JHTL ARCHITECTS

DESIGN + CONSTRUCTION
jhartzerlagatgmail.com

PROPOSED 2-STOREY RESIDENTIAL BUILDING


Specifications

Prepared by:
JULES HARTZER T. LAGAT
BS-ARCH 3A

Submitted to:
AR. ROEL MOZART ACEBES
BUILDING TECHNOLOGY 4 INSTRUCTOR

1|Page
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
GENERAL BUILDING SPECIFICATIONS

[FOR HLURB PURPOSES ONLY]

DIVISION 1: GENERAL REQUIREMENTS


01100 SUMMARY

Project Name: PROPOSED 2-STOREY RESIDENTIAL BUILDING


Project Owner: MR. RONALD MOGAN
Represented by: JULES HARTZER LAGAT
Location: NEW CARMEN, TACURONG CITY, SULTAN KUDARAT, PHILIPPINES
01200 PRICE AND PAYMENT PROCEDURES
01210 ALLOWANCES
01211- THE CONTRACTOR'S PRICE FOR THE WORK SHALL INCLUDE ALL OF THE
CONTRACTOR'S COSTS ASSOCIATED WITH SUCH ALLOWANCE OR ALLOWANCES. IF THE
ACTUAL COSTS TO THE CONTRACTOR OF SUCH ALLOWANCE OR ALLOWANCES IS
DIFFERENT FROM THE SPECIFIED SUM, INCREASES OR DECREASES IN THE COST OF THE
ALLOWANCE AND ASSOCIATED CONTRACTOR'S COST SHALL BE ADJUSTED IN
ACCORDANCE WITH THE CONSTRUCTION AGREEMENT.
01212- USE OF ALLOWANCES MUST BE REQUESTED AND APPROVED THROUGH THE
ALLOWANCE USE AUTHORIZATION FORM.
01220 CONTRACT MODIFICATION PROCEDURES
01221- REQUESTS FOR INTERPRETATION
REQUESTS FOR INTERPRETATION (RFI) WILL BE SENT ELECTRONICALLY TO THE OWNER
(PROJECT MANAGER) AND THE DP CONCURRENTLY. THE RFI MUST INDICATE THE
OWNER’S PROJECT NUMBER, RFI #, SPEC SECTION AND PLAN SHEET IMPACTED, TRADES
INVOLVED, IMAGES IF APPLICABLE, A PROPOSED SOLUTION AND POTENTIAL COST OR
TIME IMPACT.
01222- CONSTRUCTION CHANGE DIRECTIVES
USE OWNER FORM FS#16 FOR ALL CONSTRUCTION CHANGE DIRECTIVES (CCD).
NO CHANGES IN THE WORK SHALL BE UNDERTAKEN BY THE CONTRACTOR WITHOUT
WRITTEN DIRECTION BY THE OWNER AND DP (IF A DP IS ON THE PROJECT), EITHER AS A
CCD OR A CHANGE ORDER.
01223- CONSTRUCTION CHANGE PROPOSAL REQUEST
THE CCPR FORM IS REQUIRED TO BE COMPLETED BY THE CONTRACTOR WITH A DETAILED
DESCRIPTION AND COST BREAKDOWN FOR EACH INDIVIDUAL REQUESTED CHANGE.
01224- CHANGE ORDERS
NO CHANGES IN THE WORK SHALL BE UNDERTAKEN BY THE CONTRACTOR WITHOUT
WRITTEN DIRECTION BY THE OWNER AND DP (IF A DP ON THE PROJECT), EITHER AS A CCD
OR A CHANGE ORDER. ANY CHANGES MADE WITHOUT SUCH WRITTEN DIRECTION ARE
DONE SO AT THE CONTRACTOR'S OWN RISK. CHANGE ORDERS SHALL BE PROCESSED AS
IDENTIFIED IN THE CONSTRUCTION AGREEMENT.
CHANGE PROCEDURES MUST FOLLOW THE REQUIREMENTS OUTLINED IN THE
CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONTRACTOR.
01230- PAYMENT PROCEDURES
01231- SCHEDULE OF VALUES
INDIVIDUAL CONSTRUCTION ACTIVITIES WHICH ARE INDICATED BY THE SCHEDULE OF
VALUES SHALL COINCIDE WITH ACTIVITIES PRESENTED ON THE CONTRACTOR’S
CONSTRUCTION SCHEDULE. CONTRACTOR SHALL SUBMIT PROPOSED SCHEDULE OF
VALUES FOR REVIEW AND APPROVAL BY DP AND BY OWNER, PER THE CONSTRUCTION
AGREEMENT BETWEEN OWNER AND CONTRACTOR, PRIOR TO SUBMISSION OF FIRST PAY
APPLICATION.
01232- PROGRESS PAYMENT PROCEDURES

2|Page
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
CONTRACTOR WILL SUBMIT PAYMENTS ELECTRONICALLY TO THE PROJECT MANAGER, DP
AND OWNER (PROJECT MANAGER AND PROJECT ASSISTANT) CONCURRENTLY. PAYMENTS
WILL BE MEASURED AGAINST THE SCHEDULE OF VALUES AS APPROVED BY THE DP,
OWNER AND CM (AS APPLICABLE).
01300 ADMINISTRATIVE REQUIREMENTS
01310- PROJECT MANAGEMENT AND COORDINATION
01311- PROJECT COORDINATION
PROJECT COORDINATION AND COMMUNICATION PROCEDURES WILL BE DISCUSSED IN
DETAIL AT THE PRECONSTRUCTION MEETING. THE MINUTES OF THIS MEETING SHALL
SERVE AS REFERENCE AND DOCUMENTATION OF PROPER COORDINATION AND
COMMUNICATION CHANNELS.
01312- FACILITY SERVICES COORDINATION
AN EMERGENCY CONTACT SHEET WILL BE PROVIDED TO THE CONTRACTOR WITH
CONTACTS FOR THE OWNER’S DIFFERENT DEPARTMENTS IN FACILITY SERVICES. THE
CONTRACTOR WILL FILL OUT WITH THEIR EMERGENCY NUMBERS AND RETURN TO THE
OWNER FOR DISTRIBUTION.
01313- MULTIPLE CONTRACT COORDINATION
THE OWNER RESERVES THE RIGHT TO AWARD OTHER CONTRACTS RELATED TO THE
PROJECT, OR TO PERFORM CERTAIN WORK ITSELF. ANY SUCH OTHER WORK MAY OR MAY
NOT BE KNOWN TO THE OWNER OR DISCLOSED TO THE CONTRACTOR PRIOR TO
EXECUTION OF THE AGREEMENT. THE CONTRACTOR SHALL ALLOW THE OWNER AND
SUCH OTHER ADDITIONAL CONTRACTORS TO DELIVER AND STORE THE ADDITIONAL
CONTRACTORS’ OR OWNER’S MATERIALS AND EQUIPMENT AND TO EXECUTE THE
ADDITIONAL CONTRACTORS’ OR OWNER’S WORK, AND SHALL PROPERLY COORDINATE
THE CONTRACTOR’S WORK WITH THE ADDITIONAL CONTRACTORS’ OR OWNER’S WORK IN
SUCH MANNER AS THE OWNER OR DESIGN PROFESSIONAL MAY DIRECT. THE
CONTRACTOR SHALL ALSO ASSURE AT THE CONTRACTOR’S OWN COST REASONABLE
ACCESS OF ADDITIONAL CONTRACTORS TO THE CONTRACTOR’S SITE AND THE
CONTRACTOR’S WORK.
01314- PROJECT MEETINGS
REFER TO THE REQUIRED PROJECT MEETINGS IN THE CONSTRUCTION AGREEMENT.
01315- PRECONSTRUCTION MEETINGS
A PRECONSTRUCTION MEETING SHALL BE HELD FOR ALL PROJECTS. NOTIFICATION OF
THE TIME AND DATE OF SUCH CONFERENCE SHALL BE MADE TO THE SELECTED
CONTRACTOR IN THE NOTICE OF INTENT TO AWARD, OR VIA OTHER COORDINATION
METHODS.
01320 SITE MOBILIZATION MEETINGS
01321- PROGRESS MEETINGS
PROGRESS MEETINGS SHALL OCCUR ON A REGULAR BASIS (WEEKLY) ACCORDING TO A
SCHEDULE DETERMINED AT THE PRE-CONSTRUCTION CONFERENCE OR AS ESTABLISHED
IN THE CONTRACT.
01322- PRE-INSTALLATION MEETINGS
THE CONTRACTOR SHALL SCHEDULE A PRE-INSTALLATION MEETING BEFORE STARTING
ANY TRADE WORK IN THE FIELD, BETWEEN THE OWNER’S TRADE INSPECTOR(S), THE
CONTRACTOR AND SUBCONTRACTOR(S). THE CONTRACTOR PERFORMING THE WORK
(WHICH MAY BE THE CONTRACTOR IF SELF-PERFORMING OR A SUBCONTRACTOR) MUST
BE IN ATTENDANCE AT THIS MEETING. THE PRE-INSTALLATION MEETING WILL REVIEW THE
INSTALLATION AND INSPECTION PROTOCOL (QUALITY CONTROL, WORKMANSHIP
EXPECTATIONS, MEANS AND METHODS ETC.) AND REVIEW PROJECT SPECIFICATIONS AND
DRAWINGS WITH THE CONTRACTOR AND SUBCONTRACTOR(S). THE PRE-INSTALLATION
MEETINGS SHALL BE SPECIFIED WHEN APPLICABLE FOR THE FOLLOWING WORK:
• CONCRETE FORMWORK AND PLACING

3|Page
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
• WATERPROOFING
• MORTAR / MASONRY
• FLASHING
• ROOFING
• SEALANT
• VAPOR BARRIER
• PAINTING AND DRYWALL
• FIRE SPRINKLER
• FIRE ALARM
• HVAC
• PLUMBING
• ELECTRICAL
• SITE UTILITIES
01330- CONSTRUCTION PROGRESS DOCUMENTATION
01331- SCHEDULING OF WORK
IN GENERAL, HOURS OF CONSTRUCTION ACTIVITY SHALL BE LIMITED TO 7 A.M. UNTIL 7
P.M., MONDAY THROUGH FRIDAY, UNLESS WRITTEN APPROVAL IS OBTAINED FROM OWNER
(PROJECT MANAGER). ADDITIONALLY, THE CONTRACTOR SHALL AGREE TO LIMIT ANY
NOISY ACTIVITIES.
01332- CONSTRUCTION PROGRESS SCHEDULE
THE FOLLOWING REQUIREMENTS SHALL SUPPORT AND AMPLIFY THE REQUIREMENTS OF
THE CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONTRACTOR.
IN CONJUNCTION WITH THE CONTRACTOR’S CONSTRUCTION SCHEDULE, THE
CONTRACTOR SHALL PROVIDE A PROCUREMENT SCHEDULE FOR ALL MAJOR PROJECT
COMPONENTS TO BE PURCHASED AND INCORPORATED BY THE CONTRACTOR INTO THE
PROJECT.
THE PROCUREMENT SCHEDULE SHALL INDICATE SCHEDULED DELIVERY OF MAJOR
PROJECT COMPONENTS, BOTH EQUIPMENT AND MATERIALS, IN SUPPORT OF THE
ACTIVITIES INCLUDED ON THE CONTRACTOR’S CONSTRUCTION SCHEDULE.
REVISIONS TO THE CONTRACTOR’S CONSTRUCTION SCHEDULE SHALL BE COORDINATED
WITH REVISIONS TO THE PROCUREMENT SCHEDULE.
IN THE EVENT SIGNIFICANT DELAYS OR LAGS IN SCHEDULE, AS DETERMINED BY THE
OWNER, ARE ENCOUNTERED, THE CONTRACTOR SHALL PROVIDE TO THE OWNER A
REVISED CONTRACTOR’S CONSTRUCTION SCHEDULE INDICATING PROPOSED
RESCHEDULING OF SUBSEQUENT ACTIVITIES TO ACHIEVE PROJECT COMPLETION BY THE
CONTRACT COMPLETION TIME OR AMENDED COMPLETION TIME. ADDITIONS TO OR
DELETIONS FROM THE CONTRACT, AUTHORIZED THROUGH CHANGE ORDERS, SHALL BE
REFLECTED IN THE CONTRACTOR’S CONSTRUCTION SCHEDULE.
01333- SUBMITTALS SCHEDULE
THE CONTRACTOR IS REQUIRED TO MAKE SUBMITTALS FOR THE DP AND OWNER REVIEW
IN A PROMPT AND TIMELY MANNER. A SCHEDULE OF SUBMITTALS IS TO BE DELIVERED TO
THE OWNER WITHIN XX DAYS OF THE NOTICE TO PROCEED. SUBMITTALS ARE REQUIRED
FOR EACH SUBSECTION DETAILED IN THE INDIVIDUAL SECTIONS OF DIVISIONS 2 THROUGH
16.
01334- CONSTRUCTION PROGRESS REPORTING
THE CONTRACTOR SHALL MAINTAIN A WRITTEN DAILY LOG IN ACCORDANCE WITH THE
CONSTRUCTION AGREEMENT.
01335- PHOTOGRAPHIC DOCUMENTATION
PHOTOS ARE REQUIRED ON PROJECTS AS DETERMINED BY OWNER, SUBMITTED
ELECTRONICALLY WITH PAY APPLICATION, AND REPRESENTATIVE OF THE WORK FOR
WHICH THE PAY APPLICATION IS FOR. PHOTOGRAPHS SHALL BE A MINIMUM OF 5
MEGAPIXELS. A DESCRIPTION OF PHOTOS REQUIRED WILL BE DISCUSSED AT THE

4|Page
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
PRECONSTRUCTION MEETING. THE PHOTO’S FILE NAME SHALL BE LABELED WITH FIRST
THE LOCATION OF THE PHOTO, DIRECTION OF VIEW AND THEN DESCRIPTION. EXTERIOR
LOCATIONS MUST PROVIDE THE LOCATION WITH GPS COORDINATES.
01336- PROCUREMENT TRACKING
INCLUDED IN THE CONTRACTOR’S CRITICAL PATH SCHEDULE, THE CONTRACTOR SHALL
PROVIDE PROCUREMENT DURATIONS FOR ALL MAJOR PROJECT COMPONENTS
(EQUIPMENT AND MATERIAL) TO BE PURCHASED (REGARDLESS IF PURCHASED BY OWNER
OR CONTRACTOR).
EXPEDITING REPORTS/SCHEDULE CORRECTIONS SHALL BE PROVIDED BY THE
CONTRACTOR TO THE OWNER IN THE EVENT THAT SCHEDULED DELIVERIES, OF A
SIGNIFICANT NATURE, DO NOT ARRIVE AS PLANNED AND THE CONTRACTOR SHALL MAKE
ALL REASONABLE EFFORT TO EXPEDITE DELIVERIES IN ACCORDANCE WITH THE ORIGINAL
SCHEDULE.
TIME SUBMITTED BY THE CONTRACTOR ON THE BASIS OF DELAYED MATERIAL OR
EQUIPMENT DELIVERIES, SHALL BE ACCOMPANIED BY DOCUMENTATION FROM THE
VENDOR/SUPPLIER INDICATING THE DATE ORDER WAS PLACED, USUAL TIME REQUIRED
FOR DELIVERY AND THE DATE OF SCHEDULED DELIVERY.
01350 SPECIAL PROCEDURES
01351-OWNER SAFETY REQUIREMENTS
THE CONTRACTOR'S RESPONSIBILITY FOR PROJECT SAFETY IS ACCORDING TO THE
CONSTRUCTION AGREEMENT, WHICH INCLUDES SUBMITTING A WRITTEN SAFETY PLAN TO
OWNER AND DP. THIS SAFETY PLAN SHALL INCLUDE THE NAME AND CONTACT
INFORMATION OF THE CONTRACTOR/VENDOR SAFETY OFFICER, EMERGENCY CONTACT
INFORMATION, INFORMATION ON HAZARDS LIKELY TO BE ENCOUNTERED ON THE WORK
SITE, WORK SITE PPE REQUIREMENTS, AND ANY SAFETY TRAINING REQUIREMENTS,
TRAINING LOGS OR PROOF OF CERTIFICATION, AND JOB HAZARD ANALYSES (JHA’S) FOR
THE PLANNED ACTIVITIES. THE CONTRACTOR SHALL DESIGNATE AN EMPLOYEE AS SAFETY
OFFICER AT THE PROJECT SITE WHOSE DUTIES SHALL INCLUDE PREVENTION OF
ACCIDENTS AND MONITORING/ENFORCEMENT OF THE CONTRACTOR'S SAFETY PROGRAM.
THE CONTRACTOR'S SAFETY OFFICER SHALL ATTEND THE PRECONSTRUCTION MEETING.
FAILURE OF THE CONTRACTOR TO PROMPTLY CORRECT UNSAFE CONDITIONS,
SUBSEQUENT TO WRITTEN NOTIFICATION BY THE OWNER, SHALL CONSTITUTE VIOLATION
OF THE STANDARDS INDICATED HEREIN. THE OWNER RESERVES THE RIGHT, IN THE EVENT
OF SUCH VIOLATION, TO CORRECT UNSAFE CONDITIONS THROUGH THE MOST EXPEDIENT
MEANS AVAILABLE. ANY COSTS INCURRED BY THE OWNER FOR SUCH CORRECTIVE WORK
SHALL BE REIMBURSED BY THE CONTRACTOR, VIA DEDUCTIVE CHANGE ORDER.
01352- HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR CONTAMINATED
SITES
THIS INFORMATION CAN BE OBTAINED FROM THE OWNER’S OFFICE OF ENVIRONMENTAL
HEALTH & SAFETY.
01353- ENVIRONMENTAL PROCEDURES
THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL MATERIALS AND EQUIPMENT
WHICH ARE REMOVED AS PART OF THE PROJECT CONSTRUCTION PROCESS TO INCLUDE
MATERIALS BOTH ABOVE AND BELOW THE EXISTING GROUND SURFACE.
CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO DISPOSING OF SUCH MATERIALS AND
EQUIPMENT. OWNER WILL NOTIFY THE CONTRACTOR PROMPTLY IF POSSESSION IS TO BE
TAKEN BY THE OWNER.
MATERIALS NOT CLAIMED BY THE OWNER WITHIN THREE WORKING DAYS OF
NOTIFICATION OF IMPENDING DISPOSAL SHALL BE REMOVED FROM THE PROJECT SITE BY
THE CONTRACTOR AND DISPOSED OF APPROPRIATELY.
HAZARDOUS MATERIALS PROCEDURES

5|Page
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
THE CONTRACTOR SHALL INFORM OWNER (OFFICE OF ENVIRONMENTAL HEALTH & SAFETY
(EH&S) AND THE PROJECT MANAGER) OF ANY HAZARDOUS CHEMICALS THEY WILL BE
USING ON CAMPUS. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS
SPECIFIED IN OSHA'S HAZARD COMMUNICATION PROGRAM (29 CFR 1910.1200). THE
CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE SAFE AND LEGAL DISPOSAL OF
ALL CHEMICALS USED ON THE JOB SITE. IF ANY HAZARDOUS WASTE IS GENERATED ON
SITE AS A RESULT OF A PROJECT, PLEASE CONTACT OWNER (EH&S) FOR DETERMINATION
OF WHETHER THE WASTE MUST BE DISPOSED OF IN ACCORDANCE WITH EPA
REGULATIONS.
01354- SECURITY PROCEDURES
CONTRACTOR IS RESPONSIBLE FOR SECURING ACCESS TO ALL CONSTRUCTION AREAS TO
PREVENT DAMAGE OR THEFT. THIS MAY INCLUDE BUT IS NOT LIMITED TO SECURING SITE
FENCING, TEMPORARY CONSTRUCTION AND BUILDING ENTRANCES.
01400 QUALITY REQUIREMENTS
01410- CODES AND STANDARDS
ALL DESIGN AND CONSTRUCTION WORK SHALL BE DONE IN SUCH A MANNER THAT THE
COMPLETION OF THE PROJECT IS IN COMPLIANCE WITH THE FOLLOWING CODES AND
STANDARDS THE OWNER HAS ADOPTED AS CODE. WHEN REFERENCE IS MADE TO "THIS
CODE" IT SHALL MEAN ALL THE CODES LISTED BELOW. IN THE EVENT THERE IS A
CONFLICT BETWEEN ANY OF THESE CODES AND STANDARDS, THE MOST RESTRICTIVE
CODE SHALL APPLY.
PS - PHILIPPINE STANDARD
NBC - NATIONAL BUILDING CODE OF THE PHILIPPINES
NSC - NATIONAL STRUCTURAL CODE OF THE PHILIPPINES
PCP - PLUMBING CODE OF THE PHILIPPINES
PEC - PHILIPPINE ELECTRICAL CODE
01420 QUALITY CONTROL
01421- TESTING AND INSPECTING SERVICES
ALL WORK MUST BE INSPECTED AND ACCEPTED BY OWNER. ANY WORK REQUIRED TO BE
INSPECTED WHICH IS COVERED PRIOR TO INSPECTION, MUST BE UNCOVERED BY
CONTRACTOR AT CONTRACTOR’S EXPENSE.
REINFORCING STEEL OR STRUCTURAL FRAMEWORK OF ANY PART OF ANY BUILDING OR
STRUCTURE SHALL NOT BE COVERED OR CONCEALED WITHOUT FIRST OBTAINING
APPROVAL OF THE DP OR STRUCTURAL ENGINEER.
FOUNDATION INSPECTION: TO BE MADE AFTER EXCAVATIONS FOR FOOTINGS ARE
COMPLETE AND ANY REQUIRED REINFORCING STEEL IS IN PLACE. FOR CONCRETE
FOUNDATIONS, ANY REQUIRED FORMS SHALL BE IN PLACE PRIOR TO INSPECTION.
CONCRETE SLAB OR UNDER-FLOOR INSPECTION: TO BE MADE AFTER ALL IN-SLAB OR
UNDER-FLOOR BUILDING SERVICE EQUIPMENT, CONDUIT, PIPING ACCESSORIES AND
OTHER ANCILLARY EQUIPMENT ITEMS ARE IN PLACE, BUT BEFORE ANY CONCRETE IS
PLACED OR FLOOR SHEATHING INSTALLED, INCLUDING THE SUB-FLOOR.
FRAME AND ROUGH-IN MECHANICAL, PLUMBING AND ELECTRICAL INSPECTION: TO BE
MADE AFTER THE ROOF, ALL FRAMING, FIRE BLOCKING AND BRACING ARE IN PLACE AND
ALL PIPES, CHIMNEYS AND VENTS ARE COMPLETE AND THE ROUGH ELECTRICAL,
PLUMBING, AND HEATING, PIPES AND DUCTS, AND FIRE SPRINKLER PIPING ARE
APPROVED.
LATH AND/OR GYPSUM BOARD INSPECTION: TO BE MADE AFTER ALL LATHING AND
GYPSUM BOARD, INTERIOR AND EXTERIOR, IS IN PLACE BUT BEFORE ANY PLASTERING IS
APPLIED OR BEFORE GYPSUM BOARD JOINTS AND FASTENERS ARE TAPED AND FINISHED.
SUBSTANTIAL COMPLETION INSPECTION: PRIOR TO ISSUANCE OF THE SUBSTANTIAL
COMPLETION CERTIFICATE, ALL REQUIRED IN PROGRESS INSPECTIONS LISTED IN FORM
FS#15 SHALL BE PASSED. THE CONTRACTOR MUST SCHEDULE A WALKTHROUGH WITH

6|Page
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
EACH TRADE INSPECTOR INDIVIDUALLY TO SIGN OFF ON THE SUBSTANTIAL COMPLETION
LINES OF THE FS#15 AND PROVIDE A PUNCH LIST.
FINAL COMPLETION INSPECTION: PRIOR TO FINAL PAYMENT THE CONTRACTOR MUST
SCHEDULE AN ADDITIONAL WALK WITH EACH TRADE INSPECTOR ENSURE THAT ALL PUNCH
WORK IS COMPLETED AND INSPECTED, AND ALL REQUIRED INSPECTIONS LISTED IN FORM
FS#15 SHALL BE PASSED.
01500 TEMPORARY FACILITIES AND CONTROLS
01510- TEMPORARY UTILITIES
TEMPORARY CONSTRUCTION UTILITY CONNECTIONS ARE TO BE APPROVED BY OWNER
(UTILITY SERVICES DEPARTMENT) AND SHALL BE METERED.
01520- TEMPORARY NATURAL-GAS
TEMPORARY NATURAL GAS IS NOT ALLOWED. PROPANE MAY BE USED FOR TEMPORARY
HEATING.
01530- TEMPORARY TELECOMMUNICATIONS
TEMPORARY TELEPHONE SERVICE IS AVAILABLE THROUGH OWNER. CONTRACTOR IS
RESPONSIBLE FOR ALL CONNECTION, MAINTENANCE, AND SERVICE FEES.
01540- TEMPORARY WATER
TEMPORARY WATER CONNECTIONS MUST HAVE A BACK-FLOW PREVENTION DEVICE WITH
METER, OBTAINED FROM OWNER (PLUMBING DEPARTMENT) AND INSTALLED BY THE
CONTRACTOR.
01520- CONSTRUCTION FACILITIES
 THE CONTRACTOR SHALL PROVIDE A STAGING PLAN/SITE LOGISTIC PLAN AT THE
PRECONSTRUCTION MEETING. THE STAGING PLAN SHALL CLEARLY IDENTIFY THE
FOLLOWING ITEMS:
 CONSTRUCTION TRAILER
 MATERIAL STAGING
 WASH DOWN AREAS (CONCRETE, MUD, ETC.)
 DUMPSTERS
 TRAFFIC CONTROL INCLUDING SIGNALS AND BARRICADES
 SIGNAGE
 SITE FENCING INCLUDING GATE LOCATIONS AND HEIGHT OF THE FENCE
 SITE ACCESS FOR CONTRACTORS, MATERIAL DELIVERY AND WASTE HAUL OFF
 SANITARY FACILITIES
 TEMPORARY UTILITIES
 TEMPORARY PARKING
ANY OTHER PROVISION, DIRECTION OR ACCOMMODATION AGREED TO AND APPROVED BY
OWNER, THE CONTRACTOR AND DP, SHALL BE CLEARLY NOTED AND CONVEYED ON THE
STAGING/SITE DEMOLITION PLAN.

01530- FIELD OFFICES AND SHEDS


LOCATION OF FIELD OFFICE MUST BE APPROVED BY OWNER. ALL UTILITIES TO THE FIELD
OFFICE MUST BE METERED. AREA MUST BE RESTORED TO ITS ORIGINAL CONDITION
WHEN FIELD OFFICE IS REMOVED, INCLUDING DEMOLITION OF UTILITIES BACK TO THE
SOURCE.
01531- SANITARY FACILITIES
CONTRACTORS SHALL NOT USE OWNER’S SANITARY FACILITIES. CONTRACTORS ARE
RESPONSIBLE FOR PROVIDING AND MAINTAINING ADEQUATE TEMPORARY SANITATION
FACILITIES AND INDICATE LOCATION(S) ON THE SITE LOGISTICS PLAN.

01541- TEMPORARY ACCESS ROADS

7|Page
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
OPTIMUM TRUCK ROUTES AND ACCESS ROADS, INCLUDING FIRE DEPARTMENT ACCESS,
TO THE PROJECT SITE SHALL BE IDENTIFIED AT THE PRE-CONSTRUCTION CONFERENCE
AND NOTED IN THE SITE LOGISTICS PLAN.
01550 TEMPORARY BARRIERS AND ENCLOSURES
01551- TEMPORARY FENCING
PROJECT SITE FENCING
CONTRACTOR SHALL ERECT AND MAINTAIN IN GOOD CONDITION A SIX-FOOT HIGH CHAIN
LINK FENCE OF STANDARD CONSTRUCTION SURROUNDING THE PROJECT SITE AND
ENCLOSING THE AREA OF WORK AND MATERIALS STAGING. LOCATION OF THE FENCE
SHALL BE APPROVED BY THE
01600 PRODUCT REQUIREMENTS
01610 COMMON PRODUCT REQUIREMENTS
01611- SOFTWARE LICENSING REQUIREMENTS
01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS
REFER TO AGREEMENT FOR INFORMATION REGARDING ON-SITE AND OFF-SITE STORAGE.
01700 EXECUTION AND CLOSEOUT REQUIREMENTS
01710 EXECUTION
01711- CUTTING AND PATCHING
CUTTING AND PATCHING OF ASPHALT AND CONCRETE MAY NECESSITATE REMOVAL OF
EMBEDDED UTILITY SURVEY MARKERS. THE CONTRACTOR IS REQUIRED TO FIELD VERIFY
MARKER LOCATIONS PRIOR TO BIDDING AND INCLUDE REPLACEMENT OF MARKERS
WHERE NECESSARY. REFER TO DIVISION 33 FOR INSTALLATION STANDARDS.
VERIFICATION OF MARKER LOCATION REQUIRES SIGN-OFF ON THE FS#15 PRIOR TO
SUBSTANTIAL COMPLETION.
01712- CLEANING AND WASTE MANAGEMENT
01713- PROGRESS CLEANING
THE CONTRACTOR SHALL MAINTAIN ALL WORK AND STAGING AREAS IN A CLEAN AND
ORDERLY CONDITION TO ENHANCE THE SAFETY AND APPEARANCE OF THE JOBSITE.
ACCUMULATIONS OF REFUSE WILL NOT BE PERMITTED EXCEPT AS SPECIFICALLY
APPROVED IN WRITING BY THE OWNER.
CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF BLUE STAKE MARKINGS AND
RETURNING THE SITE TO ITS ORIGINAL CONDITION.
01720 SITE MAINTENANCE
01721- CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
THE CONTRACTOR WILL IDENTIFY WASTE DIVERSION OPPORTUNITIES AND TRACK WASTE
AND RECYCLING FIGURES FOR EACH OF THEIR RESPECTIVE PROJECTS. WASTE AND
WASTE DIVERSION TOTALS SHOULD BE TRACKED ON A MONTHLY BASIS AND ENTERED
INTO THE PROJECT-SPECIFIC SPREADSHEET FS#49.
THE CONTRACTOR WILL PROVIDE PROPER AND ADEQUATE TRASH CONTAINERS AT NO
ADDITIONAL COST TO THE OWNER. THESE CONTAINERS WILL BE EMPTIED AT REGULAR
INTERVALS SO THAT TRASH WILL NOT BE ALLOWED TO OVERFLOW AND/OR COLLECT
AROUND THE DUMP AREA.
THE PLACING OF TRASH OR DEBRIS IN ANY OWNER TRASH CONTAINER BY THE
CONTRACTOR OR ANY SUBCONTRACTOR IS EXPRESSLY FORBIDDEN. CONTRACTOR
SHALL BE RESPONSIBLE FOR COSTS INCURRED BY THE OWNER FOR THE REMOVAL OF
TRASH PLACED IN OWNER TRASH CONTAINERS.
01722- FINAL CLEANING
PROVIDE FINAL CLEANING OF THE WORK AREA PRIOR TO OWNER OCCUPANCY. FINAL
CLEANING SHALL MEAN CLEANING EACH SURFACE OR UNIT OF WORK TO CONDITIONS
EXPECTED IN A NEW BUILDING AND HIGH-LEVEL MAINTENANCE PROGRAM. COMPLY WITH
MANUFACTURER'S INSTRUCTIONS FOR CLEANING OPERATIONS. CLEANING SHALL
INCLUDE BUT NOT BE LIMITED TO ALL OF THE FOLLOWING AS APPLICABLE:

8|Page
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
• CLEAN TRANSPARENT/REFLECTIVE SURFACES TO A POLISHED, STREAK FREE
CONDITION INCLUDING ALL MIRRORS, WINDOWS AND DOOR GLASS. REMOVE ALL PAINT,
PUTTY, LABELS OR OTHER VISION OBSCURING MATERIALS. REPLACE ANY BROKEN OR
DAMAGED SURFACES.
• REMOVE MARKS, STAINS, FINGERPRINTS, OTHER SOIL AND DIRT FROM PAINTED,
DECORATED OR STAINED WORK.
• CLEAN POLISH AND/OR WAX WOODWORK AS PREFERRED BY OWNER.
• CLEAN LIGHT FIXTURES AND LAMPS SO AS TO FUNCTION AT FULL EFFICIENCY. REMOVE
DIRT, DUST, FINGERPRINTS, EXCESS LUBRICATION, DRYWALL, PAINT ETC. AND ALL NON-
PERMANENT LABELS.
• WIPE CLEAN ALL MECHANICAL AND ELECTRICAL EQUIPMENT; REMOVE EXCESS
LUBRICATION AND OTHER SUBSTANCES.
• CLEAN EXPOSED INTERIOR AND EXTERIOR SURFACE FINISHES TO A CONDITION FREE OF
DIRT, DUST, STAINS, FILMS OR OTHER NOTICEABLE DISTRACTING SUBSTANCE.
• CLEAN EXTERIOR AND INTERIOR METAL SURFACES, INCLUDING DOORS AND WINDOWS,
OF OIL, STAINS, DUST, DIRT, PAINT AND THE LIKE.
• CLEAN AND POLISH ALL HARD FLOORS, REMOVE DIRT, MATERIAL OR WATER STAINS,
SCRATCHES ETC.; CLEAN AND VACUUM ALL CARPETED AREAS.
• CLEAN PLUMBING FIXTURES TO POLISHED, SANITARY CONDITION FREE OF STAINS
INCLUDING THOSE RESULTING FROM WATER EXPOSURE.
• EXCEPT AS OTHERWISE INDICATED OR REQUESTED BY OWNER, REMOVE ALL
TEMPORARY PROTECTION DEVICES AND FACILITIES WHICH WERE INSTALLED DURING THE
COURSE OF THE WORK.
MAKE BUILDING READY FOR OCCUPANCY IN ALL RESPECTS. PROTECT CLEANED AREAS
UNTIL FINAL INSPECTION AND ACCEPTANCE.
ALL EXISTING IMPROVEMENTS INSIDE OR OUTSIDE THE PROPERTY WHICH HAVE BEEN
DISTURBED, DAMAGED OR DESTROYED BY THE WORK UNDER THE CONTRACT SHALL BE
RESTORED TO THE CONDITION IN WHICH THEY ORIGINALLY WERE, INCLUDING ALL
STORAGE AND STAGING AREAS. IF CONCRETE WORK WAS UNDERTAKEN AS PART OF THE
PROJECT, ALL DEBRIS OR EXCESS MATERIALS SHALL BE REMOVED FROM SITE AND THE
AREA LEFT IN A CLEAN AND TIDY STATE. FINAL INSPECTION OF STORAGE / STAGING
AREAS USED DURING CONSTRUCTION IS REQUIRED PRIOR TO FINAL PAYMENT.
IF THE CONTRACTOR FAILS TO CLEAN UP DURING, OR AT THE COMPLETION OF THE WORK,
OR FAILS TO ENFORCE SUCH CLEAN UP BY SUBCONTRACTORS, THE OWNER,
SUBSEQUENT TO ADVISING THE CONTRACTOR IN WRITING, MAY AFTER FIVE (5) WORKING
DAYS PROCEED TO PERFORM CLEAN-UP OF AREAS WHICH POSE A THREAT TO
LIFE/SAFETY OR ARE EXCESSIVELY UNSIGHTLY. THE COST OF CLEANING PROVIDED BY
THE OWNER UNDER THIS CONDITION SHALL BE BORNE BY THE CONTRACTOR, VIA
DEDUCTIVE CHANGE ORDER.
01730 CLOSEOUT PROCEDURES
01731- PRELIMINARY CLOSEOUT REVIEWS
THE CONTRACTOR SHALL REQUEST THE OWNER TO SCHEDULE A CLOSEOUT MEETING TO
BE SCHEDULED 30 DAYS PRIOR TO SUBSTANTIAL COMPLETION.
01732- FINAL CLOSEOUT REVIEW
THE CONTRACTOR WILL SCHEDULE A MEETING WITH THE OWNER AND DP WHEN THE ALL
THE DOCUMENT PACKAGES ARE READY FOR THE INDIVIDUAL SUBSTANTIAL COMPLETION,
FINAL COMPLETION AND FINAL PAYMENT PHASES.

