unboxing / inventory checklist


No. Item name/description Quantity

1 Top Module 3

2 Bottom Module 3

3 Studs 12
2 2 2
A A B B

4 Exterior Corner Laths 4

5 Top Laths (Short+Long) 8 1 1 1

6 Bottom Laths (Short+Long) 9

7 Interior Corner Laths 4

8 Door Handle &Window Handle 1&2


Atop Atop Btop Btop

9 Door Rain Cover 1 4 12 13 14


3 5 6 7 8
10 Elecric Box + Cable Canalet 3
11 Bolts&Nuts + Screw Set 3
10
12 Interior Wall Connection Cover 4

13 Floor Connection Cover 2


9 11
14 Floor Conncetion Filler OSB 4
15
15 Short Wall+Exterior Door 1
16 Door Leaf 1 19 18
16 17
17 Short Wall 3
18 Long Wall 2
19 Long Wall Extension 2
20 Short Wall+Window 2
21 Window Leaf 2
20 17 19 18
22 Bottom connection plate 4
23 Top connection plate 4 21
24 Gasket 1
25 Mineral Wool Connection Filler 4

25
20 17
22
21
23 24

www.b2kon.com 1
TRIMOD ASSEMBLY
Please scan the code
for the assembly
2,4m x 6m x 2,5m video.

1st step A A B B
B
A
2
B

A 2

2 B

14
B

2
B

14 B

2
2
A

1 Place the bottom modules with correct order 2 “Lift” the excessive floor coverings at the 2,4m
[ Proceed this step on flat, levelled ground] sides Place the floor connection fillers inside
the channels
[ Proceed this step on flat, levelled ground]
2
2nd step

2
2
M1
A

1 Connect bottom modules and bottom


B

2 connection plates using M12 bolts&nuts


M1
2
M1
A
B 20
3 3

3 1
3
3 M12 22
2 3
3
3
Plates M12

3 Interior Connection M12

Studs M8

M8
M12
2 Place Studs to bottom module using
bolts & nuts
[ Connect Studs and bottom modules at 90º angle]
M12
[ Fully tight all the bolts & nuts after all Studs are
in place]

www.b2kon.com 2
TRIMOD ASSEMBLY
Please scan the code
for the assembly
2,4m x 6m x 2,5m video.

3rd step
Atop Atop Btop Btop
M8

Place top module, connect to studs with


1 bolts & nuts
[ Fully tight the bolt & nuts after all Studs are in
place ]
3
1 3

23
2 3
*
**
1st Interior Connection M12
2nd Plates M12
3rd Studs M8
Connect top modules an top connection+crane plates
using M12 bolts&nuts 23
2
M1
M12
M12

M8
M8

4th step

1
top
A p
to
1 B

23
24

1 top
A p
to
B

Cut the top gasket at right lenghts


and place it on the top module Correctly assembly; middle top connections
connections.

www.b2kon.com 3
TRIMOD ASSEMBLY
Please scan the code
for the assembly
2,4m x 6m x 2,5m video.

5th step

4
1 Place “Exterior Corner Laths” interior side of the studs
* [This assembly step does not require screws.
Exterior Corner Laths will stay at place with the
force applied by the walls ]

Place Short Walls

20

15
correct assembly tall pannels
20 exterior view should be in the channel

FOR RIGHT LATHS


CHECK PAGE 10

At unpacking stage,
16
dissassemble door
use only
from the wall pannel. pre drilled Alignment
holes
İmprotant
Place the wall panell with
door chasis
Assembly top laths, apply pressure at vertical and horizontal
Place the door leaf on the directions. Start from center and upper screws
hinge
start start
* ** center center
complete 2 complete
1 all all

www.b2kon.com 4
TRIMOD ASSEMBLY
Please scan the code
for the assembly
2,4m x 6m x 2,5m video.

6th step

17

Place “Exterior Corner Laths” interior side of the studs Place other “Short Walls”

7th step

correct assembly tall pannels


exterior view should be in the channel
FOR RIGHT LATHS
CHECK PAGE 10

use only
pre drilled Alignment
holes
İmprotant

Cut excessive floor covering from 2,40 m end sides,


Assembly top laths, apply pressure at vertical and horizontal
directions. Start from center and upper screws follow the assembly channel
start start
* ** center center
complete 2 complete
1 all all

www.b2kon.com 5
TRIMOD ASSEMBLY
Please scan the code
for the assembly
2,4m x 6m x 2,5m video.

