The document outlines the key points discussed in a meeting on 08/08/2023. It lists various action items around site progress, material procurement, quality control, planning, and coordination with vendors and clients. Key tasks include clearing RA bill measurements by 12 PM tomorrow, increasing footing and column construction, achieving daily targets for footing and PCC work, and coordinating with MEP teams and clients on other work. Daily site meetings will continue to track progress on these and other action items.
The document outlines the key points discussed in a meeting on 08/08/2023. It lists various action items around site progress, material procurement, quality control, planning, and coordination with vendors and clients. Key tasks include clearing RA bill measurements by 12 PM tomorrow, increasing footing and column construction, achieving daily targets for footing and PCC work, and coordinating with MEP teams and clients on other work. Daily site meetings will continue to track progress on these and other action items.
The document outlines the key points discussed in a meeting on 08/08/2023. It lists various action items around site progress, material procurement, quality control, planning, and coordination with vendors and clients. Key tasks include clearing RA bill measurements by 12 PM tomorrow, increasing footing and column construction, achieving daily targets for footing and PCC work, and coordinating with MEP teams and clients on other work. Daily site meetings will continue to track progress on these and other action items.
RA Bill measurements to be cleared by tomorrow 12:00PM
Mobile tower will be arrived on site on date 10.08.2023 Daily site meeting for Progress, Material, Manpower & bill status Vendor selection for compound wall sample. Written Instruction & approval needed for black japan from JLL. 65 mm Cover block making (Total stock Qty at site & Mfg start date & todays status) Waller material procurement status Site store will be ready by the Date - Quality cube reports required on daily basis. Column shuttering schedule to be given to Parag sir Daily basis cost sheet to be mail to HO GFC general drawing to be mail to JLL by tommorow Long lead items to be provide by Friday on Dated 11.08.2023 Labour report(Carpenter & fitter) to be maintain Raj Karan labour requirement to be increased. Make delay register(As like as FAME site) & mail by tomorrow 09.08.2023 HO Paver block completion work for pathway. DDS & DLS to be fill by site team & submit to planning team Plan vs Achieved & next day planning required on daily basis at the EOD Footing casting to be increased. For reinforcement checking mail to client to reduce the delay in casting work. Avoid sharing planning documents like DPR, DLR, WPR, MPR etc. direct to client (without approval from HO team , Vijay sir, Parag sir & Aditya sir) 20 no’s footing & 7 no’s columns should be cast till Saturday by Dated 12.08.2023 6 footings & 6 PCC per day target to be achieved anyhow. Mail to MEP department for CCTV installation. Make RFI & mail to client regarding 8mm steel in Plinth beam top bar. Make trial mix for another RMC plant nearby ISPAT Gate plant by 09.08.2023