DIVISION 2: SITE CONSTRUCTION


02050 BASIC SITE MATERIALS AND METHODS
GENERAL

9|Page
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
1. THESE NOTES CONTAIN GENERAL INFORMATION AND ARE NOT COMPLETE FOR
CONSTRUCTION PURPOSES. CONTRACTOR SHALL VERIFY INFORMATION GIVEN
HERE WITH THE SPECIFICATIONS AND OTHER DOCUMENTS AND BRING ANY
CONFLICTS TO THE ATTENTION OF THE ENGINEER BEFORE BEGINNING
AFFECTED WORK. THE ENGINEER WILL RESOLVE ANY SUCH CONFLICTS.
2. BEFORE FABRICATION AND/OR CONSTRUCTION ALL DIMENSIONS SHALL BE
VERIFIED AND COORDINATED WITH ARCHITECTURAL, ELECTRICAL, PLUMBING
AND MECHANICAL DRAWINGS.
3. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT
THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHODS OF
CONSTRUCTION, UNLESS SO STATED. THE CONTRACTOR SHALL PROVIDE ALL
NECESSARY MEASURES TO PROTECT THE STRUCTURES, ADJACENT
PROPERTY, WORKMEN AND OTHER PERSONS DURING ALL PHASES OF
CONSTRUCTION
4. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACING AND
SHORING FOR ALL STRUCTURAL MEMBERS AS REQUIRED FOR STRUCTURE
STABILITY DURING ALL PHASES
OF CONSTRUCTION.
5. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
02200 EXISTING CONDITIONS
02210- EXISTING CONDITIONS ASSESSMENT
PART 1 – GENERAL
THIS SECTION APPLIES TO ALL ACTIVITIES THAT MATERIALLY CHANGE OR AFFECT THE
CURRENT FEATURES FOUND ON CAMPUS. AREAS INCORPORATED INTO THIS SECTION
ARE CIVIL SURVEYS, GEOTECHNICAL ENGINEERING INVESTIGATION, ARCHAEOLOGICAL
STUDIES AND UTILITY MAPPING.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
ALL EXISTING BUILT SITE FEATURES SHALL BE NOTED AS TO THEIR DISPOSITION DURING
AND AFTER CONSTRUCTION, I.E., REMOVED, RELOCATED, DEMOLISHED, STORED, ETC.
CONTRACTOR IS TO PROVIDE RECORD PHOTOGRAPHS, PRIOR TO THE START OF
CONSTRUCTION, DOCUMENTING THE CONDITION OF ALL SITE FEATURES AND AREAS TO
REMAIN (I.E., PARKING LOTS, LANDSCAPE AREAS, ETC.).
ALL LANDSCAPE MATERIAL (TREES, SHRUBS, ETC.) AND IRRIGATION SUPPLY DEVICES
SHALL BE NOTED AS TO REMAIN, STORED, RELOCATED OR DEMOLISHED. IF EXISTING
PLANT MATERIAL IS TO REMAIN OR BE STORED FOR FUTURE PROJECT USE, IT SHALL BE
NOTED AS THE CONTRACTOR’S RESPONSIBILITY TO MAINTAIN SUCH PLANT MATERIAL FOR
THE DURATION OF CONSTRUCTION.
ANY EXISTING SITE FEATURE (BUILT OR PLANT MATERIAL) SHALL BE CLEARLY IDENTIFIED
AS TO WHOM WILL REMOVE, RELOCATE, DEMOLISH OR STORE IT.
02450 FOUNDATION AND LOAD-BEARING ELEMENTS
FOUNDATION
FOUNDATION DESIGN WAS BASED ON ASSUMED ALLOWABLE SOIL BEARING
CAPACITY OF 5730 PSF (275 kpa). THE CONTRACTOR SHALL VERIFY SOIL CONDITION AT
SITE & SHALL NOTIFY STRUCTURAL ENGINEER IF ACTUAL SOIL PROPERTY APPEARS
WEAKER TO THAT ASSUMED. FOUNDATION SHALL REST ON NATURAL SOIL UNLESS
OTHER WISE NOTED BY THE ENGINEER. NO PART OF FOUNDATION SHALL REST ON
FILL. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION
HAVE BEEN COMPLETED AND PRIOR TO CONCRETING TO CONFIRM THE DESIGN SOIL
BEARING CAPACITY.
02500 SITE REMEDIATION

10 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
PART 1 – GENERAL
THROUGH THE OWNER’S OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY, OWNER WILL
PROVIDE SOME INFORMATION ON POTENTIAL EXISTING SITE CONDITIONS THAT MIGHT
REQUIRE SITE REMEDIATION. THIS COULD ALSO BE DISCOVERED DURING SUBSURFACE
INVESTIGATIONS. DEPENDING ON THE NATURE OF THE REQUIRED REMEDIATION, OWNER
MAY ELECT TO EITHER HIRE AN INDEPENDENT CONTRACTOR TO CONDUCT THE
REMEDIATION EFFORT, OR HAVE THE DP AND CONTRACTOR IDENTIFY THE NATURE OF
THE REMEDIATION AND HIRE SOME EXPERTS APPROPRIATELY.
IF DURING THE COURSE OF CONSTRUCTION, SOME UNKNOWN CONDITIONS ARE
DISCOVERED BY THE CONTRACTOR, THEY SHOULD BE REPORTED IMMEDIATELY TO
OWNER’S PROJECT MANAGER WHO WILL TAKE THE APPROPRIATE MEASURE, INCLUDING
CONTACTING THE OWNER’S OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
02600 CONTAMINATED SITE MATERIAL REMOVAL
PART 1 – GENERAL
SHOULD THE CONTRACTOR ENCOUNTER CONTAMINATED SITE MATERIALS DURING
EARTHWORK ACTIVITIES, CONTRACTOR SHALL STOP ALL WORK AND REPORT
IMMEDIATELY TO OWNER (PROJECT MANAGER). DEPENDING ON THE NATURE OF THE
CONTAMINATION, OWNER WILL MAKE THE DETERMINATION TO EITHER CONTRACT THE
CONTRACTOR TO REMOVE ALL CONTAMINATED MATERIALS OR HIRE AN INDEPENDENT
CONTRACTOR TO PERFORM SUCH TASK.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A

DIVISION 3: CONCRETE

03050 BASIC CONCRETE MATERIALS & METHODS


03051 GENERAL
THIS SECTION INCLUDES ALL OPERATIONS NECESSARY FOR THE SUPPLY AND DELIVERY
OF ALL MATERIALS, LABOR, EQUIPMENT AND ALL ASSOCIATED ACTIVITIES NECESSARY TO
COMPLETE THE WORK CONFORMING TO THE FOLLOWING STANDARDS:
ASTM C-31 METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD
ASTM C-33 SPECIFICATION FOR CONCRETE AGGREGATES
ASTM C-39 METHOD OF TEST FOR COMPRESSIVE STRENGTH OF MOLDED CYLINDRICAL
CONCRETE SPECIMENS ASTM C-94 SPECIFICATION FOR READY-MIXED CONCRETE
ASTM C-143 TEST FOR SLUMP OF PORTLAND CEMENT CONCRETE
ASTM C-150 SPECIFICATION FOR PORTLAND CEMENT
ASTM A-615 SPECIFICATION FOR DEFORMED AND PLAIN BILLET STEEL BARS FOR
CONCRETE REINFORCEMENT
03052 MATERIALS
8.1 ALL CEMENT SHALL BE PORTLAND CEMENT AND SHALL BE TYPE 1, CONFORMING TO
ASTM C-150.
8.2 FINE AND COARSE AGGREGATES SHALL BE OBTAINED FROM THE APPROVED SOURCE
AS CONFORMING TO DPWH STANDARD SPECIFICATIONS AND SHALL CONFORM TO ASTM
C-33.
8.3 WATER SHALL BE POTABLE AND FREE FROM DELETERIOUS AMOUNTS OF ACIDS,
ALKALIS, OILS OR ORGANIC MATTER.

11 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
8.4 ADMIXTURES SHALL ONLY BE USED WITH THE PRIOR WRITTEN CONSENT OF THE
ENGINEER. ADMIXTURES SHALL NOT CONTAIN CALCIUM CHLORIDE. THE USE OF AN
ADMIXTURE SHALL NOT CHANGE THE REQUIRED QUANTITIES OF CEMENT SPECIFIED AND
THE QUANTITY OF ADMIXTURE USED AND METHOD OF MIXING SHALL BE IN ACCORDANCE
WITH THE MANUFACTURER’S INSTRUCTION AS THE CASE MAY BE.
8.5 REINFORCEMENT STEEL SHALL BE DEFORMED STEEL BARS CONFORMING TO
STRUCTURAL GRADE (PHIL. STANDARD) GRADE 40. SHAPES AND DIMENSIONS SHALL BE
AS INDICATED ON THE DRAWINGS.
03053 QUALITY OF CONCRETE
9.1 THE QUALITY OF CONCRETE SHALL COMPLY WITH THE “NATIONAL STRUCTURAL CODE
OF THE PHILIPPINES, VOLUME 1” AND WITH THE SPECIFIC REQUIREMENTS OUTLINED IN
THE VARIOUS SECTIONS OF THIS SPECIFICATION.
9.2 TESTING OF SAMPLES FROM CONCRETE POURS SHALL BE AS REQUIRED BY THE
“NATIONAL STRUCTURAL CODE OF THE PHILIPPINES, VOLUME 1”.
9.3 TESTS OF SPECIMENS SHALL BE DEEMED ACCEPTABLE PROVIDED THEY MEET THE
REQUIREMENTS OF THE “NATIONAL STRUCTURAL CODE OF THE PHILIPPINES, VOLUME 1”.
9.4 SHOULD FURTHER TESTING OF THE FINISHED CONCRETE BE NECESSARY BUT TEST
SPECIMENS ARE NOT AVAILABLE, IT SHALL BE CARRIED OUT IN ACCORDANCE WITH THE
APPROVED PROCEDURES LAID DOWN IN “NATIONAL STRUCTURAL CODE OF THE
PHILIPPINES, VOLUME 1”.
9.5 HARDENED CONCRETE THAT IS DEEMED NOT TO COMPLY WITH THIS SPECIFICATION,
BUT WHICH THE ENGINEER PERMITS FOR TESTING, SHALL BE SUBJECT FOR
COMPRESSIVE STRENGTH.
9.6 ANY CONCRETE WILL BE REJECTED UNDER THIS SPECIFICATION IF THE RESULTS FAIL
TO MEET THE REQUIREMENTS OF “NATIONAL STRUCTURAL CODE OF THE PHILIPPINES,
VOLUME 1”.
9.7 HARDENED CONCRETE MAY ALSO BE REJECTED AND THE ENGINEER HAS THE OPTION
TO LET THE CONTRACTOR TO DEMOLISH THE REJECTED PORTION FOR ANY ONE OF THE
FOLLOWING CONDITIONS:
A. IT IS POROUS, SEGREGATED OR HONEYCOMBED.
B. ITS PLACING HAS BEEN SO INTERRUPTED THAT THERE IS A CONSTRUCTION OR SIMILAR
JOINT NOT IN ACCORDANCE WITH THE NATIONAL STRUCTURAL CODE OF THE
PHILIPPINES, VOLUME 1.
C. THE REINFORCING STEEL IT INCORPORATES HAS BEEN DISPLACED.
D. CONSTRUCTION TOLERANCES HAVE NOT BEEN MET.
E. THE REQUIRED SURFACED FINISH HAS NOT BEEN MET.
F. THE CONCRETE CAN BE SHOWN TO BE OTHERWISE DEFECTIVE.
10.7 WATER CARRIED BY THE AGGREGATE, IN EXCESS OF THAT GIVING A SATURATED
SURFACE-DRY CONDITION SHALL BE CONSIDERED AS PART OF THE REQUIRED MIXING
WATER.
10.8 CONCRETE SHALL BE MIXED UNTIL THE MATERIALS ARE UNIFORMLY DISTRIBUTED.
THE TIME OF MIXING SHALL NOT BE LESS THAN ONE AND ONE HALF (1 ½) MINUTES AFTER
ALL INGREDIENTS ARE IN THE MIXER.
10.9 NO CONCRETE SHALL BE PLACED UNTIL THE REQUIRED BEDDING HAD BEEN LAID AND
COMPACTED, THE NECESSARY REINFORCEMENT, FORMS, AND FALSE WORK HAD BEEN
INSTALLED, HAD ATTAINED THE REQUIRED ELEVATION, INSPECTED AND APPROVED BY
THE ENGINEER. BEFORE DEPOSITING CONCRETE, ALL DEBRIS, FOREIGN MATTER, DIRT
AND WATER SHALL BE REMOVED FROM THE FORMS, AND THE SURFACE OF ANY
CONCRETE PREVIOUSLY PLACED SHALL BE CLEANED AND BRUSHED WITH CEMENT
PASTE.
10.10 NO CONCRETE SHALL BE PLACED ON FILLED GROUND UNTIL IT HAS ATTAINED THE
REQUIRED COMPACTION AND APPROVED BY THE ENGINEER.

12 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
10.11 ALL CONCRETE SHALL BE PLACED IN DAYLIGHT OR UNDER SUCH LIGHTING
CONDITION THAT MAY BE APPROVED BY THE ENGINEER AS THE CASE MAY BE.
10.12 THE METHOD AND MANNER OF PLACING CONCRETE SHALL BE SUCH AS TO AVOID
THE POSSIBILITY OF SEGREGATION OF THE CONCRETE OR THE DISPLACEMENT OF THE
REINFORCEMENT. WHERE TROUGHS OR CHUTES ARE USED IN PLACING CONCRETE, THE
ANGLE OF INCLINATION WITH RESPECT TO THE HORIZONTAL SHALL NOT EXCEED THIRTY
(30) DEGREES.
10.13 CONCRETE SHALL NOT BE ALLOWED TO DROP INTO PLACE FROM A HEIGHT
EXCEEDING ONE (1) METER.
10.14 THE PLACING OF CONCRETE SHALL BE EVENLY REGULATED TO AVOID THE
DEPOSITING OF A LARGE QUANTITY AT ANY ONE POINT. CONCRETE IN HORIZONTAL
LAYERS SHALL BE DEPOSITED AS NEAR AS PRACTICABLE TO ITS FINAL POSITION IN THE
FORMS.
10.15 CONCRETE SHALL BE DEPOSITED IN A CONTINUOUS OPERATION AS FAR AS IT IS
PRACTICABLE TO AVOID INITIAL SETTING STARTING IN ANY PART OF THE WORK BEFORE
ANOTHER FRESH CONCRETE SHALL BE PLACED AGAINST IT.
10.16 COMPACTION OF CONCRETE SHALL BE BY IMMERSION TYPE OF VIBRATOR.
VIBRATION SHALL BE LIMITED TO THE TIME NECESSARY TO PRODUCED THOROUGH
COMPACTION OF THE CONCRETE WITHOUT SEGREGATION. UNDER NO CIRCUMSTANCES,
VIBRATOR SHALL BE USED TO MOVE CONCRETE LATERALLY, NOR SHALL IT BE ALLOWED
TO PENETRATE CONCRETE IN THE PREVIOUS BATCH.
10.17 DURING PLACING AND UNTIL CURING, ALL NEW CONCRETE SHALL BE PROTECTED
AGAINST THE HARMFUL EFFECTS OF EXPOSURE TO THE ELEMENTS AND TO RUNNING
WATER.
10.18 WHEN CONCRETE HARDENS SUFFICIENTLY, IT MUST BE COVERED WITH DAMP,
CLOSED-WOVEN BURLAP OR SIMILAR MATERIAL, OR CLEAN SAND, WHICH SHALL BE KEPT
THOROUGHLY SATURATED OVER A PERIOD OF FOURTEEN (14) DAYS. WHERE WOOD
FORMS ARE USED, THEY SHALL BE KEPT WET FOR THE SAME PERIOD TO PREVENT
OPENINGS AT THE JOINTS AND DRYING OUT OF THE CONCRETE.
03054 SCOPE OF WORKS AND METHODS OF CONSTRUCTION
10.1 CONCRETE SHALL NOT BE PLACED UNTIL ALL FORMWORKS, INSTALLATION OF
REINFORCEMENT, AND THE PREPARATION OF SURFACES HAVE BEEN APPROVED BY THE
ENGINEER. PRIOR TO CONCRETING THE CONTRACTOR SHALL SUBMIT A PROPOSED
POURING SCHEDULE FOR THE VARIOUS STAGES OF THE WORK FOR APPROVAL BY THE
ENGINEER. NO CONCRETE SHALL BE POURED WITH OUT THE ENGINEER’S APPROVAL
PRESENCE. SUBSEQUENTLY, THE CONTRACTOR SHALL GIVE THE ENGINEER TWENTY
FOUR (24) HOURS NOTICE OF HIS INTENTION TO PROCEED WITH THE NEXT STAGES OF
THE WORK.
10.2 ALL BATCHES OF MORTAR OR CONCRETE SHALL BE ADJUSTED TO THE CAPACITY OF
THE MIXER. IF HAND MIXING SHALL BE ALLOWED, THE BATCH SHALL BE SO
PROPORTIONED AS TO USE ONLY FULL BAG BATCHES. IN CASE READY MIXED CONCRETE
SHALL BE USED, IT MUST COMPLY WITH ASTM C-94 AND ALL THE REQUIREMENTS
THEREIN.
10.3 ALL MORTAR AND CONCRETE SHALL BE USED WHILE FRESH AND WHEN THERE IS NO
EVIDENCE OF INITIAL SETTING. NO TAMPERING OF MORTAR OR CONCRETE WILL BE
ALLOWED.
10.4 READY MIXED CONCRETE (I.E., OFF-SITE TRANSIT MIXER CONCRETE) SHALL COMPLY
WITH ASTM C-94 AND THE REQUIREMENTS HEREIN. BATCH DELIVERIES SHALL NOT
EXCEED THE RATED CAPACITY SPECIFIED FOR THE MIXER BY ITS MANUFACTURER. THE
CONTRACTOR SHALL SUBMIT AFFIDAVITS, FOR THE APPROVAL OF THE ENGINEER,
CERTIFYING THAT THE PROPOSED MIX TO BE SUPPLIED SHALL SATISFY THE
REQUIREMENTS OF THESE SPECIFICATIONS.

13 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
10.5 THE ACCURACY OF WEIGHING EQUIPMENT AND THE ACCURACY OF BATCHING SHALL
COMPLY WITH THE APPLICABLE REQUIREMENTS OF ASTM C-94 AND ITS REFERENCE
STANDARDS. THE MATERIALS SHALL BE SO MEASURED AS TO GIVE THE REQUIRED MIX
PROPORTIONS. CEMENT AND AGGREGATES SHALL BE MEASURED BY WEIGHT OR ANY
OTHER METHOD APPROVED BY THE ENGINEER.
10.6 THE DEVICE EMPLOYED TO MEASURE AND DISCHARGE THE AMOUNT OF WATER FOR
THE MIXTURE SHALL BE CAPABLE OF ADJUSTMENT AND CHECKING.
10.7 WATER CARRIED BY THE AGGREGATE, IN EXCESS OF THAT GIVING A SATURATED
SURFACE-DRY CONDITION SHALL BE CONSIDERED AS PART OF THE REQUIRED MIXING
WATER.
10.8 CONCRETE SHALL BE MIXED UNTIL THE MATERIALS ARE UNIFORMLY DISTRIBUTED.
THE TIME OF MIXING SHALL NOT BE LESS THAN ONE AND ONE HALF (1 ½) MINUTES AFTER
ALL INGREDIENTS ARE IN THE MIXER.
10.9 NO CONCRETE SHALL BE PLACED UNTIL THE REQUIRED BEDDING HAD BEEN LAID AND
COMPACTED, THE NECESSARY REINFORCEMENT, FORMS, AND FALSE WORK HAD BEEN
INSTALLED, HAD ATTAINED THE REQUIRED ELEVATION, INSPECTED AND APPROVED BY
THE ENGINEER. BEFORE DEPOSITING CONCRETE, ALL DEBRIS, FOREIGN MATTER, DIRT
AND WATER SHALL BE REMOVED FROM THE FORMS, AND THE SURFACE OF ANY
CONCRETE PREVIOUSLY PLACED SHALL BE CLEANED AND BRUSHED WITH CEMENT
PASTE.
10.10 NO CONCRETE SHALL BE PLACED ON FILLED GROUND UNTIL IT HAS ATTAINED THE
REQUIRED COMPACTION AND APPROVED BY THE ENGINEER.
10.11 ALL CONCRETE SHALL BE PLACED IN DAYLIGHT OR UNDER SUCH LIGHTING
CONDITION THAT MAY BE APPROVED BY THE ENGINEER AS THE CASE MAY BE.
10.12 THE METHOD AND MANNER OF PLACING CONCRETE SHALL BE SUCH AS TO AVOID
THE POSSIBILITY OF SEGREGATION OF THE CONCRETE OR THE DISPLACEMENT OF THE
REINFORCEMENT. WHERE TROUGHS OR CHUTES ARE USED IN PLACING CONCRETE, THE
ANGLE OF INCLINATION WITH RESPECT TO THE HORIZONTAL SHALL NOT EXCEED THIRTY
(30) DEGREES.
10.13 CONCRETE SHALL NOT BE ALLOWED TO DROP INTO PLACE FROM A HEIGHT
EXCEEDING ONE (1) METER.
10.14 THE PLACING OF CONCRETE SHALL BE EVENLY REGULATED TO AVOID THE
DEPOSITING OF A LARGE QUANTITY AT ANY ONE POINT. CONCRETE IN HORIZONTAL
LAYERS SHALL BE DEPOSITED AS NEAR AS PRACTICABLE TO ITS FINAL POSITION IN THE
FORMS.
10.15 CONCRETE SHALL BE DEPOSITED IN A CONTINUOUS OPERATION AS FAR AS IT IS
PRACTICABLE TO AVOID INITIAL SETTING STARTING IN ANY PART OF THE WORK BEFORE
ANOTHER FRESH CONCRETE SHALL BE PLACED AGAINST IT.
10.16 COMPACTION OF CONCRETE SHALL BE BY IMMERSION TYPE OF VIBRATOR.
VIBRATION SHALL BE LIMITED TO THE TIME NECESSARY TO PRODUCED THOROUGH
COMPACTION OF THE CONCRETE WITHOUT SEGREGATION. UNDER NO CIRCUMSTANCES,
VIBRATOR SHALL BE USED TO MOVE CONCRETE LATERALLY, NOR SHALL IT BE ALLOWED
TO PENETRATE CONCRETE IN THE PREVIOUS BATCH.
10.17 DURING PLACING AND UNTIL CURING, ALL NEW CONCRETE SHALL BE PROTECTED
AGAINST THE HARMFUL EFFECTS OF EXPOSURE TO THE ELEMENTS AND TO RUNNING
WATER.
10.18 WHEN CONCRETE HARDENS SUFFICIENTLY, IT MUST BE COVERED WITH DAMP,
CLOSED-WOVEN BURLAP OR SIMILAR MATERIAL, OR CLEAN SAND, WHICH SHALL BE KEPT
THOROUGHLY SATURATED OVER A PERIOD OF FOURTEEN (14) DAYS. WHERE WOOD
FORMS ARE USED, THEY SHALL BE KEPT WET FOR THE SAME PERIOD TO PREVENT
OPENINGS AT THE JOINTS AND DRYING OUT OF THE CONCRETE.

14 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
10.19 IF THE TEMPERATURE OF THE SURROUNDING AIR IS HIGHER THAN 32 DEGREE
CELSIUS PRIOR THE POURING OF CONCRETE, THE FOLLOWING SHALL PROCEDURES
MUST BE APPLIED BY THE CONTRACTOR:
A. THE FORMWORK SHALL BE CONTINUALLY SPRAYED WITH COLD WATER IN ADVANCE OF
THE CONCRETING AND EXCESS WATER SHALL BE REMOVED FROM THE INSIDE OF THE
FORMS IMMEDIATELY PRIOR TO THE PLACEMENT OF CONCRETE.
B. THE REINFORCEMENT OF THE FORMWORK, IF METAL FORMS ARE USED, SHALL BE
PROTECTED FROM THE EFFECTS OF HOT WINDS AND DIRECT SUNLIGHT.
C. SUITABLE BARRIERS SHALL BE PROVIDED TO PROTECT THE FRESHLY PLACED
CONCRETE FROM WIND, SHALL BE COVERED AND ALLOW THE CONCRETE TO HARDEN
SUFFICIENTLY.
D. THE CONCRETE SHALL BE HELD TO A TEMPERATURE OF 32 DEGREE CELSIUS DURING
POURING.
E. THE CONCRETE SHALL BE MIXED, TRANSPORTED, PLACED AND COMPACTED AS
RAPIDLY AS POSSIBLE AND SHALL BE THEN COVERED WITH AN IMPERVIOUS MEMBRANE
AND SHALL KEPT WET FOR CURING.
03055 METHODS OF CONSTRUCTION
16.1 ALL MASONRY UNITS SHALL BE LAID PLUMBED, LEVELED AND ACCURATELY SPACED.
WALL INTERSECTION SHALL BE TOOTHED ALTERNATELY. END OF WALLS SHALL BE IN
VERTICAL LINE.
16.2 ALL MASONRY UNITS SHALL BE WETTED BEFORE LAYING. THE BLOCKS SHALL BE LAID
IN MORTAR BEDDING IN SUCH A WAY THAT NO CRACKS ARE FORMED BETWEEN THE
BLOCKS AND THE MORTAR AT THE TIME THE MASONRY UNITS ARE PLACED.
16.3 THE CONCRETE BLOCKS SHALL BE ADJUSTED TO ITS FINAL POSITION WHILE MORTAR
IS STILL SOFT AND PLASTIC TO INSURE A GOOD BOND.
16.4 THE POSITION OF THE CONCRETE BLOCK SHALL NOT BE SHIFTED AFTER THE
MORTAR HAS STIFFENED.
16.5 ALL HORIZONTAL AND VERTICAL JOINTS MUST BE FILLED SOLID WITH 3/8-INCH (9.5MM)
THICK MORTAR UNLESS OTHERWISE SPECIFIED OR DETAILED ON THE DRAWINGS. ANY
PATCHING NECESSARY TO FILL THE JOINTS SHOULD BE COMPLETED.
16.6 ALL VERTICAL MASONRY WALL REINFORCEMENT SHALL BE ANCHORED TO CONCRETE
WALL FOOTINGS AND ROOF BEAM. LIKEWISE HORIZONTAL REINFORCEMENTS SHOULD BE
ANCHORED TO COLUMN BARS AND SHALL BE TIED TO EVERY VERTICAL MASONRY WALL
REINFORCEMENTS.
16.7 FILLING OF CHB CELLS SHALL BE CARRIED OUT IN STAGES NOT EXCEEDING 3
COURSES AT A TIME AND THE CONCRETE PROPERLY COMPACTED WITHOUT DISTURBING
THE NEWLY LAID CONCRETE BLOCKS.
16.8 THE FILLER CONCRETE SHALL BE STOPPED AT A LEVEL ABOUT THIRTY SIX (36) MM. (1
½ IN.) BELOW THE TOP OF THE BLOCKS LAID, WHEN FILLING OF CONCRETE SHALL BE
STOPPED FOR MORE THAN ONE (1) HOUR.
16.9 AT THE COMPLETION OF THE WORK, ALL EXCESS MORTAR ON MASONRY SURFACES
AND MORTAR SPILLED ON FLOOR SLABS SHALL BE REMOVED.
03100 CONCRETE FORMS AND ACCESSORIES

03110 GENERAL
THE CONCRETE CONTRACTOR SHALL SUPPLY ALL FORMWORK COMPLETE WITH
NECESSARY SHORING, BRACING AND ANCHORAGE.
EARTH FORMS ARE PERMITTED IN THE FORMING OF APPROPRIATE SUBGRADE ELEMENTS.
SIDES OF EARTH FORMS SHALL BE HAND TRIMMED AND BOTTOMS SWEPT CLEAN OF ALL
LOOSE DIRT PRIOR TO PLACEMENT OF CONCRETE. NO CONCRETE SHALL BE PLACED IN
EARTH FORMS PRIOR TO REVIEW AND INSPECTION BY THE DP AND THE OWNER’S
PROJECT MANAGER.