7th step

Place Long Wall


Panels.
tall pannels
correct assembly should be in the channel
exterior view shorter pannels
should be on the floor

18 use only
pre drilled
holes Alignment
19 İmprotant

Assembly top laths, apply pressure at vertical and horizontal


directions. Start from center and upper screws
FOR RIGHT LATHS start start
CHECK PAGE 10 * ** center center
complete 2 complete
1 all all

8th step
Assembly bottom laths, apply pressure at vertical and horizontal Place Interior Corner Laths
directions. Start from center and down side screws with screw
start use only
center
complete pre drilled
use only all holes
pre drilled
holes

start
center
complete
all

2
For
All
for all short & long walls Corners
FOR RIGHT LATHS
CHECK PAGE 10
www.b2kon.com 6
TRIMOD ASSEMBLY
Please scan the code
for the assembly
2,4m x 6m x 2,5m video.

9th step 1 Place Mineral Wool Fillers at the connection cavities.

2 Place Interior Wall Connection Covers with screws

12

12

use only pre drilled holes

10th step

13

Align the floor coverings and stick floor


connection covers
[Floor connection covers have adhesive
tapes they do not require screw]

www.b2kon.com 7
TRIMOD ASSEMBLY
Please scan the code
for the assembly
2,4m x 6m x 2,5m video.

11th step ***DETAILS AT PAGE 11 13th step


Place cable canalet (canalets comes with self adhesive tapes) Place door rain cover assembly at the place with screws
connect the cable and electric box sockets
After everything is at right place and connected, close canalet cap
lift socket connection piece to secure and tight the conncetion

DRC
10 9

10

10

14th step
10 Assembly window handle as shown below
all parts are included at the package

12th step
Assembly door handle and lock mechanisms as shown below
all parts are included at the package

www.b2kon.com 8
TRIMOD ASSEMBLY
Please scan the code
for the assembly
2,4m x 6m x 2,5m video.

15th step to hide top module’s PVC wainscot, place and screw ceiling hiding laths
ceiling hiding laths
at the module connections on top of wainscot’s ends.

1
2
3
4
use only
pre drilled
holes

start
* ** center
complete
1 all
just CE
FI
-OF
upper IM
OD
TR
direction
smallest
Y
laths BLed
E l
M
p
Sm
et
Co
AS

16th step Sealant Application To enhance watertightness of the structure


please apply provided sealent at these connection points

Interior bottom side Studs connection’s Exterior faces Top connection side
of the exterior of of
entrance doors faces window sills Door Rain Cover

www.b2kon.com 9
TRIMOD ASSEMBLY
Please scan the code
for the assembly
2,4m x 6m x 2,5m video.

LATHS & DESCRIPTIONS


TSL6 TLL1
TSL5 19

TSL4 19
TSL1

TSL2

TSL3

TLL2

ECL1

ICL1

BSL4
BLL1

BML1
BSL1

BSL3
BDL1
18

BSL2
18

BLL2

TSL1 TOP SHORT LATH 6 PCS ECL1 EXTERIOR CORNER LATH 4 PCS BDL1 BOTTOM DOOR LATHS 1+1 PCS

TLL1 TOP LONG LATH 2 PCS ICL1 INTERIOR CORNER LATH 4 PCS BSL1 BOTTOM SHORT LATH 4PCS

CHL1 CEILING HIDING LATH 4 PCS 22 BOTTOM CONNECTION PLATE 1 PCS BML1 BOTTOM MIDDLE LATH 1 PCS
23 TOP CONNECTION PLATE 1 PCS BLL1 BOTTOM LONG LATH 2 PCS
DRC DOOR RAIN COVER 1 PCS

www.b2kon.com 10
TRIMOD ASSEMBLY
Please scan the code
for the assembly
2,4m x 6m x 2,5m video.

ELECTRICAL CONNECTION DETAILS


TRIMOD UNIMOD
2,4m x 6m x 2,5m
1 Choose the right “Electric Box”
2,4m x 2m x 2,5m
LIGHT SWITCH
WALL PLUG Choose the right electric box as shown at the label.
ELECTRIC BOX 7-1 At the labels on top of the elcetrical boxes, palces, and
OFFİCE 1/2
accesoires of the boxes are described. The marked black
box indicates the right place and box combination you need.

2 Set the correct Height & Place the box


Cable lenghts are provided longer at the production stage.
Set your optimal heigt for the assembly. Place the electric
box on the wall as shown at the picture using provided screws.

3 Measure the Cable Canalet & Place


Cable canalets are provided longer at than you need for the
assembly stage. Measure and cut at the length you want.
Place the canalet at the line that you want to connect.Screw
canelets to the walls

***4 Cable Works & Connection


*MEASURE **CUT ***STRIP ****CONNECT

Measure the top module’s cable, cut the wire at the desired length. Strip the cable and inlays to
prepare them to connection. Connect inlays with each other. Only connect the wires with same color.
MAIN ELECTRIC IN LINE Cafeully connect cables to female
& adaptors.(Provided inside
electric box package )
INTER CONNECETION LINES Make sure that symbols
and indicators are lined correctly.

Phases are marked with


RED dots.
Connect phase sides
to each other