.18 3 10.10 16. 90 7.5 23.35 67
31 4 32 0
Waste generated by Vats for year 2011=205×0.3 cum = 61.500 cum

187 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
Table 5.58 represents the community vats required in the Block Note: The units are per day waste generation.
areas for every 10 years.

Table 5.58: Equipments required (Block area) Table 5.59: Miscellaneous waste generation (Municipal area)
EQUIPMENTS Total HH catered Nos Nos Nos
Source Waste generated ( in MT/day) Waste Volume (in Cum/day
2011 2021 2031 required(2011) required(2021) required(2031)
2011 2021 2031 2011 2021 20
Push carts (100 HH) 5016 6020 6959 50 60 70
Commercial 24.6 28.16 34.6 54.7 62.6 76
Tricycles(200 HH) 5016 6020 6959 25 30 35
Medical 0.52 0.92 1.07 1.2 2.0 2.4
Motored vehicle(350 10031 12041 13919 29 35 40
Hotels 1.2 1.3 1.5 2.7 2.9 3.3
HH)
Total 26.3 30.4 37.2 58.5 67.5 82
Tippers(mini) 123 vats 140 vats 159 vats 4 5 5

Waste generated by Vats for year 2011=123×0.3 =36.9 cum Table 5.60: Miscellaneous waste generation (Municipal area)

Source Waste generated ( in MT/day) Waste Volume (in Cum/day


Vehicles required =36.9/10=4 vehicles 2011 2021 2031 2011 2021 20
Commercial 0.2 2.1 2.8 0.4 4.7 6.2
Waste generated by Vats for year 2021=140×0.3 cum = 42 cum Medical 0.09 0.55 0.63 0.2 1.2 1.4
Total 0.3 2.7 3.4 0.6 5.9 7.6

Vehicles required =42/10=5 vehicles


The following are the considerations:‐
Waste generated by Vats for year 2031=159×0.3 cum =47.7 cum
• Volume collected by one pushcart=(150*0.35*4.5)/450=0.525
Vehicles required =47.7/10=5 vehicles
MT/day
• Volume collected by one Tricycle=(250*0.35*4.5)/450=0.875
d) Equipments required for other waste collection
MT/day
The miscellaneous waste generation is derived from the earlier • Volume collected by one Motored
vehicle=(400*0.35*4.5)/450=1.4 MT/day
calculations. However in the case of this calculation the volume is the
• Capacity of Vat in Municipal areas= 3 Cum & block areas = 0.375
basis of calculation instead of households as in the previous section. Cum
Table 5.59 gives the waste generation of waste other than household
waste with the volumes with respect to the municipal area

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 188
5
ROURKELA CDP PROPOSAL

• Assuming a Tipper makes 4 trips a day, volume it collects per • The vats and motorized vehicles account for most of the
day =20 Cum ( for 5 cum capacity)/10 cum (for 2.5 cum waste collection as these waste are huge in quantity and
capacity). Thus, No required=(No of vats * capacity of vat/20
The following are assumed:‐
cannot be handled manually.
• Push carts and tricycles cater to 20 % of the total miscellaneous
waste generated Table 5.62: Equipments required (Block area)
• Motorized vehicles and Community vats cater to 30% of the
miscellaneous waste Blocks Equipments Total volume catered Nos Nos Nos
required require required
• Tippers used in the municipal areas are of 5 cum capacity (2011) d (2031)
whereas for the blocks they are of 2,5 cum capacity (2021)
2011 2021 2031
Push carts (20%) 0.13 1.18 1.52 1 2 3
Table 5.61: Equipments required ( Municipal area) Tricycles (20%) 0.13 1.18 1.52 1 2 2
Motored vehicle 0.19 1.77 2.29 1 2 2
MUNICIPALITY Total volume catered Nos required Nos required (30%)
Nos required
equipments (2011) (2021) Vats (30%)(350L)
(2031) 0.19 1.77 2.29 1 7 9
2011 2021 2031 Tippers (2.5 cum for 1
Push carts (20%) 11.7 13.50 16.52 22 26 vats)
31
Tricycles (20%) 11.7 13.50 16.52 13 15 19
Motored vehicle (30%) 17.5 20.25 24.78 13 14 18
Vats (30%)(3 cum) 17.5 20.25 24.8 6 7
Table
8
5.62 shows the equipments required in a municipal area.
Tippers (5cum for vats) 1 1 Some
1 points to be noted are
• The vat capacity is 0.35 cum because the waste generation
Table 5.61 shows the equipments required in a municipal area. Some sources like the commercial outlets and hospitals are
points to be noted are comparatively less in number here.
• The vats and motorized vehicles accounts for most of the waste
• The vat capacity is 3 cum because the waste generated under collection as this waste is huge in quantity and cannot be
this category are source specific that is they are handled manually.
concentrated in certain areas like commercial areas or • Even though Tippers used are of 2.5 cum there isn’t sufficient
hospital zones that may have a large bin to cater to their waste produced to employ a tipper
needs

189 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
e) Final inventory of equipments • Tippers require 3 people: one to drive, two for hoisting the
vat
Table 5.63 shows the final inventory of the equipments required in As per the Ministry of Urban Development, Number of workers
a municipal area and lock areas. required for sweeping are
• City centre: more than 40 sweepers employed per square
Table 5.63: Inventory of Equipments km(one depot within one km grid)
• Sub‐urban residential area: number of sweepers per square km
Equipment Municipal Blocks(Equipments Total may be one or even less
s area(Equipments required) Municipal area:‐
required) Area of all High density wards= 98 Ha= 0.98 Sq. km
201 202 203 201 202 203 Max Workers required=(45 per sq km)=44
1 1 1 1 1 1 Area of all Medium density wards= 382 Ha= 3.82 Sq. km
Push carts 91 115 134 51 62 73 207 Workers required= (35 per sq km)=130
Tricycles 82 93 105 26 32 37 142 Area of all low density wards= 1062 Ha= 10.62 Sq. km
Motored 32 34 38 30 37 42 80 Workers required= (10 per sq km)=106
vehicle Area of all minimum density wards= 1738 Ha= 17.38 Sq. km
Vats (3 6 7 8 ‐‐ ‐‐ ‐‐ 8 Workers required= (5 per sq km)=85
Cum) Block area=6397 Ha=63.97 Sq km
Vats (0.375 205 222 238 124 147 168 406 Workers required=(5 per sq km)= 320
Cum) Total workers required for street sweeping = 685
Tippers (5 4 5 5 ‐ ‐ ‐ 5
Cum) Equipments required for street sweeping:‐
Tipper (2.5 ‐ ‐ ‐ 4 5 6 6 Equipment Equipment numbers required
Cum) Municipality Blocks Total
Man 249 291 330 149 183 212 542+68 Broom 365 320 685
power 5 Shovel 365 320 685
Man power required:‐ Containers 191 320 511
for transfer
This is given by the following assumptions:‐ of sweepings
• Every push cart and tricycle requires one person
• Every motorized vehicle requires 2 person

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 190
5
ROURKELA CDP PROPOSAL

From above table it is clear that the containers are for the low dense g) Waste Disposal
areas where the worker requires a temporary storage as the community
vats are far spaced. The collected waste must be disposed off in such a manner that no
further pollution or problems are caused by it. This section deals with
f) Location of transfer stations the disposal of waste.

As per Ministry of Urban development, the transfer stations are The bio degradable part of the waste must be separated from the rest
required when of the waste to ensure that there is no odour and decay. This helps in
the process of seqregation that can lead to the separation of both the
• In large cities where disposal sites are more than 10 km. away recyclable and organic waste. The organic waste shall be composted in
from the city boundary and smaller vehicles are used for a compost plant and the rest of the inert material that cannot be
transportation of waste recycled or decomposed shall be disposed off in a sanitary landfill. This
• Large size 15 to 20 cu. M. containers could be kept at transfer has also been made mandatory by the Municipal Solid
stations to receive waste from small vehicles Waste(Management& Handling) Rules, 2000.
Transfer station must be located away from habitable zones due to h) Land fills: considerations
unsanitary conditions that it may produce. Their preferable location
must be in industrial areas. Hence the best possible locations will be in Landfill facilities are adopted for safe disposal of waste such that they
the steel plant area where they are already depositing slang. do not affect the surrounding environment. They differ from dump
yards in the manner that even the residues from the landfill are taken
Three possible locations for waste transfer station have been identified care of. This particular type of landfill is called the sanitary landfill and
as indicated in Proposed. They cater to a group of wards and the should be compulsorily adopted while disposing of waste.
following functions takes place in them:‐
However even sanitary landfills have their own problems and issues.
• Storage of waste They lead to residues which need to be taken care of and must properly
• Segregation of waste treated before disposal. The following are the issues associated with
land fill:‐

• Leachate: This is the solution resulting from the leaching, as of


soluble constituents from soil, Landfill etc by downward

191 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
percolating ground water. This must not reach the Ground • A liner system at the base and sides of the landfill which
water table else it may contaminate it. Leachate production is prevents migration of leachate or gas to the surrounding
highest in the first few years of land fill when settling is soil.
maximum. • A leachate collection and control facility which collects and
• Methane Gas: Methane and other combustible gases are extracts leachate from within and from the base of the
formed during the life time of the landfill due to the landfill and then treats the leachate.
decomposition of the waste. This makes the landfill area prone • A gas collection and control facility (optional for small
to fire hazards. However the same gas if trapped efficiently can landfills) which collects and extracts gas from within and
be a source of energy. from the top of the landfill and then treats it or uses it for
• Surface Water: runoff water from the surrounding areas needs energy recovery.
to be directed away from the landfill as they accelerate • A final cover system at the top of the landfill which
leachate production. There must be no stagnation of water enhances surface drainage, prevents infiltrating water and
over the land fill. Also after the landfill is full there must a supports surface vegetation.
proper capping provided to prevent rain water from • A surface water drainage system which collects and
percolating through it. removes all surface runoff from the landfill site.
• Smell: Many odorous gases are released from a landfill site due • An environmental monitoring system which periodically
to the decomposition. However this can be prevented by laying collects and analyses air, surface water, soil‐gas and ground
soil covers regularly over the waste. The waste must never be water samples around the landfill site.
left open to air else it can attract scavengers and thus result in • A closure and post‐closure plan which lists the steps that
a mess. must be taken to close and secure a landfill site once the
filling operation has been completed and the activities for
i) Components of Landfill
long‐term monitoring, operation and maintenance of the
To deal with the above issues there are certain components completed landfill.
integrated into the landfill facility that mitigates the effects of
these residues. As per the Ministry of Urban Development, a The Ministry of Urban Development also lays down certain
sanitary landfill has the following components:‐ rules and regulation for locating a landfill. They are:‐

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 192
5
ROURKELA CDP PROPOSAL

• Lake or Pond: No landfill should be constructed within 200 m of distance if some kind of screening is used with a high fence
any lake or pond. Because of concerns regarding runoff of around the landfill and a secured gate.
waste water contact, a surface water monitoring program • Critical Habitat Area: No landfill should be constructed within
should be established if a landfill is sited less than 200 m form a critical habitat areas. A critical habitat area is defined as the
lake or pond. area in which one or more endangered species live. It is
• River: No landfill should be constructed within 100 m of a sometimes difficult to define a critical habitat area. If there is
navigable river or stream. The distance may be reduced in some any doubt then the regulatory agency should be contacted.
instances for non meandering rivers but a minimum of 30 m • Wetlands: No landfill should be constructed within wetlands. It
should be maintained in all cases. is often difficult to define a wetland area. Maps may be
• Flood Plain: No landfill should be constructed within a 100 year available for some wetlands, but in many cases such maps are
flood plain. A landfill may be built within the flood plans of absent or are incorrect. If there is any doubt, then the
secondary streams if an embankment is built along the stream regulatory agency should be contacted.
side to avoid flooding of the area. However, landfills must not • Ground Water Table: A landfill should not be constructed in
be built within the flood plains of major rivers unless properly areas where water table is less than 2 m below ground surface.
designed protection embankments are constructed around the Special design measures must be adopted, if this cannot be
landfills. adhered to.
• Highway: No landfill should be constructed within 200 m of the • Airports: No landfill should be constructed within the limits
right of way of any state or national highway. This restriction is prescribed by regulatory agencies (MOEF/CPCB/Aviation
mainly for aesthetic reasons. A landfill may be built within the Authorities) from time to time.
restricted distance, but no closer than 50 m, if trees and breams • Water Supply Well: No landfill should be constructed within 500
are used to screen the landfill site. m of any water supply well. It is strongly suggested that this
• Habitation: A landfill site should be at least 500 m from a locational restriction be abided by at least for down gradient
notified habited area. A zone of 500 m around a landfill wells. Permission from the regulatory agency may be needed if
boundary should be declared a No‐Development Buffer Zone a landfill is to be sited within the restricted area.
after the landfill location is finalized. • Coastal Regulation Zone: A landfill should not be sited in a
• Public parks: No landfill should be constructed within 300 m of coastal regulation zone.
a public park. A landfill may be constructed within the restricted

193 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
• Unstable Zone: A landfill should not be located in potentially The land fill site of 30 acres is located in the Lathikata Block area and is
unstable zones such as landslide prone areas, fault zone etc. indicated in Proposed Map.
• Buffer Zone: A landfill should have a buffer zone around it, up
to a distance prescribed by regulatory agencies.
k) Design of Compost Plant

From the previous sections we have the following quantity of


j) Design of Landfill site
biodegradable waste:‐ Density of compacted organic waste is 1029 Kg
The following are the assumptions made for the design of a landfill:‐ per cum i.e. 1.029 MT per cum

• The depth of the landfill is considered 10 m Table 5.65: Total Organic waste generation
• Waste to soil ratio is 3:1
Source Organic Volume(cum) Soil
• The organic waste produced is composted separately by
Waste(in MT) Volume(Cum)
compost plants Residential 904251.6 878767.34 ‐
Commercial 81259.45 78969.34 ‐
From the previous sections we have the following quantity of inert
Medical 7012.22 6814.6 ‐
waste:‐ Density of compressed inert waste is 0.8 MT per cum. Thus the Hotels 8085.80 7857.92 ‐
volume can be calculated. Total 1000609 972409.2 ‐

