2631 6100 3924 6100 6100 6100 4100 6100 6100 6100 6100 2631
A
UP
OPEN OFFICES
STAIRS
STAIRS
8850
OPEN OFFICES
B
OFFICE
LIFT
7800
OVERUN KITCHEN /
BREAKOUT SPACE
AGILE WORKING MEETING ROOM
OFICES
OFICES
C
OFFICE
WAITING /
WC LOBBY
MEETING OFFICE
8850
OPEN OFFICES ROOM
WC OFFICE /
STORE
OPEN OFFICES
STAIRS
RECEPTION
OFFICE
0m 2m 4m 6m 8m 10m
1:100 @ A1 1:200 @ A3
Rev Date Version Description Drn Chk Contractor Logo Client Logo Client Drawing Details North
SAFETY, HEALTH AND
ENVIRONMENTAL INFORMATION FI-REM
Project Name Drawing Status
In addition to the hazards/risks normally associated with the
types of work detailed on this drawing, refer to Designers Risk
Canal Mill (Botany Bay Mill) DMWR Job No.
Assessment, note the following :
PRELIMINARY
It is assumed that all works will be carried out by a competent contractor Canal Mill, Botany Brow, Chorley PR6 9AF 3908
working, where appropriate, to an approved method statement
WIP
Drawing Title Drawn By Drawn Date Checked By Scale @ A1
41 Spring Gardens
Use Dimensions - DO NOT SCALE Fourth Floor
Manchester M2 2BG Proposed Fourth Floor Plan (HQ Offices) Author 11/11/22 Checker 1 : 100
Contractors Must Verify All Dimensions On Site Before Starting Work t 0161 413 4656 Drawing Number Status Revision