15 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
CONCRETE VALVE COLLARS LOCATION AND PLACEMENT TO BE REVIEWED WITH DP AND
OWNER’S PROJECT MANAGER PRIOR TO PLACEMENT.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
THE PROPER CONCRETE HYDRATION REACTION IS PARTICULARLY SENSITIVE TO COLD
TEMPERATURES WHEN USING EARTH FORMS. THE FOLLOWING STANDARDS SHALL BE IN
PLACE FOR COLD WEATHER CONCRETE PLACEMENT IN ADDITION TO THE ACI 306
GUIDELINES FOR COLD WEATHER CONCRETING AS REFERENCED BY MARICOPA
ASSOCIATION OF GOVERNMENTS SPECIFICATIONS AND DETAILS FOR PUBLIC WORKS
CONSTRUCTION (MAG).
ALL TEMPERATURES REFERENCED UNDER COLD WEATHER CONCRETE ARE TO BE TAKEN
IN THE SHADE AND AWAY FROM ARTIFICIAL HEAT SOURCES. TEMPERATURES SHALL BE
COLLECTED AND RECORDED IN FAHRENHEIT DEGREES.
IN CASES WITH AMBIENT TEMPERATURE CONCRETE, CONCRETE PLACEMENT
OPERATIONS SHALL NOT BE CONTINUED WHEN A DESCENDING AIR TEMPERATURE FALLS
BELOW 40 DEGREES F; NOR SHALL CONCRETE PLACEMENT OPERATIONS BE RESUMED
UNTIL AN ASCENDING AIR TEMPERATURE REACHES 35 DEGREES F. MIXING AND PLACING
CONCRETE SHALL CONTINUE NO LATER IN ANY DAY THAN THAT TIME WHICH WILL ALLOW
SUFFICIENT TIME TO PLACE, FINISH AND PROTECT THE CONCRETE ALREADY PLACED
BEFORE THE AIR TEMPERATURE DROPS TO 35 DEGREES F.
WHEN USING HEATED CONCRETE MIXES, CONCRETE OPERATIONS MAY BE ALLOWED
WITH SPECIFIC DP AND OWNER’S PROJECT MANAGER APPROVAL, ALTHOUGH THE AIR
TEMPERATURE IN THE SHADE AND AWAY FROM ARTIFICIAL HEAT IS BELOW THE LIMIT
PERMITTED ABOVE. WHERE CONCRETE OPERATIONS ARE THUS ALLOWED, THE
CONTRACTOR SHALL USE EQUIPMENT TO HEAT THE AGGREGATES OR WATER OR BOTH,
PRIOR TO MIXING. AGGREGATES SHALL BE UNIFORMLY HEATED TO AT LEAST 60 DEGREES
F. AND SHALL HAVE NO CHUNKS OF ICE. EQUIPMENT USED TO HEAT THE AGGREGATES
SHALL BE SUCH THAT UNIFORM TEMPERATURES ARE OBTAINED THROUGHOUT THE
AGGREGATE WITHIN EACH BATCH AND FROM ONE BATCH TO ANOTHER. WATER SHALL
NOT BE HEATED IN EXCESS OF 150 DEGREES F.
THE CONTRACTOR SHALL PROVIDE ADEQUATE INSULATION OR HEAT OR BOTH, TO
PROTECT THE CONCRETE AFTER PLACEMENT. THIS PROTECTION SHALL BE TO THE
EXTENT REQUIRED TO MAINTAIN A TEMPERATURE UNDER THE INSULATION OF THE
CONCRETE OF FROM 60 TO 90 DEGREES F. FOR A PERIOD OF 72 HOURS AFTER
PLACEMENT AND FROM 40 TO 90 DEGREES F. FOR AN ADDITIONAL 96 HOURS.
REGARDLESS OF THE AIR TEMPERATURE AT THE TIME OF MIXING AND PLACING
CONCRETE, THE PROTECTION SPECIFIED ABOVE SHALL BE PROVIDED AT ALL TIMES WHEN
THE AIR TEMPERATURE IS BELOW 35 DEGREES F.
FORMS SHALL REMAIN IN PLACE THROUGHOUT ANY REQUIRED CURING PERIOD. ALL
PORTIONS OR PIECES OF ANY WOOD FORMS SHALL BE REMOVED COMPLETELY AFTER
THE CURE PERIOD HAS BEEN COMPLETED AND PRIOR TO OWNER POSSESSION.

03130 CONCRETE ACCESSORIES


PART 1 – GENERAL
ALL ANCHORS AND INSERTS IN EXTERIOR WORK EXPOSED TO WEATHER SHALL BE INSET
AND/OR PROTECTED TO PREVENT RUSTING. THE CONCRETE COVER FOR ANCHORS AND
INSERTS MUST MEET THE MINIMUM CONCRETE COVER REQUIREMENTS PER ACI 318.
PART 2 – PRODUCTS
N/A
PART 3 –
1. REBAR PLACEMENT SHOULD BE PARALLEL TO DIRECTION INDICATED

16 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
2. USE GRADE 40 BARS AND 3000 PSI (1:2:3 mix) CONCRETE
3. BOTTOM OF FOOTING SHALL BE 1.50 M FROM NATURAL GROUND LEVEL
4. BOTTOM OF WALL FOOTING SHALL BE 0.60 M FROM NATURAL GROUND LEVEL

03200 CONCRETE REINFORCEMENT

1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST


BUILDING CODE OF AMERICAN CONCRETE INSTITUTE (ACI-318).
2. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END
OF TWENTY EIGHT (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE
& SLUMPS AS FOLLOWS.

LOCATION 28 DAYS STRENGTH MAX. SIZE AGGREGATE MAX. SLUMP


FOUNDATION 3000 PSI (20.7 mpa) 3/4 IN. (19 MM) 4 IN. (100 MM)
COLUMNS 3000 PSI (20.7 mpa) 3/4 IN. (19 MM) 4 IN. (100 MM)
SUSPENDED BEAMS & 3000 PSI (20.7 mpa) 3/4 IN. (19 MM) 4 IN. (100 MM)
SLABS 3000 PSI (20.7 mpa) 3/4 IN. (19 MM) 4 IN. (100 MM)
SLAB ON GRADE 3000 PSI (20.7 mpa) 3/4 IN. (19 MM) 4 IN. (100 MM)
ALL OTHERS

3. ALL REINFORCING BARS SHALL CONFORM TO ASTM SPECS GRADE 33 (227 mpa)
FOR 12Ø & SMALLER AND GRADE 40 (275 mpa) FOR 16Ø TO 25Ø BARS.
4. IN GENERAL THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE
DETAILING REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO
UNLESS OTHERWISE SHOWN OR NOTED.
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS.

SUSPENDED SLABS 3/4 IN. (19 MM)


SLAB ON GRADE 1 1/2 IN. (38 MM)
WALLS ABOVE GRADE 1 IN. (25 MM)
BEAM STIRRUPS AND COLUMN TIES 1 1/2 IN. (38 MM)
WHERE CONCRETE IS EXPOSED TO 2 IN. (50 MM)
EARTH BUT POURED AGAINST FORMS 3 IN. (75 MM)
WHERE CONCRETE IS DEPOSITED
DIRECTLY AGAINST EARTH

6. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN


ACCORDANCE W/ TABLE 1 (TABLE OF LAP SPLICE & ANCHORAGE LENGTH)
UNLESS OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED
WHENEVER POSSIBLE.
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY
POSITIONED & SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS,
STOOLS, EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE
ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS.
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN
CONSECUTIVE DAYS IMMEDIATELY AFTER POURING BY THE USE OF WET
BURLAP FOG SPRAYING, CURING COMPOUNDS OR OTHER APPROVED
METHODS.
10. STRIPPING OF FORMS AND SHORES:
FOUNDATION 24 HRS.

17 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com

SUSPENDED SLAB EXCEPT WHEN 8 DAYS


ADDITIONAL LOADS ARE IMPOSED
WALLS 18 HRS.
BEAMS 14 DAYS

11. DEVELOPMENT LENGTH (Ld) OF REINFORCING STEEL BARS SHALL BE AS


FOLLOWS:
SIZE OF BARS (mm) DEVELOPMENT LENGTH
(mm) IF THE DEPTH OF CONCRETE
10 375 CAST IN ONE LIFT BENEATH THE
12 440 BARS EXCEEDS 300 mm,
16 590 INCREASE THE ABOVE LENGTHS
20 730 BY 1.40.
25 920 03600 GROUTING
28 1030 THE CONTRACTOR, PRIOR THE
32 1170 POURING OF ANOTHER BATCH OF
CONCRETE ON HARDENED CONCRETE SURFACE GROUTING SHALL BE MADE. BEFORE ANY
GROUTING OPERATION, ALL SURFACES TO BE GROUTED SHALL BE CLEARED OF
EXTRANEOUS MATERIALS.
03630 EPOXY GROUTING
PART 1 – GENERAL
USE OF EPOXY GROUT IS NOT ENCOURAGED. HOWEVER, IT MAY BE USED AS A RETROFIT
OR REPAIR MATERIAL UPON APPROVAL BY THE DESIGN PROFESSIONAL.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
DIVISION 4: MASONRY
04100 BASIC MASONRY MATERIALS AND METHODS
THE SCOPE OF THE WORK COVERS THE FURNISHING OF ALL LABOR, EQUIPMENT AND
MATERIALS FOR THE ERECTION OF WALLS MADE OF NON LOAD BEARING, 100MM AND/OR
150MM THICK CONCRETE HOLLOW BLOCKS. FOR EXTERIOR WALLS USE 150MM THICK CHB,
AND FOR INTERIOR WALLS USE 100MM THICK CHB.
04110 MATERIALS
15.1 ALL MATERIALS SUPPLIED UNDER THE CONTRACT SHALL CONFORM TO THE
REQUIREMENTS OF THE PHILIPPINE STANDARD ASSOCIATION AND THE NATIONAL
STRUCTURAL CODE OF THE PHILIPPINES, VOLUME 1.
15.2 RECOMMENDED STRENGTH OF CHB FOR BOTH EXTERIOR & INTERIOR WALLS OF THE
BUILDING SHALL NOT BE LESS THAN 450 PSI.
15.3 PORTLAND CEMENT MORTAR FOR LAYING CONCRETE HOLLOW BLOCKS SHALL
CONSIST OF ONE (1) PART PORTLAND CEMENT, AND THREE (3) PARTS SAND.
15.4 MORTAR MATERIALS SHALL BE ACCURATELY MEASURED BY VOLUME AND
THOROUGHLY MIXED UNTIL EVENLY DISTRIBUTED THROUGHOUT THE BATCH. UNLESS
OTHERWISE APPROVED BY THE ENGINEER, MIXING BY BATCH SHALL BE BY MECHANICAL
MIXER OF NOT LESS THAN TWO (2) MINUTES PER BATCH.
15.5 MASONRY MATERIALS SHALL BE HANDLED WITH CARE TO PREVENT CHIPPING AND
BREAKAGE. MASONRY UNITS WITH CRACK SHALL NOT BE INSTALLED AND SHALL BE
REPLACED IMMEDIATELY. MATERIAL FOR CONCRETE MASONRY UNITS SHALL BE STACKED
ON PLATFORM AND COVERED OR STORED IN ANY OTHER APPROVED MANNER THAT WILL
PROTECT THESE MATERIALS FROM CONTACT WITH THE SOIL AND EXPOSURE TO THE
WEATHER. CEMENT SHALL BE STORED OFF THE GROUND UNDER WATER TIGHT COVER

18 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
AND AWAY FROM SWEATING WALLS AND OTHER DAMP SURFACES UNTIL READY FOR USE.
DAMAGE OR DETERIORATED MATERIALS SHALL BE REMOVED FROM THE PREMISES.
15.6 ALL STEEL REINFORCEMENT FOR MASONRY WORKS SHALL BE IN ACCORDANCE WITH
THE APPROVED PLAN AND DETAILS AS SHOWN ON THE DRAWINGS.
METHODS OF CONSTRUCTION
16.1 ALL MASONRY UNITS SHALL BE LAID PLUMBED, LEVELED AND ACCURATELY SPACED.
WALL INTERSECTION SHALL BE TOOTHED ALTERNATELY. END OF WALLS SHALL BE IN
VERTICAL LINE.
16.2 ALL MASONRY UNITS SHALL BE WETTED BEFORE LAYING. THE BLOCKS SHALL BE LAID
IN MORTAR BEDDING IN SUCH A WAY THAT NO CRACKS ARE FORMED BETWEEN THE
BLOCKS AND THE MORTAR AT THE TIME THE MASONRY UNITS ARE PLACED.
16.3 THE CONCRETE BLOCKS SHALL BE ADJUSTED TO ITS FINAL POSITION WHILE MORTAR
IS STILL SOFT AND PLASTIC TO INSURE A GOOD BOND.
16.4 THE POSITION OF THE CONCRETE BLOCK SHALL NOT BE SHIFTED AFTER THE
MORTAR HAS STIFFENED.
16.5 ALL HORIZONTAL AND VERTICAL JOINTS MUST BE FILLED SOLID WITH 3/8-INCH (9.5MM)
THICK MORTAR UNLESS OTHERWISE SPECIFIED OR DETAILED ON THE DRAWINGS. ANY
PATCHING NECESSARY TO FILL THE JOINTS SHOULD BE COMPLETED.
16.6 ALL VERTICAL MASONRY WALL REINFORCEMENT SHALL BE ANCHORED TO CONCRETE
WALL FOOTINGS AND ROOF BEAM. LIKEWISE HORIZONTAL REINFORCEMENTS SHOULD BE
ANCHORED TO COLUMN BARS AND SHALL BE TIED TO EVERY VERTICAL MASONRY WALL
REINFORCEMENTS.
16.7 FILLING OF CHB CELLS SHALL BE CARRIED OUT IN STAGES NOT EXCEEDING 3
COURSES AT A TIME AND THE CONCRETE PROPERLY COMPACTED WITHOUT DISTURBING
THE NEWLY LAID CONCRETE BLOCKS.
16.8 THE FILLER CONCRETE SHALL BE STOPPED AT A LEVEL ABOUT THIRTY SIX (36) MM. (1
½ IN.) BELOW THE TOP OF THE BLOCKS LAID, WHEN FILLING OF CONCRETE SHALL BE
STOPPED FOR MORE THAN ONE (1) HOUR.
16.9 AT THE COMPLETION OF THE WORK, ALL EXCESS MORTAR ON MASONRY SURFACES
AND MORTAR SPILLED ON FLOOR SLABS SHALL BE REMOVED.
MASONRY AND CONCRETE BLOCKS
1. ALL NON-LOAD BEARING TYPE CONCRETE BLOCKS SHALL HAVE A UNIT WEIGHT
NOT TO EXCEED 80 PCF. FOR LOAD BEARING TYPE, TYPE CONCRETE BLOCKS, A
MINIMUM COMPRESSIVE STRENGTH f'm = 3.50 mpa (500psi) SHALL BE
DEVELOPED.
2. PROVIDE 1-Ø16 VERTICAL BARS AT CORNERS, INTERSECTIONS, END OF WALLS
AND EACH SIDE OF OPENINGS.
3. LINTEL BEAMS SHALL BEAR AT LEAST 8 INCHES (200 MM) ON EACH SIDE OF
MASONRY WALL OPENING.
4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS.

WALL THICKNESS VERTICAL REINFORCEMENT Ø12 HORIZONTAL REINFORCEMENT


6 IN. (150 MM) @ 600 MM Ø10 @ 600 MM
4 IN. (100 MM) Ø12 @ 600 MM Ø10 @ 600 MM

5. REINFORCING BARS SHALL BE LAPPED A MINIMUM OF 30 BAR DIAMETERS


WHERE SPLICE DOWELS FROM FOOTING OR SLABS SHALL EXTEND INTO THE
BLOCK WALL A MINIMUM OF 30 BAR DIAMETERS. REBARS TO BE PROPERLY TIED
W/ G.I. WIRE.

19 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
04200 MASONRY UNITS
04210 GENERAL
04211- SCOPE
FURNISH ALL MATERIALS, LABOR, EQUIPMENT, PLANT, TOOLS, REQUIRED TO COMPLETE:
 CONCRETE UNIT MASONRY
04212- HANDLING AND STORAGE
A. HANDLE IN A MANNER TO PREVENT UNDUE CHIPPING AND BREAKAGE
B. PROTECT STORAGE PILES, STACKS AND BINS FROM HEAVY TRAFFIC.
C. PROVIDE PLATFORMS TO PROTECT BOTTOM PILES FROM CONTACT WITH SOIL.
04213- VISUAL INSPECTION
A. ALL UNITS SHALL BE SOUND AND FREE FROM CRACKS OR OTHER DEFECTS THAT
WOULD INTERFERE WITH THE
PROPER PLACING OF THE UNIT OR IMPAIR THE STRENGTH OR PERMANENCE OF THE
CONSTRUCTION.
B. UNITS THAT ARE INTENDED TO SERVE AS A BASE FOR PLASTER SHALL HAVE
SUFFICIENTLY ROUGH SURFACE
TO AFFORD GOOD BOND.
04214- PRODUCTS
REFER TO SECTION 01020 SUMMARY OF MATERIALS AND FINISHES.
04220 EXECUTION
04221- CONCRETE UNIT MASONRY
A. LAY ALL MASONRY UNIT, PLUMB, TRUE TO LINE, LEVEL AND WITH ACCURATELY SPACED
COURSE.
B. LET THE ARCHITECT APPROVE SAMPLE OF SPECIAL STONE ARRANGEMENT WHERE
REQUIRED.
C. KEEP BOND PLUMB THROUGHOUT. KEEP CORNERS AND REVEALS PLUMB AND TRUE.
D. BUILD IN ANCHORS, WALL PLUGS AND ACCESSORIES TO MASONRY AS ERECTION
PROGRESSES.
E. BED SOLIDLY EACH COURSE IN PORTLAND CEMENT MORTAR. KEEP ALL UNITS DAMP
WHEN LAID.
F. WEDGE UNITS TERMINATING AGAINST BEAM OR SLAB SOFFITS TIGHTLY WITH MORTAR
AND REINFORCEMENT
PROPERLY SECURED TO DOWELS.
G. CONSULT DRAWINGS AS TO THE SCHEDULE OF REINFORCEMENTS.
H. MASONRY JOINTS
1. UNLESS OTHERWISE SPECIFIED OR DETAILED ON PLANS, MAKE HORIZONTAL AND
VERTICAL MORTAR
JOINTS 10 MM (3/8") WITH FULL MORTAR COVERAGE ON THE FACE SHELLS AND ON THE
WEBS. FILL
SURROUNDING CELLS.
2. FILL ALL JOINTS SOLIDLY.
3. DO NOT PERMIT FURROWING OF THE MORTAR.
I. TOOLED JOINTS
1. USE CONCAVE JOINTS WHERE TOOLED MORTAR JOINTS ARE CALLED FOR IN THE
DRAWINGS.
2. JOINTS MUST BE NEAT AND CLEAN, PLUMB AND TRUE TO LINE.
04222- UNFINISHED WORK
A. STEP BACK UNFINISHED WORK FOR JOINING WITH NEW WORK.
B. BEFORE NEW WORK IS STARTED, REMOVE ALL LOOSE MORTAR AND WET THE EXPOSED
JOINT THOROUGHLY
NOT LESS THAN ONE HOUR BEFORE LAYING NEW WORK.
04223- CLEANING

20 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
WASH FINISHED SURFACE IN A MANNER MOST APPROPRIATE AND SATISFACTORY TO THE
ARCHITECT. NO
CEMENT DUSTING IS PERMITTED FOR ANY CEMENT FINISH.
4400 STONE
04420 CAST STONE
04421 GENERAL
1.01 SCOPE OF WORK
FURNISH ALL MATERIALS, LABOR, EQUIPMENT, PLANT, TOOLS, REQUIRED TO COMPLETE:
 CAST STONE ELEMENTS FOR WINDOW SILLS, WALL CAPS, OUTDOOR LANDSCAPE
ELEMENTS
1.02 HANDLING AND STORAGE
A. HANDLE IN A MANNER TO PREVENT UNDUE CHIPPING AND BREAKAGE
B. PROTECT STORAGE PILES, STACKS AND BINS FROM HEAVY TRAFFIC.
C. PROVIDE PLATFORMS TO PROTECT BOTTOM PILES FROM CONTACT WITH SOIL.
1.03 VISUAL INSPECTION
A. ALL UNITS SHALL BE SOUND AND FREE FROM CRACKS OR OTHER DEFECTS THAT
WOULD INTERFERE WITH THE
PROPER PLACING OF THE UNIT OR IMPAIR THE STRENGTH OR PERMANENCE OF THE
CONSTRUCTION.
B. UNITS THAT ARE INTENDED TO SERVE AS A BASE FOR PLASTER SHALL HAVE
SUFFICIENTLY ROUGH SURFACE
TO AFFORD GOOD BOND.

1.04 QUALITY ASSURANCE


A. MANUFACTURER QUALIFICATIONS: A QUALIFIED MANUFACTURER OF CAST STONE
UNITS SIMILAR TO THOSE
INDICATED FOR THIS PROJECT, THAT HAS SUFFICIENT PRODUCTION CAPACITY TO
MANUFACTURE REQUIRED
UNITS, AND IS A PLANT CERTIFIED BY THE CAST STONE INSTITUTE OR THE
ARCHITECTURAL PRECAST
ASSOCIATION.
B. TESTING AGENCY QUALIFICATIONS: QUALIFIED ACCORDING TO ASTM E 329 FOR
TESTING INDICATED.
C. SOURCE LIMITATIONS FOR CAST STONE: OBTAIN CAST STONE UNITS THROUGH SINGLE
SOURCE FROM
SINGLE MANUFACTURER.
D. SOURCE LIMITATIONS FOR MORTAR MATERIALS: OBTAIN MORTAR INGREDIENTS OF A
UNIFORM QUALITY,
INCLUDING COLOR, FROM ONE MANUFACTURER FOR EACH CEMENTITIOUS COMPONENT
AND FROM ONE
SOURCE OR PRODUCER FOR EACH AGGREGATE.
E. MOCKUPS: FURNISH CAST STONE FOR INSTALLATION IN MOCKUPS SPECIFIED IN
DIVISION 4 SECTION
"UNIT MASONRY ASSEMBLIES."

1.05 DELIVERY, STORAGE, AND HANDLING


A. COORDINATE DELIVERY OF CAST STONE WITH UNIT MASONRY WORK TO AVOID
DELAYING THE WORK AND
TO MINIMIZE THE NEED FOR ON-SITE STORAGE.
B. PACK, HANDLE, AND SHIP CAST STONE UNITS IN SUITABLE PACKS OR PALLETS.
1. LIFT WITH WIDE-BELT SLINGS; DO NOT USE WIRE ROPE OR ROPES THAT MIGHT CAUSE
STAINING.
MOVE CAST STONE UNITS, IF REQUIRED, USING DOLLIES WITH WOOD SUPPORTS.

21 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
2. STORE CAST STONE UNITS ON WOOD SKIDS OR PALLETS WITH NONSTAINING,
WATERPROOF
COVERS, SECURELY TIED. ARRANGE TO DISTRIBUTE WEIGHT EVENLY AND TO PREVENT
DAMAGE TO
UNITS. VENTILATE UNDER COVERS TO PREVENT CONDENSATION.
C. STORE CEMENTITIOUS MATERIALS ON ELEVATED PLATFORMS, UNDER COVER, AND IN A
DRY LOCATION.
DO NOT USE CEMENTITIOUS MATERIALS THAT HAVE BECOME DAMP.
D. STORE MORTAR AGGREGATES WHERE GRADING AND OTHER REQUIRED
CHARACTERISTICS CAN BE
MAINTAINED AND CONTAMINATION CAN BE AVOIDED.
04700 SIMULATED MASONRY
04710 GENERAL
1.01 SUMMARY
A. SECTION INCLUDES: SIMULATED MASONRY, INCLUDING MANUFACTURED STONE
VENEER, MANUFACTURED BRICK VENEER AND TRIM.
SPECIFIER NOTE: REVISE PARAGRAPH BELOW TO SUIT PROJECT REQUIREMENTS. ADD
SECTION NUMBERS AND TITLES PER CSI MASTERFORMAT AND
SPECIFIER’S PRACTICE.
B. RELATED SECTIONS: SECTION(S) RELATED TO THIS SECTION INCLUDE:
1. FRAME SUPPORT FOR SUBSTRATE: DIVISION 5 COLD FORMED METAL FRAMING
SECTION.
2. WALL FRAMING AND SHEATHING: DIVISION 6 ROUGH CARPENTRY SECTION.
3. FLASHING: DIVISION 7 FLASHING SECTION.
4. PERIMETER SEALING AT OPENINGS: DIVISION 7 JOINT SEALERS SECTION.
5. FINISH PLASTER: DIVISION 9 LATH AND PLASTER SECTION.
6. FIREPLACES AND STOVES: DIVISION 10 FIREPLACE AND STOVE SECTION.
SPECIFIER NOTE: ARTICLE BELOW MAY BE OMITTED WHEN SPECIFYING MANUFACTURER’S
PROPRIETARY PRODUCTS AND RECOMMENDED INSTALLATION.
RETAIN REFERENCE ARTICLE WHEN SPECIFYING PRODUCTS AND INSTALLATION BY AN
INDUSTRY REFERENCE STANDARD. IF RETAINED, LIST STANDARD(S)
REFERENCED IN THIS SECTION. INDICATE ISSUING AUTHORITY NAME, ACRONYM,
STANDARD DESIGNATION AND TITLE. ESTABLISH POLICY FOR INDICATING
EDITION DATE OF STANDARD REFERENCED. CONDITIONS OF THE CONTRACT OR DIVISION
1 REFERENCES SECTION MAY ESTABLISH THE EDITION DATE OF
STANDARDS. THIS ARTICLE DOES NOT REQUIRE COMPLIANCE WITH STANDARD, BUT IS
MERELY A LISTING OF REFERENCES USED. ARTICLE BELOW SHOULD LIST
ONLY THOSE INDUSTRY STANDARDS REFERENCED IN THIS SECTION. RETAIN ONLY THOSE
REFERENCE STANDARDS TO BE USED WITHIN THE TEXT OF THIS
SECTION. ADD AND DELETE AS REQUIRED FOR SPECIFIC PROJECT.
1.02 REFERENCES
A. GENERAL: STANDARDS LISTED BY REFERENCE, INCLUDING REVISIONS BY ISSUING
AUTHORITY, FORM A PART OF THIS SPECIFICATION SECTION TO
EXTENT INDICATED. STANDARDS LISTED ARE IDENTIFIED BY ISSUING AUTHORITY,
AUTHORITY ABBREVIATION, DESIGNATION NUMBER, TITLE OR
OTHER DESIGNATION ESTABLISHED BY ISSUING AUTHORITY. STANDARDS SUBSEQUENTLY
REFERENCED HEREIN ARE REFERRED TO BY ISSUING
AUTHORITY ABBREVIATION AND STANDARD DESIGNATION.
B. ASTM INTERNATIONAL:
1. ASTM C67 STANDARD TEST METHODS FOR SAMPLING AND TESTING BRICK AND
STRUCTURAL CLAY TILE.
2. ASTM C91 STANDARD SPECIFICATION FOR MASONRY CEMENT.

22 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
3. ASTM C150 STANDARD SPECIFICATION FOR PORTLAND CEMENT.
4. ASTM C177 STANDARD TEST METHOD FOR STEADY-STATE HEAT FLUX MEASUREMENTS
AND THERMAL TRANSMISSION PROPERTIES
BY MEANS OF THE GUARDED-HOT-PLATE APPARATUS.
5. ASTM C207 STANDARD SPECIFICATION FOR HYDRATED LIME FOR MASONRY PURPOSES.
6. ASTM C270 STANDARD SPECIFICATION FOR MORTAR FOR UNIT MASONRY.
7. ASTM C482 STANDARD TEST METHOD FOR BOND STRENGTH OF CERAMIC TILE TO
PORTLAND CEMENT.
8. ASTM C567 STANDARD TEST METHOD FOR DENSITY STRUCTURAL LIGHTWEIGHT
CONCRETE.
C. UNDERWRITERS LABORATORIES, INC. (UL):
1. UL 723 STANDARD FOR SAFETY FOR SURFACE BURNING CHARACTERISTICS OF
BUILDING MATERIALS.
D. UNIFORM BUILDING CODE (UBC):
1. UBC STANDARD NO. 32-12 FOR WATER ABSORPTION.
2. UBC STANDARD NO. 14-1 KRAFT WATERPROOF BUILDING PAPER.
3. UBC STANDARD NO. 26-10 PARTS I AND IV: TEST METHOD FOR COMPRESSIVE
STRENGTH OF CYLINDRICAL CONCRETE SPECIMENS.
1.03 SYSTEM DESCRIPTION
A. PERFORMANCE REQUIREMENTS: PROVIDE [SECTION/PRODUCT TITLE] THAT HAS BEEN
MANUFACTURED, FABRICATED AND INSTALLED TO
WITHSTAND LOADS FROM [SPECIFY CODE/STANDARD REFERENCE.] AND TO MAINTAIN
[SPECIFY PERFORMANCE CRITERIA.] PERFORMANCE CRITERIA
STATED [CERTIFIED] BY MANUFACTURER WITHOUT DEFECTS, DAMAGE OR FAILURE.
SPECIFIER NOTE: ARTICLE BELOW INCLUDES SUBMITTAL OF RELEVANT DATA TO BE
FURNISHED BY CONTRACTOR BEFORE, DURING OR AFTER CONSTRUCTION.
COORDINATE THIS ARTICLE WITH ARCHITECT’S AND CONTRACTOR’S DUTIES AND
RESPONSIBILITIES IN CONDITIONS OF THE CONTRACT AND DIVISION 1 SUBMITTAL
PROCEDURES SECTION.
1.04 SUBMITTALS
A. GENERAL: SUBMIT LISTED SUBMITTALS IN ACCORDANCE WITH CONDITIONS OF THE
CONTRACT AND DIVISION 1 SUBMITTAL PROCEDURES
SECTION.
B. PRODUCT DATA: SUBMIT PRODUCT DATA, INCLUDING MANUFACTURER’S SPEC-DATA™
PRODUCT SHEET, FOR SPECIFIED PRODUCTS.
C. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS SHOWING LAYOUT, PROFILES AND
PRODUCT COMPONENTS, INCLUDING ANCHORAGE, ACCESSORIES,
FINISH COLORS, PATTERNS AND TEXTURES.
D. SAMPLES: SUBMIT SELECTION AND VERIFICATION SAMPLES FOR FINISHES, COLORS
AND TEXTURES.
E. QUALITY ASSURANCE SUBMITTALS: SUBMIT THE FOLLOWING:
1. TEST REPORTS: CERTIFIED TEST REPORTS SHOWING COMPLIANCE WITH SPECIFIED
PERFORMANCE CHARACTERISTICS AND PHYSICAL
PROPERTIES.
2. CERTIFICATES: PRODUCT CERTIFICATES SIGNED BY MANUFACTURER CERTIFYING
MATERIALS COMPLY WITH SPECIFIED PERFORMANCE
CHARACTERISTICS AND CRITERIA AND PHYSICAL REQUIREMENTS.
3. MANUFACTURER’S INSTRUCTIONS: MANUFACTURER’S INSTALLATION INSTRUCTIONS.
SPECIFIER NOTE: COORDINATE PARAGRAPH BELOW WITH PART 3 FIELD QUALITY
REQUIREMENTS ARTICLE HEREIN. RETAIN OR DELETE AS APPLICABLE.
4. MANUFACTURER’S FIELD REPORTS: MANUFACTURER’S FIELD REPORTS SPECIFIED
HEREIN.

23 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
F. CLOSEOUT SUBMITTALS: SUBMIT THE FOLLOWING:
1. OPERATION AND MAINTENANCE DATA: OPERATION AND MAINTENANCE DATA FOR
INSTALLED PRODUCTS IN ACCORDANCE WITH
DIVISION 1 CLOSEOUT SUBMITTALS (MAINTENANCE DATA AND OPERATION DATA)
SECTION. INCLUDE METHODS FOR MAINTAINING
INSTALLED PRODUCTS, AND PRECAUTIONS AGAINST CLEANING MATERIALS AND
METHODS DETRIMENTAL TO FINISHES AND PERFORMANCE.
2. WARRANTY: WARRANTY DOCUMENTS SPECIFIED HEREIN.
1.05 QUALITY ASSURANCE
A. QUALIFICATIONS:
1. INSTALLER QUALIFICATIONS: INSTALLER EXPERIENCED IN PERFORMING WORK OF THIS
SECTION WHO HAS SPECIALIZED IN INSTALLATION OF
WORK SIMILAR TO THAT REQUIRED FOR THIS PROJECT.
2. MANUFACTURER QUALIFICATIONS: MANUFACTURER CAPABLE OF PROVIDING FIELD
SERVICE REPRESENTATION DURING CONSTRUCTION AND
APPROVING APPLICATION METHOD.
SPECIFIER NOTE: PARAGRAPH BELOW SHOULD LIST OBLIGATIONS FOR COMPLIANCE WITH
SPECIFIC CODE REQUIREMENTS PARTICULAR TO THIS SECTION.
GENERAL STATEMENTS TO COMPLY WITH A PARTICULAR CODE ARE TYPICALLY
ADDRESSED IN CONDITIONS OF THE CONTRACT AND DIVISION 1 REGULATORY
REQUIREMENTS SECTION. REPETITIVE STATEMENTS SHOULD BE AVOIDED. CURRENT
DATA ON BUILDING CODE REQUIREMENTS AND PRODUCT COMPLIANCE
MAY BE OBTAINED FROM CULTURED STONE TECHNICAL SUPPORT SPECIALISTS.
PRODUCTS ARE TESTED AND LISTED BY UNDERWRITERS LABORATORIES, INC.
B. REGULATORY REQUIREMENTS: [SPECIFY APPLICABLE REQUIREMENTS OF REGULATORY
AGENCIES.].
SPECIFIER NOTE: RETAIN PARAGRAPH BELOW FOR ERECTED ASSEMBLIES (EITHER
ONSITE OR OFFSITE) REQUIRED FOR REVIEW OF CONSTRUCTION, COORDINATION
OF WORK OF SEVERAL SECTIONS, TESTING OR OBSERVATION OF OPERATION. MOCK-UPS,
WHEN ACCEPTED OR APPROVED, ESTABLISH STANDARDS BY WHICH
WORK WILL BE JUDGED. COORDINATE BELOW WITH DIVISION 1 QUALITY CONTROL (MOCK-
UP REQUIREMENTS) SECTION.
C. MOCK-UPS: INSTALL AT PROJECT SITE A JOB MOCK-UP USING ACCEPTABLE PRODUCTS
AND MANUFACTURER APPROVED INSTALLATION METHODS.
OBTAIN OWNER’S AND ARCHITECT’S ACCEPTANCE OF FINISH COLOR, TEXTURE AND
PATTERN, AND WORKMANSHIP STANDARD. COMPLY WITH
DIVISION 1 QUALITY CONTROL (MOCK-UP REQUIREMENTS) SECTION.
SPECIFIER NOTE: EDIT PARAGRAPH BELOW TO SPECIFYING MOCK-UP SIZE.
1. MOCK-UP SIZE: [SPECIFY MOCK-UP SIZE.] SAMPLE PANEL AT JOBSITE AT LOCATION AS
DIRECTED.
2. PATTERN: ILLUSTRATE FIELD PATTERN OF [STONE] [BRICK] [FIELD CUTTING OF UNITS
WHERE REQUIRED] AND COLOR AND TOOLING OF JOINTS.
3. MAINTENANCE: MAINTAIN MOCK-UP DURING CONSTRUCTION FOR WORKMANSHIP
COMPARISON; REMOVE AND LEGALLY DISPOSE OF
MOCK-UP WHEN NO LONGER REQUIRED.
4. INCORPORATION: MOCK-UP MAY BE INCORPORATED INTO FINAL CONSTRUCTION UPON
OWNER’S APPROVAL.
D. PREINSTALLATION MEETINGS: CONDUCT PREINSTALLATION MEETING TO VERIFY
PROJECT REQUIREMENTS, SUBSTRATE CONDITIONS,
MANUFACTURER’S INSTALLATION INSTRUCTIONS AND MANUFACTURER’S WARRANTY
REQUIREMENTS. COMPLY WITH DIVISION 1 PROJECT
MANAGEMENT AND COORDINATION (PROJECT MEETINGS) SECTION.