Table 5.64: total inert waste generation


Assuming that a compost bed of length 18 ft. breadth 9 ft and height 3
Source Organic Volume(cum) Soil
ft. Hence volume of the bed=486 cubic feet=13.762 cum
Waste(in MT) Volume(Cum)
Residential 627998.6 784998.2091 ‐‐ (Source: Solid waste management for residential and commercial areas
Commercial 94346.7 117933.375 ‐‐
under Cuttack Municipality: MCP dissertation thesis, Author: Dibyajyoti)
Medical 3155.5 3944.375 ‐‐
Hotels 4042.9 5053.625 ‐‐ With respect to the density of compacted organic waste and the
Total 729543.7 911929.6 300936.8 volume of the bed the waste a single bed can hold= 13.762 cum × 1.029
Total volume required=911929.6+300936.8=1212866.4 cum
MT/cum= 14.163 MT
Area required=1212866.4/10=121286.64 Sqm=30 Acres
Total waste generated for a period of 21 years is 1000609 MT.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 194
5
ROURKELA CDP PROPOSAL

So waste generated per day=1000609/(365×21)=130542 Kg per N sch ma ho ndar ) sch ma ho ndar


(2021 ool ry ol y ool ry ol y
day=130.542 MT per day ) s s
Muni 31316 209 104 26 16 3 358952 239 120 30 18 4
No of compost beds required=130.542/14.163=10 compost beds. cipal 0
Area
SAIL 22002 147 73 18 11 2 226694 151 76 19 11 2
Since it takes 30 days to decompose waste, the no. of pits required for area 7
Lathi 88737 59 30 7 4 1 98190 65 33 8 5 1
30 days =10×30=300 pits katha
Kuar 87614 58 29 7 4 1 101730 68 34 8 5 1
Area of one pit = 18ft. × 19 ft. =342 Sq feet=9.684 Sqm mun
da
Bisra 10659 7 4 1 1 0 10444 7 3 1 1 0
Total 72019 480 240 60 36 7 796010 531 265 66 40 8
7
5.9 EDUCATION
The existing numbers of educational institutions are enough for The number of educational institutions in the sail area and
municipal area are enough for serving the current and future
projected population for 2021. But an additional number of 24 primary
population under their respective boundaries. But in case of block
schools, 3 high schools and 5 senior secondary schools are needed for
areas the existing educational institutions are not sufficient for
2031. The quality of educational facility available in the block areas
the current as well as the future projected population both in
especially in the tribal zones should be improved.
terms of quality as well as quantity.
5.9.1 REQUIRED NUMBER OF EDUCATIONAL INSTITUTIONS AS
5.9.2 FUTURE PROPOSALS
PER UDPFI GUIDELINES

The required number of institutions as per the projected population for The existing number of educational facilities and the quantitative
2021 and 2031 are given in Table 5.66. shortage for 2021 and 2031 is given in Table 5.67.

Table 5.66: Required number of Educational Institutes Table 5.67: Proposed number of Educational Institutes
Existing no. of educational institutions
AREA PROJE Type of institution Projecte Type of institution High school Senior Colleges
CTED Pri Up Hi Seni coll d Pri Up Hi Seni coll
POPU ma per gh or ege populati ma per gh or ege Secondary
LATIO ry pri sc seco s on(2031 ry pri sc seco s Lathikatha 5 3 1

195 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
Kuarmunda 1 3 0 Table 5.68: Proposed Educational Institutes
Bisra 2 3 0
Additional no. of institutions required for 2021 High school Senior Colleges
Lathikatha 2 1 0 secondary
Kuarmunda 6 1 1 Lathikatha 3 1 0
Bisra 0 0 0 Kuarmunda 4 1 0
Additional no. of institutions required for 2031 Ward no. 1 1 0 0
Lathikatha 3 2 0 Ward no. 3 1 0 0
Kuarmunda 7 2 1 Land area required
Bisra 0 0 0 Lathikatha 3×1.60 ha 1×2.20 ha 0
Kuarmunda 4×1.60 ha 1×2.20 ha 0
Ward no. 1 1×1.60 ha 0 0
For 2021 there is a need for 2 high schools and 1 senior secondary Ward no. 3 1×1.60 ha 0 0
school in Lathikatta. An additional high school and a senior secondary
school are needed for 2031. 3 new high schools and one senior
In Lathikatta 7 ha land is required for the proposed institutions. But one
secondary school are proposed in Lathikatta block. One of the high
of the high school needs to be upgraded to senior secondary school by
schools should be upgraded to senior secondary school by 2031. All the
2031. So an extra 0.60 ha should be reserved for future expansion of
three proposed high schools are in the new proposed residential zone.
one of the high schools. In Kuarmunda 8.6 ha land is required for
For Kuarmunda there is need for 6 high schools and a senior secondary
proposed institutions and extra 0.6 ha for future expansion. 1.60 ha
school for 2021. An additional high school and a senior secondary
land is required for ward number 1 and ward number 3 for proposed
school are needed for 2031. 4 new high schools and one senior senior
high schools. So in total 20 ha land is required for the proposed
secondary school are proposed in Kuarmunda. The locations are
educational institutions in Rourkela.
carefully selected so as to serve the existing as well as the proposed
residential zone. One high school is proposed in ward number 3 and 5.9.3 PROPOSED SITES FOR EDUCATIONAL INSTITUTES
one in ward number 1. Ward number 1 and ward number 3 are located
near to Kuarmunda and easily accessible. One of the proposed high The location of the proposed institutions are determined according to
school in Kuarmunda should be upgraded to senior secondary school by the proximity to the proposed and existing residential areas in this
2031. The area requirements for the proposed schools are shown in blocks and also according to the serving population in this areas and
Table 5.68. accessibility to the location. The new proposed sites are easily

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 196
5
ROURKELA CDP PROPOSAL

accessible through the existing and/or proposed public transportation 5.10.2 REQUIREMENT OF HEALTH CARE FACILITIES WITH
routes. The location of the schools is determined in such a way so that RESPECT TO POPULATION
the schools are within the walkable distance (1.61 km) from the
residential zones. But in some cases especially for Lathikatta, it is not Number of bed available in IGH & RGH is 685& 210 respectively, I.e. 895
practical to provide schools at walkable distance for every residential beds.
zone, since the tribal colonies are spread out and low in population size.
Number of other general Hospitals in Rourkela=36
In such cases the locations are determined so that it can be easily
accessible from these remote areas. Even if the municipal area has Considering average of number of beds from the available data of
enough number of schools to serve the existing as well as the future primary survey number of beds available in other hospitals= 36×18=648
population, there are some areas/wards which do not have any beds
institutions in walkable distances. Ward number 3 and ward number 1
comes under this category. One high school is proposed on each of Total number of bed available in General hospitals= 895+648=1543
these wards to overcome this problem. beds

Table 5.69: Required number of beds in General Hospitals

Area Projected No. of Projected No. of


5.10 HEALTH CARE FACILITES
Population beds Population beds
(2021) required (2031) required
Rourkela has 36 general hospitals other than RGH, IGH and specialized
(2021) (2031)
clinics. Most of the hospitals are placed in urban area where rural areas
Municipal 313208 626 361612 723
are lacking for the higher facilities. There is only one Veterinary Area
Hospital in the city. SAIL Area 220027 440 226694 453
Lathikatha 88737 177 97141 194
5.10.1 UDPFI GUIDELINES FOR CREMATORIUM: Kuarmunda 87614 175 104231 208
Bisra 10659 21 13114 26
General hospital: Provision of one general hospital for at least 2.5 lakh
Total 720245 1440 802792 1606
population with 500 beds. According to this there is requirement of one Minimum required number of beds for 2013=1606 – 1543=63 beds.
bed for 500 people.

197 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
With respect to population of Lathikatha a Polyclinic is proposed with For health care PMCs are present in rural blocks near Rourkela. But
capacity of 150 beds which fulfills the overall requirement of required some villages are still lacking in the same because of poor road quality
number of beds. There is requirement of 2 Veterinary hospitals in rural and distance in between. Considering population of those areas some
areas as mentioned in Table 5.69. additional PMCs are proposed in those villages. Lathikatha is complete
rural area and there is absence of General Hospital. As per UDPFI
5.10.3 REQUIREMENT OF HEALTH CARE FACILITIES WITH guidelines a polyclinic can be proposed in Lathikatha block based on its
RESPECT TO DISTANCE AND AREA population and density. Polyclinic is proposed in 300 meter away from
NH so that it can be accessed by more number of villages.
In rural areas there is provision of Primary health Centers, but Lathikata
area is far away from any general hospital. With respect to its In rural areas most of the people has Agriculture background and
population General hospital cannot be provided. So a Polyclinic is Rourkla has only one Veterinary hospital. Tow Veterinary hospitals are
proposed in Lathikata area to serve the rural population of the region. proposed in rural areas of Lathikatha and Kuarmunda.
Two villages in Lathikata block are lacking in health care facilities. PMCs
are proposed in those villages. Location of the proposed Polyclinc and 5.11 CREMATION & GRAVEYARD
PHC are marked in proposed map.
There are 9 graveyards in Rourkla which are located near ethic pockets
Table 5.70: proposed health Care Centers of Muslim and Christian religions. Grave shifting hasn’t been done since
last 25 years in most of the graveyards. According to U.S. norms grave
Polyclinic/Community Veterinary Hospital
shifting can be done after every 10 years in a city like Rourkla. So
health Centre
number of graveyard is sufficient for the city. As most of the population
Lathikatha 1 1
Kuarmunda 0 1 is Hindu there is requirement of crematoriums. In present condition
Bisra 0 0 Vedvyas Burning Ghat is the only available crematorium which is placed
Land area required on the opposite side of the river Brahmani.
Lathikatha 0.3 ha ‐
Kuarmunda ‐ ‐ 5.11.1 GUIDELINES FOR CREMATORIUM
Bisra ‐ ‐
Provision of at least 2 sites for 5 lakh population and one electric
crematorium for large size towns is required (UDPFI). Area of the site is
18.3.4 Proposed sites for Health Care facilities

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 198
5
ROURKELA CDP PROPOSAL

based on the population it is serving. Preferred location is near a residential area 12 % area is reserved for open spaces. Locations are
religious site to manage public response towards it. preferred in the central area of a community to provide equal
accessibility to all.
5.11.2 REQUIREMENT OF CREMATORIUMS WITH RESPECT TO
POPULATION 5.13 ENVIRONMENT.
Table 5.71: Number of Crematorium required
5.13.1 INTRODUCTION
Year Population Crematorium Required
The future proposals with respect to environment have been broadly
2011 645877 3
2021 686961 3 classified into two categories, namely:
2031 741255 3
Immediate action plans‐ goals for undertaking within a period of 2‐3
Required number of Crematoriums in Rourkala is 2. Electric cremation
years.
facility can be provided in both. Required crematoriums are located in
the proposed map. Long term proposals‐ Goals to be accomplished within 10‐15 years.

5.11.3 Proposed sites for Crematorium 5.13.2 IMMEDIATE ACTION PLANS


Proposed sites for crematorium are located near river for the ethical 1. Installation of Continuous Ambient Air Quality Monitoring System
reason. People prefer to cremate human body near a running water (CAAQMS)‐
body for the purpose of ‘Asthi Visarhan’. One of the sites is located near
Tarkara Dam and other is in Jhirpani. Both crematoriums are proposed Ambient air monitoring needs to be carried out at critical points in
considering area it is serving as well as existing cremation ground. Both Rourkela like Kalunga industrial area, Kuarmunda area.
crematoriums should have facility for electric cremation also.
2. Immediate action to avoid night time switching off electrostatic
5.12 OPEN SPACES precipitator (ESP) in sponge iron factories of Kalunga industrial area.

3. Proper operation of ESP, Wet scrubbers, bag filters and swivelling


As per UDPFI guidelines minimum of 10 % area has to be used for open
hood in sponge iron factories of Kalunga industrial area.
spaces like park and playground. As major portion of the proposed
housing is located in rural area need of open space is less. In proposed

199 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
4. Planning trees in the freight parking area in the 2 km stretch road ‐ Planting of trees should be undertaken in appropriate encircling rows
from Vedvyas chowk to Sundargarh to reduce the dust pollution in the around the project site.
atmosphere.
‐Generally fast growing species should be planted.
5. An action plan to identify the appropriate tree species and plant
them to ensure biodiversity conservation. ‐Since, the tree trunk is normally devoid of foliage up to a height of 3 m,
it may be useful to have shrubbery in front of the trees so as to gives
6. Public awareness programs to promote environmental security. coverage to this portion.

