This document is a load schedule for a proposed electrical engineering building phase 2 at the University of the Philippines Los Baños in Laguna, Philippines. It was prepared by Enrique O. Olonan & Associates and lists the project location, contents of the sheet, and people who reviewed and approved it.
This document is a load schedule for a proposed electrical engineering building phase 2 at the University of the Philippines Los Baños in Laguna, Philippines. It was prepared by Enrique O. Olonan & Associates and lists the project location, contents of the sheet, and people who reviewed and approved it.
This document is a load schedule for a proposed electrical engineering building phase 2 at the University of the Philippines Los Baños in Laguna, Philippines. It was prepared by Enrique O. Olonan & Associates and lists the project location, contents of the sheet, and people who reviewed and approved it.
ENRIQUE O. OLONAN & ASSOCIATES REPUBLIC OF THE PHILIPPINES
ARCHITECTS ENGINEERS CONSULTANTS MANUEL V. PANIS PROPOSED ELECTRICAL ENGINEERING BUILDING PHASE 2 UNIVERSITY OF THE PHILIPPINES LOS BAÑOS SUITE 305 XAVIERVILLE SQUARE CONDOMINIUM NO. 38 XAVIERVILLE AVE., LOYOLA HEIGHTS QUEZON CITY 1108 LOS BAÑOS, LAGUNA TEL. NOS.: 426 7009; 426 3002 TO 04 FAX NOS.: 927 0608; 426 7214 DR. FERNANDO O. PARAS, JR. DR. JOSE V. CAMACHO, JR.
Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910, Start/End Papers
The New York Tunnel Extension of the Pennsylvania Railroad