24 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
1.06 DELIVERY, STORAGE & HANDLING
A. GENERAL: COMPLY WITH DIVISION 1 PRODUCT REQUIREMENTS SECTIONS.
B. ORDERING: COMPLY WITH MANUFACTURER’S ORDERING INSTRUCTIONS AND LEAD
TIME REQUIREMENTS TO AVOID CONSTRUCTION DELAYS.
C. DELIVERY: DELIVER MATERIALS IN MANUFACTURER’S ORIGINAL, UNOPENED,
UNDAMAGED CONTAINERS WITH IDENTIFICATION LABELS INTACT.
D. STORAGE AND PROTECTION: STORE MATERIALS PROTECTED FROM EXPOSURE TO
HARMFUL WEATHER CONDITIONS AND AT TEMPERATURE AND
HUMIDITY CONDITIONS RECOMMENDED BY MANUFACTURER. STORE MORTAR AND OTHER
MOISTURE-SENSITIVE MATERIALS IN PROTECTED
ENCLOSURES; HANDLE BY METHODS THAT AVOID EXPOSURE TO MOISTURE.
1.07 PROJECT CONDITIONS
A. ENVIRONMENTAL REQUIREMENTS/CONDITIONS: AMBIENT AIR TEMPERATURE SHALL BE
IN ACCORDANCE WITH MANUFACTURER’S REQUIREMENTS.
1. MAINTAIN MATERIALS AND SURROUNDING AIR TEMPERATURE TO MINIMUM 40 DEGREES
F (4 DEGREES C) PRIOR TO, DURING AND FOR 48
HOURS AFTER COMPLETION OF WORK.
2. PROTECT MATERIALS FROM RAIN, MOISTURE AND FREEZING TEMPERATURES PRIOR
TO, DURING AND FOR 48 HOURS AFTER COMPLETION OF
WORK.
3. ALLOW NO CONSTRUCTION ACTIVITY ON OPPOSITE SIDE OF WALL DURING
INSTALLATION AND FOR 48 HOURS AFTER COMPLETION OF WORK.
SPECIFIER NOTE: COORDINATE ARTICLE BELOW WITH CONDITIONS OF THE CONTRACT
AND WITH DIVISION 1 CLOSEOUT SUBMITTALS (WARRANTY) SECTION.
1.08 WARRANTY
A. PROJECT WARRANTY: REFER TO CONDITIONS OF THE CONTRACT FOR PROJECT
WARRANTY PROVISIONS.
B. MANUFACTURER’S WARRANTY: SUBMIT, FOR OWNER’S ACCEPTANCE,
MANUFACTURER’S STANDARD WARRANTY DOCUMENT EXECUTED BY
AUTHORIZED COMPANY OFFICIAL. MANUFACTURER’S WARRANTY IS IN ADDITION TO, AND
NOT A LIMITATION OF, OTHER RIGHTS OWNER MAY HAVE
UNDER CONTRACT DOCUMENTS.
SPECIFIER NOTE: COORDINATE PARAGRAPH BELOW WITH MANUFACTURER’S WARRANTY
REQUIREMENTS. CULTURED STONE PRODUCTS ARE COVERED FOR A
PERIOD OF 50 YEARS FROM THE DATE OF PURCHASE WHEN USED ON A STRUCTURE THAT
CONFORMS TO LOCAL BUILDING CODES AND WHEN INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER’S INSTRUCTIONS.
1. WARRANTY PERIOD: [SPECIFY TERM.] YEARS COMMENCING ON DATE OF SUBSTANTIAL
COMPLETION.
2.02 PRODUCT SUBSTITUTIONS
A. SUBSTITUTIONS: NO SUBSTITUTIONS PERMITTED.
2.03 RELATED MATERIALS
A. RELATED MATERIALS: REFER TO OTHER SECTIONS LISTED IN RELATED SECTIONS
SPECIFIED HEREIN FOR RELATED MATERIALS.
B. MORTAR:
1. PORTLAND CEMENT, ASTM C150, TYPE I OR MASONRY CEMENT (TYPE N), ASTM C91.
2. MASONRY SAND.
3. LIME: ASTM C207.
4. IRON OXIDE PIGMENTS.
C. MASONRY SEALER: [IF SPECIFYING USE: BREATHER TYPE (NON-FILM FORMING)
SEALER.].

25 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
D. WEATHER RESISTANT BARRIER: KRAFT WATERPROOF BUILDING PAPER, UBC
STANDARD NO. 14-1 OR ASTM D226 FOR TYPE 1 FELT.
E. METAL LATH: 18 GAUGE GALVANIZED WOVEN WIRE MESH OR GALVANIZED [2.5 LB (1.1
KG) FLAT DIAMOND MESH] [3.4 LB (1.5 KG) FLAT RIB].
2.04 MORTAR MIXES
A. MIXING: MIX PROPRIETARY MATERIALS IN ACCORDANCE WITH MANUFACTURER’S
INSTRUCTIONS, INCLUDING PRODUCT DATA AND PRODUCT
TECHNICAL BULLETINS. THOROUGHLY MIX MORTAR INGREDIENTS IN QUANTITIES NEEDED
FOR IMMEDIATE USE IN ACCORDANCE WITH ASTM
C270, TYPE N. DO NOT USE ANTIFREEZE COMPOUNDS TO LOWER THE FREEZING POINT OF
MORTAR
2.05 SOURCE QUALITY
A. SOURCE QUALITY: OBTAIN [PRODUCT TITLE] MATERIALS FROM A SINGLE
MANUFACTURER.
PART 3 EXECUTION
SPECIFIER NOTE: ARTICLE BELOW IS AN ADDITION TO THE CSI SECTIONFORMAT AND A
SUPPLEMENT TO MANU-SPEC. REVISE ARTICLE BELOW TO SUIT
PROJECT REQUIREMENTS AND SPECIFIER’S PRACTICE.
3.01 MANUFACTURER’S INSTRUCTIONS
A. COMPLIANCE: COMPLY WITH MANUFACTURER’S PRODUCT DATA, INCLUDING PRODUCT
TECHNICAL BULLETINS, PRODUCT CATALOG INSTALLATION
INSTRUCTIONS AND PRODUCT CARTON INSTRUCTIONS FOR INSTALLATION.
3.02 EXAMINATION
A. SITE VERIFICATION OF CONDITIONS: VERIFY SUBSTRATE CONDITIONS, WHICH HAVE
BEEN PREVIOUSLY INSTALLED UNDER OTHER SECTIONS, ARE
ACCEPTABLE FOR PRODUCT INSTALLATION IN ACCORDANCE WITH MANUFACTURER’S
INSTRUCTIONS.
3.03 PREPARATION
SPECIFIER NOTE: EDIT ARTICLE BELOW TO SPECIFY REQUIREMENTS FOR SUBSTRATES
USED ON PROJECT.
A. SURFACE PREPARATION: [SPECIFY APPLICABLE PRODUCT PREPARATION
REQUIREMENTS.].
1. OPEN STUD: INSTALL PAPERBACKED METAL LATH TO STUDS USING GALVANIZED NAILS
OR STAPLES WHICH PENETRATE A MINIMUM OF
1 INCH AND 4 INCHES (25.4 AND 102 MM) ON CENTER. APPLY 1/2 INCH - 3/4 INCH (12.7 - 19.1
MM) SCRATCH COAT AND ALLOW TO
DRY 48 HOURS. WRAP WEATHER RESISTANT BARRIER AND METAL LATH A MINIMUM OF 16
INCHES (406 MM) AROUND ALL OUTSIDE AND
INSIDE CORNERS.
2. SHEATHED SURFACES: INSTALL 1 LAYER OF WEATHER RESISTANT BARRIER WITH LAP
JOINTS 4 INCHES (102 MM) SHINGLE FASHION. APPLY
CODE APPROVED METAL LATH, ATTACH WITH GALVANIZED NAILS OR STAPLES WHICH
PENETRATE A MINIMUM OF 1 INCH (25.4 MM).
APPLY 6 INCHERS (152 MM) ON CENTER VERTICALLY AND 16 INCHES (406 MM) ON CENTER
HORIZONTALLY. WRAP WEATHER RESISTANT
BARRIER AND METAL LATH A MINIMUM OF 16 INCHES (406 MM) AROUND ALL OUTSIDE AND
INSIDE CORNERS.
3. CONCRETE AND MASONRY SURFACES, NEW, CLEAN AND UNTREATED: NO
PREPARATION NEEDED. EXAMINE NEWLY POURED CONCRETE
CLOSELY TO ENSURE THAT ITS FINISHED SURFACE CONTAINS NO RELEASING AGENTS
(FORM OIL). IF IT DOES CONTAIN FORM OIL, ETCH

26 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
SURFACE WITH MURIATIC ACID, RINSE THOROUGHLY AND/OR SCORE WITH A WIRE BRUSH,
OR USE HIGH PRESSURE WATER OR SANDBLASTING
TO REMOVE.
4. EXISTING CONCRETE AND MASONRY SURFACES: IF REQUIRED, REMOVE PAINT,
COATINGS, SEALERS AND DIRT AS RECOMMENDED
HEREIN.
SPECIFIER NOTE: RETAIN PARAGRAPH EITHER ABOVE OR BELOW.
5. APPLY METAL LATH TO SURFACES; ATTACH WITH GALVANIZED CONCRETE NAILS THAT
PENETRATE A MINIMUM OF 1 INCH (25.4 MM).
APPLY 6 INCHES (152 MM) APART, 16 INCHES (406 MM) ON CENTER.
SPECIFIER NOTE: COORDINATE ARTICLE BELOW WITH MANUFACTURER’S RECOMMENDED
INSTALLATION DETAILS AND REQUIREMENTS. MANUFACTURER
RECOMMENDS SPREADING OUT CULTURED STONE PRODUCTS AT THE JOBSITE SO THERE
IS A GOOD VARIETY OF SIZES, SHAPES AND COLORS FROM WHICH TO
CHOOSE. PLAN SOME VARIETY AND CONTRAST IN THE OVERALL DESIGN. USE SMALL
STONES NEXT TO LARGE ONES, HEAVY-TEXTURED PIECES NEXT TO
SMOOTH AND THICK STONES NEXT TO THINNER ONES. MIXING CULTURED STONE
PRODUCTS FROM DIFFERENT BOXES DURING APPLICATION WILL ALLOW A
DESIRABLE BALANCE OF INDIVIDUAL STONES ON THE FINISHED PROJECT. TINTING
MORTAR COMPLEMENTS THE COLOR OF THE STONE BEING INSTALLED.
EXAMPLE: USE TAN MORTAR WITH EARTH TONE STONES. THIS WILL GREATLY ENHANCE
THE APPEARANCE OF THE FINISHED INSTALLATION. REGULAR MORTARS CAN BE TINTED
TO COMPLEMENT CULTURED STONE PRODUCTS USING IRON OXIDE PIGMENTS.
3.04 MANUFACTURED STONE VENEER INSTALLATION
SPECIFIER NOTE: IF STONE IS BEING APPLIED IN HOT OR DRY WEATHER, THE BACK OF
EACH PIECE SHOULD BE MOISTENED WITH A FINE SPRAY OF WATER OR
A WET BRUSH TO ADEQUATELY PREVENT EXCESSIVE ABSORPTION OF MOISTURE FROM
THE MORTAR. IF BEING INSTALLED OVER CONCRETE, MASONRY OR
SCRATCH COAT SUBSTRATE, THE SUBSTRATE SURFACE AREA SHOULD ALSO BE
DAMPENED BEFORE APPLYING MORTAR. APPLICATIONS SHOULD BE PROTECTED
FROM FREEZING AS MORTAR WILL NOT SET UP PROPERLY UNDER SUCH CONDITIONS. DO
NOT USE ANTIFREEZE COMPOUNDS TO LOWER THE FREEZING POINT OF MORTAR.
SPECIFIER NOTE: EDIT PARAGRAPH BELOW. APPLY MORTAR AND STONE WORKING FROM
THE BOTTOM UP, OR MOST STONES CAN BE APPLIED FROM THE TOP DOWN. WORKING
FROM THE TOP DOWN MAY HELP AVOID SPLASHING PREVIOUSLY APPLIED STONE WITH
DRIPPING MORTAR. LEDGESTONE TYPES SHOULD BE
INSTALLED FROM THE BOTTOM UP. USING A TROWEL, APPLY MORTAR 1/2 INCH - 3/4 INCH
(12.7 - 19.1 MM) THICK TO PREPARED SURFACE AREA. DO NOT
SPREAD MORE THAN A WORKABLE AREA OF 5 - 10 FT2 (0.47 - 0.93 M2) SO THAT MORTAR
WILL NOT “SET UP” BEFORE STONE IS APPLIED.
A. MORTAR: APPLY 1/2 INCH - 3/4 INCH (12.7 - 19.1 MM) OF MORTAR TO [LATH] [DAMPENED
MASONRY, STUCCO OR CONCRETE SURFACES],
COVERING A MAXIMUM OF 10 FT2 (0.93 M2) AT ONE TIME. PRESS THE UNITS FIRMLY INTO
POSITION IN SOFT MORTAR BED, WIGGLE AND APPLY
SLIGHT PRESSURE TO UNIT TO ENSURE FIRM BONDING, CAUSING MORTAR TO EXTRUDE
SLIGHTLY AROUND EDGES OF UNITS.
SPECIFIER NOTE: EDIT PARAGRAPH BELOW. IN ORDER TO OBTAIN THE MOST NATURAL
LOOK, JOINTS SHOULD BE AS NARROW AS POSSIBLE; AVERAGE JOINT
SHOULD NOT EXCEED 1/2 INCH (12.7 MM) IN WIDTH. AN ATTRACTIVE LOOK CAN ALSO BE
ACHIEVED BY FITTING STONES TIGHTLY TOGETHER IF DESIRED.
B. JOINTS: PLACE UNITS WITH UNIFORM MORTAR JOINTS. STONE JOINTS SHOULD NOT BE
OVER 1/2 INCH - 3/4 INCH (12.7 - 19.1 MM) IN WIDTH.

27 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
WHEN INSTALLING PRE-FITTED STONE TEXTURES, [PRO-FIT LEDGESTONE] [CAROLINA
LEDGESTONE] [EUROPEAN CASTLE STONE], UNITS SHOULD
BE FITTED TIGHT AGAINST EACH OTHER WITH NO ALLOWANCE FOR MORTAR JOINTS.
BRICK JOINTS SHOULD BE A UNIFORM 3/8 INCH (9.5 MM) IN
WIDTH, WITH HORIZONTAL JOINTS LEVEL, [WITH HEAD JOINTS OF BRICK EVENLY SPACED
AND CENTERED ABOVE UNIT BELOW]. INSTALL OUTSIDE
CORNER RETURN UNITS WITH SHORT AND LONG LENGTHS ALTERNATED.
1. REMOVE EXCESS MORTAR; DO NOT ALLOW MORTAR TO SET UP ON FACE OF UNITS.
POINT [RAKE] AND TOOL JOINTS BEFORE MORTAR HAS
SET. CLEAN AND FINISH JOINTS IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS.
SPECIFIER NOTE: EXTERIOR APPLICATIONS: ON EXTERIOR APPLICATIONS, THE
INCORRECT INSTALLATION OR ABSENCE OF FLASHING, CANT STRIPS, GUTTERS AND
DOWNSPOUTS MAY RESULT IN DIVERSION OF WATER RUNOFF ONTO FINISHED SURFACE
AREAS. MASONRY AND OTHER BUILDING PRODUCTS SUBJECTED TO THESE
CONDITIONS MAY DEVELOP STAINING AND, WHEN COMBINED WITH SEVERE FREEZE/THAW
CONDITIONS, MAY EVENTUALLY CAUSE SURFACE DAMAGE. THE
APPLICATION OF CULTURED STONE UNDER THESE CONDITIONS IS NOT RECOMMENDED.
C. SETTING UNITS: PRESS EACH STONE INTO THE MORTAR SETTING BED FIRMLY ENOUGH
TO SQUEEZE SOME MORTAR OUT AROUND THE STONE’S
EDGES. APPLY PRESSURE TO THE STONE TO ENSURE A GOOD BOND. ENSURE COMPLETE
COVERAGE BETWEEN THE MORTAR BED AND BACK
SURFACE OF THE STONE. MORTAR MAY ALSO BE APPLIED TO THE ENTIRE BACK OF THE
STONE.
1. INSTALL HEARTH PIECES IN A FULL 1/2 INCH - 3/4 INCH (12.7 - 19.1 MM) DEEP MORTAR
SETTING BED.
D. CUTTING: PERFORM NECESSARY CUTTING WITH PROPER TOOLS TO PROVIDE UNIFORM
EDGES; TAKE CARE TO PREVENT BREAKING UNIT CORNERS OR
EDGES.
E. FINISH COLOR/TEXTURES/PATTERNS: [SPECIFY INSTALLATION FINISHES COORDINATED
WITH FINISHES SPECIFIED IN PART 2 PRODUCTS.].
F. RELATED PRODUCTS INSTALLATION: REFER TO OTHER SECTIONS LISTED IN RELATED
SECTIONS SPECIFIED HEREIN FOR RELATED MATERIALS
INSTALLATION.
3.05 FIELD QUALITY REQUIREMENTS
SPECIFIER NOTE: EDIT PARAGRAPH BELOW. ESTABLISH NUMBER AND DURATION OF
PERIODIC SITE VISITS WITH OWNER AND MANUFACTURER, AND SPECIFY
BELOW. CONSULT WITH MANUFACTURER FOR SERVICES REQUIRED. COORDINATE
PARAGRAPH BELOW WITH DIVISION 1 QUALITY ASSURANCE SECTION AND
PART 1 QUALITY ASSURANCE SUBMITTALS HEREIN. DELETE IF MANUFACTURER’S FIELD
SERVICE NOT REQUIRED.
A. MANUFACTURER’S FIELD SERVICES: UPON OWNER’S REQUEST, PROVIDE
MANUFACTURER’S FIELD SERVICE CONSISTING OF PRODUCT USE
RECOMMENDATIONS AND PERIODIC SITE VISIT FOR INSPECTION OF PRODUCT
INSTALLATION IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS.
1. SITE VISITS: [SPECIFY NUMBER AND DURATION OF PERIODIC SITE VISITS.].
3.06 CLEANING
A. CLEANING: REMOVE TEMPORARY COVERINGS AND PROTECTION OF ADJACENT WORK
AREAS. REMOVE CONSTRUCTION DEBRIS FROM PROJECT
SITE AND LEGALLY DISPOSE OF DEBRIS.
1. CLEANING: USE A STRONG SOLUTION OF GRANULATED SOAP OR DETERGENT AND
WATER WITH A BRISTLE BRUSH. DO NOT USE A WIRE

28 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
BRUSH AS IT WILL CAUSE DAMAGE TO THE SURFACE. RINSE IMMEDIATELY WITH FRESH
WATER. DO NOT ATTEMPT TO CLEAN USING ACID OR
ACID BASED PRODUCTS. DO NOT CLEAN WITH HIGH PRESSURE POWER WASHER.
2. SALT AND DE-ICING CHEMICALS: DO NOT USE DE-ICING CHEMICALS ON AREAS
IMMEDIATELY ADJACENT TO A CULTURED STONE
PRODUCTS APPLICATION.
SPECIFIER NOTE: EDIT PARAGRAPH BELOW. SCUFFING OCCURS ON ALL NATURAL STONE.
OCCASIONALLY, SOME SCUFFING WILL OCCUR ON THE SURFACE OF
CULTURED STONE PRODUCTS. SOME SCUFF MARKS CAN BE REMOVED BY CLEANING AS
DESCRIBED ABOVE.
3. SCUFFING: REMOVE SCUFF MARKS BY CLEANING AS SPECIFIED HEREIN.
SPECIFIER NOTE: EDIT PARAGRAPH BELOW. ON RARE OCCASIONS, EFFLORESCENCE MAY
OCCUR ON CULTURED STONE PRODUCTS.
4. EFFLORESCENCE: TO REMOVE EFFLORESCENCE, ALLOW STONE TO DRY THOROUGHLY,
THEN SCRUB VIGOROUSLY WITH A STIFF BRISTLE BRUSH
AND CLEAN WATER. RINSE THOROUGHLY. DO NOT USE A WIRE BRUSH. FOR DIFFICULT
EFFLORESCENCE PROBLEMS, SCRUB THOROUGHLY WITH
A SOLUTION OF 1 PART WHITE HOUSEHOLD VINEGAR TO 5 PARTS WATER. RINSE
THOROUGHLY.
3.07 PROTECTION
A. PROTECTION: PROTECT INSTALLED PRODUCT AND FINISH SURFACES FROM DAMAGE
DURING CONSTRUCTION.
DIVISION 5: METALS

05050. BASIC METAL MATERIALS AND METHOD


DESCRIPTION OF WORK
THIS SECTION SPECIFIES GENERAL REQUIREMENTS FOR ALL SECTIONS OF DIVISION 5 -
METALS.
05051. RELATED WORK
PROVISIONS OF THE GENERAL CONDITIONS, SUPPLEMENTAL CONDITIONS, AND DIVISION 1
OF THE CONTRACT ARE BY THIS REFERENCE A PART OF THIS DIVISION AND SHALL
GOVERN WORK UNDER THIS DIVISION WHERE APPLICABLE.
05052. SUBMITTALS
SUBMIT SHOP DRAWINGS FOR ALL METAL FABRICATION ITEMS IN ALL SECTIONS OF
DIVISION 5 IN ACCORDANCE WITH THE GENERAL CONDITIONS.
A. PRODUCT DATA: SUBMIT 5 COPIES OF MANUFACTURER’S DATA FOR ALL ITEMS IN
DIVISION 5 INDICATING SHAPES, SIZES, AND PHYSICAL AND STRUCTURAL PROPERTIES.
B. SHOP DRAWINGS: SUBMIT PAPER OR ELECTRONIC (PDF) COPY OF SHOP DRAWINGS
INCLUDING COMPLETE PLAN AND PROFILES, SIZE, DETAILS, SCHEDULES FOR
FABRICATION, AND ASSEMBLY OF MEMBERS. INCLUDE MATERIAL IDENTIFICATION,
DETAILS OF CUTS, CONNECTIONS, FASTENER TYPES AND MATERIAL, FASTENER
LOCATIONS, AND OTHER PERTINENT DATA. INDICATE WELDS BY AWS SYMBOLS AND
SHOW SIZE, LENGTH, AND TYPE OF WELD. IDENTIFY DETAILS BY REFERENCE TO SHEET
AND DETAIL NUMBER ON THE DRAWINGS.
1. INCLUDE ERECTION DRAWINGS, ELEVATIONS, AND DETAILS. THE CONTRACTOR SHALL
VERIFY FIELD DIMENSIONS FOR ALL METAL FABRICATIONS AND PROVIDE SHOP DRAWINGS
FOR THE ENGINEER’S REVIEW AND ACCEPTANCE FOR ALL FABRICATED ITEMS PRIOR TO
SHOP FABRICATION.
2. INDICATE WELDED CONNECTIONS USING STANDARD AWS WELDING SYMBOLS. INDICATE
WELD LENGTHS. INCLUDE DATA FOR WELDING MATERIALS AND METHODS TO BE USED.
WATERPROOFS WELDS SHALL BE TESTED TO ENSURE PROPER FUNCTION FOR INTENDED
APPLICATIONS.
05053. QUALITY ASSURANCE
A. ALL WELDERS SHALL BE QUALIFIED IN ACCORDANCE WITH AWS AND BE WABO
CERTIFIED WITHIN THE PAST 12 MONTHS. WRITTEN CERTIFICATION FOR WELDERS
PERFORMING FABRICATION WORK SHALL BE FURNISHED TO THE ENGINEER.

29 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
B. MILL-SPOT MARKINGS OF ALLOY AND TEMPER SHALL BE ON ALUMINUM PRODUCTS. IF
SUCH MARKINGS ARE OBLITERATED OR ELIMINATED IN FABRICATIONS, THE FABRICATOR
SHALL FURNISH A CERTIFICATE VERIFYING THE INFORMATION.
C. WATERPROOF WELDS SHALL BE TESTED TO ENSURE PROPER FUNCTION FOR
INTENDED APPLICATIONS.

05100 STRUCTURAL METAL FRAMING

05110 REINFORCING STEEL


PART 1 – GENERAL
ALL REINFORCEMENT SHALL BE IN CONFORMANCE WITH MAG SECTION 727: STEEL
REINFORCEMENT. ALL PLACEMENT OF REINFORCEMENT SHALL BE IN ACCORDANCE WITH
SECTION 505.5 PLACING REINFORCEMENT.
REINFORCING STEEL SHALL BE A MINIMUM OF 60 KSI YIELD GRADE, DEFORMED.
EXCEPTIONS TO THIS SHALL REQUIRE DP APPROVAL.
ALL SIDEWALKS SHALL HAVE, PLACED TO REINFORCE THE SLAB AT MIDPOINT, STEEL
WELDED WIRE MESH WITH 6 IN X 6 IN OPENINGS.
EXTERIOR FACILITIES THAT ARE EXPOSED TO WEATHER THAT MAY BE SUBJECTED TO
DEICING DURING THE WINTER INCLUDING BUT NOT LIMITED TO: STAIRS, WALKS, RAMPS,
CURBS AND LOADING DOCKS, SHALL HAVE ALL REINFORCING STEEL AND ACCESSORIES
EPOXY COATED PER ASTM A775.
CONCRETE FEATURES THAT HOUSE INTERIOR CORROSIVE ENVIRONMENTS SUCH AS
CHEMICAL STORAGE ROOMS AND SWIMMING POOL BUILDINGS SHALL HAVE ALL
REINFORCING STEEL AND ACCESSORIES EPOXY COATED PER ASTM A775.
OTHER REINFORCEMENT MAY BE UNCOATED PER MAG SECTION 727.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
05120 WELDED WIRE FABRIC REINFORCING
PART 1 – GENERAL
N/A
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
WELDED WIRE FABRIC SHALL BE HELD FIRMLY IN PLACE AND SPLICED NOT LESS THAN 2
MESHES PER MAG 505.5.3.
05200 COLD-FORMED METAL FRAMING
05210 STRUCTURAL METAL STUD FRAMING
PART 1 - GENERAL
ALL WALL FRAMING TO FOLLOW THE FOLLOWING:
WALLS UP TO 10’ COLD ROLLED STUDS TO BE 25 GAUGE.
WALLS OVER 10’ TO 14’ COLD ROLLED STUDS TO BE 20 GAUGE.
WALLS OVER 14’ COLD ROLLED STUDS TO BE 16 GAUGE.
ALL WALL STUDS TO BE MINIMUM 16” ON CENTER.
ADDITIONAL STANDARDS FOR COLD FORMED STUD WALLS AS CITED IN THE IBC ARE: AISI
S211 OR AISI S100.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
05500 METAL FABRICATIONS
05510 GENERAL

30 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
THIS SECTION APPLIES TO ALL METAL FABRICATIONS THAT HAVE A VISUAL AESTHETIC
IMPACT BOTH INTERIOR AND EXTERIOR.

05520 PRODUCTS
METAL USED FOR INTERIOR RAILINGS SHALL CONFORM TO ASTM A 500.

05530 EXECUTION
WELDS SHOULD BE SMOOTHLY GROUND TO MATCH SURFACE TEXTURE OF PARENT
METAL. ALL GAPS, HOLES AND GOUGES SHOULD BE FILLED WITH A PERMANENT MATERIAL
(SOLDER OR BRAZING). DESIGN LIMITATIONS OF GRINDERS, FILES ETC., DICTATE THAT
ADJOINING METAL TUBING PIECES AT ANGLES LESS THAN 125O GENERALLY NEED A
MINIMUM OF 1/4" RADIUS BUTT WELD IN ORDER TO GRIND SMOOTH.
FULLY CONCEAL ADJOINING RAILING SPLICES IN RUNS THAT APPEAR CONSTANT. AT
ELBOW BENDS, UTILIZE MITERED JOINTS.
LIMITING UNSUPPORTED LENGTH SHOULD NOT EXCEED 6' FOR DIAMETERS 2" OR LESS.
CABLE USED AS RAILING INTERMEDIATES IS NOT ALLOWABLE.
THE USE OF EXPANSION BOLTS TO SECURE RAILING ASSEMBLIES TO VERTICAL OR
HORIZONTAL SURFACES IS NOT ALLOWABLE. ANCHORAGE SYSTEMS SHOULD CONSIST OF
DIRECT IMBEDS (SLEEVED OR PLATES) AND/OR WELDING.

05520 METAL RAILINGS


05521 PIPE AND TUBE RAILINGS
PART 1 - GENERAL
IN GENERAL, HANDRAILS ARE REQUIRED FOR BOTH SIDES OF ALL STAIRS, RAMPS, ETC.
EXTERIOR HANDRAILS MUST CONFORM TO THE LANDSCAPE MASTER PLAN.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
05580 FORMED METAL FABRICATIONS
PART 1 – GENERAL
N/A
PART 2 – MATERIALS
METAL BOLLARDS FOR PROTECTION (I.E., FIRE HYDRANTS, GENERATORS,
TRANSFORMERS, TRASH ENCLOSURES, ETC.) SHALL BE A MINIMUM OF 6" DIAMETER
ROUND, SCHEDULE 40 STEEL, FILLED WITH 4,000 PSI CONCRETE.