7. Ban on use of plastic bags. The species recommended for greenbelt development are given below:

8. Speed up the road construction activities and ensure proper A. Along the Roadside
sprinkling in road construction sites to reduce concentration of 1. Alstonia scholaris R. Br. –Chatin
particulate matter in the atmosphere. 2. Albizia chinesis Merr. –Siris
3. Bauhinia purpurea L. –Kanchan
5.13.3 LONG TERM PROPOSALS 4. Cassia fistula L.‐ honoru
5. Juglans regia‐Walnut
1. cleaning of Brahmani River at Panposh area where it has been
6. Pinus roxburghii Sarg. –Chirpine
polluted by untreated municipal sewers and beautification of the banks
7. Populus euphratiaca Oliv. – Poplar
by creating parks and recreational activities.
8. Prunus persica (L.) Batsch. B‐each
2. Development of green buffer zone of 200 m around new proposed 9. Thuja orientalis –thuja
thermal power plant‐Green buffer area of 200 m should be given B. Near Infrasturcture facilities
preferably which act as a carbon will sink. 1. Aegle marmelos correa – Bel
2. Alnus nepalensis D. Don‐Utis‐Ass
The general consideration involved while developing the greenbelt are: 3. Artocarpus chaplasa Roxb. –Sangri‐Ass
‐Trees growing up to 10 m or above in height with perennial foliage 4. Illicium griffithiii Hook. F. & Thomson –Lishi
should be planted around various appurtenances of the proposed 5. Mangifera indiaca L.‐Aam
project. 6. Mallotus philippensis (Lam.) Muell. Arg.‐Sindoori
7. Malus sylvestris Mill. –Apple

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 200
5
ROURKELA CDP PROPOSAL

8. Pieris ovalifolia D. Don. –Shak sheng r Genera Cem Bri Ash Filling Capt Total Utilization
9. Pyrus pashia Buch.‐Ham. Ex D. Don‐Mehal tion ent ck Dvke of ive (%)
(MT) Plant Kil Risin Low Brick
n g Lying Pant
Table 5.72: List of trees that can be used for green buffer
Areas
depending on properties to absorb the impurities
200 220252 0 0 1509 0 0 1509 68.5
SO₂ NOx SPM 2‐ 60 60
Pterospermum Bauhinia variegate Butea monsperma 03
acerifolium 200 301096 0 0 4528 0 0 4528 15.0
Bauhinia variegate Zizyphus jujuba Spathodea 3‐ 8 8
companulata 04
Bambusa spp Syzigium cuminii Ficus infectoria 200 321371 7312 50 2500 0 0 3281 10.2
Delbergia sisoo Mimusops elengi Cassia fistula 4‐ 0 0 2
Eucalyptus spp. Eucalyptus spp. Anthocephalus 05
cadamba 200 362000 2435 11 1200 1728 0 3182 87.9
Cassia siamea Pterospermum Kigelia pinnata 5‐ 0 00 00 15 65
acerifolium 06
Zizyphus jujuba Mangifera indica Cassia siamea 200 397294 0 14 5900 1688 0 2292 57.7
(Source: Google) 6‐ 28 0 38 66
07
3. Ash Utilization and Ash Disposal 200 405057 0 23 5300 0 0 5532 13.7
7‐ 25 0 5
Proposals and policies to have maximum ash utilization in various 08
application areas by setting up more units of Ash Brick Plant of 40000‐ 200 336684 0 12 0 3726 0375 3741 111.1
50000 bricks/day capacity as well as in various areas like brick 8‐ 00 00 75
manufacturing, cement plant, ash dyke raising, filling up of low lying 09
areas etc. 200 385461 0 0 0 6902 1306 6915 179.4
9‐ 65 71
Table 5.73: Ash utilization 10
201 424957 0 0 9156 0 1719 9173 216.0
Yea Ash Ash Utilization(MT)Break up Ash 0‐ 24 43

201 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
5
ROURKELA CDP PROPOSAL
11 government (dependency ratio). Endogenous factors include: revenue
201 422896 0 0 2999 1506 1345 4519 107.0 (tas) administration, cost recovery and quality of expenditure
1‐ 59 63 67
12 5.14.1 EXOGENOUS FACTORS
Tot 357706 3166 65 1668 1555 4745 3266 97.57(Ave
al 8 2 53 831 181 972 rage) The exogenous factors are essentially those factors over which the MCs
(Source: Environmental Impact Assessment Report‐NTPC‐SAIL Power do not have any control. Since the level of spending depends upon the
Company Private Limited) level of resources available with the MC, the delegation of revenue
powers ( fiscal decentralization) and grants (intergovernmental
4. Urban forestry
transfers), which determine the resources of the local bodies, would be
Urban forestry has been used by many other municipalities successfully the key exogenous factors influencing the ability to the MC to spend
to increase the green cover and improve the environmental status of and provide these services. These factors could be captured in the form
the city with measures like developing gardens, tree plantation drives, of ‘dependency ratio’ and ‘decentralization ratio’, defined as below:
preparing an urban forestry master plan, recycling and reusing garden
a) Dependency ratio refers to the share of grants a MC
waste, promoting tree adoption schemes, undertaking environment
receives to its total expenditure.
awareness tours for school children, etc.
Based on 2011‐12 financial year, the dependency ratio for Rourkela
5.14 ASSESSMENT OF MUNICIPAL FINANCIAL HEALTH Municipality is 0.32. A significant positive relationship implies that
There are a host of factors which could be responsible for the level of higher dependency would lead to higher under‐spending. Rourkela
under‐spending, which can be divided into two broad categories. – Municipality has presently an average dependency on state and centre
Exogenous and Endogenous. grants for expenditure.

Exogenous Factors are those that are not within the control of b) Decentralization ratio refers to the delegation of
concerned ULB whereas Endogenous Factors refer to those that have to autonomy in decision‐making with respect to the
do with the ULBs’ own operations. finances of the MC.

Exogenous factors include: delegation of revenue powers Revenue decentralization ratio is measured by ratio of MC’s per capita
(decentralization) and dependency of ULB for resources on upper tier of revenue to State per capita revenue receipt.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 202
5
ROURKELA CDP PROPOSAL

Based on 2011‐12 financial year, the decentralization ratio for Rourkela


Municipality is 0.58. Higher the revenue decentralization, lower the
level of under‐spending. Rourkela Municipality lies in an average
decentralization ratio.

203 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE

The present chapter details out guidelines for enabling the preparation P1‐ Recreational Green.
of detailed plans. It includes designation of use zones and use premises, P2‐ Public Parks and Playgrounds.,
subdivisions of use zones into premises, use premises to be permitted P3‐ Green Belt.
in the use zone and use activities to be permitted in use premises.
5 Public and Semi‐public
6.1 USE ZONES AND USE PREMISES DESIGNATED PS1‐ Institutional.
PS2‐ Facilities and utilities.
6.1.2 USE ZONES
6. Transportation
Use Zone means an area for any one of the specific dominant uses of T1 ‐ Transportation
the urban functions. T2 – Railway line Corridor
There shall be 17 use zones classified in 8 categories namely: T3‐ Airport area
Residential, Commercial,
Industrial, Public and Semi Public, Transportation, Recreational, 7 Agriculture / Water Bodies
Agriculture/ water bodies, A1‐ Agricultural Land
and River Front Development Zone. The 17 use zones are as under:‐ A2‐ Water Body including Rivers, Canals and Open Drains, Ponds etc.,

1. Residential 8. RF ‐ River Front Development Area


R1‐ Residential (Medium density below 500 pph)
R2‐ Residential (High density above 500 pph) Use Premises
R3‐ Village Abadi Use premises means one of the many sub‐divisions of a use zone,
designated at the time of
2 Commercial preparation of layout plan, for a specific main use or activity.
C1‐ Commercial
C2‐ Wholesale Commercial including Warehousing/Mandi.
6.2 ZONING REGULATIONS
3 Industrial
M1‐ Industrial 6.2.1 OBJECTIVES OF ZONING
M2‐ Special Economic Zone
Generally, Residential, Commercial, Industrial, Institutional, public and
4 Recreational semi‐public facilities, transportation, parks, open spaces and

235 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
agricultural land uses are marked/ identified in the CDP. The ancillary/ (4) The concept of floating land‐use has been adopted in zoning
incidental activities, that are not displayed separately in the land‐use regulations, according to which the activities that are not envisaged in
map, are to be permitted according to the zoning regulations. The the general scheme/ layout plan and there Zoning Regulation may be
provision of ancillary/ incidental activities/ utilities is required to be considered in future according to their merits.
made by competent authority according to the zoning regulations and
the specific requirement of a particular scheme so that public health,
welfare and security may be ensured in the proposed planned areas. 6.2.4 CATEGORIES OF DIFFERENT ACTIVITIES/ UTILITIES

6.2.2 SALIENT FEATURES OF ZONING REGULATIONS The different activities/ utilities to be provided or planned in the
proposed main land‐use categories are as under:
The development of various activities/ utilities in ever‐changing
physical, social and economical scenario of Rourkela Planning Area is an (a) Permissible Uses
ongoing process. In the zoning regulations, the approval of various These activities/ utilities which are ancillary to the main land‐use and
activities/ utilities under main land‐use areas has been laid down in are planned and permitted.
order to simplify the procedures of planning and responding to the
requirements of development. The salient features of the zoning (b) Conditional Uses
regulations are as under: These activities which are planned and permitted under the required
terms and conditions in connections with the main land‐use on the
(1) The complicacies in usual zoning regulations are removed in order to basis of their specific requirements. The required terms and conditions
simplify them. The permission of various activities in the main land‐use are given with the zoning matrix.
areas are made user‐friendly through a matrix.

(2) The concept of flexible and multi‐utility use of land is adopted (c) Permissible uses under the specific permission of the Authority
instead of regimented use of land, so that it may boost the fast These activities will be planned or permitted under specific permission
development of the Rourkela. of the Rourkela Development Authority keeping in view the
infrastructure and its environmental impact on the surrounding area
(3) The planning and permission of multi‐utility of a piece of land will be etc. i.e. on the basis of their merits and demerits.
on the basis of their ancillaries and preference measures, so that the
operational and economical capability of inter‐dependent multi‐utility (d) Prohibited Activities
land may be enhanced and main land use also retain the basic These activities will generally not be permitted in the concerned land‐
character. use.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 236
6
ZONING REGULATIONS AND DEVELOPMENT CODE

6.2.5 FLOATING ACTIVITIES


Its advantage is that there will be no centralization of non‐performing
After coming of the CDP in force some activities/ utilities are proposed activities in any single land‐use zone. In addition to that, to curb any ill
according to the changing physical, social, economical and political effect or deterioration on the dominant character of a land‐use zone
scenario of the Rourkela, which become essential according to the due to extra floating utilities and to control the pressure on the
demand of time, but are not envisaged in the CDP/ scheme or zoning establishments in the concerned area, a provision has been laid down
regulations. Such activities include bus/ truck/ rail terminal, wholesale that if a floating utility is not permissible in a particular zone, it may be
trading complex, public utilities and services, electricity sub‐station, allowed by the Authority by specific permission on the ground of the
treatment plants, etc. To permit such activities it becomes inevitable at merits/demerits of the case.
times, to change the land‐use. Therefore, to permit for such activities/
utilities, as per demand, the concept of floating use/ activity is included.

237 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE

6.3 DEFINITIONS OF LAND‐USE PREMISES/ ACTIVITIES

S.No. Ref. No. Definition


1 1.1 (a) Residential House/Plot – Plotted Housing :
A premise for one or more than one dwelling unit and may or may not
have on it one main building block and one accessory block for garage /
garages and sevant quarters.

2 1.1(b) Residential Flat :


Residential accommodation for one family (one household) which may
occur as part of group housing or independently.

3 1.2 Group Housing :


A premise of size not less than 2000 sq.m. comprising of residential flats
with basic amenities like parking, park, convenient shops, public utilities
etc. as specified or permitted in the building regulations.

4 1.3 Guard/ chaukidar residence :


Residential accommodation for watch and ward staff responsible for
security and/ or maintenance of principal use.

5 2.1 (a) Retail shop/ platform :


A premise for sale of commodities directly to consumers with necessary
storage.

6 2.2 Repair shop ;


A premise equivalent of a retail shop for carrying out repair of goods.

7 2.3
Personal service shop :
A premise equivalent of a retail shop providing personal service like
tailor, barber etc.

8 2.4 Vending booth :

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 238
6
ZONING REGULATIONS AND DEVELOPMENT CODE

A premise in the form of booth or Kiosk for sale of commodities of daily


needs either through a mechanical installation or otherwise.

9 2.5 Showroom :
A premise with facilities for display, sale and storage of commodities.

10 2.6 Weekly Market :


An area used in a week by a group of informal shop establishments in
the form of a market. These markets may shift from one area to another
on different days of the week and may be planned at designated places
in all land uses.

11 2.7 Convenience shopping centre :


A group of shops in a neighbourhood in residential and other areas
serving mainly for daily needs and a population of about 5,000 to
10,000 persons.

12 2.8 Local/ Sector level Shopping Centre :


A group of shops about 75 in number in a residential areas serving a
population of about 10,000 to 25,000 persons.

13 2.9 (a) Shopping Centre/Commercial Centre :


A premise having group of shops/commercial establishments, offices.
.

14 2.9 (b) Shopping Mall :


A Shopping Mall is one or more buildings forming a complex of shops
representing merchandisers, with interconnecting walkways enabling
visitors to easily walk from unit to unit, along with a parking area – a
modern, indoor version of the traditional marketplace with controlled
environment.

15 2.10 Informal Commercial Unit / Platform :


A premise meant for commercial activities for informal sector.

16 2.11 Wholesale Market/ Mandi :


A premise from where goods and commodities are sold/ delivered to

239 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
retailers. The premise includes storage, godown, loading and unloading
facilities.

17 2.12(a) Bakery :
A Bakery (also called baker’s shop or bakehouse) is an establishment
which produces or/and sells baked goods from an oven.

18 2.12 (b) Confectionary :


A premise for retail sale of confectionary items directly to consumers
with necessary storage.

19 2.12 (c) Atta Chakki :


A premise where grinding of grain, spices and dried eatables is carried
out.

20 2.13 (a) Coal Market :


A premise for retail sale of coal directly to consumers with necessary
storage.

21 2.13 (b) Wood Market :


A premise for retail sale of fuel wood directly to consumers with
necessary storage.

22 2.13 (c) Building Material Market :


A premise for retail sale of building materials like timber, stone, bricks,
cement, hardware, paints etc directly to consumers with necessary
storage.

23 2.14 Vegetable / Fruit Market :


A premise for retail sale of fruits and vegetables in shops or platforms.

24 2.15 Cold Storage :


A premise where perishable commodities are stored in covered space
using mechanical and electrical devices to maintain the required
temperature etc.

25 2.16 Hotel :

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 240
6
ZONING REGULATIONS AND DEVELOPMENT CODE

A premise used for lodging on payment with or without meals.

26 2.17 Serviced Apartment :


A serviced Apartment is a type of furnished apartment available for short
term or long term stays, which provides services and amenities for daily
use.

27 2.18 (a) Restaurant :


A premise used for serving food items on commercial basis including
cooking facilities. It may have covered or open space or both for sitting
arrangement.

28 2.18 (b) Canteen :


A premise used for serving food items to workers in an institution
including cooking facilities. It may have covered or open space or both
for sitting arrangement.

29 2.18 (c) Food Court :


A Food Court is an (usually) indoor plaza or common area within a
facility that is contiguous with the counters of multiple food vendors and
provides a common area for self-serve dining. Food Courts may be part
of shopping malls etc or may be stand-alone development.

30 2.19 Drive-in-cinema :
A cinema with facilities for projection of movies and stills for car
audience including an audience for auditorium.

31 2.20 (a) Exhibition Hall :


A hall with facilities for exhibition and display of paintings, photographs,
sculptures, murals, ceramics, handicrafts or products of specific
category/ class.

32 2.20 (b) Exhibition Centre :


A premise with facilities for exhibition, display and storage of paintings,
photographs, sculptures, murals, ceramics, handicrafts or products of
specific category/ class with related facilities.

241 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE

33 2.21 Banquet Hall/ Barat Ghar :


A premise used for marriage and other social functions and run by an
individual, or institution or a public agency.

34 2.22 Petrol/ Diesel/ Gas Filling Station :


A premise for sale of petroleum products to consumers. It may include
servicing of automobiles.

35 2.23(a) Oil Depot :


A premise for storage of petroleum products with all related facilities.

36 2.23(b) LPG Refilling Plant : A premise for refilling facilities of LPG on bulk basis.

37 2.24 Gas Godown :


A premise where cylinders of cooking gas or other gas are stored.

38 2.25 Warehouse/ Godown for Non-Hazardous items :


A premise for exclusive use of storage of non-hazardous goods and
commodities in a manner as per requirement of respective goods/
commodities. The premises includes loading and unloading facilities.

39 2.26 Warehouse/ Godown for Hazardous items :


A premise for exclusive use of storage of hazardous goods and
commodities in a manner as per requirement of respective goods/
commodities. The premises includes loading and unloading facilities.

40 2.27 (a) Automobiles Showroom :


A premise for display, sale and repair of automobiles.

41 2.27 (b) Automobile Showroom cum Service Station :


A premise for display, sale, repair and servicing of automobiles.

42 2.28 (a) Freight Complex :


A complex having premises for booking and storage of goods that a
train, truck, ship or aircraft carries.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 242
6
ZONING REGULATIONS AND DEVELOPMENT CODE

43 2.28 (b) Logistic Park :


A premise within which all activities related to transport , logistics and
the distribution of goods- both of national and international transmit , are
carried out by various operators on commercial basis and includes
facilities like warehouses, distribution centres, storage areas , offices,
truck services etc and relates public facilities.

44 2.29 Steel/ Cement/ Building Material Yard :


A premise having storage and sale facilities for bulk building materials
like cement, steel etc.

45 2.30 Weigh Bridge/ Dharam Kanta :


A premise with weighing facilities for empty or loaded trucks.

46 2.31 (a) Cinema/ Muliplex :


A premise with facilities for projection of movies and stills with a covered
space to seat audience.

47 3.1 (a) Service Industry :


An industry comprised of companies that primarily earn revenue through
providing tangible products and services. Service industry companies
are involved in retail, transport, distribution, food services, as well as
other service-dominated businesses.

48 3.1 (b) Cottage Industry :


An industry where the creation of products and services is home based,
rather than factory based.

49 3.2 Flatted Factories :


A premise having a group of small industrial units having upto 50
workers with non-hazardous performance. These units may be located
in multistoried buildings.

50 3.3 Information/ Software Technology Park :


A premise where computer softwares etc are prepared for information
technology and I.T. enabled services.

243 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
51 3.4 Small/ Light Industry :
Small/light industries as per classification of the State Government.

52 3.5 Industrial Plot (Specific Industry type) :


A premise for an unit for manufacturing of specific products like electric
goods etc.

53 3.6 Medium & Large scale industry :


Medium and large scale industries as per classification of the State
Government.

54 3.7 TV, Radio Programme Production Centre :


A premise with facilities for shooting, recording, broadcasting and
transmission of news and other programmes through the respective
medium. It may include some hostel accommodation for guest artists,
and transmission facilities like tower.

55 4.1 Govt./ Semi Govt/ Public Undertaking/ Local Body Office :


A premise used for offices of the Union and State Governments, semi
Government organizations, Public Sector Undertakings and Local Body
Offices.

56 4.2 Office/ Corporate Office :


A premise used for office of commercial establishment, profit making
organization and other Institutions.

57 4.3 Professional/ Personal/ Agent Office :


A premise where professional consultancy services are provided by an
individual or a group of professionals like Chartered Accountant, Lawyer,
Doctor, Architect, Designer, Computer Programmer, Tour & Travel
Agent etc.

58 4.4 Banks :
A premise for office to perform banking functions and operations.

59 4.5 Project Development/ Management/ Maintenance Office :


A premise used by a Real Estate Developer for project development,

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 244
6
ZONING REGULATIONS AND DEVELOPMENT CODE

management and maintenance within the project site for a specified


period with previous approval of the Authority.

60 4.6 Satellite/ Wireless/ Telecommunication Centre :


A premise used for installation of a tower for communication purpose.

61 5.1 Guest House/ Lodging/ Boarding House :


Guest House is a premise for housing the staff of Government, Semi-
Government, Public Undertaking and Private Limited Company for short
duration. Boarding house is a premise in which rooms are let out on a
long-term basis as compared to hotels. Lodging House is a premise
used for lodging of less than 50 persons.

62 5.2 Hostel :
A premise in which rooms attached to “Institutions” or otherwise, are let
out on a long-term basis to students, trainees and workers.

63 5.3 Reformatory and Orphanage :


Orphanage would mean a premise with facilities for boarding of children
who are bereaved of parents. It may or may not have educational
facilities. Reformatory would mean a premise with facilities for
confinement and reform of offenders.

64 5.4 School for mentally/ Physically Challenged Persons :


A premise with facilities for education, treatment, reformation and
empowerment of mentally and/or physically challenged persons. It may
be managed by an individual or institution on commercial or noncommercial
basis.

65 5.5 (a) Creche & Day care centre :


A premise having nursery facilities for infants during daytime. The centre
may be managed by an individual or institution on commercial or
noncommercial
basis.

66 5.5 (b) Play & Nursery School :


A premise with facilities for training and playing for children preparatory

245 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
to the school.

67 5.6 Old age home :


A premise with commercial or non-commercial arrangement for long or
short term stay of old people/ senior citizens. It may include arrangement
for recreation, general health, catering etc.

68 5.7 Primary School :


A premise having educational and playing facilities for students upto 5th
standard.

69 5.8 (a) Secondary School / Senior Secondary School


A premise having educational and playing facilities for students upto X or
XII standard. It shall include existing middle schools, which are upto VIII
standard.

70 5.8 (b) Integrated Residential School :


A premise having educational and playing facilities upto XII standard. It
shall have boarding facilities for students and may have residence for
faculty.

71 5.9 Vocational Institute :


A premise with training facilities for short term courses for discipline,
predatory to the employment in certain profession and trade. It includes
training-cum-work centre.

72 5.10 Degree/ PG/ professional (medical/Engg. etc) College :


A premise with educational and playing facilities for under-graduate and
post-graduate courses under a university. It includes all professional
disciplines.

73 5.11 University :
An institution for higher learning with teaching and research facilities as
recognised by UGC. A university may exist without having any college
connected with it, but have assemblage of colleges affiliated to it.

74 5.12 Post office :

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 246
6
ZONING REGULATIONS AND DEVELOPMENT CODE

A premise with facilities for postal communication for use by the public.

75 5.13 Telephone Exchange :


A premise having facilities for central operation of telephone system for a
designated area.

76 5.14 (a) Police Station :


A premise having facilities for the offices of local police station. It may include
the residence of essential staff.

77 5.14 (b) Fire Station :


A premise with facilities for fire fighting for a catchment area assigned to
it. It may or shall include residence of essential staff.

78 5.15 Police Post :


A premise having facilities for a local police post of a temporary nature
or on small scale as compared to a police station.

79 5.16 Library :
A premise having large selection of books for reading and reference for
general public or specific class.

80 5.17 R & D Centre :


A premise having facilities for research and development for any specialized
field.

81 5.18 (a) Health Centre/ Family Welfare Centre :


A premise having facilities for treatment of indoor and outdoor patients
having upto 30 beds. The health centre may be managed by a public or a
charitable institution on non-commercial basis. It includes family welfare
centre.

82 5.18 (b) Dispensary :


A premise having facilities for medical advice and provision of medicines
by a public or charitable institutions.

83 5.19 Trauma Centre :

247 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
A premise having medical facilities of specialized nature for providing
instant treatment to patients under trauma.

84 5.20 (a) Hospital :


A premise providing medical facilities of general or specialized nature for
treatment of indoor and outdoor patients.

85 5.20 (b) Medical College :


A premise where teaching, treatment, operation and research & development
related to human bodies is carried out.

86 5.21 Clinic / Polyclinics:


A premise with facilities for treatment of outdoor patients by a doctor. In
case of a polyclinic, it shall be managed by a group of doctors.

87 5.22 Nursing Home :


A premise having medical facilities for indoor and outdoor patients having
upto 30 beds. It shall be managed by a doctor on commercial basis.

88 5.23 Clinical Lab / Diagnostic Centre:


A premise with facilities for carrying out various tests for confirmation of
symptoms of a desease.

89 5.24 Veterinary Hospital/ Dispensary :


A premise offering medical and similar facilities for animals.

90 5.25 Health Club/ Gymnasium :


A room or building equipped for indoor sports and gym facilities.

91 5.26 Dance/ Music/ Art Centre :


A premise having facilities for imparting training and coaching for dance,
music and art.

92 5.27 Yoga/ Meditation Centre :


A premise having facilities for self attainment, achieving higher quality of
mind and body etc.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 248
6
ZONING REGULATIONS AND DEVELOPMENT CODE

93 5.28 Milk Booth :


A premise for retail sale of milk directly to consumers by manual or other
means.

94 5.29 Religious Building/ Centre :


A premise dedicated to accommodations and service of God and other
objects of religious nature. It may have different nomenclature in different
religions like temple for all faiths, mosque, church, gurudwara, synagogue,
ashram, bathing ghats, gaushala etc.

95 5.30 Community Centre :


A premise having an enclosed space for various social and cultural
activities of a neighbourhood or a group housing complex.

96 5.31 (a) Convention/Conference Centre :


A premise having all facilities for meeting, symposium, seminar etc. where a
number of people from different organizations will be participating.

97 5.31 (b) Auditorium :


A premise having an enclosed space to seat audience and stage for various
performances like concerts, play, dance, drama, music, recitals, functions
etc.

98 5.32 Planatarium :
A premise with necessary facilities and equipments for studying planets.

99 99 5.33 Socio-cultural Centre :


A premise with facilities for activities of socio-cultural nature.

100 5.34 PCO :


A premise with facilities to make phone calls from telephone to local,
STD and international subscribers on payment basis.

101 5.35 Internet/ Information Centre :


A premise used for internet system for communication purposes.

102 5.36 Social Welfare Centre :

249 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
A premise with facilities for welfare and promotion of community
development. It shall be run by a public or charitable institution.

103 5.37 Cremation/ Burial ground/ Crematorium :


Cremation ground would mean a premise with facilities for performing
last rites of dead bodies by burning. Burial ground would mean a
premise with facilities for burying of dead bodies. Crematorium would
mean a premise with facilities for disposing off dead bodies in an
electrical/ electronic furnace.

104 6.1 (a) Sewerage Treatment Plant :


A premise with treatment facilities used for treatment of sewage.

105 6.1 (b) Sewerage Pumping station :


A premise with a pumping station used for pumping sewage on to a higher
gradient.

106 6.2 (a) Sanitary Landfill Site :


A premises where solid waste is disposed off for short or specific period.

107 6.2 (b) Solid Waste Treatment Plant :


A premise where solid waste is collected, treated mechanically /electrically
and processed for reuse.

108 6.3 Tube well/ Over head tank/ Under ground tank/ Renny well :
Tube well : A system to extract water from underground sources using
mechanical means. It may consist of a room for operation and
maintenance.
Over head tank : A premise having overhead tank for storage and supply
of water to its neighbouring areas. It may or may not include a pump
house.
Under ground tank : A premise having underground tank for storage and
supply of water to its neighbouring areas. It may or may not include a
pump house.
Renny well : A system to extract water from underground sources on the
banks of a water body.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 250
6
ZONING REGULATIONS AND DEVELOPMENT CODE

109 6.4 Electric sub-station :


A premise having electrical installation and transformation for distribution of
power.

110 6.5 Public Toilet :


A premise having latrines and urinals for use of public.

111 6.6 Transmission tower/ Mobile tower as per RDA/ Odisha State policy :
A transmission tower or Cellular mobile tower which may be erected on
ground or roof top of a building as per policy of RDA/ Odisha State.

112 7.1 Open parking :


A premise open to sky used for parking of vehicles.

113 7.2 Covered/ Multi-level parking :


A covered premise of one or more levels for parking of vehicles.

114 7.3 (a) Taxi/ Auto stand :


A premise used for parking of intermediate public transport vehicles run
on commercial basis.

115 7.3 (b) Cycle Rickshaw stand :


A premise used for parking rickshaws and cycles.

116 7.4 Truck Terminal/ Transport Nagar :


A premise for parking of trucks on short term or long term basis. It may
include agency offices, workshops, dhabas, spare part shops, godowns,
petrol/ diesel filling stations, restaurants, guest houses, hotels and such
other operational facilities as decided by the Authority

117 7.5 Bus Stand/ Shelter :


A Bus Stand or Bus Shelter is a designated location on a road away from
carriage-way to park buses for short time periods for embarkation and
disembarkation of passengers.

118 7.6 (a) Bus Depot :


A premise used by a public transport agency or any other such agency for

251 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
parking, maintenance and repair of buses. This may or may not include a
workshop.

119 7.6 (b) Bus Terminal :


A premise used by a public or private transport agency to park the buses
for short periods. It may or may not include restaurants, guest house,
hotel and such other operational facilities for passengers.

120 7.7 Motor Garrage/ Service Garrage/ Workshop :


A premise for servicing and repair of automobiles.

121 7.8 Traffic Park/ Children Traffic Park/ Training Centre :


A premise in the form of park with facilities for introducing and educating
public/ children about traffic and signals. The training centre shall have
facilities for training of driving automobiles.

122 7.9 Loading/ Unloading facilities/ Space :

123 7.10 Transport/ Cargo booking centre : A premise used for booking office
and storage of goods by an airline.

124 7.11 Container Depot :

125 7.12 Toll Plaza :


A premise/facility for collection of toll for use of toll road. It may include
office building for management of toll collection process.

126 7.13 Helipad :


Helipad (helicopter landing pad) is a landing area for helicopters. Usually
a helipad does not have fuel and service facilities, and does not maintain
a full time air traffic controller.

127 8.1 (a) Park :


A premise used for recreational leisure activities. It may have on it related
landscaping, parking facilities, public toilet, fencing etc. It will include
synonyms like lawn, open space, green etc.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 252
6
ZONING REGULATIONS AND DEVELOPMENT CODE

128 8.1 (b) Play Ground :


A premise used for outdoor games. It may have on it landscaping, parking
facilities, public toilet etc.

129 8.2 Multipurpose open spaces :


Space / Area which is essentially open and can be used for multiple temporal
functions.

130 8.3 (a) Golf course :


Area earmarked for playing golf sport which is essentially open along
with minimal built space which supports the sports.

131 8.3 (b) Race course :


Area earmarked for racing with minimal built space for supporting the race.

132 8.4 (a) Stadium :


A premise for outdoor games with pavilion building and stadium
structure to seat spectators including related facilities.