PART 3 - EXECUTION
EXTERIOR METAL BOLLARDS FOR PROTECTION SHALL BE DIRECTLY SET IN CONCRETE
SLAB AND SHALL BE A MINIMUM OF 1/3 THE EXPOSED HEIGHT BELOW THE FINISHED
ADJACENT SURFACE.
INTERIOR METAL BOLLARDS MAY BE DIRECTLY SET OR SURFACE BOLTED TO AN
EMBEDDED PLATE.
DIVISION 6: WOOD AND PLASTICS

06050. BASIC WOOD AND PLASTIC MATERIALS AND METHODS


DESCRIPTION
THE WORK UNDER THIS ITEM SHALL CONSIST OF FURNISHING ALL REQUIRED MATERIALS,
FABRICATED WOODWORK, TOOLS, EQUIPMENT AND LABOR AND PERFORMING ALL
OPERATIONS NECESSARY OF THE SATISFACTORY COMPLETION OF ALL CARPENTRY AND
JOINERY WORKS IN STRICT ACCORD WITH APPLICABLE DRAWINGS, DETAILS AND THESE
SPECIFICATIONS.
060501. MATERIAL REQUIREMENTS
LUMBER

31 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
LIMBER OF THE DIFFERENT SPECIES HEREIN SPECIFIED FOR THE VARIOUS PARTS OF THE
STRUCTURE SHALL BE WELL SEASONED SAWN STRAIGHT, SUNDRIED OR KILN DRIED AND
FREE FROM DEFECTS SUCH AS LOOSE UNSOUND KNOTS, PITCH POCKETS, SAPWOOD,
CRACKS AND OTHER IMPERFECTIONS IMPAIRING ITS STRENGTH, DURABILITY AND
APPEARANCE.
GRADES OF LUMBER AND USAGE
A. STRESS GRADE IS SEASONED, CLOSE-GRAINED AND HIGH-QUALITY LUMBER OF THE
SPECIFIED SPECIE FREE FROM DEFECTS AND SUITABLE OR SUSTAINING HEAVY LOADS.
STRESS GRADE LUMBER SHALL BE USED FOR WOODEN STRUCTURAL MEMBERS SUBJECT
TO HEAVY LOADS, AND FOR SUB-FLOOR FRAMING EMBEDDED OR IN CONTACT WITH
CONCRETE OR MASONRY.
B. SELECT GRADE LUMBER OF THE SPECIFIED SPECIE IS GENERALLY OF HIGH QUALITY,
OF GOOD APPEARANCE, WITHOUT IMPERFECTIONS, AND SUITABLE FOR USE WITHOUT
WASTER DUE TO DEFECTS AND SUITABLE ALSO FOR NATURAL FINISH. SELECT GRADE
LUMBER SHALL BE USED FOR FLOORING, SIDINGS, FACIAL AND BASE BOARDS, TRIMS,
MOLDINGS, MILLWORK, RAILINGS, STAIRS, CABINET WORK, SHELVINGS, DOORS, WINDOW
AND FRAMES OF OPENINGS.
C. COMMON GRADE LUMBER HAS MINIMUM TIGHT MEDIUM KNOT NOT LARGER THAN 25 MM
IN DIAMETER, WITH MINIMAL IMPERFECTIONS, WITHOUT SAPWOOD, WITHOUT DECAY,
INSECT HOLES, AND SUITABLE FOR USE WITH SOME WASTE DUE TO MINOR DEFECTS AND
SUITABLE ALSO FOR PAINT FINISH. COMMON GRADE LUMBER SHALL BE USED FOR LIGHT
FRAMEWORK FOR WALL PARTITIONS, CEILING JOIST AND NAILERS. COMMON GRADE
LUMBER SHALL BE USED FOR LIGHT FRAMEWORK FOR WALL PARTITIONS. CEILING JOIST
AND NAILERS.
LUMBER SPECIES AND USAGE
UNLESS OTHERWISE SPECIFIED ON THE PLANS, THE FOLLOWING LUMBER SPECIES SHALL
BE USED AS INDICATED:
A. YACAL (STRESS GRADE) FOR STRUCTURAL MEMBER SUCH AS POST, GIRDERS, GIRTS,
SLEEPERS DOOR AND WINDOW FRAMES SET OR IN CONTACT WITH CONCRETE OR
MASONRY.
B. GUIJO (SELECT GRADE) FOR DOOR AND WINDOW FRAMES SET IN WOODEN
FRAMEWORK, FOR STAIRS, FOR ROOF FRAMING SUPPORTING CERAMIC OR CEMENT
TILES, FOR FLOOR JOIST AND OTHER WOODEN STRUCTURAL PARTS.
C. APITONG (COMMON GRADE) FOR ROOF FRAMING SUPPORTING LIGHT ROOFING
MATERIALS SUCH AS GALVANIZED IRON, ALUMINUM OR ASBESTOS SHEETS, FOR WALL
FRAMING, CEILING JOIST, HANGER AND NAILERS.
D. TANGUILE (SELECT GRADE) FOR DOORS AND WINDOWS, FACIAL AND BASE BOARDS,
TRIMS, MOLDINGS, MILLWORK, RAILINGS, STAIRS, CABINET, WORK, SHELVING’S, FLOORING
AND SIDING.
E. NARRA (SELECT GRADE) FOR STAIR RAILINGS, FLOORING BOARDS, WALL PANELS, BASE
BOARDS, TRIMS, MOLDINGS, CABINET WORK, MILLWORK, DOORS AND WINDOWS WHEN
INDICATED AS SUCH IN THE PLANS.
F. DAO (SELECT GRADE) FOR PARTS OF THE STRUCTURE AS ENUMERATED UNDER
SECTION 1003.2.1.2 (E), WHEN INDICATED AS SUCH ON THE PLANS AND TECHNICAL
SPECIFICATIONS
MOISTURE CONTENT

ROUGH LUMBER FOR FRAMING AND SIDING BOARDS SHALL BE AIR-DRIED OR SUN-DRIED
SUCH THAT ITS MOISTURE CONTENT SHALL NOT EXCEED 22 PERCENT. DRESSED LUMBER
FOR EXTERIOR AND INTERIOR FINISHING, FOR DOORS AND WINDOWS, MILLWORK,
CABINET WORK AND FLOORING BOARDS SHALL BE KILN-DRIED AND SHALL NOT HAVE A
MOISTURE CONTENT IN EXCESS OF 14 PERCENT AT THE TIME OF INSTALLATION IN THE
STRUCTURE.
SUBSTITUTION IN LUMBER SPECIE
ANY LUMBER EQUALLY GOOD FOR THE PURPOSE INTENDED MAY BE SUBSTITUTED FOR
THE SPECIFIED KIND SUBJECT TO THE PRIOR APPROVAL OF THE ENGINEER, PROVIDED
THE SUBSTITUTION SHALL BE OF AN EQUAL OR BETTER SPECIE ACCEPTABLE TO THE
ENGINEER. IN CASE OF SUBSTITUTION WITH A BETTER SPECIE, NO ADDITIONAL COST
THEREFORE SHALL BE ALLOWED TO THE CONTRACTOR.
PLY BOARD

32 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
PLY BOARD SHALL BE GOOD GRADE AND MADE OF LAMINATED WOOD STRIPS OF
UNIFORM WIDTH AND THICKNESS
BOUNDED TOGETHER WITH WATER RESISTANT RESIN GLUE. THE LAMINATED CORE SHALL
BE FINISHED BOTH FACES WITH SELECT GRADE TAN GUILE OR RED LAUAN VENEERS NOT
LESS THAN TO 2 MM THICK SIMILARLY BONDED TO THE CORE. THE PLY BOARD OF NOT
LESS THAN 19 MM THICK SHALL BE FREE FROM DEFECTS SUCH A SPLIT IN VENEER,
BUCKLING OR WARPING.
PLYWOOD
PLYWOOD SHALL CONFORM TO THE REQUIREMENTS OF THE PHILIPPINE TRADE
STANDARDS 631-02. THICKNESS OF A SINGLE LAYER LAMINAE SHALL NOT BE LESS THAN 2
MM. THE LAMINAE SHALL BE SUPERIMPOSED IN LAYERS WITH GRAINS CROSSING AT
RIGHT ANGLES IN SUCCESSIVE LAYERS TO PRODUCE STIFFNESS. THE FACE VENEERS
SHALL BE ROTARY CUT FROM SELECT GRADE TIMBER. THE LAMINAE AND FACE VENEERS
SHALL BE BONDED WITH WATER RESISTANT RESIN GLUE, HOT PRESSED AND PRESSURE
TREATED. ORDINARY TANGUILE OR RED LAUAN PLYWOOD WITH GOOD QUALITY FACE
VENEERS, 6 MM THICK SHALL BE USED FOR DOUBLE WALLING AND CEILING NOT EXPOSED
TO MOISTURE; WATERPROOF OR MARINE PLYWOOD SHALL BE USED FOR CEILING
EXPOSED TO MOISTURE SUCH AS AT TOILETS AND EAVES, AND CEILING TO BE FINISHED
WITH ACRYTEX.
06052.MATERIALS OTHER THAN LUMBER
PLASTIC SHEET
WHEN REQUIRED FOR COUNTER TOP, PLASTIC SHEET SUCH AS FORMICA SHALL NOT BE
LESS THAN 1.50 MM THICK AND SHALL HAVE HARD, DURABLE AND GLOSSY SURFACE
RESISTANT TO STAIN, ABRASION AND HEAT. COLOR AND DESIGN SHALL BE AS SELECTED
FROM THE MANUFACTURER’S STANDARD AND APPROVED BY THE ENGINEER.
GLUE
GLUE SHALL BE FROM WATER RESISTANT RESINS WHICH, UPON HARDENING, SHALL NOT
DISSOLVE NOR LOSE ITS BOND OR HOLDING POWER EVEN WHEN SOAKED WITH WATER
FOR EXTENDED PERIOD. GLUE IN POWDER FORM BE IN SEALED CONTAINER AND SHALL
BE WITHOUT EVIDENCE OF LUMPING OR DETERIORATION IN QUALITY.
FASTENERS
NAILS, SCREW, BOLTS AND STRAPS SHALL BE PROVIDED AND USED WHERE SUITABLE
FOR FIXING CARPENTRY AND JOINERY WORKS. ALL FASTENERS SHALL BE BRAND NEW
AND OF ADEQUATE SIZE TO ENSURE RIGIDITY OF CONNECTIONS.
A. NAILS OF ADEQUATE SIZE SHALL BE STEEL WIRE, DIAMOND-POINTED, RIBBED SHANK
AND BRIGHT FINISH.
B. SCREWS OF ADEQUATE SIZE SHALL BE CADMIUM OR BRASS PLATED STEEL WITH
SLOTTED HEAD.
C. LAG SCREWS OF ADEQUATE SIZE, FOR ANCHORING HEAVY TIMBER FRAMING IN
CONCRETE OR MASONRY, SHALL BE GALVANIZED STEEL.

D. BOLTS AND NUTS SHALL BE OF STEEL HAVING A YIELD POINT OF NOT LESS THAN 245
MPA. BOLTS SHALL HAVE SQUARE HEADS AND PROVIDED WITH STANDARD FLAT STEEL
WASHERS AND HEXAGONAL NUTS. THREADS SHALL CONFORM TO TECHNICAL
SPECIFICATIONS AMERICAN COARSE THREAD SERIES. THE THREADED PORTION SHALL BE
LONG ENOUGH SUCH THAT THE NUT CAN BE TIGHTENED AGAINST THE BOLTED MEMBERS
WITHOUT ANY NEED FOR BLOCKING. THE BOLT’S THREADED END SHALL BE FINISHED
SMOOTH FOR EASE OF ENGAGING AND TURNING OF THE NUT.

E. WROUGHT IRON STRAPS OR ANGLES, WHEN REQUIRED IN CONJUNCTION WITH BOLTS


OR LAG SCREWS TO PROVIDE PROPER ANCHORAGE, SHALL BE OF THE SHAPE AND SIZE
SHOWN ON THE PLANS.
06052.CONSTRUCTION REQUIREMENTS
QUALITY OF MATERIALS
ALL MATERIALS TO BE INCORPORATED IN THE CARPENTRY AND JOINERY WORKS SHALL
BE OF THE QUALITY SPECIFIED UNDER SECTION 2. BEFORE INCORPORATION IN WORK,
ALL MATERIALS SHALL HAVE BEEN INSPECTED/ACCEPTED BY THE ENGINEER OR HIS
AUTHORIZED REPRESENTATIVE.
06052.STORAGE AND PROTECTION OF MATERIALS

33 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
LUMBER AND OTHER MATERIALS SHALL BE PROTECTED FROM DAMPNESS DURING AND
AFTER DELIVERY AT THE SITE. MATERIALS SHALL BE DELIVERED WELL IN ADVANCE OF
ACTUAL NEED AND IN ADEQUATE QUANTITY TO PRECLUDE DELAY IN THE WORK. LUMBER
SHALL BE PILED IN ORDERLY STACK AT LEAST 150 MM ABOVE GROUND AND AT
SHELTERED PLACE WHERE IT WILL BE OF LEAST OBSTRUCTION TO THE WORK.
06052.SHOP DRAWINGS
SHOP DRAWINGS COMPLETE WITH ESSENTIAL DIMENSIONS AND DETAILS OF
CONSTRUCTION, AS MAY BE REQUIRED BY THE ENGINEER IN CONNECTION WITH
CARPENTRY AND JOINERY WORK, SHALL BE SUBMITTED FOR APPROVAL BEFORE
PROCEEDING WITH THE WORK.

06100 ROUGH CARPENTRY

ROUGH CARPENTRY COVERS TIMBER STRUCTURAL FRAMING FOR ROOF, FLOORING,


SIDING, PARTITION AND CEILING.

A. FRAMING SHALL BE STRESS GRADE OR COMMON GRADE LUMBER OF THE SPECIE


SPECIFIED UNDER SECTION.

B. ROUGH CARPENTRY SHALL BE DONE TRUE TO LINES, LEVELS AND DIMENSIONS. IT


SHALL BE SQUARED, ALIGNED, PLUMBED AND WELL FITTED AT JOINTS.

C. TRUSSES AND OTHER ROOF FRAMING SHALL BE ASSEMBLED, FITTED AND SET TO
EXACT LOCATION AND SLOPE INDICATED ON THE PLANS.

D. FASTENERS, CONNECTORS AND ANCHORS OF APPROPRIATE TYPE AND NUMBER SHALL


BE PROVIDED AND FITTED WHERE NECESSARY.

E. STRUCTURAL MEMBERS SHALL NOT BE CUT, BORED OR NOTCHED FOR THE PASSAGE
OF CONDUITS OR PIPED WITHOUT PRIOR APPROVAL OF THE ENGINEER. MEMBERS
DAMAGED BY SUCH CUTTING OR BORING SHALL BE REINFORCED BY MEANS OF
SPECIFICALLY FORMED AND APPROVED STEEL PLATES OR SHAPES, OTHERWISE,

DAMAGED STRUCTURAL MEMBERS SHALL BE REMOVED AND REPLACED TO THE


SATISFACTION OF THE ENGINEER.

F. TIMBER FRAMING IN CONTACT WITH CONCRETE OR MASONRY SHALL BE TREATED WITH


TERMITE-PROOFING SOLUTION AND AFTER DRYING COATED WITH BITUMINOUS PAINT.

06200 FINISH CARPENTRY


PART 1 – GENERAL
FORMALDEHYDE CONTAINING PARTICLE BOARD AND SIMILAR COMPOSITION PRODUCTS
ARE NOT ENCOURAGED, AND MUST BE APPROVED BY OWNER. FORMALDEHYDE OFF-
GASSING RATES ARE TO BE LESS THAN 0.03 MILLIGRAMS PER SQUARE FOOT OF
SURFACE/HR IN ACCORDANCE WITH ASTM D5116-90.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
062023 INTERIOR FINISH CARPENTRY
PART 1 – GENERAL
SYNTHETIC COUNTER TOPS SHALL BE HIGH PRESSURE LAMINATE, OR, IN EXTRA HEAVY-
DUTY USE APPLICATIONS, A SOLID SURFACE, 1/2" MINIMUM THICKNESS.
GUIDES FOR PLASTIC LAMINATE FINISHING ARE AS FOLLOWS: MIN. 0.050" EXPOSED
HORIZONTAL SURFACES; MIN. 0.028" EXPOSED VERTICAL SURFACES; MIN 0.020" CABINET
LININGS AND CONCEALED BACKING.

34 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
HIGH MOISTURE AREAS SUCH AS LAVATORY TOPS, COFFEE BAR TOPS, OR WORK
SURFACES THAT ARE REPEATEDLY SUBJECTED TO SPILLAGE, WATER CLEANING, OR
SUBJECT TO CHEMICAL SUBSTANCES SHALL HAVE SOLID SURFACE COUNTERTOPS AND
BACKSPLASHES
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
06400 ARCHITECTURAL WOODWORK
PART 1 – GENERAL
THIS SECTION APPLIES TO ARCHITECTURAL MILL AND CASEWORK. IN GENERAL, THE
DESIGN AND SPECIFICATION OF ITEMS NORMALLY CONTAINED IN THIS SECTION MUST BE
CONSIDERED TO LAST THE LIFETIME OF THE BUILDING (ASSUME 50 YEARS). FLEXIBILITY,
YEARS OF HEAVY USE AND MISUSE, LIMITED MAINTENANCE, HIGH IMPACT, OCCASIONAL
OVERLOADING AND INITIAL COST EFFECTIVENESS SHOULD BE THE CRITERIA IN THE
DESIGN AND FINISH.

ENDANGERED OR LIMITED TREE SPECIES USED AS VENEERS OR SOLID STOCK


(MAHOGANY, TEAK, ETC.) ARE NOT ALLOWABLE. SOFT SPECIES USED FOR FACE VENEERS,
TOPS, KICK PLATES, BASES OR ANY OTHER HIGH IMPACT OR ABRASION RELATED USE ARE
NOT ALLOWABLE.
WOOD THRESHOLDS ARE NOT ACCEPTABLE UNLESS RETROFITTING HISTORIC BUILDINGS.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
06410 ARCHITECTURAL WOOD CASEWORK
PART 1 – GENERAL
CASE OR MILLWORK THAT WILL BE SPECIFIED AS RECEIVING A PAINTED FINISH, SHOULD
BE LIMITED TO LOWER COST SPECIES (BIRCH, POPLAR, ETC.).
ALL CABINET AND MILLWORK TOPS, SIDES, DIVIDERS, SHELVING, ETC., SHALL BE 3/4"
MINIMUM STOCK. STAINED VENEER MATERIALS SHALL CONFORM TO ARCHITECTURAL
WOODWORK INSTITUTE (AWI) CUSTOM GRADE, MINIMUM THICKNESS 1/16".
UNEXPOSED FRAMING SHALL BE NOMINAL 1 X 2 HARDWOOD, AWI CUSTOM GRADE.
DOORS AND DRAWER FRONTS SHALL BE 3/4" MINIMUM CORE STOCK.
DRAWER BOXES SHALL BE 1/2" MINIMUM WITH MINIMUM 1/4" PLYWOOD BOTTOMS.
CABINET TOPS SHOULD BE OF SUFFICIENT HEIGHT TO COMPLY WITH DISABLED
ACCESSIBILITY REQUIREMENTS PER ICC A117.1 AND 2010 ADA STANDARDS FOR
ACCESSIBLE DESIGN.
BUILT-IN SHELVING OR FREE-STANDING MODULAR SHELVING HEIGHT SHOULD NOT
EXCEED 6' FROM FINISHED FLOOR (UNLESS USED IN LARGE STORAGE AREAS) AND BE
SECURELY ANCHORED TO STUDS OR TO UNIT MASONRY WALLS THAT ARE REINFORCED
TO ACCEPT THE LOADING.
ALL SHELVING SHOULD BE DESIGNED AS FULLY ADJUSTABLE, 3/4" MINIMUM THICKNESS.
"LINE BORE AND PIN" METHOD OF SHELVING ADJUSTMENT (EITHER IN CABINETS OR
STANDING SHELVING) IS DESIRED. SHELF STANDARDS MORTISED IN WITH BRACKETS IS
ALSO ACCEPTABLE.
THE USE OF PAINTED PARTICLEBOARD AS THE FINISH FOR CABINETS AND TOPS IS NOT
ACCEPTABLE. PARTICLE BOARD IS ALLOWABLE AS CORE STOCK IN LOW/NO MOISTURE
AREAS WHEN RECEIVING A HIGH-PRESSURE PLASTIC LAMINATE FINISH.

PARTICLE BOARD IS NOT AN ACCEPTABLE MATERIAL FOR SHELVING WITH GREATER THAN
A 2-FOOT UNSUPPORTED SPAN.

35 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
THE USE OF MELAMINE OR OTHER SIMILAR LOW MILL FINISHES (LESS THAN .020") AS
INTERIOR CABINET LINING OR UNDERSIDE OF SHELVING IS NOT ACCEPTABLE. MELAMINE
THERMO FUSED ¾” IS ACCEPTABLE FOR INTERIOR FINISH OF CABINETS ONLY.
ALL MILLWORK DESIGNED TO SUPPORT ELECTRICAL EQUIPMENT (COMPUTERS, PHONES,
CLOCKS, ETC.) SHALL HAVE GROMMET OPENINGS ALLOWING CORDS, INTERCONNECT
CABLES, ETC., TO BE CONCEALED OR ROUTED INTERNALLY. GROMMETS SHALL BE 2-1/2"
MINIMUM DIAMETER PLASTIC, COLOR TO MATCH ADJACENT FINISH.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
06 41 93 CABINET AND DRAWER HARDWARE
PART 1 - GENERAL
ALL MILLWORK AND ACCESSORY HARDWARE SHALL COMPLY WITH ANSI A156.9, MINIMUM
QUALITY LEVEL TYPE 2 (INSTITUTIONAL). HINGES, GUIDES, SLIDES, ETC., SHALL UTILIZE
BEARINGS COMPLYING WITH BHMA 201.
ALL CABINET HINGES SHOULD BE SELF-CLOSING AND SPRING LOADED. DRAWER SLIDES
SHOULD ALLOW FULL EXTENSION (1" LONGER THAN TOTAL DRAWER DEPTH) AND BE
SPECIFIED AS HEAVY DUTY (100 LB. MINIMUM).
ALL EXPOSED CABINET HARDWARE SHOULD BE SPECIFIED WITH A PERMANENT, DURABLE
FINISH THAT IS EASILY CLEANABLE.
ALL LOCKABLE CABINET AND DRAWER LOCKS SHALL ACCEPT THE BEST 7PIN SFIC CORES
AND BE OLYMPUS 721DW OR EQUAL TO MEET THE APPLICATION.
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
DIVISION 7: THERMAL & MOISTURE PROTECTION

07050 BASIC THERMAL AND MOISTURE PROTECTION MATERIALS AND METHODS


GENERAL
IN GENERAL, FOLLOW THE GUIDELINES BELOW WHEN DESIGNING, SPECIFYING AND
INSTALLING ROOFING, WATERPROOFING, EXTERIOR SIDING, INSULATION, FIRE STOPPING
OR SEALANT SYSTEMS. UNLESS SPECIFICALLY INDICATED OTHERWISE, THESE
GUIDELINES ARE NOT INTENDED TO RESTRICT OR REPLACE PROFESSIONAL JUDGMENT.
1. ALL SYSTEMS AND MATERIALS LISTED IN THIS DIVISION SHALL BE IN ACCORDANCE WITH
THE MANUFACTURER’S RECOMMENDATIONS AS WELL AS THE NRCA MANUAL OF ROOFING
AND WATERPROOFING MANUAL ANTHOLOGY.
2. “DAMP PROOFING” IS NOT ALLOWED. WATERPROOFING SHALL BE CONSIDERED THE
BASIC REQUIREMENT.
3. FOR CHEMICAL COMPATIBILITY PURPOSES, SPECIFICATIONS SHALL REQUIRE THAT ANY
“SYSTEMS” (E.G., ROOFING) SHALL BE BY A SINGLE MANUFACTURER. FURTHERMORE,
ONLY THE MANUFACTURERS RECOMMENDED ACCESSORIES OR ADHESIVES SHALL BE
ALLOWED.
4. FOR SPECIALTY ROOFING SYSTEMS, OR LEED COMPLIANT SYSTEMS, PROVIDE
ADEQUATE DESIGN CRITERIA, DATA, COST AND LIFE CYCLE INFORMATION TO THE EMU
PHYSICAL PLANT PRIOR TO THE COMMENCEMENT OF DESIGN TO PROPERLY EVALUATE
AND DETERMINE APPROPRIATENESS OF USE OF THE SPECIALTY ROOFING SYSTEM.
5. FOR ALL THERMAL OR MOISTURE PROTECTION SYSTEMS, MATERIALS SHALL BE
APPROPRIATELY IN A DRY, SAFE ENVIRONMENT. WET OR DAMAGED MATERIALS SHALL
NOT BE USED FOR ROOFS, WATERPROOFING, INSULATION, SEALANTS, ETC.
070501.BELOW GRADE SPACES
• BELOW GRADE SPACES ARE HIGH-RISK, EXPENSIVE DESIGNS. WHEREVER POSSIBLE,
AVOID
• THE USE OF FINISHED BELOW GRADE SPACES REQUIRING DRAINAGE SYSTEMS AND
WALL WATERPROOFING

36 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
• PLANTERS ABOVE OR ADJACENT TO BASEMENT AREAS FINISHED SPACES WILL RECEIVE
THE STRONGEST SCRUTINY DURING THE PROGRAMMING AND CONCEPTUAL DESIGN
PHASES. BE PREPARED TO THOROUGHLY DOCUMENT THE UNAVOIDABLE NEED FOR SUCH
ELEMENTS.
• WHEREVER BELOW GRADE WALLS ARE EXPOSED TO NATURALLY FLOWING
GROUNDWATER OR SUBSTANTIAL LANDSCAPE IRRIGATION WATER, EVEN IF SIMPLY
FOUNDATION WALLS, INCLUDE A FOUNDATION DRAINAGE SYSTEM IN ADDITION TO
DAMPPROOFING OR WATERPROOFING THE WALLS.
070502.TRAFFIC DECKS
• TRAFFIC BEARING DECKS ARE VERY DIFFICULT AND EXPENSIVE TO SUCCESSFULLY
WATERPROOF AND MAINTAIN. WHEREVER POSSIBLE, AVOID USE OF FINISHED SPACES
WITH TRAFFIC DECKS EXPOSED TO THE WEATHER ABOVE THEM.

• SPECIAL ATTENTION SHOULD BE GIVEN TO ENSURE THAT ALL HORIZONTAL TRAFFIC


SURFACES PROVIDE APPROPRIATE SLIP RESISTANCE.
070503.ROOF DESIGN
• DO NOT DESIGN ROOFS WHICH ARE INTENDED TO SERVE AS WALKING SURFACES FOR
USER FUNCTIONS. ACTIVITIES WHICH MUST
BE CONDUCTED ON THE ROOF TOP (E.G. ASTRONOMICAL OR WEATHER OBSERVATIONS,
GREENHOUSES, ETC.) REQUIRE A DESIGN WHICH INCORPORATES PLATFORMS,
PENTHOUSES OR SIMILAR SPECIAL ENCLOSURES.
• SIMILARLY, DO NOT DESIGN ROOFS WHICH ARE REQUIRED TO BE USED AS WORKING
PLATFORMS FOR MAINTENANCE OF MECHANICAL AND ELECTRICAL EQUIPMENT. ENCLOSE
SUCH ELEMENTS IN A PENTHOUSE.
• AVOID WHEREVER POSSIBLE USE OF CONDUIT AND PIPING INSTALLED ON TOP OF THE
ROOF.
• ANY MECHANICAL OR ELECTRICAL EQUIPMENT WHICH MUST BE INSTALLED ON THE
ROOF MUST BE INSTALLED ON EITHER A PREFABRICATED CURB OR A FIELD FABRICATED
PLATFORM. WHERE THE TOP SURFACE OF SUCH CURBS AND PLATFORMS IS NOT
COMPLETELY COVERED AND WATERPROOFED BY THE ACTUAL EQUIPMENT, THE TOP
SURFACE MUST BE A SOLID SHEET METAL CAP.
• INSTALLATION OF ANY TYPE OF ROOF TOP MECHANICAL OR ELECTRICAL EQUIPMENT ON
SLEEPERS IS NOT ACCEPTABLE.
• WHEREVER POSSIBLE, MAKE THE BASIC ROOF SLOPE, AND THE SLOPE OF THE
CRICKETS TO THE DRAINS, PART OF THE STRUCTURAL SYSTEM (SLOPE THE STRUCTURE).
AVOID AS MUCH AS POSSIBLE THICKNESS’ OF ROOF INSULATION GREATER THAN 2". BY
SLOPING THE STRUCTURE, IT WILL BE POSSIBLE TO ELIMINATE USE OF LIGHTWEIGHT
CONCRETE FILL ALTOGETHER.
• DEAD FLAT ROOFS ARE NOT ACCEPTABLE.
• DESIGN FOR A SLOPE OF 3/8" PER FOOT, THROUGHOUT THE FIELD OF THE ROOF AND
FOR ALL CRICKETS, AT THE TIME OF CONSTRUCTION. ENSURE THAT ANTICIPATED
DEFLECTIONS AND PROPOSED CAMBERS WILL RESULT IN A MINIMUM SLOPE OF 1/4" PER
FOOT THROUGHOUT THE LIFE OF THE FACILITY.
• SPACE DRAINS SO THAT SLOPES IN CRICKET VALLEYS ARE AT LEAST 1/8" PER FOOT.
• PROVIDE METAL OR WOOD FRAMING AND SUB-FRAMING FOR LARGE CRICKETS. CRICKET
SURFACES MUST BE ABLE TO ACCEPT LIVE LOADS SIMILAR TO THOSE OF THE BASIC
ROOF DECK.
• SMALL CRICKETS UP-SLOPE OF EQUIPMENT CURBS MUST MAINTAIN 1/8" PER FOOT
SLOPE IN THEIR VALLEYS, AND MAY BE FABRICATED OF TAPERED INSULATION, NOT TO
EXCEED 4" THICK.
• DESIGN THE PROJECT TO ALLOW FOR ONE COMPLETE RE-ROOFING WITHOUT REMOVAL
OF THE EXISTING ROOF SYSTEM, SHOULD THE UNIVERSITY DECIDE TO DO SO. THIS
INCLUDES:
• STRUCTURAL LOAD CAPACITY
• CAMBER AND DEFLECTION
• PARAPET HEIGHTS
• JOINTS, DRAINS, AND FLASHINGS

• ENSURE THAT THE DESIGN MAKES ADEQUATE ALLOWANCE FOR PROPER FLASHING OF
PERIMETERS AND PENETRATIONS. SUFFICIENT VERTICAL DIMENSION TO INSTALL THE

37 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
CANT STRIP, BASE FLASHING, COUNTERFLASHING, AND COPING, WILL RESULT IN A
PARAPET AT LEAST 18" ABOVE THE FINISHED ROOF AT THE HIGHEST POINT OF THE ROOF
SLOPE. INCLUDE A SPECIFIC DETAIL IN THE CONSTRUCTION DOCUMENTS. THIS INCLUDES:
• PARAPET WALLS
• PARTIAL ROOF STRUCTURES
• EQUIPMENT CURBS AND PLATFORMS
• DOOR AND WINDOW SILLS
• DO NOT ASSUME THAT BASE FLASHINGS AND COUNTERFLASHING CAN BE
SUCCESSFULLY NAILED INTO CONCRETE OR MASONRY. PROVIDE A 3/4" PLYWOOD NAILER
AT ALL PARAPETS.
• DO NOT USE INTERIOR ROOF DRAINS WITHOUT THE SPECIFIC PERMISSION OF THE
PROJECT COORDINATOR. WHEN UNAVOIDABLE, PROVIDE POSITIVE OVERFLOW
DRAINAGE, PREFERABLY WITH A SCUPPER THROUGH THE PARAPET WALL TO DAYLIGHT,
OR WITH A COMPLETE SEPARATE PARALLEL OVERFLOW DRAIN SYSTEM.
• DESIGN ALL ROOF DRAINS AND OVERFLOW DRAINS IN A DEPRESSED SUMP. REROOFING
MUST COMPLY WITH THE REQUIREMENTS FOR NEW INSTALLATIONS AS MUCH AS
POSSIBLE. THE CONSULTANT IS RESPONSIBLE FOR PREPARING COMPLETE DETAILS AND
SPECIFICATIONS FOR THE REQUIRED REROOFING WORK.
• ROOFING REPAIRS (E.G. INSTALLATION OF A NEW EXHAUST FAN), MUST COMPLY WITH
THE REQUIREMENTS FOR NEW INSTALLATIONS AS MUCH AS POSSIBLE. THE CONSULTANT
IS RESPONSIBLE FOR PREPARING COMPLETE DETAILS AND SPECIFICATIONS FOR THE
REQUIRED REPAIR WORK. GENERIC NOTES SUCH AS "FLASHING AS REQUIRED" ARE NOT
ACCEPTABLE. WHILE THE UNIVERSITY IS NOT INTERESTED IN TELLING THE CONSULTANT
WHETHER THE ARCHITECT OR THE MECHANICAL ENGINEER SHOULD PREPARE THE
DETAILS AND SPECIFICATIONS FOR THIS TYPE OF REPAIR, THE INFORMATION MUST BE
THOROUGH AND COMPLETE REGARDLESS OF THE AUTHOR.