133 8.4 (b) Sports training centre :


A premise having facilities for training and coaching for different indoor
and outdoor games including swimming. It shall also include centre for
physical education.

134 8.4 (c) Sports Complex :


A premise for outdoor and indoor games with pavilion building, stadium
and related facilities.

135 8.5 Picnic Spot :


A premise within the tourist/ recreational centre which is used for short
duration stay for recreational or holiday purpose.

136 8.6 Indoor stadium/ Games hall :


A premise for indoor stadium with play area and spectator seating
including related facilities.

137 8.7 Amusement/ Specialised/ Theme Park :

253 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
Amusement Park and Theme Park are terms for a group of rides and
other entertainment attractions assembled for the purpose of
entertaining a large group of people. An Amusement Park is more
elaborate than a simple park or playground, usually providing attractions
meant to cater to children, teenagers and adults.

138 8.8 (a) Recreational Club :


A premise used for gathering of a group of persons for social and
recreational purpose with all related facilities.

139 8.8 (b) Swimming pool :


A premise with facilities for swimming and spectators seating which shall
vary with standard and purpose.

140 8.9 (a) Museum / Auditorium :


Museum means a premise with facilities for storage and exhibition of
objects illustrating antiques, natural history, art etc..
Auditorium means a premise having an enclosed space to seat
audience and stage for various performance like concerts, play, recitals,
functions etc.

141 8.9 (b) Conference Hall :


A premise having facilities for meeting, symposium, seminar etc. where
a number of people will be participating.

142 8.9 (c) Art/ Exhibition Gallery :


A premise with facilities for exhibition and display of paintings,
photographs, sculptures, murals, ceramics, handicrafts or products of
specific class.

143 8.10 Open air theatre :


A premise having facilities for audience seating and a stage for
performance open to sky.

144 8.11 National Memorial :


A protected area that memorializes a historic person or event of national
importance. The memorial need not be located on a site directly related

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 254
6
ZONING REGULATIONS AND DEVELOPMENT CODE

to the subject.

145 9.1 Orchard/ Plant Nursery/ Social Forestry :


Orchard would mean a premise with a thick growth of fruit trees. It may
also include garden with fruit trees. Plant nursery would mean a premise
with facilities for rearing and sale of young plants. Forestry would mean
a premise with thick natural flora including social forestry, which may
have part natural flora and part man made flora.

146 9.2 Farm House :


A dwelling house on a farm.

147 9.3 Dairy farm/ poultry farm :


A premise with facilities for rearing and processing of dairy/ poultry products.
It may have temporary structures for sheds of cows/ birds.

148 9.4 Agricultural equipment workshop/ service centre :


A premise with facilities for servicing and repair of agricultural equipments
like tractor, trolley, harvesters etc.

149 10.1 Lal dora Boundary:


Lal Dora Boundary marked around villages falling under RPA and demarcate
the jurisdiction or territory of a village within which norms and controls of
municipality or Rourkela Development Authority is applicable. However, the
limits of Lal Dora Boundary is subjected to change by the approval of
Rourkela Development Authority.

255 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE

6.4 ZONING REGULATIONS

Zoning (1) In the Comprehensive Development Plan area, various use zones viz, Residential, commercial, industrial,
administrative, institutional, open space uses, transport & communication , green belt, natural drainage channel and
water bodies having their zonal boundaries as indicated in the development plan shall be regulated as per the table
under Regulation 25. Except as otherwise provided no structure or land hereinafter shall be used and no structure shall
be erected, re‐erected or altered unless its use is in conformity with these Regulations.

(2) All places of worship, temples, churches, mosques, burial and cremation ground etc. existing prior to enforcement of
these Regulations shall be exempt from being treated as non‐conforming uses, provided that continuance of such uses
are not detrimental to the locality as decided by the Authority from time to time.

(3) All non‐conforming uses of land and buildings shall be discontinued by the owner and the modified uses shall be
made to conform to the land use of the development plan in force within six months of the Regulations coming in force.

Different (1) Permission for different uses shall be accorded outright for the principal use earmarked in the different zones
use of land. described in column(3) of the table No. 2.

(2) Permission for different uses described in column ‐4 shall be permitted on special consideration and reasons for
such consideration shall be recorded in writing.

(3) The purposes specified in column (5) of the said table shall not be permitted in the areas reserved for particular
uses.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 256
6
ZONING REGULATIONS AND DEVELOPMENT CODE

(3) Residential buildings may be permitted in the open space use zone if the following conditions are satisfied along
with other conditions of these Regulations.

A. the land is a stitiban land and is not a leasehold land;


B. the coverage is not more than 40%;
C. the height is not more than 7.0 (seven) meters; and at least 20 percent of land is used for plantation;

(4) Mixed land use may be permitted in a particular zone. However, the main use shall cover not less than 2/3rd of the
total floor area and the ancillary use shall not exceed 1/3rd of the total floor area .

TABLE 6.1 : LAND USES PERMITTED/PROHIBITED IN DIFFERENT USE ZONES

Sl. Use Zone Uses/ Activities Permitted Uses/ Activities Permitted on application to the Uses/ Activities Prohibited
No. competent Authority

(a) (b) (c)

257 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
1. Residential Use Zone 1. Residential, residential flat 1. Places of worship 1. a Heavy, large and extensive industry,
2. Hostel, Boarding and lodging houses 2. Convenience shopping noxious, obnoxious and hazardous
3. Night shelters, foreign missions, 3. Government and Semi‐Government offices industries
dharamshala, guest houses 4. Colleges and research institutions 2. Warehousing, storage godowns of
4. Professional offices not exceeding one 5. Petrol Filling Stations perishables, hazardous, inflammable
floor 6. Places of entertainment goods
5. Educational buildings (nursery, primary, 7. Cinema halls 3.Turnkey yards,
high – school, college) 8. Markets for retail goods, weekly markets, 4. Workshop for buses etc. Slaughter housing
6. Research institutes multi – purpose or junior technical shops 5.Wholesale mandis
7. Social, cultural and neighborhood, 9. IT, IT enabled services 6.Hospitals treating contiguous diseases
recreational institutions with adequate 10. Tourism related services, transient visitor 7.Sewage treatment plant/disposal work,
parking facilities camps 8.Water treatment plant, solid waste
8. Marriage hall, community hall 11. Motor vehicle repairing workshop/ garages, dumping ground
9. Convenience shopping centers, storage of LPG gas cylinders 10. Zoological garden, botanical garden, bird
local(retail) shopping 12. Burial – grounds, restaurants and hotels sanctuary
10. Community centers, club, auditoriums 11. International conference center
11. Exhibition and art galleries 13. Printing press 12. Reformatory, district battalion offices,
12. Library, gymnasium 14. Godowns / warehousing, forensic science laboratory
13. Medicals, clinics, dispensaries, nursing 15. Bus depots without workshop 13. All uses not specifically permitted
home, health centers (20 beds)

14. Public utilities and public buildings


15. Nursery and green houses
16. Household occupation if the area for such
use does not exceed one floor and there
shall be no public display of the goods
17. Banks and other financial institutions not
exceeding one floor
18. Bus stop, taxi stand
19. Services for households (saloon, parlours,
bakery, sweet shop, dry cleaning, internet
kiosk, etc) not part of a residential
building
20. Police post
21. Park/ tot – lots, technical training center,
yoga center/ health clinics

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 258
6
ZONING REGULATIONS AND DEVELOPMENT CODE
2. (a) Commercial Use Zone 1. Retail business, mercantile 1.Place of entertainment and recreational uses 1. Polluting industries.
2. Business and Professional Offices 2. Place of worship 2. Large scale storage of hazardous
3. Government/ institutional offices, and 3. Service garage provided they do not directly materials expecting in area, specifically
semi Government offices abut the main road earmarked for the purpose
4. Shops 4. Printing presses employing not more than 10 3. Dwellings except those of essential watch
5. Services persons. and ward personnel
6. Restaurants, hotels 5. 20 bed hospitals not treating contagious 4. Heavy, extensive, noxious, obnoxious,
7. Hostels/Boarding houses, social and diseases and mental patients hazardous and extractive industrial units
welfare institutions 5. Hospitals/ research laboratories treating
8.Convenience/ neighbourhood shopping 6. Wholesale storage yards. contiguous diseases
center, local shopping centers, weekly/ 7. Weigh bridge 6. Poultry farms/dairy farms, slaughter
formal markets, bakeries and 8. Polytechnics and higher technical institutes houses,
confectionaries 9. Sports/ stadium and 7. Sewages treatment/disposal sites
9.Cinema hall/theater, banquet halls, 10.Public utility installation 8. Agricultural uses, storage of perishable and
auditoriums 11.Transient visitor’s homes inflammable commodities
10. Guest houses 12. Incidental/ancillary residential use 9. Quarrying of
11. Marriage hall, night shelter gravel, sand, clay and stone
13. Residential plot/group housing 10. Zoological garden and botanical gardens,
14. College bird sanctuary
15. Religious places 11. International convention center
16. Commercial centers 12. Courts, sports training center,
17.Research/training institute reformatory
18. Public utilities 13. District battalion offices
19. Parking lots 14. Forensic science laboratory and all other
20. Meat, fish, Vegetable & Fruit markets activities which may cause nuisance
21.Banks and financial services noxious and obnoxious in nature
22. Bus stop, taxi stand/ 3‐wheeler stands 15. All uses not specifically permitted in the
23.Filling and service stations column (a) and (b)
24.IT and IT enabled services
25.Telephone exchange

259 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
(b) Wholesale Ware‐housing 1. Wholesale and retail business. 1. Truck terminal and parking 1. Polluting Industries
and Storage. 2. Wholesale and storage buildings 2. Freight terminal 2. Large scale storage of hazardous and
3. Commercial and business offices/ work 3. Junk‐yards 4. Service garage other inflammable materials excepting in
places 5. Non‐ polluting, non‐ obnoxious light areas, specifically earmarked for the
4. Restaurants industries purpose.
5. Public utilities 6. Warehousing/ storage godowns of 3. All uses not specifically permitted in
6. Railway and road freight station perishable, inflammable goods, coal, wood, columns (a) and (b)
7. Weigh bridge timber yards
8. Banks and financial services/stock 7. Bus and truck depots
exchange 8. Gas installation and gas works
9. Bus stop 9. Water treatment plants
10. Parking space 10. Railway yards/ stations
11. Petrol pumps and service stations on 11. Incidental/ ancillary residential use
roads of 12 meter or more ROW
12. Government and semi Government offices
13. Convention centre
14. God owns/ covered storage and
warehousing
15. Service centres/ garages/workshops
16. Parks and open spaces Museums, library
17. Police station/ posts, post offices

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 260
6
ZONING REGULATIONS AND DEVELOPMENT CODE
3. Industrial use zone, light 1. All kind of industries 1. Technical education institutions 1. Polluting industries
manufacturing industry, 2. IT 2. General Residences
service industry and medium 3. ITES 2. Government and semi government buildings
industry 4. Financial services 3. General business unless incidental to and
5. Textiles and apparels 3. Private business offices on the same site with industry.
6. Food processing industries 4. Hotels
7. Agro processing industries 5. Noxious, obnoxious and hazardous industries 4. Any manufacturing establishment
8. Common facility centres except storage of perishable and inflammable detrimental by way of nuisance or hazard
9. Tool rooms 5. Industries not permitted by Orissa
goods
10. Industrial research institutions
Pollution Control Board
11. Non polluting industries
6. Junkyards
12. Light engineering
7. Sports/stadiums/ playgrounds 6. Residential dwellings other than those
13. Auto components
14.Electrical and electronic goods
8. Sewage disposal works
15. Pharmaceuticals
9. Electric power plants, service stations
16. Beverages
10. Cemeteries,
17. Breweries
11. Banks and financial institutions
18. Small scale industries
19. SEZs notified by government of India essential operational and watch and ward
20. Activities associated with film production 12. Helipads staff
21. Computer hardware
22. Machine tool industry 13. Hospitals/medical centers, religious 7. Schools and colleges
23. Convention centers
24. Exhibition stalls buildings 8. Hotels, motels
25. Transport terminals
26.Hospitals to cater to the industrial workers 14. Taxi stands 9. Caravan parks, recreational spots or
27. Medical center 15. Gas installations and gas works centers

28.Recreational facilities for industrial 16. Animal racing or riding stables 10. Other non‐industrial related activities
workers
29. Parks and playgrounds 17. Workshops/ 11. Irrigated and sewage farms
30. Restaurants
31.Services for industrial workers garages 12. Major oil depot and LPG refilling plants
32.Residential buildings for essential staff and
for watch and ward 18. Dairy and farming 13. Commercial offices, educational
33. Public utilities 19. Quarrying of gravel, sand, clay and stone institutions, social buildings
34. Parking, loading, unloading spaces 20. Other industries and facilities as suggested by 14. All uses not specifically permitted in
35. Warehousing, storage and depots of non the Industries Department of Government in column (a) and (b)
perishable and non‐ inflammable consultation with Orissa Pollution Control
commodities and incidental use
Board and the Authority
261 36. Cold storage and ice factory
37. Gas godowns
Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
38. Cinemas
39. Wholesale business establishments
40. Petrol filling station with garages and
service stations
6
ZONING REGULATIONS AND DEVELOPMENT CODE
4. Public Semi‐Public Use Zone. 1. Local, State and Central Govt. Offices 1. Residential flats, residential plots for group 1. Heavy, extensive and other obnoxious,
2. Semi‐government housing and staff housing hazardous industries,
3. Public undertaking offices 2. It services 2. Slaughterhouses, junkyard, wholesale
4. Universities and specialized educational 3. Hostels, transit accommodation mandies
institutions, schools 4. Entertainment and recreational complexes 3. Dairy and poultry farms, farmhouses
5. Educational and Medical Institutions, 5. Nursery and kindergarten, welfare centre 4. Workshops for servicing and repairs,
Research institutions, college 6. Open air theatre, playground processing and sale of farm products and
6. Hotels/ guest houses 7. Residential club, guest house 5. Uses not specifically permitted herein
7. Commercial uses centre, other 8. Truck terminals, helipads 6. All uses not specifically permitted in
uses/activities column (a) and (b)
8. Shopping complex
9. Social and cultural institutions/ welfare
centres
10. Libraries
11. Community hall
12. Conference halls, auditoriums
13. Marriage hall, dharamashala
14. Hospitals/nursing home/health
centre/clinic/ dispensary
15. Hostels
16. Public utility buildings
17. Uses incidental to Govt. Offices
18. Local Municipal offices
19. Monuments and religious
20. Museums/art galleries/libraries exhibition
halls
21. Institutions
22. IT,ITES, Financial services
23. Multi level car parking
24. Convention centre
25. Banking and financial services
26. Police stations, police lines, jails, fire
stations, post offices
27. Uses for defence purpose, defence
quarters, educational and police
headquarters
28. Bus and Railway Passenger terminals
29. Incidental/ancillary residential use