07100 DAMPPROOFING AND WATERPROOFING


PART 1 – GENERAL
THIS SECTION APPLIES TO WATERPROOFING OF BUILDING COMPONENTS THAT RECEIVE
OR ARE IN AND AROUND AREAS TO RECEIVE SUCH TREATMENT.
WATERPROOFING AND DAMPPROOFING ARE NOT INTERCHANGEABLE MATERIALS.
PROJECT MAY HAVE ONE, BOTH, OR NEITHER.
WATERPROOFING IS USED ON SURFACES WHICH ENCLOSE HABITED SPACE AND WHERE
MOISTURE PENETRATION IS NOT ACCEPTABLE.
DAMPPROOFING IS USED TO REDUCE MOISTURE MIGRATION THROUGH EXTERIOR
SURFACES SUCH AS RETAINING WALLS AND PLANTERS.
WHERE SUCH SURFACES ARE INTENDED TO BE SUBJECT TO FOOT TRAFFIC, AND
THEREFORE ARE NOT "ROOFS", REFER TO THE REQUIREMENTS OF SECTION 07 59 00
HORIZONTAL TRAFFIC SURFACING.
THE DP SHALL SPECIFY WATERPROOFING ASSEMBLIES TO BE PROCURED FROM A SINGLE
MANUFACTURER.
THE DP SHOULD PROVIDE MANUFACTURER(S) CAPABLE OF PROVIDING A 5-YEAR
WARRANTY ON THE MATERIAL(S) BEING SPECIFIED AND REQUIRE THAT MATERIALS
MANUFACTURER(S) AND INSTALLER(S) DEMONSTRATE 5 YEARS OF SUCCESSFUL
INSTALLATIONS OF SIMILAR SYSTEMS.
SUBMITTAL OF MANUFACTURER'S LITERATURE DESCRIBING THE SYSTEM, AND SAMPLES
OF PROPOSED MEMBRANE MATERIALS IS REQUIRED
THE DP SHOULD PAY PARTICULAR ATTENTION TO THE DRAINAGE COURSE AGAINST THE
WALL AND TO PERIMETER DRAINS. DESCRIBE REQUIREMENTS FOR THESE ELEMENTS ON
THE DRAWINGS.
CROSS REFERENCE WITH REQUIREMENTS OF DIVISION 2 (EXTERIOR FINISH GRADES)
SHALL BE SPECIFIED TO SLOPE AWAY FROM BUILDINGS.
EXPANDED WARRANTIES ARE REQUIRED AS FOLLOWS:
• 5 YEAR WARRANTY FROM THE INSTALLER COVERING DEFECTS IN INSTALLATION
• 10 YEAR WARRANTY FROM THE MATERIALS MANUFACTURER INCLUDING DEFECTS IN
MATERIALS AND INSTALLATION, AND GUARANTEEING TO MAINTAIN THE SYSTEM IN A
WATERPROOF OR DAMPPROOF CONDITION (AS APPLICABLE) FOR THE LIFE OF THE
WARRANTY

38 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
• INCLUDE SEALING OF ALL PERIMETERS, JOINTS, AND PENETRATIONS
• RENEWAL OPTION FOR AN ADDITIONAL 10 YEARS FROM THE MATERIALS
MANUFACTURER
• FULL REPLACEMENT VALUE WITHOUT PRORATION
PART 3 – EXECUTION
SEE ABOVE SECTION 07100
07130 SHEET WATERPROOFING
PART 1 –GENERAL
SEE ABOVE SECTION 07 10 00
PART 2 – PRODUCTS
SPECIFY A SHEET WATERPROOFING SYSTEM WHICH INCLUDES THE FOLLOWING:
• JOINT PREPARATION
• CONTINUOUS SELF-HEALING SHEET MEMBRANE
• TERMITE-RESISTANT PROTECTION BOARD EMBEDDED IN A FLUID-APPLIED COATING TO
PROHIBIT DISPLACEMENT
PART 3 – EXECUTION
SEE ABOVE SECTION 07100
07140 FLUID-APPLIED WATERPROOFING
PART 1 – GENERAL
SEE ABOVE SECTION 07 10 00
PART 2 – PRODUCTS
SPECIFY A SHEET WATERPROOFING SYSTEM WHICH INCLUDES THE FOLLOWING:
• JOINT PREPARATION
• FLUID-APPLIED MEMBRANE WHICH CURES IN PLACE TO FORM A CONTINUOUS
MONOLITHIC SELF-HEALING MEMBRANE
• TERMITE-RESISTANT PROTECTION BOARD EMBEDDED IN A FLUID-APPLIED COATING TO
PROHIBIT DISPLACEMENT
PART 3 –EXECUTION
SEE ABOVE
07400 ROOFING AND SIDING PANELS
PART 1 – GENERAL
SYSTEMS DESCRIBED IN THIS SECTION ARE INTENDED TO BE INSTALLED IN SITUATIONS
WHERE THE ROOF SLOPE IS AT LEAST 2-1/2 INCHES PER FOOT, AND WHERE THE ROOFS
ARE NOT INTENDED TO RECEIVE REGULAR FOOT TRAFFIC FOR EQUIPMENT
MAINTENANCE.
SPECIFY A COMPLETE ROOFING SYSTEM, MAKING THE MATERIALS MANUFACTURER
RESPONSIBLE FOR THE ROOFING AND FLASHING SYSTEM. REQUIRE THE MATERIALS
MANUFACTURER TO MAKE PERIODIC INSPECTIONS OF THE WORK IN PROGRESS TO
ENSURE THAT THE COMPLETED WORK WILL QUALIFY FOR THE REQUIRED WARRANTIES.
DO NOT USE ROOF DECK INSULATION AS THE ONLY ELEMENT IN THE OVERALL BUILDING
THERMAL RESISTANCE SYSTEM. REFER TO SPECIFICATION SECTION 07 21 00.
METAL ROOF REPAIRS AND MODIFICATIONS WHICH ARE PART OF A RENOVATION
PROJECT (E.G. INSTALLATION OF A NEW EXHAUST FAN) SHALL FOLLOW THESE
STANDARDS. EXISTING ROOF WARRANTIES MUST NOT BE COMPROMISED. THE DP SHALL
PREPARE A COMPLETE SPECIFICATION AND DETAILS FOR THE REQUIRED REPAIR WORK.
GENERIC "FLASHING AS REQUIRED" NOTES (WHICH OFTEN APPEAR ON ENGINEERING
DETAILS FOR NEW EXHAUST FANS) ARE NOT ACCEPTABLE.
COORDINATE SPECIFICATION REQUIREMENTS WITH ROOFING, FLASHING, AND PARAPET
WALL DETAILS.
SPECIFY (OR DETAIL) 3/4" PLYWOOD NAILERS AT ALL PARAPET WALLS.
THE DP SHALL ENSURE THAT METAL ROOF DESIGN ADDRESSES POTENTIAL FOR
EXCESSIVE SNOW SLIDES, ICICLE ACCUMULATION AND FALLING AREA, PARTICULARLY IN
THE AREAS OF ENTRANCES, EMERGENCY EXITS, LOADING DOCKS, LOWER ROOF AREAS,
LANDSCAPING AND WALK-WAYS.
REQUIRE THAT MATERIALS MANUFACTURER(S) AND INSTALLER(S) DEMONSTRATE 5
YEARS OF SUCCESSFUL INSTALLATIONS OF SIMILAR SYSTEMS.
REQUIRE SUBMITTAL OF:
• MANUFACTURER'S LITERATURE DESCRIBING THE SYSTEM
• SHOP DRAWINGS SHOWING PANEL LAYOUT, AND ALL EDGE, TRANSITION, AND
PENETRATION DETAILS

39 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
• SAMPLES OF PROPOSED METAL PANELS
SPECIFY EXPANDED WARRANTIES AS FOLLOWS:
• 5-YEAR WARRANTY FROM THE INSTALLER COVERING DEFECTS IN INSTALLATION
• 30-YEAR WARRANTY FROM THE MATERIALS MANUFACTURER INCLUDING DEFECTS IN
MATERIALS AND INSTALLATION, HAIL DAMAGE, AND GUARANTEEING TO MAINTAIN THE
SYSTEM IN A WATERPROOF CONDITION FOR THE LIFE OF THE WARRANTY
• FULL REPLACEMENT VALUE WITHOUT PRORATION
• INCLUDE ALL COMPONENTS OF THE ROOF ASSEMBLY, FROM THE DECK UP
• INCLUDE SEALING OF ALL PERIMETERS, JOINTS, AND PENETRATIONS
PART 2 – PRODUCTS
REQUIRE THAT ALL PRIMARY AND SECONDARY MATERIALS BE SUPPLIED BY A SINGLE
MANUFACTURER, OR APPROVED BY THE PRIMARY MATERIALS MANUFACTURER, TO
ENSURE SINGLE-POINT RESPONSIBILITY FOR THE INSTALLATION AND WARRANTY.
SPECIFY A MANUFACTURER'S STANDARD PREFORMED METAL ROOFING SYSTEM AS
FOLLOWS:
• UL CLASS A FIRE RATING
• UL WIND UPLIFT RATING CAPABLE OF RESISTING WIND SPEEDS UP TO 100 MILES PER
HOUR
• MINIMUM 15-LB ASPHALT SATURATED UNDERLAYMENT
• FACTORY FORMED PANELS, STEEL, ALUMINUM, OR COPPER
• CONCEALED FASTENER INSTALLATION
• FACTORY APPLIED POLYVINYLIDINE FLUORIDE FINISH, OR NATURAL METAL FINISH
INTENDED FOR EXPOSURE TO THE ELEMENTS
LIMIT ROOF INSULATION TO 2" THICK. INSULATIONS WHICH PROVIDE ADEQUATE LOAD-
BEARING CAPACITY SHALL BE THE 2" THICKNESS.
COORDINATE THE DESIGN OF TESTED ROOFING ASSEMBLIES WITH THE SUPPORTING
ROOF STRUCTURAL SYSTEM.
MINIMUM GAUGES:
• ROOFS 22 GA
• WALLS 18 GA
MINIMUM PANEL WIDTH 12"
PART 3 – EXECUTION
A PRE-INSTALLATION CONFERENCE IS REQUIRED AFTER THE SUBSTRATES ARE
COMPLETE, AND MUST INCLUDE THE CONTRACTOR, DESIGN PROFESSIONAL, OWNER,
MATERIALS MANUFACTURER, AND INSTALLING SUBCONTRACTOR(S).
METAL ROOFING IS A FINISH MATERIAL, NOT A STAGING PLATFORM FOR FURTHER
CONSTRUCTION WORK. INCLUDE THE FOLLOWING PROVISIONS:
• A "TEMPORARY ROOF" IS REQUIRED IF THE CONTRACTOR IS TO "DRY-IN" THE BUILDING
TO ALLOW INTERIOR CONSTRUCTION TO BEGIN OR TO PROVIDE A PLATFORM FOR
FURTHER EXTERIOR CONSTRUCTION
• IF CONTRACTOR WANTS TO DRY-IN, THE CONTRACTOR MUST DO SO ONLY WITH A
TEMPORARY ROOF
REFERENCE THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION (NRCA)
REQUIREMENTS FOR TEMPORARY ROOFS, INCLUDING "SACRIFICIAL" INSULATION ON
METAL DECKS
• PHASED ROOFING IS PROHIBITED
• FINISHED ROOFS ARE REQUIRED TO BE PROTECTED WITH PLYWOOD SHEETS FOR ANY
AND ALL CONSTRUCTION TRAFFIC, AND ALL EQUIPMENT MOVING BE ACCOMPLISHED WITH
ROLLERS. ANY DAMAGE TO A FINISHED ROOF PRIOR TO PROJECT SUBSTANTIAL
COMPLETION IS CONTRACTOR’S RESPONSIBILITY. ANY DAMAGE CAUSED TO FINISHED
ROOF AFTER SUBSTANTIAL COMPLETION AND PRIOR TO FINAL COMPLETION WILL BE
ASSESSED TO DETERMINE RESPONSIBILITY.
WHEN 6-INCH RIGID INSULATION IS DESIGNED FOR THE ROOF SYSTEM, SECONDARY
PURLIN SUPPORT FRAMING SHALL BE PROVIDED FOR PRE-ENGINEERED SYSTEMS.
THE ROOF IS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS.
REFER TO AND DESCRIBE THE APPROPRIATE SMACNA DETAILS FOR EACH EDGE AND
PENETRATION CONDITION.
THE INSTALLATION CONTRACTOR SHALL RECEIVE, ACCEPT, AND INSTALL, ALL SHEET
METAL FLASHINGS.

40 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
THE FOLLOWING ARE SPECIFICALLY PROHIBITED:
• PITCH PANS
• GUY WIRES FASTENED DIRECTLY TO THE DECK
A SPRAY TEST IS REQUIRED AFTER COMPLETION OF THE ROOFING SYSTEM, TO BE
WITNESSED BY THE CONTRACTOR, DESIGN PROFESSIONAL, OWNER, MATERIALS
MANUFACTURER, AND INSTALLING CONTRACTOR(S).
07600 - FLASHING AND SHEET METAL
INTRODUCTION
WHEREVER POSSIBLE, DESCRIBE FLASHING SYSTEMS WHICH USE CONCEALED
FASTENERS, CLIPS, AND CLEATS. WHERE EXPOSED
FASTENERS ARE UNAVOIDABLE, SPECIFICALLY DESCRIBE A FASTENING SYSTEM WHICH
ABSOLUTELY PROHIBITS ENTRANCE OF WATER,
AND WHICH WILL REMAIN WATERTIGHT FOR THE LIFE OF THE FACILITY.
WHEREVER POSSIBLE, AVOID RELIANCE ON SEALANTS AS THE SOLE MEANS OF
PROHIBITING ENTRANCE OF WATER.
USE MATCHING MATERIALS ON RENOVATIONS OF EXISTING BUILDINGS WHICH CONTAIN
COPPER FLASHING MATERIALS.
DESCRIBE ALL REQUIREMENTS FOR INSTALLATION OF SHEET METAL WORK WHICH IS
ASSOCIATED WITH THE ROOFING SYSTEM AND ITS
SPECIAL WARRANTIES IN THE APPROPRIATE ROOFING SECTION, TO MAINTAIN SINGLE-
POINT RESPONSIBILITY FOR THE ROOF WARRANTY.
DESCRIBE ALL REQUIREMENTS FOR SEALANTS IN SECTION 07900.
SPECIFICALLY DETAIL ALL CONDITIONS ON THE DRAWINGS, INCLUDING REFERENCES TO
SPECIFIC REQUIREMENTS OF THE SHEET METAL
AND AIR CONDITIONING CONTRACTOR'S NATIONAL ASSOCIATION (SMACNA)
"ARCHITECTURAL SHEET METAL MANUAL".
PART 1 - GENERAL
• REQUIRE SUBMITTAL OF SHOP DRAWINGS AND DETAILS OF EACH CONDITION AND JOINT.
PART 2 - PRODUCTS
• SPECIFY MINIMUM 24 GAUGE THICKNESS FOR GALVANIZED METAL, AND IDENTIFY
SPECIFIC HEAVIER GAUGES WHERE THE
PROJECT REQUIRES.
-OR-
• SPECIFY MINIMUM 16 OUNCE FOR COPPER, AND IDENTIFY SPECIFIC HEAVIER MATERIALS
WHERE THE PROJECT REQUIRES.
• USE ONLY MINIMUM 16 OUNCE COPPER FOR MASONRY THROUGH-WALL, LINTEL, OR
OTHER SIMILAR EMBEDDED FLASHINGS.
• USE ONLY 4 POUND LEAD FOR ROOF DRAIN SUMP PANS.
• WHEN NECESSARY, USE 4 POUND LEAD FOR FLASHINGS INVOLVING COMPOUND CURVES
OR WHERE SHEETMETAL CAN NOT BE
ADEQUATELY FORMED. THIS APPLICATION REQUIRES A GALVANIZED SHEET METAL
PROTECTIVE COVER.
• WHERE 2-PIECE REGLETS ARE REQUIRED, DESCRIBE THE SPECIFIC SHAPE AND
SUBSTRATE CONDITIONS, BUT DO NOT REFERENCE
PROPRIETARY MANUFACTURER'S PRODUCTS.
• DO NOT SPECIFY ROOF JACKS OR BOOTS WHICH UTILIZE INTEGRAL NEOPRENE SEALS.
• USE ONLY GALVANIZED STRUCTURAL STEEL TUBE OR PIPE FOR DOWNSPOUT SECTIONS
WHICH ARE SUBJECT TO IMPACT AND
ABUSE.
• SPECIFY ONLY 50/50 TIN/LEAD SOLDER WHEN APPLICABLE.
• SPECIFY ONLY NON-CORROSIVE FASTENERS, SAME MATERIAL AS METAL BEING
FASTENED, WITH MATCHING FINISH ON EXPOSED
HEADS. SPECIFY NEOPRENE-BACKED WASHERS FOR SCREW FASTENERS.
• PART 3 – EXECUTION

• SPECIFICALLY DESCRIBE REQUIREMENTS FOR EXPANSION AND CONTRACTION JOINTS,


AND FOR SEALING JOINTS IN RUNNING
FLASHINGS. DO NOT RELY ON GENERIC "PROVIDE EXPANSION JOINTS AS REQUIRED"
NOTES.

41 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
• SPECIFICALLY DESIGN JOINTS TO ALLOW FOR REMOVAL AND REINSTALLATION OF
FLASHINGS DURING RE-ROOFING. TWO-PIECE
REGLETS ARE PREFERRED.
• SPECIFICALLY DESCRIBE REQUIREMENTS FOR SEPARATING DISSIMILAR METALS.

07700 ROOF AND WALL SPECIALTIES AND ACCESSORIES

07720 ROOF ACCESSORIES


PART 1 – GENERAL
ROOF HATCH ROOF ACCESS IS TO BE THROUGH A FULL SIZE DOOR (3’-0” X 7’-0”).
ALL ROOFS SHALL BE ACCESSIBLE FOR MAINTENANCE PURPOSES, REGARDLESS OF
PRESENCE OF MECHANICAL OR ELECTRICAL EQUIPMENT ON THE ROOF. ANNUAL
MAINTENANCE INCLUDES CLEANING DOWNSPOUT AND GUTTERS AND
WHEN A HATCH IS PROVIDED, IT SHALL BE A SELF-FLASHING HATCH. MINIMUM
DIMENSIONS SHALL BE SUCH THAT ANY PIECE OF EQUIPMENT LOCATED ON THE ROOF
CAN BE REMOVED FROM THE ROOF THROUGH THE HATCH. IF NO EQUIPMENT ON THE
ROOF, USE A MINIMUM 24” X 36” CLEAR OPENING.
FALL PREVENTION SYSTEM SHALL BE INSTALLED ON THE ROOF TO ALLOW FOR
MAINTENANCE.
RIDGE VENTS: INSTALLED PER CONSTRUCTION DOCUMENTS
SCUPPERS, DOWNSPOUTS AND OVERFLOW DRAINS SHALL NOT BE INSTALLED IN SUCH A
MANNER AS TO ALLOW THE WATER TO RUN DOWN THE FACE OF THE BUILDING WALL OR
ACROSS SIDEWALKS.
ALL ROOF CURBS TO BE A MINIMUM OF 12 INCHES ABOVE FINISHED ROOF MEMBRANE
PART 2 – PRODUCTS
N/A
PART 3 – EXECUTION
N/A
07760 ROOF PAVERS
PART 1 – GENERAL
ROOF PAVERS OR REINFORCED SINGLE PLY MEMBRANE MATERIAL SHALL BE INSTALLED
TO PROVIDE ACCESS FROM ROOF DOOR /HATCH TO ANY PIECES OF EQUIPMENT THAT
WILL REQUIRE ACCESS TO PERFORM MAINTENANCE.
PART 2 – PRODUCTS
N/A

PART 3 – EXECUTION
N/A
07800 FIRE AND SMOKE PROTECTION
07820 BOARD FIREPROOFING
PART 1 – GENERAL
INDICATE ON THE DRAWINGS THE UL LISTING NUMBER AND FIRE RESISTANCE RATING
WHICH IS REQUIRED FOR EACH CONDITION OF STRUCTURAL FIREPROOFING.
ALL MATERIALS MANUFACTURER(S) AND APPLICATOR(S) MUST DEMONSTRATE 5 YEARS
OF SUCCESSFUL INSTALLATION OF SIMILAR MATERIALS.
A SUBMITTAL OF MANUFACTURER'S LITERATURE DESCRIBING ALL MATERIALS, AND THE
SPECIFIC SYSTEMS IS REQUIRED.
PART 2 – PRODUCTS
THE USE OF ASBESTOS CONTAINING MATERIALS IS PROHIBITED.
WHEN RE-FIREPROOFING STRUCTURAL ELEMENTS WHERE ASBESTOS-CONTAINING
FIREPROOFING HAS BEEN ABATED BY THE OWNER, ONLY MATERIALS WHICH ARE KNOWN
TO BE COMPATIBLE WITH ASBESTOS ENCAPSULATES CAN BE USED.
PART 3 – EXECUTION
DESCRIBE REQUIREMENTS FOR PROTECTION OF COMPLETED FIREPROOFING.
DESCRIBE SPECIFIC REQUIREMENTS FOR REPAIR OF FIREPROOFING IN THE EVENT OF
DAMAGE.
WHEN RE-FIREPROOFING STRUCTURAL ELEMENTS WHERE ASBESTOS-CONTAINING
FIREPROOFING HAS BEEN SPOT-ABATED BY THE OWNER, SPECIFICALLY DESCRIBE
PRECAUTIONS WHICH THE CONTRACTOR MUST TAKE TO PROTECT ADJOINING ASBESTOS
CONTAINING FIREPROOFING WHICH REMAINS.

42 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
07840 FIRESTOPPING
PART 1 - GENERAL
ONLY TESTED FIRESTOP SYSTEMS SHALL BE USED IN SPECIFIC LOCATIONS AS FOLLOWS:
A. PENETRATIONS FOR THE PASSAGE OF DUCT, CABLE, CABLE TRAY, CONDUIT, PIPING,
ELECTRICAL BUSWAYS AND RACEWAYS THROUGH FIRE-RATED VERTICAL BARRIERS
(WALLS AND PARTITIONS), HORIZONTAL BARRIERS (FLOOR/CEILING ASSEMBLIES), AND
VERTICAL SERVICE SHAFT WALLS AND PARTITIONS.
B. SAFING SLOT GAPS BETWEEN EDGE OF FLOOR SLABS AND CURTAIN WALLS.
C. OPENINGS BETWEEN STRUCTURALLY SEPARATE SECTIONS OF WALL OR FLOORS.
D. GAPS BETWEEN THE TOP OF WALLS AND CEILINGS OR ROOF ASSEMBLIES.

E. EXPANSION JOINTS IN WALLS AND FLOORS.


F. OPENINGS AND PENETRATIONS IN FIRE-RATED PARTITIONS OR WALLS CONTAINING
FIRE DOORS.
G. OPENINGS AROUND STRUCTURAL MEMBERS WHICH PENETRATE FLOORS OR WALLS.
RELATED WORK OF OTHER SECTIONS
COORDINATE WORK OF THIS SECTION WITH WORK OF OTHER SECTIONS AS REQUIRED TO
PROPERLY EXECUTE THE WORK AND AS NECESSARY TO MAINTAIN SATISFACTORY
PROGRESS OF THE WORK OF OTHER SECTIONS, INCLUDING:
1. CAST-IN-PLACE CONCRETE
2. JOINT SEALERS
3. MASONRY WORK
4. LATH AND PLASTER
5. GYPSUM DRYWALL SYSTEMS
6. SOUND, VIBRATION AND SEISMIC CONTROL
7. FIRE SUPPRESSION AND SUPERVISORY SYSTEMS
8. BASIC MECHANICAL MATERIALS AND METHODS
9. MECHANICAL INSULATION
10. FIRE PROTECTION
11. PLUMBING
12. BASIC ELECTRICAL MATERIALS AND METHODS
THROUGH-PENETRATION UL CLASSIFICATION SYSTEM
FIRE STOPPING SYSTEMS UL CLASSIFICATION SYSTEM
CONSTRUCTION TYPE OF SYSTEM - PENETRATED CONSTRUCTION IDENTIFICATION
1. NO PENETRATING ITEMS: F, W, C A, B, J, K, L 0001-0999
2. METALLIC PIPES, CONDUIT OR TUBING: F, W, C A, B, J, K, L 1001-1999
3. NONMETALLIC PIPE, CONDUIT OR TUBING: F, W, C A, B, J, K, L 2001-2999
4. ELECTRIC CABLES: F, W, C A, B, J, K, L 3001-3999
5. CABLE, TRAYS WITH ELECTRIC CABLES: F, W, C A, B, J, K, L 4001-4999
6. INSULATED PIPES: F, W, C A, B, J, K, L 5001-5999
7. ELECTRICAL BUSSDUCT PENETRATIONS: F, W, C A, B, J, K, L 6001-6999
8. MECHANICAL DUCTWORK PENETRATIONS: F, W, C A, B, J, K, L 7001-7999
9. MULTIPLE PENETRATIONS THROUGH COMMON OPENINGS: F, W, C A, B, J, K, L 8000-8999
CONSTRUCTION PENETRATION
F - FLOOR PENETRATION
W - WALL PENETRATION
C - EITHER FLOOR OR WALL PENETRATION

TYPE OF CONSTRUCTION
A – CONCRETE FLOORS EQUAL TO OR LESS THAN 5-INCHES THICK
B – CONCRETE FLOORS GREATER THAN 5-INCHES THICK
J – CONCRETE OR MASONRY WALLS EQUAL TO OR LESS THAN 8-INCHES THICK
K– CONCRETE OF MASONRY WALLS GREATER THAN 8-INCHES THICK
L – FRAMED WALLS
JOINT UL CLASSIFICATION SYSTEM
FIRE-RESISTANT JOINT SYSTEMS UL CLASSIFICATION SYSTEM
JOINT
SYSTEM
MOVEMENT
CAPABILITY JOINT WIDTH

43 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
1. FLOOR-TO-FLOOR FF D 0000-0999
2. WALL-TO-WALL WW D 0000-0999
3. FLOOR-TO-WALL: FW D 0000-0999
4. HEAD OF WALL: HW D 0000-0999
MOVEMENT CAPABILITY
D=DYNAMIC HAS MOVEMENT CAPABILITY
S=STATIC WHICH DOES NOT REQUIRE MOVEMENT CAPABILITY
JOINT WIDTH
0000-0999 LESS THAN OR EQUAL TO 2”
1000-1999 GREATER THAN 2” LESS THAN OR EQUAL TO 6”
2000-2999 GREATER THAN 6” LESS THAN OR EQUAL TO 12”
QUALITY ASSURANCE
A. FIRE-TEST-RESPONSE CHARACTERISTICS: PROVIDE THROUGH-PENETRATION FIRE
STOP SYSTEMS AND FIRE- RESISTIVE JOINT SYSTEMS THAT COMPLY WITH SPECIFIED
REQUIREMENTS OF TESTED SYSTEMS.
B. FIRE STOP SYSTEM INSTALLATION MUST MEET REQUIREMENTS OF ASTM E 814, UL 1479
OR UL 2079 TESTED ASSEMBLIES THAT PROVIDE A FIRE RATING EQUAL TO THAT OF
CONSTRUCTION BEING PENETRATED.
C. PROPOSED FIRE STOP MATERIALS AND METHODS SHALL CONFORM TO APPLICABLE
GOVERNING CODES HAVING LOCAL JURISDICTION.
D. FIRE STOP SYSTEMS DO NOT REESTABLISH THE STRUCTURAL INTEGRITY OF LOAD
BEARING PARTITIONS/ASSEMBLIES, OR SUPPORT LIVE LOADS AND TRAFFIC. INSTALLER
SHALL CONSULT THE STRUCTURAL ENGINEER PRIOR TO PENETRATING ANY LOAD
BEARING ASSEMBLY.
E. FOR THOSE FIRESTOP APPLICATIONS THAT EXIST FOR WHICH NO QUALIFIED TESTED
SYSTEM IS AVAILABLE THROUGH A MANUFACTURER, AN ENGINEERING JUDGMENT
DERIVED FROM SIMILAR QUALIFIED TESTED SYSTEM DESIGNS OR OTHER TESTS WILL BE
SUBMITTED TO OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION.
ENGINEERING JUDGMENT DOCUMENTS MUST FOLLOW REQUIREMENTS SET FORTH BY
THE INTERNATIONAL FIRESTOP COUNCIL.
1. CONTRACTORS WILL BE RESPONSIBLE TO CHECK WITH MANUFACTURER TO VERIFY
THAT MANUFACTURER DOES NOT HAVE A TESTED ASSEMBLY FOR A GIVEN APPLICATION
PRIOR TO SUBMISSION OF ANY ENGINEERING JUDGMENT.
SUBMITTALS
A. SUBMIT PRODUCT DATA: MANUFACTURER'S SPECIFICATIONS AND TECHNICAL DATA
FOR EACH MATERIAL INCLUDING THE COMPOSITION AND LIMITATIONS, DOCUMENTATION
OF QUALIFIED TESTED FIRESTOP SYSTEMS TO BE USED, AND MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
B. MANUFACTURER'S ENGINEERING JUDGMENT IDENTIFICATION NUMBER AND DOCUMENT
DETAILS WHEN NO QUALIFIED TESTED SYSTEM IS AVAILABLE FOR AN APPLICATION.
ENGINEERING JUDGMENT MUST INCLUDE BOTH PROJECT NAME AND CONTRACTOR’S
NAME WHO WILL INSTALL FIRESTOP SYSTEM AS DESCRIBED IN DOCUMENT.
C. SUBMIT MATERIAL SAFETY DATA SHEETS AND CERTIFICATES OF COMPLIANCE
PROVIDED WITH PRODUCT DELIVERED TO JOBSITE.
D. VOC CONTENT LIMITATIONS: FOR FIRESTOP SYSTEM PRODUCTS, SUBMIT
DOCUMENTATION OF CONFORMANCE WITH LEED’S LOW-EMITTING MATERIALS
REQUIREMENTS.
INSTALLER QUALIFICATIONS
A. CONTRACTOR SHALL BE OR ENGAGE AN EXPERIENCED INSTALLER WHO IS CERTIFIED,
LICENSED, OR OTHERWISE QUALIFIED BY THE FIRESTOPPING MANUFACTURER AS HAVING
BEEN PROVIDED THE NECESSARY TRAINING TO INSTALL MANUFACTURER’S PRODUCTS
PER SPECIFIED REQUIREMENTS. A SUPPLIER’S WILLINGNESS TO SELL ITS FIRESTOPPING
PRODUCTS TO THE CONTRACTOR OR TO AN INSTALLER ENGAGED BY THE CONTRACTOR
DOES NOT IN ITSELF CONFER QUALIFICATION ON THE BUYER.
B. INSTALLATION RESPONSIBILITY: ASSIGN INSTALLATION OF THROUGH-PENETRATION
FIRESTOP SYSTEMS AND FIRE-RESISTIVE JOINT SYSTEMS IN PROJECT TO A SINGLE
SOURCE SPECIALTY FIRESTOP CONTRACTOR.
C. THE WORK IS TO BE INSTALLED BY A CONTRACTOR WITH AT LEAST ONE OF THE
FOLLOWING QUALIFICATIONS:
1. UL APPROVED CONTRACTOR

44 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
2. FM 4991 APPROVED CONTRACTOR
D. CONTRACTOR SHALL HAVE AT LEAST 3-YEARS’ EXPERIENCE WITH COMPLETE FIRE
STOP INSTALLATIONS.
E. CONTRACTOR SHALL HAVE SUCCESSFULLY COMPLETED 3 OR MORE COMPARABLE
SCALE PROJECTS USING SIMILAR SYSTEMS.
DELIVERY, STORAGE, AND HANDLING
A. DELIVER MATERIALS UNDAMAGED IN MANUFACTURER'S CLEARLY LABELED, UNOPENED
CONTAINERS, IDENTIFIED WITH BRAND, TYPE, AND UL LABEL WHERE APPLICABLE.
B. COORDINATE DELIVERY OF MATERIALS WITH SCHEDULED INSTALLATION DATE TO
ALLOW MINIMUM STORAGE TIME AT JOBSITE.
C. STORE MATERIALS UNDER COVER AND PROTECT FROM WEATHER AND DAMAGE IN
COMPLIANCE WITH MANUFACTURER'S REQUIREMENTS, INCLUDING TEMPERATURE
RESTRICTIONS.
D. COMPLY WITH RECOMMENDED PROCEDURES, PRECAUTIONS OR REMEDIES
DESCRIBED IN MATERIAL DATA SAFETY SHEETS AS APPLICABLE.
E. DO NOT USE DAMAGED OR EXPIRED MATERIALS.
PROJECT CONDITIONS
A. DO NOT USE MATERIALS THAT CONTAIN FLAMMABLE SOLVENTS.
B. SCHEDULE INSTALLATION OF FIRESTOPPING AFTER COMPLETION OF PENETRATING
ITEM INSTALLATION BUT PRIOR TO COVERING OR CONCEALING OF OPENINGS.
C. VERIFY EXISTING CONDITIONS AND SUBSTRATES BEFORE STARTING WORK AND
CORRECT UNSATISFACTORY CONDITIONS BEFORE PROCEEDING.
D. WEATHER CONDITIONS: DO NOT PROCEED WITH INSTALLATION OF FIRESTOP
MATERIALS WHEN TEMPERATURES EXCEED THE MANUFACTURER'S RECOMMENDED
LIMITATIONS FOR INSTALLATION PRINTED ON PRODUCT LABEL AND PRODUCT DATA
SHEET.
E. DURING INSTALLATION, PROVIDE MASKING AND DROP CLOTHS TO PREVENT
FIRESTOPPING MATERIALS FROM CONTAMINATING ANY ADJACENT SURFACES.
PART 2 – PRODUCTS
FIRESTOPPING, GENERAL
A. PROVIDE FIRESTOPPING COMPOSED OF COMPONENTS THAT ARE COMPATIBLE WITH
EACH OTHER, THE SUBSTRATES FORMING OPENINGS, AND THE ITEMS, IF ANY,
PENETRATING THE FIRESTOPPING UNDER CONDITIONS OF SERVICE AND APPLICATION, AS
DEMONSTRATED BY THE FIRESTOPPING MANUFACTURER BASED ON TESTING AND FIELD
EXPERIENCE.
1. THE USE OF MULTIPLE MANUFACTURERS’ MATERIALS WITHIN THE CONTEXT OF THE
SAME OPENING VOIDS ALL WARRANTEES AND WILL NOT BE ACCEPTED.
B. PROVIDE COMPONENTS FOR EACH FIRESTOPPING SYSTEM THAT ARE NEEDED TO
INSTALL FILL MATERIAL. USE ONLY COMPONENTS SPECIFIED BY THE FIRESTOPPING
MANUFACTURER AND APPROVED BY THE QUALIFIED TESTING AGENCY FOR THE
DESIGNATED FIRE-RESISTANCE-RATED SYSTEMS.
C. FIRESTOPPING MATERIALS ARE EITHER “CAST-IN-PLACE” (INTEGRAL WITH CONCRETE
PLACEMENT) OR “POST INSTALLED.” PROVIDE CAST-IN-PLACE FIRESTOP DEVICES PRIOR
TO CONCRETE PLACEMENT.
D. SEAL ALL OPENINGS OR VOIDS MADE BY PENETRATIONS TO ENSURE AN AIR- AND
WATER- RESISTANT SEAL.
E. CONSULT WITH DP, OWNER, AND DAMPER MANUFACTURER PRIOR TO INSTALLATION OF
THROUGH-PENETRATION FIRESTOP SYSTEMS THAT MIGHT HAMPER THE PERFORMANCE
OF FIRE DAMPERS AS IT PERTAINS TO DUCT WORK.
F. PROTECT MATERIALS FROM DAMAGE ON SURFACES SUBJECTED TO TRAFFIC.
G. APPLY A SUITABLE BOND-BREAKER TO PREVENT THREE-SIDED ADHESION IN
APPLICATIONS WHERE THIS CONDITION MIGHT OCCUR SUCH AS THE INTERSECTION OF A
GYPSUM WALLBOARD/STEEL STUD WALL TO FLOOR OR ROOF ASSEMBLY WHERE THE
JOINT IS BACKED BY A STEEL CEILING RUNNER OR TRACK.
H. WHERE JOINT APPLICATION IS EXPOSED TO THE ELEMENTS, FIRE-RESISTIVE JOINT
SEALANT MUST BE APPROVED BY MANUFACTURER FOR USE IN EXTERIOR APPLICATIONS
AND SHALL COMPLY WITH ASTM C-920, “SPECIFICATION FOR ELASTOMERIC JOINT
SEALANTS”.
MANUFACTURERS

45 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
A. MANUFACTURERS ARE SUBJECT TO COMPLIANCE WITH THROUGH PENETRATION
FIRESTOP SYSTEMS (XHEZ), JOINT SYSTEMS (XHBN), AND PERIMETER FIRESTOP SYSTEMS
(XHDG) LISTED IN VOLUME 2 OF THE UL FIRE RESISTANCE DIRECTORY.
B. OWNER HAS PRE-APPROVED THE FOLLOWING MANUFACTURERS TO BE IN COMPLIANCE
WITH THESE STANDARDS: A. SPECIFIED TECHNOLOGIES INC. STI SOMERVILLE, NEW
JERSEY 800.992.1180/WWW.STIFIRESTOP.COM
B. HILTI, INC., TULSA, OKLAHOMA 800-879-8000/WWW.US.HILTI.COM
C. APPROVED EQUAL, AS APPROVED IN WRITING FROM OWNER
PERFORMANCE REQUIREMENTS
A. PROVIDE PRODUCTS THAT UPON CURING DO NOT RE-EMULSIFY, DISSOLVE, LEACH,
BREAKDOWN OR OTHERWISE DETERIORATE OVER TIME FROM EXPOSURE TO
ATMOSPHERIC MOISTURE, SWEATING PIPES, PONDING WATER OR OTHER FORMS OF
MOISTURE CHARACTERISTIC DURING AND AFTER CONSTRUCTION.
B. PROVIDE FIRESTOP SEALANTS SUFFICIENTLY FLEXIBLE TO ACCOMMODATE MOTION
SUCH AS PIPE VIBRATION, WATER HAMMER, THERMAL EXPANSION AND OTHER NORMAL
BUILDING MOVEMENT WITHOUT DAMAGE TO THE SEAL.
C. PIPE INSULATION SHALL NOT BE REMOVED, CUT AWAY OR OTHERWISE INTERRUPTED
THROUGH WALL OR FLOOR OPENINGS. PROVIDE PRODUCTS APPROPRIATELY TESTED
FOR THE THICKNESS AND TYPE OF INSULATION UTILIZED.
D. FIRE RATED PATHWAY DEVICES SHALL BE THE PREFERRED PRODUCT AND SHALL BE
INSTALLED IN ALL LOCATIONS WHERE FREQUENT CABLE MOVES, ADD-ONS AND CHANGES
WILL OCCUR.
E. WHEN MECHANICAL CABLE PATHWAYS ARE NOT PRACTICAL, OPENINGS WITHIN WALLS
AND FLOORS DESIGNED TO ACCOMMODATE VOICE, DATA AND VIDEO CABLING SHALL BE
PROVIDED WITH RE-ENTERABLE PRODUCTS SPECIFICALLY DESIGNED FOR RETROFIT.
F. PENETRANTS PASSING THROUGH FIRE-RESISTANCE RATED FLOOR-CEILING
ASSEMBLIES CONTAINED WITHIN CHASE WALL ASSEMBLIES SHALL BE PROTECTED WITH
PRODUCTS TESTED BY BEING FULLY EXPOSED TO THE FIRE OUTSIDE OF THE CHASE
WALL. SYSTEMS WITHIN THE
UL FIRE RESISTANCE DIRECTORY THAT MEET THIS CRITERION ARE IDENTIFIED WITH THE
WORDS “CHASE WALL OPTIONAL”.
G. PROVIDE FIRE-RESISTIVE JOINT SEALANTS SUFFICIENTLY FLEXIBLE TO ACCOMMODATE
MOVEMENT SUCH AS THERMAL EXPANSION AND OTHER NORMAL BUILDING MOVEMENT
WITHOUT DAMAGE TO THE SEAL.
H. PROVIDE FIRE-RESISTIVE JOINT SEALANTS DESIGNED TO ACCOMMODATE A SPECIFIC
RANGE OF MOVEMENT AND TESTED FOR THIS PURPOSE IN ACCORDANCE WITH ACYCLIC
MOVEMENT TEST CRITERIA AS OUTLINED IN STANDARDS, ASTM E-1399, ASTM E-1966 OR
ANSI/ UL 2079.
I. PROVIDE THROUGH-PENETRATION FIRESTOP SYSTEMS AND FIRE-RESISTIVE JOINT
SYSTEMS SUBJECTED TO AN AIR LEAKAGE TEST CONDUCTED IN ACCORDANCE WITH THE
STANDARDS, ANSI/ UL1479 FOR PENETRATION AND ANSI/UL2079 FOR JOINT SYSTEMS,
WITH PUBLISHED L-RATINGS FOR AMBIENT AND ELEVATED TEMPERATURES AS EVIDENCE
OF THE ABILITY OF THE FIRESTOP SYSTEM TO RESTRICT THE MOVEMENT OF SMOKE.
J. PROVIDE T-RATING COLLAR DEVICES TESTED IN ACCORDANCE WITH ASTM E-814 OR
ANSI/UL1479 FOR METALLIC PIPE PENETRATIONS REQUIRING T-RATINGS PER THE
APPLICABLE BUILDING CODE.
MATERIALS
A. USE ONLY FIRESTOP PRODUCTS THAT HAVE BEEN UL 1479, ASTM E 814 OR UL 2079,
ASTM E 1966 TESTED FOR SPECIFIC FIRE-RATED CONSTRUCTION CONDITIONS
CONFORMING TO CONSTRUCTION ASSEMBLY TYPE, PENETRATING ITEM TYPE, ANNULAR
SPACE REQUIREMENTS, AND FIRE-RATING INVOLVED FOR EACH SEPARATE INSTANCE.
B. PRE-INSTALLED FIRESTOP DEVICES FOR USE WITH NONCOMBUSTIBLE AND/OR
COMBUSTIBLE PIPES (CLOSED AND OPEN SYSTEMS), CONDUIT, AND/OR CABLE BUNDLES
PENETRATING CONCRETE FLOORS.
C. OWNER HAS PRE-APPROVED THE FOLLOWING PRODUCTS TO BE IN COMPLIANCE WITH
THESE STANDARDS:
1. STI CAST-IN PLACE DEVICES
A. CD200, CD300, CD400, CD600 CAST-IN PLACE FOR COMBUSTIBLE OR NON-COMBUSTIBLE
PENETRANTS, OR CD200M, CD300M, CD400M, CD600M CAST-IN PLACE FOR NON-
COMBUSTIBLE PENETRANTS

46 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
B. ADD METAL DECK ADAPTER KIT/S CD200DK, CD300DK, CD400DK, CD600DK ON ANY
CORRUGATED METAL DECK TO BRIDGE FLUTES
C. ADD HEIGHT ADAPTER CD200X, CD300X, CD400X, CD600X FOR CONCRETE SLABS WHICH
EXCEED 8” OVERALL THICKNESS
D. ADD TUB BOX KIT CD200T FOR USE WITH TUB INSTALLATIONS
2. HILTI CP 680P OR CP 680M CAST-IN PLACE FIRESTOP DEVICES:
A. ADD AERATOR ADAPTER WHEN USED IN CONJUNCTION WITH AN AERATOR (SOVENT
SYSTEM)
B. ADD METAL DECK ADAPTER KIT IF UTILIZING CP 680P OR M ON CORRUGATED METAL
DECK.
C. ADD HEIGHT EXTENSION IF UTILIZING CP 680P OR M IN CONCRETE SLABS THICKER
THAN 8”.
D. ADD HILTI WATER MODULE (2” UP TO 6”) TO ACHIEVE UL W-RATING
E. ADD HILTI TOP SEAL (1/2” UP TO 2”) TO ACHIEVE UL W-RATING
3. HILTI CP 681 TUB BOX KIT FOR USE WITH BATHTUB INSTALLATIONS.
4. HILTI TOILET FLANGE FOR USE WITH FLOOR OUTLET WATER CLOSETS.
5. HILTI COUPLING SLEEVE FOR USE WITH FLOOR, SHOWER OR GENERAL PURPOSES
DRAINS
C. FIRE RATED CABLE PATHWAY DEVICES SHALL BE USED FOR ALL LOW-VOLTAGE, VIDEO,
DATA AND VOICE CABLING, OPTICAL FIBER RACEWAYS AND CERTAIN HIGH-VOLTAGE
CABLING WHERE FREQUENT CABLE MOVES, ADDS AND CHANGES MAY OCCUR. PATHWAYS
REQUIRED FOR HIGH VOLTAGE CABLING WILL BE DETAILED ON THE PRINTS. SUCH
DEVICES SHALL:
1. MEET THE HOURLY FIRE-RATING OF FIRE RATED WALL AND OR FLOOR PENETRATED.
2. BE TESTED FOR THE SURROUNDING CONSTRUCTION AND CABLE TYPES INVOLVED.
3. HAVE UL SYSTEMS PERMITTING CABLE LOADS FROM; “ZERO TO 100% VISUAL FILL.” THIS
REQUIREMENT ELIMINATES NEED FOR FILL-RATIO CALCULATIONS TO BE MADE BY CABLE
TECHNICIANS TO ENSURE CABLE LOAD IS WITHIN MAXIMUM ALLOWED BY UL SYSTEM.
4. NOT HAVE INNER FABRIC LINER THAT TIGHTENS AROUND AND COMPRESSES CABLES
TIGHTLY TOGETHER ENCOURAGING ALIEN CROSS-TALK INTERFERENCE.
5. BE “ZERO-MAINTENANCE”, ZERO-MAINTENANCE IS DEFINED AS; NO ACTION REQUIRED
BY CABLING TECHNICIAN TO OPEN AND/OR CLOSE PATHWAY FOR CABLE MOVES, ADDS
OR CHANGES, SUCH AS, BUT NOT LIMITED TO: A. OPENING OR CLOSING OF DOORS.
B. SPINNING RINGS TO OPEN OR CLOSE FABRIC LINER.
C. REMOVAL AND OR REPLACEMENT OF ANY MATERIAL SUCH AS, BUT NOT LIMITED TO,
FIRESTOP CAULK, PUTTY, PILLOWS, BAGS, FOAM MUFFINS, FOAM, FOAM PLUGS, FOAM
BLOCKS, OR FOAM CLOSURES OF ANY SORT.
D. FURNISH LETTER FROM MANUFACTURER CERTIFYING COMPLIANCE WITH THIS
DEFINITION OF “ZERO-MAINTENANCE”.
6. PATHWAYS SHALL BE ENGINEERED SUCH THAT TWO OR MORE DEVICES MAY BE
GANGED TOGETHER FOR LARGER CABLE CAPACITIES.
7. PATHWAYS SHALL BE ENGINEERED TO BE RE-ENTERABLE SO THEY CAN BE
RETROFITTED AND REMOVED FROM AROUND EXISTING CABLES WITHOUT CUTTING AND
RE-SPLICING THEM.
8. CABLE PATHWAY DEVICES PASSING VERTICALLY THROUGH FLOORS SHALL HAVE
EQUAL F & T RATING. (SEE UL SYSTEM # F-A-3037, ITEM #4 “EZ-PATH GRID T-RATING KIT”
PART # TRK444)
9. AFFIX ADHESIVE WALL LABEL IMMEDIATELY ADJACENT TO DEVICES TO COMMUNICATE
TO FUTURE CABLE TECHNICIANS, AUTHORITIES HAVING JURISDICTION AND OTHERS THE
MANUFACTURER OF THE DEVICE AND THE CORRESPONDING UL SYSTEM NUMBER
INSTALLED.
D. AS AN ALTERNATE TO USING A FIRE-RATED CABLE PATHWAY DEVICE FOR SINGLE LOW
VOLTAGE CABLES (UP TO 0.27 IN. (7 MM) O.D) PENETRATING ONE OR TWO-HOUR, GYPSUM
BOARD/STUD WALL ASSEMBLIES, EITHER AS A THROUGH-PENETRATION OR AS A
MEMBRANE-PENETRATION, A FIRE-RATED CABLE GROMMET MAY BE SUBSTITUTED. THE
FIRESTOP SHALL CONSIST OF A MOLDED, TWO-PIECE, PLENUM-RATED GROMMET HAVING
A FOAM FIRE AND SMOKE SEALING MEMBRANE THAT CONFORMS TO THE OUTSIDE
DIAMETER OF THE INDIVIDUAL CABLE. THE GROMMET PRODUCT SHALL BE CAPABLE OF
LOCKING INTO PLACE TO SECURE THE CABLE PENETRATION WITHIN THE WALL ASSEMBLY.

47 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
THE GROMMET SHALL BE UL CLASSIFIED AND TESTED TO THE REQUIREMENTS OF ASTM
E814 (UL1479) AND CAN/ULC S115.
E. SEALANTS, CAULKING MATERIALS, OR FOAMS FOR USE WITH NON-COMBUSTIBLE ITEMS
INCLUDING STEEL PIPE, COPPER PIPE, RIGID STEEL CONDUIT AND ELECTRICAL METALLIC
TUBING (EMT). OWNER HAS PRE-APPROVED THE FOLLOWING PRODUCTS TO BE IN
COMPLIANCE WITH THESE STANDARDS:
1. STI TRIPLE S INTUMESCENT FIRESTOP SEALANT
2. STI LCI INTUMESCENT FIRESTOP SEALANT
3. STI LC ENDOTHERMIC FIRESTOP SEALANT
4. STI AS ELASTOMERIC FIRESTOP SPRAY
5. STI PEN OR PENSL SILICONE FIRESTOP SEALANT
6. HILTI FS-ONE INTUMESCENT FIRESTOP SEALANT
7. HILTI CP 604 SELF-LEVELING FIRESTOP SEALANT
8. HILTI CP 620 FIRE FOAM
9. HILTI CP 606 FLEXIBLE FIRESTOP SEALANT
10. HILTI CP 601S ELASTOMERIC FIRESTOP SEALANT
F. SEALANTS OR CAULKING MATERIALS FOR USE WITH SHEET METAL DUCTS. OWNER HAS
PRE-APPROVED THE FOLLOWING PRODUCTS TO BE IN COMPLIANCE WITH THESE
STANDARDS:
1. STI TRIPLE S INTUMESCENT FIRESTOP SEALANT
2. STI LCI INTUMESCENT FIRESTOP SEALANT
3. STI LC ENDOTHERMIC FIRESTOP SEALANT
4. STI AS ELASTOMERIC FIRESTOP SPRAY
5. STI PEN OR PENSL SILICONE FIRESTOP SEALANT
6. HILTI CP 601S ELASTOMERIC FIRESTOP SEALANT
7. HILTI CP 606 FLEXIBLE FIRESTOP SEALANT
8. HILTI FS-ONE INTUMESCENT FIRESTOP SEALANT
G. SEALANTS, CAULKING OR SPRAY MATERIALS FOR USE WITH FIRE-RATED
CONSTRUCTION JOINTS AND OTHER GAPS. OWNER HAS PRE-APPROVED THE FOLLOWING
PRODUCTS TO BE IN COMPLIANCE WITH THESE STANDARDS:
1. STI AS ELASTOMERIC FIRESTOP SPRAY
2. STI FAST TACK FIRESTOP SPRAY
3. STI ES ELASTOMERIC FIRESTOP SEALANT
4. STI LC ENDOTHERMIC FIRESTOP SEALANT
5. STI SPEED FLEX JOINT SOLUTION SYSTEM
6. STI PEN OR PENSL SILICONE FIRESTOP SEALANT
7. HILTI CP 672 SPEED SPRAY
8. HILTI CP 672 FC “FAST CURE” SPEED SPRAY
9. HILTI CP 601 S ELASTOMERIC FIRESTOP SEALANT
10 HILTI CP 606 FLEXIBLE FIRESTOP SEALANT
11. HILTI CP 604 SELF-LEVELING FIRESTOP SEALANT
H. PRE-FORMED MINERAL WOOL DESIGNED TO FIT FLUTES OF METAL PROFILE DECK AND
GAP BETWEEN TOP OF WALL AND METAL PROFILE DECK; AS A BACKER FOR SPRAY
MATERIAL. OWNER HAS PRE-APPROVED THE FOLLOWING PRODUCTS TO BE IN
COMPLIANCE WITH THESE STANDARDS:
1. HILTI CP 777 SPEED PLUGS
2. HILTI CP 767 SPEED STRIPS
3. ANY MANUFACTURER WHO CAN PROVIDE A 4PCF OR GREATER MINERAL WOOL SUCH
AS THERMAFIBER, ROXUL ETC. TESTED TO ALL APPLICABLE STANDARDS
I. INTUMESCENT SEALANTS, CAULKING MATERIALS FOR USE WITH COMBUSTIBLE ITEMS
(PENETRANTS CONSUMED BY HIGH HEAT AND FLAME) INCLUDING INSULATED METAL PIPE,
PVC JACKETED, FLEXIBLE CABLE OR CABLE BUNDLES AND PLASTIC PIPE. OWNER HAS
PRE-APPROVED THE FOLLOWING PRODUCTS TO BE IN COMPLIANCE WITH THESE
STANDARDS:
1. STI TRIPLE S INTUMESCENT FIRESTOP SEALANT
2. STI LCI INTUMESCENT FIRESTOP SEALANT
3. HILTI FS-ONE INTUMESCENT FIRESTOP SEALANT
J. FOAMS, INTUMESCENT SEALANTS, OR CAULKING MATERIALS FOR USE WITH FLEXIBLE
CABLE OR CABLE BUNDLES. OWNER HAS PRE-APPROVED THE FOLLOWING PRODUCTS TO
BE IN COMPLIANCE WITH THESE STANDARDS:

48 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
1. STI TRIPLE S INTUMESCENT FIRESTOP SEALANT
2. STI LCI INTUMESCENT FIRESTOP SEALANT
3. STI SSP INTUMESCENT FIRESTOP PUTTY
4. STI CS105 CABLE SPRAY
5. STI FS READY SLEEVE OR FSR SPLIT SLEEVE PATHWAY DEVICES
6. HILTI FS-ONE INTUMESCENT FIRESTOP SEALANT
7. HILTI CP 620 FIRE FOAM
8. HILTI CP 601S ELASTOMERIC FIRESTOP SEALANT
9. HILTI CP 606 FLEXIBLE FIRESTOP SEALANT
K. NON-CURING, RE-PENETRABLE INTUMESCENT PUTTY OR FOAM MATERIALS FOR USE
WITH FLEXIBLE CABLE OR CABLE BUNDLES. OWNER HAS PRE-APPROVED THE FOLLOWING
PRODUCTS TO BE IN COMPLIANCE WITH THESE STANDARDS:
1. STI SSP INTUMESCENT FIRESTOP PUTTY
2. STI FP200, FP400 INTUMESCENT FIRESTOP PLUG
3. STI SSB INTUMESCENT FIRESTOP PILLOWS
4. STI FS READY SLEEVE OR FSR SPLIT SLEEVE PATHWAY DEVICES
5. HILTI CP 618 FIRESTOP PUTTY STICK
6. HILTI CP 658T FIRESTOP PLUG
L. WALL OPENING PROTECTIVE MATERIALS FOR USE WITH U.L. LISTED METALLIC AND
SPECIFIED NONMETALLIC OUTLET BOXES. OWNER HAS PRE-APPROVED THE FOLLOWING
PRODUCTS TO BE IN COMPLIANCE WITH THESE STANDARDS:
1. STI SSP4S OR SSP9S INTUMESCENT PUTTY PAD
2. STI EP44 OR EP45 INTUMESCENT BOX INSERT
3. HILTI CP 617 FIRESTOP PUTTY PAD
4. HILTI FIRESTOP BOX INSERT
5. HILTI FS 657 FIRE BLOCK
M. FIRESTOP COLLAR OR WRAP DEVICES ATTACHED TO ASSEMBLY AROUND
COMBUSTIBLE PLASTIC PIPE (CLOSED AND OPEN PIPING SYSTEMS). OWNER HAS PRE-
APPROVED THE FOLLOWING PRODUCTS TO BE IN COMPLIANCE WITH THESE STANDARDS:
1. STI LCC INTUMESCENT FIRESTOP COLLARS
2. STI RTC INTUMESCENT RANGE TAKING COLLARS
3. STI SSWRED OR SSWBLU INTUMESCENT WRAP STRIPS
4. HILTI CP 643 N FIRESTOP COLLAR
5. HILTI CP 644 FIRESTOP COLLAR
6. HILTI CP 648E ENDLESS WRAP STRIPS
7. HILTI CP 648S SINGLE WRAP STRIPS
N. MATERIALS USED FOR LARGE OPENINGS AND COMPLEX PENETRATIONS MADE TO
ACCOMMODATE CABLE TRAYS AND BUNDLES, MULTIPLE STEEL AND COPPER PIPES,
ELECTRICAL BUSWAYS IN RACEWAYS. OWNER HAS PRE-APPROVED THE FOLLOWING
PRODUCTS TO BE IN COMPLIANCE WITH THESE STANDARDS:
1. STI SSM FIRESTOP MORTAR
2. STI SSB INTUMESCENT FIRESTOP PILLOWS
3. STI CS INTUMESCENT COMPOSITE SHEET
4. STI TRIPLE S INTUMESCENT FIRESTOP SEALANT
5. STI LCI INTUMESCENT FIRESTOP SEALANT
6. HILTI CP 637 FIRESTOP MORTAR
7 HILTI FS 657 FIRE BLOCK
8. HILTI CP 620 FIRE FOAM
9. HILTI CP 675T FIRESTOP BOARD
O. NON-CURING, RE-PENETRABLE MATERIALS USED FOR LARGE SIZE/COMPLEX
PENETRATIONS MADE TO ACCOMMODATE CABLE TRAYS AND BUNDLES, MULTIPLE STEEL
AND COPPER PIPES, ELECTRICAL BUSWAYS IN RACEWAYS. OWNER HAS PRE-APPROVED
THE FOLLOWING PRODUCTS TO BE IN COMPLIANCE WITH THESE STANDARDS:
1. STI SSB INTUMESCENT FIRESTOP PILLOWS
2. STI CS INTUMESENT COMPOSITE SHEET
3. HILTI FS 657 FIRE BLOCK
4. HILTI CP 675T FIRESTOP BOARD
P. SEALANTS OR CAULKING MATERIALS USED FOR OPENINGS BETWEEN STRUCTURALLY
SEPARATE SECTIONS OF WALL AND FLOORS. OWNER HAS PRE-APPROVED THE
FOLLOWING PRODUCTS TO BE IN COMPLIANCE WITH THESE STANDARDS:

49 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
1. STI AS ELASTOMERIC FIRESTOP SPRAY
2. STI ES ELASTOMERIC FIRESTOP SEALANT.
3. STI LC ENDOTHERMIC FIRESTOP SEALANT
4. STI FAST TACK SILICONE FIRESTOP SPRAY
5. STI PEN OR PENSL SILICONE FIRESTOP SEALANT
6. HILTI CP 672 SPEED SPRAY
7. HILTI CP 601S ELASTOMERIC FIRESTOP SEALANT
8. HILTI CP 606 FLEXIBLE FIRESTOP SEALANT
9. HILTI CP 604 SELF-LEVELING FIRESTOP SEALANT
Q. FOR BLANK OPENINGS MADE IN FIRE-RATED WALL OR FLOOR ASSEMBLIES, WHERE
FUTURE PENETRATION OF PIPES, CONDUITS, OR CABLES IS EXPECTED. OWNER HAS PRE-
APPROVED THE FOLLOWING PRODUCTS TO BE IN COMPLIANCE WITH THESE STANDARDS:
1. STI SSP INTUMESCENT FIRESTOP PUTTY
2. STI FS READY SLEEVE OR FSR SPLIT SLEEVE PATHWAY DEVICE
3. STI FP INTUMESCENT FIRSTOP PLUG
4. STI SSB INTUMESCENT FIRESTOP PILLOW
5. HILTI FS 657 FIRE BLOCK
6. HILTI CP 658T FIRESTOP PLUG
R. PROVIDE A FIRESTOP SYSTEM WITH A "F" RATING AS DETERMINED BY UL 1479 OR ASTM
E814 WHICH IS EQUAL TO THE TIME RATING OF CONSTRUCTION BEING PENETRATED.
S. PROVIDE A FIRESTOP SYSTEM WITH AN ASSEMBLY RATING AS DETERMINED BY UL 2079
OR ASTM E 1966 WHICH IS EQUAL TO THE TIME RATING OF CONSTRUCTION JOINT
ASSEMBLY.
T. PROVIDE A FIRESTOP SYSTEM WITH A “T” RATING WHERE APPLICABLE AS DETERMINED
BY UL 1479 OR ASTM E814 WHICH IS EQUAL TO THE “F” RATING OF CONSTRUCTION BEING
PENETRATED. PLEASE NOTE “T” RATINGS ARE NOT REQUIRED IN WALLS OR WHEN A
PENETRATION THROUGH THE FLOOR EXISTS WITHIN A WALL CAVITY.
PART 3 – EXECUTION
PREPARATION
A. VERIFICATION OF CONDITIONS: EXAMINE AREAS AND CONDITIONS UNDER WHICH WORK
IS TO BE PERFORMED AND IDENTIFY CONDITIONS DETRIMENTAL TO PROPER OR TIMELY
COMPLETION.
1. VERIFY PENETRATIONS ARE PROPERLY SIZED AND IN SUITABLE CONDITION FOR
APPLICATION OF MATERIALS.
2. SURFACES TO WHICH FIRESTOP MATERIALS WILL BE APPLIED SHALL BE FREE OF DIRT,
GREASE, OIL, RUST, LAITANCE, RELEASE AGENTS, WATER REPELLENTS, AND ANY OTHER
SUBSTANCES THAT MAY AFFECT PROPER ADHESION.
B. PROVIDE MASKING AND TEMPORARY COVERING TO PREVENT SOILING OF ADJACENT
SURFACES BY FIRESTOPPING MATERIALS.
C. COMPLY WITH MANUFACTURER'S RECOMMENDATIONS FOR TEMPERATURE AND
HUMIDITY CONDITIONS BEFORE, DURING AND AFTER INSTALLATION OF FIRESTOPPING.
D. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
COORDINATION
A. COORDINATE CONSTRUCTION OF OPENINGS, PENETRATIONS AND CONSTRUCTION
JOINTS TO ENSURE THAT THE FIRE STOP SYSTEMS ARE INSTALLED ACCORDING TO
SPECIFIED REQUIREMENTS.
B. COORDINATE SIZING OF SLEEVES, OPENINGS, CORE-DRILLED HOLES, OR CUT
OPENINGS TO
ACCOMMODATE THROUGH-PENETRATION FIRE STOP SYSTEMS. COORDINATE
CONSTRUCTION AND SIZING OF JOINTS TO ENSURE THAT FIRE-RESISTIVE JOINT SYSTEMS
ARE INSTALLED ACCORDING TO SPECIFIED REQUIREMENTS.
C. COORDINATE FIRE STOPPING WITH OTHER TRADES SO THAT OBSTRUCTIONS ARE NOT
PLACED IN THE WAY PRIOR TO THE INSTALLATION OF THE FIRE STOP SYSTEMS.
D. DO NOT COVER UP THROUGH-PENETRATION FIRE STOP AND JOINT SYSTEM
INSTALLATIONS THAT WILL BECOME CONCEALED BEHIND OTHER CONSTRUCTION UNTIL
EACH INSTALLATION HAS BEEN EXAMINED BY THE BUILDING INSPECTOR, PER
REQUIREMENTS OF IBC.
INSTALLATION
A. REGULATORY REQUIREMENTS: INSTALL FIRESTOP MATERIALS IN ACCORDANCE WITH
UL FIRE RESISTANCE DIRECTORY OR OMEGA POINT LABORATORIES DIRECTORY.