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 262
6
ZONING REGULATIONS AND DEVELOPMENT CODE
5. Utilities and Services 1. Public utilities and buildings, solid waste 1. Water supply installations 1. Any building or structure which is not
dumping grounds 2. Sewage disposal works required for uses related to public utilities
2. Local municipal facilities like water supply, 3. Service stations and activities is not permitted therein.
sewerage, drainage, solid waste 4. Cemeteries/graveyards 2. All uses not specifically permitted in
3. Booking office 5. Warehouse/storage go downs column (a) and (b)
4. Radio and television station 6. Health centre for public and staff or any other
5. Tele communication centres, telephone use incidental to public utilities and services
exchange 7. Nursery and kindergarten, welfare centre
6. Cremation grounds and cemeteries, burial 8. Residential club, guest house
grounds
7. Police post, fire post 9. Community hall
8. Post and telegraph office 10. Truck terminals, helipads
9. Observatory and weather office 11. Commercial uses center, other uses/ activities
10. Power plants/ electrical substation
11.Incidental/ancillary residential use

6. Recreation 1. Specialized parks/ maidans for 1. Building and structure ancillary to use 1. Any building or structure, which is not
multipurpose use permitted in open spaces and parks such as required for open air recreation, dwelling
2. Special recreational zones stands for vehicles on hire, taxis and scooters unit except for watch and ward, and uses
3. Special education areas 2. Commercial use of transit nature like not specifically permitted therein.
4. Regional parks, district parks, cinemas, circus and other shows 2. All uses not specifically permitted in
playgrounds, children traffic parks 3. Public assembly halls column (a) and (b)
5. Botanical/ zoological garden, bird 4. Restaurants and
sanctuary 5. Caravan parks
6. Clubs 6. Open air cinemas/ theatre
7. Community hall 7. Entertainment and recreational complexes
8. Stadiums, picnic huts, holiday resorts 8. Open air theatre, playground
9. Shooting range, sports training centre 9. Residential club, guest house
10. Swimming pools 10. Fire post, police station, post and telegraph
11.Bus and railway passenger terminals, office, polytechnics
library 11. Commercial uses center, other uses/ activities
12. Public utilities and facilities such as police
post, fire post, post and telegraph office,
health centre for players and staff
13.Incidental/ancillary residential use

263 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
7. Transportation Use Zone 1. Bus bays, Auto stand, Bus shelter, 1. Tourism related projects 1. Use/activity not specifically related to
information kiosk 2. Way side shops and restaurants transport and communication permitted
2. Parking areas 3. All ancillary (complimentary) uses for above herein.
3. Multi level car parking categories (subject to decision of the 2. All uses not specifically permitted in
4. Filling stations Authority) column (a) and (b)
5. Transport offices, booking office
6. Night shelter, boarding houses
7. Banks
8. Restaurants
9. Workshops and garages
10. Automobile spares and services, Go downs
11. Loading and unloading platforms
(with/without cold storage facility), weigh
bridges
12. Ware houses, Storage depots
13. Bus and Truck terminals
14. Railway stations yard, depots
15. Airport
16. Incidental/ancillary residential use

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 264
6
ZONING REGULATIONS AND DEVELOPMENT CODE
8. Agriculture 1.Agriculture and Horticulture 1. Houses incidental to this use. Place of 1. Residential use except those ancillary uses
Use Zone 2. Dairy and poultry farming, milk chilling worship, Dharmasala, lodging, rest shed etc permitted in agricultural use zone
centre 2. Educational and research institutions 2. Heavy, extensive, obnoxious, noxious and
3. Libraries and cultural buildings hazardous industries
3. Storage, processing and sale of farm 4. Parks and other recreational uses 3. Any activity which is creating nuisance
produce 5. Wayside shops and restaurant and is obnoxious in nature.
4. Dwelling for the people engaged in the 6.Hospital for infectious and contagious diseases,
farm (rural settlement) mental hospital after clearance of the
5. Farm houses and accessory buildings Authority
6. Forest land 7. Agro serving, agro processing, agro business
7. Brick kilns and extractive areas 8. Extensive industry
8. Cottage industries 9. Service industries accessory to obnoxious and
9. Burial and cremation grounds hazardous industries
10. Solid waste management sites 10. Ice factory, cold storage,
11. Construction of building by 11. Godowns and warehouses
government/development authorities 12. Petrol pump, garages and workshops
beyond the existing developed basti area 13. Studio
12. Building construction over plots covered 14. Activities related to tourism
under town planning scheme and 15. Green buildings
conforming uses 16. Normal expansion of land uses only in the
13. Petrol and other fuel filling stations existing homestead land
14. Public utility and facility buildings 17. Sewage disposal works
15. Incidental/ancillary residential use 18. Electric power plant
19. Quarrying of gravel, sand, clay or stone

9. Water bodies Use Zone 1. River, canal Any other use/activity Use/activity not
2. Streams, water spring incidental to Water bodies specifically related to
3. Ponds, lakes Use Zone is permitted. Water bodies Use not
4. Wetland, aqua culture pond Permitted herein.
5. Reservoir
6. Water logged/marshy area
10 Special Area Use Zone 1. Old built‐up areas having mixed land use. Any other use/activity incidental to Special Areas Use/activity not specifically related to Special
2. Areas of historical or archaeological Use Zone is permitted. Areas Use Zone not permitted herein.
importance having historical monuments
and architecturally important buildings.
3. Areas of scenic value and needs to be
preserved without spoiling the character
by putting up various kinds of structures
4. Village Settlements.

265 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE

N.B.

1. No Mixed land use shall be permitted on the plots facing road of width less than 9.0 mtr

2. Maximum 25% of permissible FAR may be allowed to be used for support facilities.

3. Support facilities mentioned below are permissible in all use premises mentioned
from 2.0 to 7.0 (unless otherwise specifically prohibited by the Rourkela Development Authority in any premise)

a. Guard/ Chowkidar residence


b. ATM
c. PCO
d. Open parking, Covered parking
e. Public conveniences
f. Helipad
g. Public facilities and utilities(Post office counter, Post office ,Post and
Telegraph office, Police Post, Police Station, Fire post, Fire Station,
Telephone exchange, RLU/RSU, Electric Sub-station, Sewage Treatment
plant, Sewage pumping station, Water works, Underground Reservoir,
Water treatment plant)
h. Satellite wireless telecommunication centre or tower,

4. In addition to the permissible activities mentioned above, if any other uses have
been permitted in earlier schemes, allotment or lease conditions prior to these
regulations, the same uses shall continue to be permissible unless otherwise
specially prohibited under special circumstances, if any by the Authority in any
particular scheme.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 266
6
ZONING REGULATIONS AND DEVELOPMENT CODE

6.5 SUB DIVISION OF REGULATIONS


The Sub division of land with a view to prepare a layout plan is done for a sector or area, which is designated primarily for a specific main
use or activity already specified as per the Rourkela Comprehensive Development Plan. The objective of regulations detailed herein is to
guide the preparation of layout plans for use areas. These regulations include norms for provisions of circulation system, open spaces, and
facilities. The service plans corresponding to these layout plans for provisions of physical infrastructure like water supply, sewerage,
drainage, power, telecom, gas and solid waste management etc. shall conform to the norms framed by the Authority from time to time.

6.5.1 RESIDENTIAL USE AREAS

The sub-division of this use areas shall be governed by the provisions stated below:

• This use areas will have plotted development or flatted development or group housing or a mix of both or all as per the scheme.
• Green and Open Spaces-
The minimum area required under green and open space for tot-lots, parks
and playground shall be in accordance with the provisions of building
regulations.
Area under RCDP green areas shall not be included in the area under green and open spaces of the scheme or sector. The
minimum average width of the green and open space shall be 7.5m. The green and open spaces can be of varied shapes provided
they fulfill the recreational need of the community.
The landscape plan shall be prepared and submitted in accordance with
the provisions of building regulations.
• Roads
i. The minimum Right Of Way of a vehicular road shall be 12 m. However in
situations where the road adjoins a park or any open space with building
only on one side, it may have a minimum width of 9 m.
ii. The roads shall have minimum width depending on the length of the road
as follows

a) Up to 200.0m. - 9.0m.
b) 201-400.0m. - 12.0m.
c) 401-600.0m. - 18.0m.
d) 601-1000.0m.- 24.0m.

267 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE
e) Above 1000.0m.- 30.0 m.
(iii) The minimum width of loop street shall be 9.0 m. and maximum length 400 m.
(iv) Maximum length of a 9.0m. wide dead end road shall be 100.0m. The
road shall be provided with a cul-de-sac of 7.5m. radius at the dead end.
Roads of less than 25m. length, cul-de-sac will not be required
• The provisions for rainwater harvesting shall be in accordance with the
provisions of Building Regulations or as per the policies of the State
Government issued from time to time.
• Provision of Social and Physical Infrastructure –
In addition to the provisions regarding facilities in the Building regulations, the
provisions of other facilities shall be made as per the following standards-

Sl. No. Use Premises Service Population Per Unit Area in Ha


Unit

A Educational Facilities

1. Integrated school with 1lakh 2.0


hostel
facility Class I to XII) /Inter
college

2. School for handicapped 1 lakh 1.0

3. Technical Education 10 lakh 2.0


Centre to
include one industrial
training
institute and one
polytechnic

4. University 5 lakh 20.0

5. Engineering/ professional 1 lakh 2.0

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 268
6
ZONING REGULATIONS AND DEVELOPMENT CODE

college

6. Medical college 10 lakh 10.0

B Health Care Facilities

1. General hospital 2.5lakh (500 beds) 4.0

2. Polyclinic with observation 50000 0.2


beds

3. child welfare and maternity 50000 0.1


centre

4. Veterinary hospital 5 lakh 0.2

C Socio-Cultural/
recreational
Facilities

1. Music, dance and drama 1lakh 0.5


centre

2. Meditation and spiritual 1lakh 0.5


centre

3. Socio-cultural centre 5lakh 4.0

4. City sports centre 10 lakh 20.0

5. Zonal sports centre 1 lakh 8.0

D Miscellaneous

269 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
6
ZONING REGULATIONS AND DEVELOPMENT CODE

1. LPG Godown 40-50000 0.1

2. Police Station 1 lakh 1.5

3. Fire Station 4lakh 10 km radius 1.25

4. Sub-fire station 1 -2.5 lakh,1-3km. 0.5


radius
5. Telephone exchange 10 lakh 0.4

6. Head Post Office 1 lakh 1.0

Note: In special circumstances the Rourkela Development Authority may relax any of the provisions mentioned above by recording the reasons for the
change. The Allottee or developer may be allowed to have higher provisions for the facilities and services in a particular scheme.

REQUIREMENTS FOR BASTI OR SLUM AREA

(1) In a basti area, permission to erect a building may be given on the basis of the available width of means of access, provided that where the
width of means of access is 4.5 meter or less, the coverage shall be limited to 50% of the plot area and the maximum height of the building
limited to two storey and the FAR limited to 1.0.
(2) For plots with narrow width (7.5 meters) zero setbacks may be allowed on one side with a passage of one meter on the other side.
(3) The rear setback and front setback shall not be less than 1.0 m and 1.5 m respectively.
(4) In each house on a basti plot having one side setback, an internal court‐yard of not less than 10 sq.m. in area and not less than 2.5 m in
width shall be provided in such a way that at least one wall of each living room abuts such court‐yards or a verandah opening to such court‐
yard.

With Special Note: All right reserved with the Rourkela Development Authority with respect to
the Rourkela Comprehensive Development Plan 2031.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 270
7
DEVELOPMENT AND FUNDING STRATEGIES

7.1 DEVELOPMENT AND FUNDING STRATEGIES complex/communication network etc both


planned and on demand basis.
7.1.1 NEW INDUSTRIES (POLLUTING AND NON‐POLLUTING) iv. Maintenance of Industrial Areas/Estates.
The corporation (IDCO) is named as nodal agency for providing v. Acquisition and allotment of land to facilitate the
industrial infrastructure in the state of Odisha. IDCO was needs of both individual/corporate entrepreneurs.
established in 1981 under Orissa Industrial Infrastructure vi. Extension of social and industrial infrastructure
Development Act (OIIDC Act), 1980 with the mandate to develop development related construction work of various
manage and maintain industrial estates/areas. Later on, it funding agencies so as to boost industrial growth in
diversified to project land acquisition and engineering works for Odisha.
clients and was declared as the “Nodal Agency” of the State IDCO also provides services related to land acquisition for
Government to develop industrial infrastructure. large corporate house/Entrepreneurs on behalf of Govt. of
IDCO performs the following broad functions: Odisha on lease basis without any infrastructure work
developed. The organization has so far established 86
i. Establishment of Industrial Areas/Industrial industrial estates and industrial areas in the different parts of
Estates/Industrial Growth centers etc. the state involving over 4000 acres of land and construction of
ii. Establishment of Economic growth centers at different nearly 1600 industrial sheds. Till date, infrastructural supports
strategic locations in the state. have been provided by IDCO to around 4000 industrial units in
iii. Establishment of infrastructure facilities like: Odisha.
a. Built‐up sheds
b. Roads drains etc. a) Function & powers of IDCO
c. Water supply net work Generally to promote and assist in the rapid and orderly
d. Power and illumination (including street lights) establishment, growth and development of industries, trade
e. Social amenities like building for banks/post and commerce in the State and in particular, and without
offices/education complex/shopping prejudice to the generality to:

271 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
7
DEVELOPMENT AND FUNDING STRATEGIES
a. Establish and manage industrial estates at places notified II. On receipt of the application of the entrepreneur
by the State Government. along with plan/schedule of selected land and
b. Develop industrial areas notified by the State Government recommendation of Promotional Agency, IDCO
for the purpose and make them available for undertakings initiates the process of land alienation (for Govt. land)
to establish themselves. & acquisition (for private land). For Government lands,
c. Undertake schemes or works, either jointly with other the alienation proposal is filled with the concerned
corporate bodies or institutions or with Government or Tahasildar whereas for private lands, the acquisition
local authorities, or on an agency basis, in furtherance of proposal is submitted to the Collector of concerned
the purposes for which the Corporation is established and district.
all matters connected therewith. III. State Government has authorized the Collectors to
alienate any quantum of Government land to IDCO
b) Land Acquisition‐ Procedure
without making any reference to higher Revenue
I. The entrepreneur is to first contact Promotional Authorities. Similarly, IDCO being a statutory
Agencies such as Industrial Promotion & Investment Corporation of the Govt., the acquisition of private
Corporation of Odisha Ltd., Agriculture Promotion & land is made using the emergency provisions of Land
Investment Corporation of Odisha Ltd., Odisha Acquisition Act. Thus, the applications of IDCO for
Electronics Development Corporation Ltd., etc. along transfer of land are dealt by the Revenue authorities
with project report and finalizes the location taking in on the fast track.
to account project requirements. IDCO extends help in IV. The entrepreneur is required to make deposit of token
identification of project site and collection of plan and amount (roughly 10 % of estimated cost) with IDCO at
schedule of land from the Revenue Authorities. While the time of filling alienation/acquisition proposals.
selecting the site, care is taken to avoid forest, Balance amount is paid as soon as the alienation or
communal, irrigated and homestead land at far as acquisition is finalized by the district administration.
possible. Preference is being given to Government V. The cost of Government land is charged at the rates
land. notified in Industrial policy. The acquisition cost of

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 272
7
DEVELOPMENT AND FUNDING STRATEGIES

private land is worked out in accordance with the Project Development Fund to develop select projects in key
provisions of Land Acquisition Act. area.
VI. For availing the services of IDCO for obtaining land, the
d) Industrial housing under Corporate Social Responsibility
entrepreneur is required to pay service charges@ 10 %
of land cost. Corporate Social Responsibility (CSR) is a concept that
VII. On deposit of land cost and service charges, the encourages organizations to consider the interests of society
alienated/acquired land is first transferred in favor of by taking responsibility for the impact of the organization’s
IDCO and subsequently in favor of the entrepreneur activities on customers, employees, shareholders,
through proper lease agreement. communities and the environment in all aspects of its
operations. This obligation is seen to extend beyond the
c) Infrastructure‐ PPP Infrastructure
statutory obligation to comply with legislation and sees
In order to meet the need for hogh quality physical and social organizations voluntarily taking further steps to improve the
infrastructure required for rapid economic development, the quality of life for employees and their families as well as for
Government of Odisha encourages greater Private Sector the local community and society at large.
Participation in infrastructure projects. With a view to provide
Suggestion under Corporate Social Responsibility
comprehensive policy and regulatory framework and
guidelines for attracting and facilitating private sector A) Well planned township with house for every employee
participation in infrastructure development, a Policy for “ B) Supply of filtered drinking water
Facilitating Public Private Partnerships(PPP) for Infrastructure C) Sanitation
Development in the State of Odisha” has been drafted which D) Essential items supply at subsidized prices
is likely to be notified soon. A dedicated Cell under Planning& E) Green coverage
Coordination Department has been setup to facilitate F) Education
development of projects in PPP format. G) Health
H) Environment etc.
IDCO has also established a Project Development &
Promotion Partnership ( PDPP) with IL & FS with a revolving

273 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
7
DEVELOPMENT AND FUNDING STRATEGIES
Proposed Sources of Income from Businesses Other Revenue Sources

e) Hazardous Waste and Impact Fee a) Revenues form business tax and licenses
b) Revenues from commercial licenses
Rourkela is an industrial town. A hazardous waste fee can be
c) Revenues from licenses for ads
charged on industries as an innovative way to increase the
d) Revenues from licenses and services
resources as well as to check environmental pollution.
e) Revenues from forest exploitation licenses
The fee program may include the following: f) The use of road infrastructure

I. Environmental Fee‐ this is a fee on industrial groups


that use, generate or store hazardous materials or
7.1.2 Models of Slum Redevelopment/ Rehabilitation
conduct activities related to those materials.
II. Facility fee‐ the facility fee applies to the owners or It is being properly analysed why this affordable housing in
operators of sites that dispose or store hazardous partnership model can be adopted in Rourkela area to
waste. accommodate EWS/LIG/MIG people relocated to new areas to
III. Waste Generator Fee‐ this is a fee determined by the reduce congestion factor in these slum areas.
total tonnage of waste generated.
Table 7.1 Funding Mechanism Selection Criteria
IV. Disposal Fee‐ the disposal fee applies to any waste
disposed of by depositing the waste on or into land in Criteria Affordable Housing in Rourkela Municipality:
any district or town. Partnership Scheme Ward 1 and 3
V. Activity Fee‐ This fee is based upon specific activities Land Land for an affordable Within ward 1 and 3
housing project for both the phases
approved by the Ministry that has environment
identified within
protection in its attributions. Types of activity fees municipal limits
include new permit modification, variance, or site No. of DUs A minimum of 200 1333 in Phase 1 and
mitigation assessment fee. affordable houses 1540
Composition of DUs A mix of EWS/LIG/MIG A mix of EWS/LIG/MIG
Interest Subsidy 5 % interest subsidy 5 % interest subsidy

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 274
7
DEVELOPMENT AND FUNDING STRATEGIES

Scheme for Housing on loans up to Rs 1 on loans up to Rs 1 which may be designated as ‘implementing agencies’,
the Urban Poor Lac Lac accompanied by duly approved layout plans and maps to scale
(ISHUP) would be posed for sanction to the State Level Steering
Area of Project At least 25 % of the 30 % for LIG and 35 % Committee and then the Central Sanctioning and Monitoring
total built up area of for EWS
Committee set up for BSUP.
the projects proposed
is EWS/LIG units. b. The layout and specifications including design of the affordable
(Source; MHUPA‐ Rajiv Awaas Yojana Guidelines for Slum‐ free City houses to be built would be approved by the State/UT
Planning) Government or its designated implementing agency.
c. The sale price of dwelling units would have an upper ceiling in
Table 7.2 Affordable Housing in Public Private Partnership terms of Rupees per square meter of carpet area. This ceiling
would be proposed by the States/UTs for different classes of
Model Central State/ULB Contribution/Loan
cities for approval by the Central Sanctioning & Monitoring
Government by Individual
Support Beneficiaries Committee.
Affordable in Share in Land Equity Contribution d. Beneficiaries would be selected and allotments made on a
partnership infrastructure Availability subsidized Housing transparent procedure by the State/implementing agency, e.g.
public, Public‐ costs Rs. 50000 Zoning/FSI Loan with 5 % draw of lottery, based on detailed guidelines approved by the
Private, etc. per unit of Incentives TDR, subsidy State/UT Government.
Affordable external
e. As far as possible, beneficiaries would be selected in advance to
House, 5 % development
beginning construction, so that the loan for construction can be
Interest cut where
Subsidy on availed directly by beneficiaries. A tripartite agreement
Housing Loan between loanee, bank and development agency should enable
(Source: MHUPA‐Rajiv Awaas yojana Guidelines for Slum –free City facilitation of loan procedures for the individual, and release to
planning) the development agency as per the progress in construction.
f. Title to the EWS/LIG houses would be given as far as possible in
Salient Features of Affordable housing in partnership Scheme: the name of the women.
a. Projects prepared by urban local bodies/urban development g. In order to promote EWS/LIG dwelling units/cross‐subsidize the
agencies/housing boards/improvement trusts/other agencies cost of land, the project, with approval of the State/UT
Governments may also offer zoning incentives such as land use

275 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
7
DEVELOPMENT AND FUNDING STRATEGIES
conversion, additional FAR/FSI for the patch, with or without Group Housing
TDR, based on the prevailing market price of land and the cost Categor Locatio Total No. Unit Estimate Central
of construction, provided the civic infrastructure at the site or y n Area of Cost(in d Cost (in Assistanc
the TDR sites is not put under strain. Unit lakh Lakh) e (in
s per Lakh)
h. The State/UT government may also permit a portion of the
housin
identified plot of land being used for construction of HIG g unit)
dwellings or commercial purpose, on which the development EWS Ward 3 5984 187 1.8 336.6 93.5
partner can raise funds to cross subsidize the construction of LIG Ward 3 8000 160 4.1 656 80
EWS/LIG dwellings. Lower Ward 3 1402 187 8 1496 93.5
i. In the case of partnership with a private developer on MIG 5
Government land, it would be required of the State/UT 2488.6 267
Government/implementing agency to select the private party
by a transparent bidding process. Table 7.4 AFFORDABLE HOUSING IN PARTNERSHIP: 2031
Cost Estimation Plotted
Categor Locatio Total No. Unit Estimate Central
Table 7.3 AFFORDABLE HOUSING IN PARTNERSHIP: 2021
y n Area of Cost(in d Cost (in Assistanc
Plotted Unit lakh Lakh) e (in
s per Lakh)
Categor Locatio Total No. Unit Estimate Central
housin
y n Area of Cost(in d Cost (in Assistanc
g unit)
Unit lakh Lakh) e (in
s per Lakh) EWS Ward 1 8075 323 2.5 807.5 161.5
housin LIG Ward 1 1108 277 6 1662 138.5
g unit) 0
EWS Ward 3 7000 280 2.5 700 140 Lower Ward 1 1938 323 10 3230 161.5
LIG Ward 3 9600 240 6 1440 120 MIG 0
Lower Ward 3 1680 280 10 2800 140 5699.5 461.5
MIG 0 Group Housing
4940 400 Categor Locatio Total No. Unit Estimate Central

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 276
7
DEVELOPMENT AND FUNDING STRATEGIES

y n Area of Cost(in d Cost (in Assistanc Private Partner


Unit lakh Lakh) e (in
s per Lakh) • Generally no profit no loss or at reasonable profit
housin organization
g unit) • Zoning Incentives such as Land use conversion,
EWS Ward 1 6912 216 1.8 388.8 108 additional FAR,TDR
LIG Ward 1 9250 185 4.1 758.5 92.5 • Cross subsidizing through sale of commercial spaces
Lower Ward 1 1620 216 8 1728 108 • Adoption of appropriate construction technology
MIG 0
2875.3 308.5
Beneficiary

Table 7.5 Total Cost Estimation • Up to Rs. 1 Lakh at 5 % interest subsidy for 20 yrs
repayment time‐Estimated EMI comes to be Rs.
Phase Estimated Cost (in Central Assistance (in 1100/‐ month (i.e. EMI=30‐40 % of Annual Income)
Lakh) Lakh) • Additional loans if needed would be at unsubsidized
Till 2021 7428.6 667 rates.
Till 2031 8574.8 770

7.1.3 TRANSPORTATION
Government
The capital cost estimated is 112 crores approximately, the total
• Land cost borne by State/RMC repayment cost is estimated to be 269 crores considering the
• Reduced Stamp Duty to 2 % for LIG & NIL for EWS repayment period i.e. 18 years with an interest of 5 %, the cost
• Subsidy amount Rs. 1 Lakh/EWS & LIG unit. recovery is done through collection of toll from freight corridor (The
• Subsidy amount Rs. 50000/MIG unit. innovative funding mechanism adopted‐Public Private Partnership),
• 25 % of total Civic Services csot.
central and state grants under road improvement schemes and also
• 5 % interest subsidy for 20 years repayment time up to
through advertisement tax.
Rs. 1 Lakh (Under ISHUP)

277 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
7
DEVELOPMENT AND FUNDING STRATEGIES
• Total grants expected every year from central and state 84.6 Cr/18 yrs
government schemes are 4.7 crores and is projected up to Total Toll Tax Collected 6.04 Cr/annum
2031 i.e. for 18 years as 84.6 crores. From Fright Corridors
108.72 Cr/ 18 yrs
• Likewise toll tax is calculated for freight corridor as per
Total (Grants+Toll) 193.32
standards mentioned by National highway Authority of
Advertisement 75.68 Cr/18 yrs
India for tax collection of Heavy vehicles considering base At 12000 63066.67
rate as 3.45 Rs. Per km distance for 71048 trucks, the tax 3503.704 18 yrs
collected per annum and for 18 years are 6.04 and 108.72 Total Hoardings 291.9753
crores respectively. Total Recovery 269
• Advertisement tax is introduced which amounts to 75.68 (Grants+Toll Tax on
crores by assuming 12000 Rs for 290‐300 hoardings Freight Corridor
Advertisement Tax)
approximately.

According to the tax reforms, hence it can be concluded that the cost of
the proposals of the transportation sector can be repaid within 2031 by
assuming 100 % cost recovery efficiency. The income from the residual 7.1.4 PHYSICAL INFRASTRUCTURE
5 yrs are used for O & M charges and also saved as part of contingency
fund. ( Refer Table 7.6) a) Financing urban infrastructure

Table 7.6 Cost recovery‐ Transportation In addition, in order to truly finance off‐budget, a special purpose
public‐or privately‐owned legal entity is necessary to own, operate and
Investment maintain the facili8ty, collect user charges, and finance and construct
Capital Cost 112.14
capacity replacement or expansion. The entity can be a private
Interest Rate 5%
partnership or joint venture, a privately‐ or publicly‐owned stock
Repayment Period 18 years
Total Amount to be 269 company, a pubic authority independent of government, a consumer
Repaid co‐operative, or some other type of private or public legal entity. The
Recovery legal entity should operate independently of government direction, be
Total Grants 4.7 Cr/annum managed by dedicated management personnel, and have its own

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 278
7
DEVELOPMENT AND FUNDING STRATEGIES

personnel and personnel policies. It needs to be sufficiently capitalized Repayment Period 8 Years
and generate enough cash flow to be able to raise debt finance or Total Amount to be 60.28 Cr
equity finance on reasonable terms and conditions and in amounts Repaid
sufficient to finance the entity’s capital needs. Recovery
Total Grants 0.65 Cr/annum
b) Water supply 5.2 Cr/8 years
2021 2031
The total capital cost estimated amounts to 40.8 crores. It has been RDA DU 103763.1 114346.8889
considered that the proposed installation gets completed by 2014 and HIG @37% 383992.35 42308.34889
the loan taken is repaid back by 2021 at an interest rate of 5 %. Thus MIG@29% 30091.3 33160.59778
the total amount to be repaid is 60.28 crores. Considering the present LIG @22% 22827.88 25156.31556
EWS@12% 12451.57 13721.62667
trend, the expected expenditure from government grants is 0.65 crores
per year. The excess expenditure amount is proposed to be balanced by
resource mobilizing technique i.e. user charges. User charges are b) Solid waste management
calculated based on percentage of population under each income
bracket existing in Rourkela i.e. 37%, 29%,22% and 12% for HIG, MIG, The total capital cost estimated amounts to 104.84 crores. It has been
LIG and EWS and accordingly the charge to be collected is decided as considered that the proposed installation gets completed by 2015 and
805540 and 25 Rs/month/HH respectively, the overall user charges the loan taken is repoaid back by 2031 at an interest rate of 5%. Thus
collected is expected to be 57.12 crores by end of 8 years i.e. 2021. the total amount to be repaid is 252.33 crores. Considering the present
Total cost recovered by 2012 is 62.32 crores. Hence this the that trend, the expected expenditure from government grants is 4.4 crore
scenario shows the water supply sector run with a surplus of 2.04 per year. The excess expenditure amount is proposed to be balanced by
crores by 2021, it could be concluded as a quite Satisfactory situation in resource mobilizing technique i.e. user charges. User charges are
Rourkela. (Refer Table 7.7) calculated based on percentage of population under each income
bracket existing in Rourkela i.e. 37%,29%,22% and 12% for HIG, MIG,
Table 7.7 Cost recovery‐Water Supply LIG and EWS and accordingly the charge to be collected is decided as
100,80,50 and 30 Rs/month/HH respectively. The overall user charges
Investment
collected is expected to be 184.75 crores by end of 18 years i.e. 2031.
Capital Cost 40.8 Cr
Interest rate 5% Total cost recovered by 2012 is 293.65 crores. Hence this scenario that
shows the MSW sector run with a surplus of 11.62 crores by 2031. It

279 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
7
DEVELOPMENT AND FUNDING STRATEGIES
resembles that project is financially feasible in Rourkela. (Refer Table
7.8)
d) Sewage and drainage
Table 7.8 Cost recovery‐solid waste management
The total capital cost estimated amounts to 102.48 crores. It has been
Investment considered that the proposed installation gets completed by 2015 and
Capital Cost 104.84 the loan taken is repaid back by 2031 at an interest rate of 5%. Thus the
Interest 5% total amount to be repaid is 246.56 crores. Considering the present
Rate trend, there is no expenditure from government grants. The whole
Repayment 18 years
expenditure amount is has to be managed through resource mobilizing
Period
technique i.e. user charges. User charges are calculated based on
Total 252.33
Amount To percentage of population under each income bracket existing in
be Repaid Rourkela i.e. 37%,29%,22% and 12% for HIG, MIG, LIG and EWS and
Recovery accordingly the charge to be collected is decided as 80,55,40 and 20
Total Grants 4.4 Cr/Annum Rs/month/HH respectively. The overall user charges collected is
79.2 Cr/18 years expected to be 241.12 crores by end of 18 years i.e. 2031. Hence this
Households 2021 2031 USER CHARGES scenario that shows the sewerage and sanitation sectors run with a
RDA DU 103763.1 114346.8889 Rs/month 2031
deficit of 106.4 crores by 2031.So the alternative mechanism adopted is
HIG@37% 38392.35 42308.34889 100 4230834.89
diverting the partial amount i.e. 106.4 crores out of 257.47 crores from
MIG@29% 30091.3 33160.59778 80 2652847.82
LIG@22% 22827.88 25156.31556 50 1257815.78 Municipal Tax and Non Tax revenue (includes octroi, property tax and
EWS@12% 12451.57 13721.62667 30 411648.8 other revenue) for sewerage and drainage services to make the project
8553147.29 financially feasible. (Refer Table 7.9)
For 18 1847479814
years Table 7.9 Cost recovery –Sewerage and drainage
184.75
Investment
Total 263.95
Grants+ Capital Cost 102.48
User Interest Rate 5%
charges Repayment 18 years
Period

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 280
7
DEVELOPMENT AND FUNDING STRATEGIES

Total 246.56 7.2 BROAD STRATEGIES FOR DEVELOPMENT IN


Amount To
be Repaid ROURKELA
Recovery
It is not advocated to launch major new revenue‐sharing schemes or
Households 2021 2031 USER CHARGES
RDA DU 103763.1 114346.8889 assigning more taxes to this local body. The main reason for this is the
HIG@37% 38392.35 42308.34889 80 3384667.911 sassing capacity in fiscal and financial management that exists both at
MIG@29% 30091.3 33160.59778 55 1823832.878 the local level and state/centre level. Therefore, in the next few years,
LIG@22% 22827.88 25156.31556 40 1006252.622 we propose needs to devote substantial efforts in improving the
EWS@12% 12451.57 13721.62667 20 274432.5333 operation, administration and performance of the existing sources.
6489185.944
For 18 1401664164
years
For 18 140.16 7.2.1 PHASE 1, TILL 2021:
years
Resource available from municipal tax 257.47 Before a market for local government can develop a number of changes
and non tax revenue in the administrative and financial framework would need to occur to
Amount Diverted from municipal tax 106.4 increase the creditworthiness of RMC. An urgent need has been felt to
and non tax revenue introduce PPP (BOT‐Build Operate Transfer) Mode and pricing of urban
Balace@ municipal Revenue 151.07 utilities and services to strengthen municipal finance and carry forward
further new development.
The augmented property tax, non tax revenue and octroi compensation 7.2.2 PHASE 2, TILL 2031:
can be used to meet financial needs and deficits of administrative and
management works, operation and maintenance of municipal services, Credit worthiness of Rourkela Municipality can be established by this
share with parastatals bodies and miscellaneous works. period and this can provide access to Municipality to various capital
markets, loans and municipal bonds. Till this period, it is expected that
RMC would repay all the loans taken from the market and would gain
self sufficiency and reliability.

281 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
7
DEVELOPMENT AND FUNDING STRATEGIES

7.3 URBAN GOVERNANCE REFORMS A separate municipal Cadre would facilitate sharing of
experiences across cities.
Proposals for Urban Governance Based on Report of the Working Group g) The functional domain of urban bodies may be restructured
on Urban Governance for 12 the Five Year Plan: under heads such as General Administration: revenue
Collection: Planning & Regulations; Water & Sanitation
a) Bringing the employees, Councilors and other office bearers
(Sewerage/Seepage Management and SWM); Health; Public
under the purview of an Ombudsman or the Lokayukta. This has
Works and Civic Amenities; Financial Management; Project
been recommended by the 13th Finance Commission one of
Management; Auditing; urban Poverty Alleviation & Social
the actions to be taken by the States for being eligible for the
welfare; Public Education and Other Services and Support
Performance Grant with effect from the year 2011‐12.
Functions.
b) Further, proper functioning of such institutions needs to be
h) Presently, the paying capacity of the local bodies particularly of
ensured through focused capacity building.
the small and medium towns is highly constrained. Thus there is
c) The non‐officials of the ULBs should also be declared as public
a need for provision for financing of the cadres from plan funds
servants under the provisions of different Laws.
in the 12th Five Year Plan.
d) As recommended by the 13th finance Commission, it is
i) Support systems for urban development and governance like
necessary to provide for regular annual audit of the accounts of
Voluntary Technical Corps need to be encouraged. Participatory
the ULBs by the Director of Local Fund Account Audit under the
forum like citizen Juries, Public Hearing Panels also have to be
technical guidance and supervision (TG&S) of the Accountant
promoted. The SHGs of the poor could be networked into a
General. Apart from the annual External Audit of the accounts,
powerful organization to give voice to the disadvantaged
it is necessary to introduce the system of social audit of various
groups.
important schemes and development work by the ULBs, on the
j) The committee recommended that an independent utility
lines of MGNREGs.
regulator should be set up at state or city level or for a cluster
e) Convergence of functions of parastatals state bodies with Local
of cities to advice regulates, monitor and adjudicate on issues
Bodies.
such as levels of service delivery, quality, pricing, equitable
f) To attract good talent into different municipal services, it is
access and roles and responsibilities of all utility providers. The
important that the Recruitment Rules provide for at least 25%
overall responsibility of the regulator would be to balance the
direct recruitment in Category A posts and 50%, in Category B.
interest of citizens, urban local bodies and service providers.
Independent regulatory mechanism has the potential to not

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 282
7
DEVELOPMENT AND FUNDING STRATEGIES

only provide comfort to the investment by public private and Rourkela is one of the towns from Odisha State. The current
partnerships but also induced efficiency and equity in urban Comprehensive Development Plan of Rourkela is design in such a way
services. that after implementation it bear the tag of one of the Smart city of
k) The group recommended that the tools of IT and E governance India. As the CDP design covers nearly all the features of Smart City
should be strengthened and adopted in all the ULBs and for Mission of India. But before discussing about the Mission a brief is
this; whatever skill up gradation is required should be done given on how Rourkela will be the smart city:

7.4.1 WHAT SHOULD BE THE VISION OF ROURKELA AS A


7.4 SMART CITY SHCEMES SMART CITY?

In the present knowledge and The Smart City Scheme strives for strengthening the planning process,
information age Indian towns and ensuring improved quality of life for all, creating conducive
cities are expanding rapidly in spatial environment of competitiveness, effective governance and generation
and demographic terms. Moreover, of employment through wider application of information
spatial information are not correlated communication technologies (ICTs) in cities and their dependent areas
with the complex urban integrated within the overall planning framework.
problems, as data generated at
various level for urban planning and
7.4.2 WHAT SHOULD BE THE OBJECTIVES?
management remains uncoordinated and redundant to support
decision‐making and leading to poor urban governance and timely To achieve the above Vision, the objectives are:
implementation of the master plan. Hence, there is an urgent need to
create common platform so as to address problems and issues in the a. To facilitate time‐bound urban planning and development
by extensively using the digital technology – GIS and
right perspective to assist cities in coping with economic realities and,
Remote Sensing;
thereby, produce high quality responsive environment and
b. To improve quality of life for all and competitiveness of
demonstrate successful urban solutions. Thus, in order to address cities by ensuring efficient and effective delivery of services
these issues in a holistic manner, the Ministry of Urban Development which should focus on smart traffic systems, smart grid
has launched the Smart City Mission for 100 cities on 25th June, 2015 technology, public safety and security, smart health

283 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
7
DEVELOPMENT AND FUNDING STRATEGIES
solutions and smart learning solutions making them II. Climate adaptation and mitigation
attracting to the people and the global investors; III. Public open spaces and playgrounds
c. To promote the use of ICTs viz broadband connectivity, d. Governance:
Internet, smart personal devices, cloud computing and I. Management Information system;
open data platform; II. E‐governance;
d. To promote effective urban governance, reengineer the
III. Institutional reengineering of planning and
regulatory framework using ICTs;
regulatory framework;
e. Involve citizen in decision making process thereby
strengthening grassroots‐up approach with reference IV. Strengthening of public participation through
Community Participation Law; and Community Participation Law;
f. To encourage innovative financing systems for smart city V. Review and revision of planning and
development. implementation laws with a view to make them
user‐friendly
7.4.3 COMPONENTS THAT WILL MAKE ROURKELA A SMART e. Financing
CITY. I. Non‐conventional and innovative development
financing mechanism.
There is a need to identify the various components under Smart City
Mission. A suggestive list of components could be as under:
Hence, CDP covers most of the components which will take Rourkela
a. Digital urban information system; Comprehensive Development Plan towards Smart City of Odisha.
b. Infrastructure
I. water supply and sanitation
7.4.4 SMART CITY FEATURES
II. Innovative waste management
III. Integrated multi‐modal, intelligent transport Some typical features of comprehensive development in Smart Cities
IV. Broadband / Wi‐Fi connectivity in public places
are described below.
V. Renewable and new energy
VI. Safety and security i. Promoting mixed land use in area‐based developments —
VII. IT‐based skill development planning for ‘unplanned areas’ containing a range of
VIII. Health care in remote areas compatible activities and land uses close to one another in
c. Environment: order to make land use more efficient. The States will
I. Air and water quality

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 284
7
DEVELOPMENT AND FUNDING STRATEGIES

enable some flexibility in land use and building bye‐laws to arts and craft, culture, sports goods, furniture, hosiery,
adapt to change; textile, dairy, etc;
ii. Housing and inclusiveness — expand housing opportunities viii. viii. Applying Smart Solutions to infrastructure and services
for all; in area‐based development in order to make them better.
iii. Creating walkable localities — reduce congestion, air For example, making Areas less vulnerable to disasters,
pollution and resource depletion, boost local economy, using fewer resources, and providing cheaper services.
promote interactions and ensure security. The road
network is created or refurbished not only for vehicles and
public transport, but also for pedestrians and cyclists, and
necessary administrative services are offered within
walking or cycling distance;
iv. Preserving and developing open spaces — parks,
playgrounds, and recreational spaces in order to enhance
the quality of life of citizens, reduce the urban heat effects
in Areas and generally promote eco‐balance; v. Promoting a
variety of transport options — Transit Oriented
Development (TOD), public transport and last mile para‐
transport connectivity;
v. Making governance citizen‐friendly and cost effective —
increasingly rely on online services to bring about
accountability and transparency, especially using mobiles to
reduce cost of services and providing services without
having to go to municipal offices;
vi. form e‐groups to listen to people and obtain feedback and
use online monitoring of programs and activities with the Figure 7.1: Smart solutions as per Smart City Mission Guidelines.
aid of cyber tour of worksites;
vii. vii. Giving an identity to the city — based on its main
economic activity, such as local cuisine, health, education,

285 Draft Proposal: Rourkela Comprehensive Development Plan 2031 for Rourkela Planning Area (RPA)
7
DEVELOPMENT AND FUNDING STRATEGIES

7.4.5 CONCLUSION

GIS based CDP of Rourkela will facilitate Rourkela Planning Area


to compete in the global competitive environment. However,
designing CDP for urban and tribal community of Rourkela
Planning Area is acted like complex entities and put forth new
challenges and opportunities for Town and Country Planning
Organisation’ planners to design the various dreams, ideas and
hopes to translate into the spatial terms. There is a need to tread
common ground so as to address problems and issues in the right
perspective to assist Rourkela’s communities in coping with
economic realities and thereby produce high quality responsive
environment and demonstrate successful urban solutions for
implementation of Rourkela CDP. Present CDP of Rourkela
tackles the real world problems after analyzing the virtual world
situations and to build smart and responsive Rourkela city.

Town and Country Planning Organisation (TCPO), Ministry of Urban Development, Government of India. 286

You might also like