50 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
B. COMPLY WITH MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION OF THROUGH
PENETRATION AND CONSTRUCTION JOINT MATERIALS.
1. SEAL ALL HOLES OR VOIDS MADE BY PENETRATIONS TO ENSURE AN AIR AND WATER
RESISTANT SEAL.
2. CONSULT WITH DP, OWNER, AND DAMPER MANUFACTURER PRIOR TO INSTALLATION OF
UL FIRESTOP SYSTEMS THAT MIGHT HAMPER THE PERFORMANCE OF FIRE DAMPERS AS IT
PERTAINS TO DUCT WORK.
3. PROTECT MATERIALS FROM DAMAGE ON SURFACES SUBJECTED TO TRAFFIC.
FIELD QUALITY CONTROL
A. EXAMINE SEALED PENETRATION AREAS TO ENSURE PROPER INSTALLATION BEFORE
CONCEALING OR ENCLOSING AREAS.
B. KEEP AREAS OF WORK ACCESSIBLE UNTIL INSPECTION BY OWNER.
C. INSPECTION OF THROUGH-PENETRATION FIRESTOPPING SHALL BE PERFORMED IN
ACCORDANCE WITH ASTM E 2174, “STANDARD PRACTICE FOR ON-SITE INSPECTION OF
INSTALLED FIRE STOPS” OR OTHER RECOGNIZED STANDARD.
D. PERFORM UNDER THIS SECTION PATCHING AND REPAIRING OF FIRESTOPPING CAUSED
BY CUTTING OR PENETRATING OF EXISTING FIRESTOP SYSTEMS ALREADY INSTALLED BY
OTHER TRADES.
E. MANUFACTURER’S FIELD SERVICES: DURING INSTALLATION, PROVIDE PERIODIC
DESTRUCTIVE TESTING INSPECTIONS TO ASSURE PROPER INSTALLATION/APPLICATION.
AFTER INSTALLATION IS COMPLETE, SUBMIT FINDINGS IN WRITING INDICATING WHETHER
OR NOT THE INSTALLATION OF THE TESTED SYSTEM IDENTIFIED WAS INSTALLED
CORRECTLY.
IDENTIFICATION & DOCUMENTATION
A. CONTRACTOR BY WAY OF THE FIRESTOP CONTRACTOR IS TO SUPPLY
DOCUMENTATION FOR EACH SINGLE APPLICATION ADDRESSED. THIS DOCUMENTATION IS
TO IDENTIFY EACH PENETRATION AND JOINT LOCATION ON THE ENTIRE PROJECT.
B. COPIES OF THESE DOCUMENTS ARE TO BE PROVIDED TO THE OWNER AT THE
COMPLETION OF THE PROJECT.
C. IDENTIFY THROUGH-PENETRATION FIRESTOP SYSTEMS WITH SELF-ADHESIVE,
PREPRINTED LABELS. ATTACH LABELS PERMANENTLY TO SURFACES OF PENETRATED
CONSTRUCTION ON BOTH SIDES OF EACH FIRESTOP SYSTEM INSTALLATION WHERE
LABELS WILL BE VISIBLE TO ANYONE SEEKING TO REMOVE PENETRATING ITEMS OR
FIRESTOP SYSTEMS. INCLUDE THE FOLLOWING INFORMATION ON LABELS:
1. INSTALLER/CONTRACTOR'S NAME, ADDRESS, AND PHONE NUMBER.
2. THROUGH-PENETRATION FIRESTOP SYSTEM DESIGNATION OF APPLICABLE TESTING
AND INSPECTING AGENCY.
3. DATE OF INSTALLATION.
4. THROUGH-PENETRATION FIRESTOP SYSTEM MANUFACTURER'S NAME.
D. FIRESTOP SYSTEMS MUST NOT BE CONCEALED FROM VIEW BEFORE BEING INSPECTED
AND APPROVED.
E. WALK THROUGH VISUAL INSPECTIONS SHOULD BE MADE DURING THE FIRESTOP
INSTALLATION.
F. WHEN NECESSARY OR REQUIRED, DESTRUCTIVE EVALUATION WILL BE MADE ON
VARIOUS TYPES OF FIRESTOP SYSTEMS.
G. CONSTRUCTION DOCUMENTS DETAILING THE FIRESTOP LOCATIONS AND SYSTEMS
MUST BE KEPT ON SITE TO ASSIST IN THE CONDUCT OF THE INSPECTION.
H. CERTIFICATE OF INSTALLATION SHALL BE PROVIDED FROM THE INSTALLING
CONTRACTOR.
ADJUSTING AND CLEANING
A. REMOVE EQUIPMENT, MATERIALS AND DEBRIS, LEAVING AREA IN UNDAMAGED, CLEAN
CONDITION.
B. CLEAN ALL SURFACES ADJACENT TO SEALED HOLES AND JOINTS TO BE FREE OF
EXCESS FIRESTOP MATERIALS AND SOILING AS WORK PROGRESSES.
LABOR USE TO INSTALL FIRESTOP SYSTEMS
A. TO ENSURE COMPLETE HARMONY ON THE PROJECT SITE, THE INSTALLATION OF EACH
SCOPE OF WORK IS TO BE PERFORMED JURISDICTIONALLY CORRECT PER EXISTING
TRADE AGREEMENTS.
07 84 13 PENETRATION FIRESTOPPING
PART 1 – GENERAL

51 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
DESCRIBE IN THIS SECTION ALL REQUIREMENTS FOR FIRESTOPPING WALL
PENETRATIONS, FLOOR PENETRATIONS, CEILING PENETRATIONS, AND JOINTS. DO NOT
RELY ON GENERAL REFERENCES IN THE SEALANTS SECTION. THIS INCLUDES BOARDS,
BLANKETS, MODULES, PILLOWS, TAPES, CAULKS, FOAMS, INTUMESCENTS, AND OTHER
SIMILAR MATERIALS.
SPECIFICALLY DESCRIBE ON THE DRAWINGS ALL REQUIREMENTS FOR INSTALLATION OF
FIRESTOPPING. GENERIC NOTES SUCH AS "FIRESTOPPING AS REQUIRED" ARE NOT
ACCEPTABLE. RELIANCE ON THE CONTRACTOR UNDERSTANDING THE BUILDING CODE
AND "COMPLYING AT NO ADDITIONAL COST" IS SIMILARLY NOT ACCEPTABLE.
REQUIRE THAT MATERIALS MANUFACTURER(S) AND INSTALLER(S) DEMONSTRATE 5
YEARS OF SUCCESSFUL INSTALLATIONS OF SIMILAR MATERIALS.
REQUIRE SUBMITTAL OF COMPLETE MANUFACTURER'S LITERATURE, INCLUDING UL TEST
RESULTS FOR EACH MATERIAL-AND APPLICATION SYSTEM REQUIRED FOR THE PROJECT.
IT IS DESIRABLE TO HAVE ALL TRADES USE THE SAME PRODUCT.
PART 2 – PRODUCTS
SPECIFY EACH TYPE OF FIRESTOPPING MATERIAL REQUIRED IN THE PROJECT. PRODUCT
SHALL BE TROWALLABLE AND PAINTABLE.
PART 3 – EXECUTION
PROVIDE A SCHEDULE IDENTIFYING LOCATION AND TYPE OF FIRESTOPPING. REQUIRE
INSTALLATION OF SLEEVES AT ALL WALL, FLOOR, AND CEILING PENETRATIONS.
FIRESTOPPING MATERIALS ARE TO BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
ALL FIRESTOPPING MUST BE INSPECTED AS COMPLETE PRIOR TO BEING COVERED BY
OTHER WORK.
DIVISION 8: DOORS & WINDOWS

08000 GENERAL DISCUSSION


INTRODUCTION
THIS GENERAL DISCUSSION SECTION CONTAINS MATERIAL WHICH IS CRITICAL TO
SUCCESSFUL DOOR AND WINDOW INSTALLATIONS, IN
NEW CONSTRUCTION AND RENOVATION, BUT WHICH IS NOT THE SOLE RESPONSIBILITY
OF ANY INDIVIDUAL TRADE. IN MANY CASES,
THE ISSUES INVOLVED ARE FUNDAMENTAL TO THE BASIC DESIGN OF THE PROJECT, AND
THE SUCCESS OR FAILURE OF THIS ELEMENT OF
THE PROJECT IS DETERMINED AT THE VERY OUTSET OF THE DESIGN PROCESS.
THE CONSULTANT IS EXPRESSLY RESPONSIBLE FOR INCORPORATING THESE OVERALL
REQUIREMENTS INTO THE PROJECT, AND FOR
ENSURING THAT ALL SUBCONSULTANTS ARE AWARE OF THE REQUIREMENTS AND
INCORPORATE THEM INTO THEIR DESIGNS AS WELL.
RELIANCE ON "AFTER-THE-FACT" MATERIAL SELECTIONS TO COMPENSATE FOR A
PROBLEMATIC DESIGN DECISION IS UNACCEPTABLE.
THE USE OF WIRED FIRE RATED SAFETY GLASS HAS BEEN DETERMINED AN UNDESIRABLE
SAFETY RISK AND IS NO LONGER ALLOWED.
CONSEQUENTLY GLAZED OPENINGS IN FIRE RATED DOORS AND WINDOWS WILL REQUIRE
THE USE OF FIRE RATED GLASS.
MAJOR ENTRANCES
GENERALLY, MAJOR BUILDING ENTRANCES WILL UTILIZE SOME SORT OF MONUMENTAL
STOREFRONT SYSTEM.
ALL OTHER EXTERIOR DOORS AND FRAMES SHOULD BE STEEL.
MULTIPLE DOORS, PAIRS OF DOORS, BANKS OF DOORS
EXIT WIDTHS IN EXCESS OF 3'-0" ARE OFTEN REQUIRED IN MAJOR FACILITIES. IN SUCH
INSTANCES, THE UNIVERSITY PREFERS TO
USE BANKS OF SINGLE LEAF DOORS, RATHER THAN DOUBLE DOORS WITH CENTER
MULLIONS. THIS REQUIREMENT INCLUDES THE
FOLLOWING SITUATIONS:
MAJOR BUILDING ENTRANCES

52 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
ASSEMBLY OCCUPANCY ENTRANCE/EXITS (BOTH INTERIOR AND EXTERIOR)
IN SUCH SITUATIONS WHICH ALSO REQUIRE LARGE WIDTHS FOR PASSAGE OF
EQUIPMENT, USE WIDER DOOR LEAVES.
PREFERABLY, USE OVERHEAD DOORS AS THE PRIMARY MEANS FOR PASSAGE OF
EQUIPMENT.
SINCE THE UNIVERSITY DOES NOT USE VERTICAL ROD EXIT DEVICES, PAIRS OF DOORS
WILL NECESSARILY HAVE CENTER MULLIONS.
IN SITUATIONS WHERE USE OF CENTER MULLIONS IS UNAVOIDABLE AND WHICH ALSO
REQUIRE LARGE WIDTHS, THE MULLIONS
MUST BE REMOVABLE. SPECIFY THESE MULLIONS IN SECTION 08710 - HARDWARE.
DO NOT SPECIFY CENTER MULLIONS FOR DOUBLE-EGRESS DOORS IN CORRIDORS.
LARGE INTERIOR DOORS
WHERE INTERIOR SPACES REQUIRE LARGE DOORS FOR THE PASSAGE OF EQUIPMENT
(E.G. GENERAL LABORATORIES, SHARED
EQUIPMENT LABORATORIES, ETC.), SPECIFY 3'-6" OR 4'-0" SINGLE LEAF DOORS (WITH
APPROPRIATE ADJUSTMENTS IN FRAME
GAUGE AND HARDWARE REQUIREMENTS) RATHER THAN PAIRS OF 3'-0" + 1-0'" DOORS.
COORDINATION AND PREPARATION
MAKE SPECIFIC REFERENCES TO ENSURE THAT REQUIREMENTS FOR COORDINATION OF
DOORS, FRAMES, AND HARDWARE, IS
CLEARLY INCLUDED IN THE CONTRACTOR'S SCOPE OF WORK. THIS OFTEN INVOLVES THE
STEEL DOOR AND FRAME SUPPLIER, THE
WOOD DOOR SUPPLIER, THE HARDWARE SUPPLIER, AND THE INSTALLERS OF THESE
MATERIALS. WHILE THIS TYPE OF COORDINATION IS IMPLICIT IN THE CONTRACTOR'S
SCOPE, A SPECIFIC REFERENCE PROVIDES AN ADDITIONAL LEVEL OF COMFORT.
A COMMON EXAMPLE OF THE LACK OF THIS COORDINATION IS AN INTERIOR WOOD DOOR
IN A STEEL FRAME WITH A SMOKE GASKET. IF EVEN ONE OF THE TRADES INVOLVED FAILS
TO PROPERLY COORDINATE, IT IS LIKELY THE DOOR WILL NOT CLOSE ANDLATCH
PROPERLY AGAINST THE GASKET.

THE CONSULTANT SHOULD ALSO ENSURE DURING SUBMITTAL REVIEW THAT SUCH
ISSUES ARE CLEARLY IDENTIFIED IN THE
SUBMITTALS OF ALL THE TRADES INVOLVED.
08050. BASIC DOOR AND WINDOW MATERIALS AND METHODS
FOR THE FRONT ELEVATION, USE UNION GALVASTEEL DURATILE WITH A THICKNESS OF
0.50MM IN BROWN COLOR FOR THE ROOF. APPLY PERMACOAT SEMI-GLOSS LATEX IN
TULLE WHITE B-706 FOR THE WALL. INSTALL A FIXED PANEL CORNER WINDOW USING 1"
FLOAT BRONZE GLASS AND ANALOK FRAMES. ADDITIONALLY, CREATE A PLANT BOX. FOR
THE 100MM THICK REINFORCED CONCRETE WALL, COAT IT WITH PERMACOAT SEMI-GLOSS
LATEX IN ANTIQUE WHITE BSC-27. YOU WILL ALSO NEED BASIC BEIGE BSG-9 AND MUD PIE
B-7581 FOR OTHER SECTIONS.
FOR THE LEFT SIDE ELEVATION, USE RIDGE ROLL AND UNION GALVASTEEL DURATILE
WITH A THICKNESS OF 0.50MM IN BROWN COLOR FOR THE ROOF AND EDGE GUTTER.
INSTALL ANALOK SLIDING DOOR FRAMES WITH FLOAT BRONZE GLASS, FIXED PANEL
WINDOWS USING SMOKED FLOAT BRONZE GLASS AND ANALOK FRAMES, AND STEEL
RAILING. ADD CONCRETE MOULDING, OUTDOOR WALL LAMPS, AND GROOVED WOODEN
SOLID DOORS WITH A SMALL STRIP FOR THE DRIVEWAY RAMP.
FOR THE RIGHT SIDE ELEVATION, USE RIDGE ROLL AND UNION GALVASTEEL DURATILE
WITH A THICKNESS OF 0.50MM IN BROWN COLOR, ALONG WITH CONCRETE MOULDING AS
NEEDED.
08100. METAL DOORS AND FRAMES
THIS SECTION APPLIES TO INTERIOR APPLICATIONS. ENDANGERED OR LIMITED TREE
SPECIES ARE NOT ALLOWABLE FOR WOOD DOOR VENEERS. DOORS RECEIVING PAINTED
FINISHES SHOULD BE LIMITED TO LOW COST SPECIES (BIRCH, MAPLE, ETC.). WELDED
HOLLOW METAL FRAMES SHOULD BE UTILIZED.

53 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
1.WOODEN DOORS ARE ACCEPTABLE ONLY FOR INTERIOR USAGE, MUST BE SOLID CORE,
AND HAVE ADHESIVES THAT ARE 100% WATERPROOF. HOLLOW CORE DOORS SHALL NOT
BE SPECIFIED AND EXISTING HOLLOW CORE DOORS SHALL NOT BE RE‐USED.
2.ALL DOORS SHALL BE SHALL BE SOLID CORE FLUSH WITH VENEER FACES, COMMERCIAL
HEAVY DUTY MINIMUM GRADE, 1‐3/4" THICK. MINIMUM WIDTH TO BE 3'‐0". EXCEPTIONS
MUST BE REVIEWED AND APPROVED BY FS BUILDING ACCESS SYSTEMS. SPECIFIED
REQUIREMENTS FOR NON‐STANDARD DOORS ARE AVAILABLE THROUGH CARPENTRY
SHOP IF
APPROVAL IS GRANTED. DOORS FOR RENOVATION WORK SHALL BE DRILLED TO MATCH
EXISTING HANDLE‐SET
ELEVATIONS.
3.ALL DOORS SHOULD BE SPECIFIED FROM A SINGLE MANUFACTURER.
4.SPECIFY FORMALDEHYDE OFF‐GASSING RATES TO BE LESS THAN .03 MILLIGRAMS PER
SQUARE FOOT OF SURFACE/HR IN ACCORDANCE WITH ASTM D5116‐90.
5.DOORS SHALL CARRY A LIFE OF INSTALLATION WARRANTY FROM THE MANUFACTURER.
ALL DOORS THAT ARE WARPED, AFTER INSTALLATION, SHALL BE REPLACED PRIOR TO
SUBSTANTIAL COMPLETION. SUBSTANTIAL COMPLETION CANNOT BE ACHIEVED IF ONE
HOUR RATED CORRIDORS INTEGRITY IS COMPROMISED BY WARPED DOORS.
DIVISION 9 FINISHES

09050 BASIC FINISH MATERIALS AND METHODS

SCOPE

 GENERAL
 MATERIALS
 METHODS & EXECUTION
 WARRANTY
09050.1 GENERAL

THIS SECTION MIGHT OUTLINE OVERARCHING REQUIREMENTS AND STANDARDS


THAT APPLY TO ALL FINISHING MATERIALS AND METHODS, INCLUDING COMPLIANCE WITH
LOCAL BUILDING CODES, SAFETY REGULATIONS, AND INDUSTRY STANDARDS.

1. QUALITY ASSURANCE
QUALITY CONTROL AND ASSURANCE: THE CONTRACTOR SHALL IMPLEMENT
QUALITY CONTROL AND ASSURANCE MEASURES TO ENSURE THAT FINISHING
MATERIALS AND WORKMANSHIP MEET THE PROJECT'S STANDARDS.

2. SUBMITTALS
A. PRODUCT DATA: THE CONTRACTOR SHALL SUBMIT DETAILED PRODUCT DATA,
INCLUDING SPECIFICATIONS, PERFORMANCE CHARACTERISTICS, AND COMPLIANCE
CERTIFICATES FOR FINISHING MATERIALS, FOR APPROVAL BY THE
ARCHITECT/ENGINEER.
B. SAMPLES: THE CONTRACTOR SHALL PROVIDE SAMPLES OF FINISHING MATERIALS
FOR REVIEW AND APPROVAL BY THE ARCHITECT/ENGINEER.
09050.2 MATERIALS

FINISHING MATERIALS SHALL BE OF THE TYPES SPECIFIED IN THE PROJECT


DOCUMENTS AND SHALL MEET THE REQUIRED QUALITY STANDARDS.

 FLOOR FINISHES
1. 60 X 60 CM SUPER WHITE GRANITE TILES
2. 60 X 60 CM NON SLIP PORCELAIN TILES
3. 100 X 20 CM WOOD PLANK CERAMIC TILE
4. 50 MM THK. MAHOGANY WOOD TREAD
 KITCHEN FINISHES
1. PLAIN CEMENT PLASTER (PAINTED)
2. ALUMINUM GRAB HANDLE
3. 3”/4” THK. MARINE PLYWOOD AUTO FINISH WHITE SHUTTER
4. WHITE QUARTS COUNTER TOP

54 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
5. 2”/4” ANODIZED ALUMINUM TUBE
09050.3 METHODS & EXECUTION

1. INSTALLATION: THE CONTRACTOR SHALL ADHERE TO METICULOUS INSTALLATION


PRACTICES FOLLOWING THE MANUFACTURER'S GUIDELINES FOR THE PROPER
INSTALLATION, APPLICATION, OR IMPLEMENTATION OF FINISHING MATERIALS. THIS
INVOLVES:
a) SURFACE PREPARATION: ENSURING THAT ALL SURFACES ARE ADEQUATELY
PREPARED TO RECEIVE FINISHING MATERIALS.
b) APPLICATION TECHNIQUES: EMPLOYING PRECISE APPLICATION TECHNIQUES TO
ACHIEVE THE DESIRED FINISH, INCLUDING CORRECT TOOL USAGE, LAYERING, AND
PATTERN CONSISTENCY.
c) CURING PROCEDURES: FOLLOWING RECOMMENDED CURING PROCEDURES,
INCLUDING DRYING TIMES, TEMPERATURE CONDITIONS, AND CURING AGENTS, WHERE
APPLICABLE.
d) SPECIFIC MATERIAL REQUIREMENTS: COMPLYING WITH ANY SPECIFIC
REQUIREMENTS OUTLINED BY THE MANUFACTURER FOR EACH MATERIAL TYPE, SUCH
AS MIXING RATIOS, DRYING TIMES, OR SPECIAL PRIMERS.
2. SURFACE PREPARATION
THE CONTRACTOR IS RESPONSIBLE FOR METICULOUSLY PREPARING ALL
SURFACES DESIGNATED FOR FINISHING MATERIALS IN STRICT ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS. SURFACE PREPARATION ENCOMPASSES THE
FOLLOWING KEY STEPS:

a) CLEANING: THOROUGHLY REMOVING ALL DIRT, DUST, GREASE, AND CONTAMINANTS


FROM THE SURFACE TO ENSURE PROPER ADHESION.
b) PATCHING AND REPAIR: ADDRESSING ANY SURFACE IMPERFECTIONS, INCLUDING
CRACKS, HOLES, OR DAMAGE, THROUGH PATCHING, REPAIRING, OR FILLING AS
NECESSARY TO ACHIEVE A SMOOTH SUBSTRATE.
c) SANDING: EMPLOYING SANDING TECHNIQUES TO SMOOTH ROUGH OR UNEVEN
SURFACES, THEREBY CREATING AN EVEN AND SUITABLE SUBSTRATE FOR THE
APPLICATION OF FINISHING MATERIALS.
d) PRIMING: APPLYING SUITABLE PRIMERS OR SEALERS TO ENHANCE ADHESION,
PROMOTE UNIFORM FINISH APPLICATION, AND CREATE AN OPTIMAL SURFACE FOR
FINISHING MATERIALS.
e) SUBSTRATE EVALUATION: CONDUCTING A COMPREHENSIVE INSPECTION OF THE
SUBSTRATE TO ASSESS ITS STRUCTURAL INTEGRITY AND VERIFY THAT IT MEETS THE
SPECIFICATIONS AND REQUIREMENTS FOR THE CHOSEN FINISHING MATERIALS.
3. FINISHING FOR SPECIFIC SURFACES
A. DRYWALL FOR WALLS:

A. QUALITY STANDARD: THE FINISHING OF DRYWALL SURFACES SHALL ADHERE TO


RECOGNIZED INDUSTRY STANDARDS, SUCH AS ASTM C840, TO ENSURE A HIGH-QUALITY
RESULT.

B. SURFACE PREPARATION: BEFORE APPLYING FINISH, ALL SEAMS, JOINTS, AND


FASTENER HEADS ON DRYWALL SURFACES SHALL BE PROPERLY TAPED, MUDDED, AND
SANDED TO CREATE A SEAMLESS AND SMOOTH SURFACE.

C. PRIMING: A SUITABLE PRIMER SHALL BE APPLIED TO THE FINISHED DRYWALL SURFACES


TO PROMOTE ADHESION AND UNIFORM PAINT ABSORPTION, ENSURING A PAINT-READY
FINISH.

B. CONCRETE FOR FLOORS:

A. FINISH TYPES: DEPENDING ON THE PROJECT'S REQUIREMENTS, CONCRETE FLOOR


FINISHES MAY INCLUDE POLISHED CONCRETE, EPOXY COATINGS, OR OTHER SPECIFIED
FINISHES.

55 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
B. SURFACE PREPARATION: CONCRETE SURFACES SHALL BE PROPERLY PREPARED,
INCLUDING GRINDING, CLEANING, AND PATCHING, TO ACHIEVE A LEVEL, BLEMISH-FREE
SUBSTRATE.

C. SLIP-RESISTANCE: IN AREAS WHERE SAFETY IS A CONCERN, SUCH AS WALKWAYS, SLIP-


RESISTANT ADDITIVES SHALL BE INCORPORATED INTO THE FINISH TO MEET SLIP-
RESISTANCE STANDARDS.

D. AESTHETIC APPEAL: CONCRETE FLOOR FINISHES SHALL BE INSTALLED TO ACHIEVE A


VISUALLY APPEALING SURFACE THAT COMPLEMENTS THE OVERALL DESIGN AESTHETIC.

C. WOOD FOR CEILINGS:

A. SELECTION: THE CHOICE OF WOOD FOR CEILING FINISHES SHALL ALIGN WITH PROJECT
SPECIFICATIONS AND DESIGN AESTHETICS, TAKING INTO ACCOUNT FACTORS SUCH AS
WOOD SPECIES, COLOR, AND GRAIN PATTERN.

B. GRAIN DIRECTION: WOOD CEILING FINISHES SHALL BE INSTALLED WITH CAREFUL


ATTENTION TO GRAIN DIRECTION TO ACHIEVE A UNIFORM APPEARANCE. THE DIRECTION
SHALL BE CONSISTENT WITH THE DESIGN INTENT.

C. FINISH CONSISTENCY: THE FINISH, WHETHER STAIN, VARNISH, OR PAINT, SHALL BE


APPLIED CONSISTENTLY TO ALL WOOD CEILING SURFACES TO MAINTAIN A COHESIVE AND
ATTRACTIVE APPEARANCE.

4. PROTECTION AND MAINTENANCE


A. PROTECTION:

A. TEMPORARY COVERINGS: THE CONTRACTOR SHALL EMPLOY SUITABLE TEMPORARY


COVERINGS AND BARRIERS TO SAFEGUARD FINISHED SURFACES DURING THE
CONSTRUCTION PROCESS. THESE MEASURES SHALL PREVENT DAMAGE FROM TOOLS,
EQUIPMENT, AND DEBRIS.

B. TRAFFIC CONTROL: WHERE APPLICABLE, THE CONTRACTOR SHALL ESTABLISH


DESIGNATED PATHWAYS AND CONTROLLED ACCESS TO MINIMIZE THE RISK OF
ACCIDENTAL DAMAGE TO FINISHED AREAS.

B. MAINTENANCE:

 THE CONTRACTOR SHALL PROVIDE THE OWNER WITH COMPREHENSIVE


MAINTENANCE INSTRUCTIONS FOR ALL FINISHED SURFACES. THESE INSTRUCTIONS
SHALL DETAIL CLEANING PROCEDURES, RECOMMENDED PRODUCTS, AND
MAINTENANCE SCHEDULES.
 THE OWNER SHALL PERFORM PERIODIC INSPECTIONS AND MAINTENANCE AS
OUTLINED IN THE INSTRUCTIONS TO ENSURE THE LONGEVITY AND APPEARANCE OF
THE FINISHES.
5. SUSTAINABILITY AND ENVIRONMENTAL CONSIDERATIONS
A. ECO-FRIENDLY MATERIALS:
 THE CONTRACTOR SHALL PRIORITIZE THE USE OF ENVIRONMENTALLY FRIENDLY
FINISHING MATERIALS, CONSIDERING OPTIONS WITH LOW ENVIRONMENTAL IMPACT
AND SUSTAINABLE SOURCING.
 WHENEVER POSSIBLE, FINISHING MATERIALS WITH RECYCLED CONTENT SHALL BE
UTILIZED TO REDUCE THE PROJECT'S CARBON FOOTPRINT.
 SUSTAINABLE BUILDING PRACTICES, INCLUDING EFFICIENT MATERIAL USAGE AND
WASTE REDUCTION, SHALL BE INCORPORATED INTO THE FINISHING PROCESS IN LINE
WITH LEED (LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN) REQUIREMENTS
WHERE APPLICABLE.
B. LOW VOC PRODUCTS:

56 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
 LOW VOC (VOLATILE ORGANIC COMPOUND) FINISHING PRODUCTS SHALL BE
SPECIFIED AND USED WHEREVER APPLICABLE TO MINIMIZE INDOOR AIR POLLUTION
AND CONTRIBUTE TO HEALTHIER INDOOR AIR QUALITY.
C. WASTE MANAGEMENT:

 THE CONTRACTOR SHALL IMPLEMENT RECYCLING PRACTICES FOR WASTE MATERIALS


GENERATED DURING THE FINISHING PROCESS, INCLUDING PACKAGING, LEFTOVER
MATERIALS, AND OLD FINISHES.
 WASTE MATERIALS SHALL BE DISPOSED OF IN ACCORDANCE WITH LOCAL
REGULATIONS, ENSURING RESPONSIBLE AND ENVIRONMENTALLY SOUND DISPOSAL
METHODS.
09050. 4 WARRANTY

1. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH ALL APPLICABLE


MANUFACTURER'S WARRANTIES FOR FINISHING MATERIALS.
2. THE CONTRACTOR SHALL PROVIDE A WORKMANSHIP WARRANTY FOR THE
INSTALLATION OF FINISHING MATERIALS, COVERING DEFECTS AND WORKMANSHIP
ISSUES FOR A PERIOD OF SPECIFIC DURATION.
09100 METAL SUPPORT ASSEMBLIES

THIS SECTION IN CONSTRUCTION SPECIFICATIONS THAT FOCUSES ON THE


INSTALLATION AND SPECIFICATIONS OF VARIOUS METAL SUPPORT ASSEMBLIES USED IN
CONSTRUCTION PROJECTS. METAL SUPPORT ASSEMBLIES ARE CRUCIAL COMPONENTS IN
CONSTRUCTION AS THEY PROVIDE STRUCTURAL SUPPORT, STABILITY, AND
REINFORCEMENT TO VARIOUS BUILDING ELEMENTS.

SCOPE

 GENERAL
 MATERIALS
 METHODS & EXECUTION
 WARRANTY
09100.1 GENERAL

METAL FURRING SYSTEMS ARE USED TO PROVIDE STRUCTURAL SUPPORT AND A


STABLE FRAMEWORK FOR VARIOUS CEILING MATERIALS, INCLUDING GYPSUM BOARD,
ACOUSTICAL TILES, AND OTHER FINISHES. THEY HELP CREATE A LEVEL AND VISUALLY
APPEALING CEILING SURFACE. THERE ARE DIFFERENT TYPES OF METAL FURRING
SYSTEMS AVAILABLE, INCLUDING HAT CHANNELS, Z-FURRING, AND RESILIENT CHANNEL
SYSTEMS, EACH DESIGNED FOR SPECIFIC APPLICATIONS AND LOAD-BEARING
REQUIREMENTS.

09100.2 MATERIALS:

METAL FURRING COMPONENTS ARE TYPICALLY FABRICATED FROM MATERIALS LIKE


GALVANIZED STEEL, ALUMINUM, OR OTHER CORROSION-RESISTANT METALS. THE
SELECTION DEPENDS ON ENVIRONMENTAL CONDITIONS AND LOAD-BEARING
REQUIREMENTS. METAL COMPONENTS MAY BE COATED WITH MATERIALS SUCH AS ZINC,
GALVANIZATION, OR PAINT TO ENHANCE CORROSION RESISTANCE AND DURABILITY.

09100.3 METHODS & EXECUTION

1. SPACING AND LAYOUT: THE SPACING AND LAYOUT OF METAL FURRING MEMBERS
SHOULD ADHERE TO PROJECT SPECIFICATIONS AND DESIGN REQUIREMENTS.
PROPER SPACING IS CRUCIAL TO PROVIDE ADEQUATE SUPPORT FOR THE CEILING
MATERIALS.
2. ANCHORING: METAL FURRING IS SECURELY ANCHORED TO THE STRUCTURAL CEILING
OR WALL USING APPROPRIATE FASTENERS. INSTALLERS MUST FOLLOW
MANUFACTURER GUIDELINES AND PROJECT SPECIFICATIONS FOR ANCHOR TYPE,
SIZE, AND PLACEMENT.

57 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
3. ATTACHMENT OF CEILING MATERIALS: GUIDELINES FOR ATTACHING CEILING
MATERIALS TO THE METAL FURRING SHOULD BE FOLLOWED METICULOUSLY. THIS
INCLUDES USING THE CORRECT FASTENERS, MAINTAINING SPECIFIED SPACING, AND
ENSURING A LEVEL INSTALLATION.
4. ALIGNMENT AND LEVELING: PROPER ALIGNMENT AND LEVELING OF THE METAL
FURRING ARE ESSENTIAL TO CREATE A FLAT AND UNIFORM SURFACE FOR CEILING
FINISHES. LASERS OR SPIRIT LEVELS MAY BE USED TO ACHIEVE PRECISE ALIGNMENT.
09100.4 WARRANTY

 THE METAL FURRING SYSTEM MAY COME WITH A MANUFACTURER'S WARRANTY. THIS
WARRANTY TYPICALLY COVERS DEFECTS IN MATERIALS AND WORKMANSHIP. ENSURE
THAT THE INSTALLATION COMPLIES WITH THE MANUFACTURER'S RECOMMENDATIONS
TO MAINTAIN WARRANTY COVERAGE.
 THE INSTALLER MAY ALSO PROVIDE A WARRANTY FOR THEIR WORKMANSHIP AND THE
PROPER INSTALLATION OF THE METAL FURRING SYSTEM. THIS WARRANTY SHOULD
SPECIFY THE DURATION AND CONDITIONS FOR COVERAGE.

 TO UPHOLD THE WARRANTY AND ENSURE THE LONGEVITY OF THE METAL FURRING
SYSTEM, REGULAR MAINTENANCE MAY BE REQUIRED. MAINTENANCE TASKS COULD
INCLUDE INSPECTING FOR LOOSE FASTENERS, CHECKING FOR CORROSION, AND
ADDRESSING ANY ISSUES PROMPTLY.
09300 TILE

SCOPE

 GENERAL
 PRODUCTS
 EXECUTIONS
09300.1 GENERAL

PURPOSE: DIVISION 09600 ENCOMPASSES THE INSTALLATION AND SPECIFICATIONS FOR


VARIOUS TYPES OF TILES USED IN FLOORING AND WALL FINISHES. THESE TILES SERVE
BOTH FUNCTIONAL AND AESTHETIC PURPOSES IN RESIDENTIAL, COMMERCIAL, AND
INDUSTRIAL SETTINGS.

DURABILITY: TILES ARE CHOSEN FOR THEIR DURABILITY, EASE OF MAINTENANCE, AND
VERSATILITY. DIFFERENT TILE TYPES HAVE DISTINCT CHARACTERISTICS THAT MAKE THEM
SUITABLE FOR SPECIFIC APPLICATIONS.

09300.2 PRODUCTS

1. GRANITE TILES:

MATERIAL: GRANITE TILES ARE NATURAL STONE TILES CUT FROM GRANITE, A DENSE AND
HARD IGNEOUS ROCK. THEY ARE KNOWN FOR THEIR EXCEPTIONAL DURABILITY AND
RESISTANCE TO WEAR AND TEAR.

USE: GRANITE TILES ARE COMMONLY USED IN HIGH-TRAFFIC AREAS SUCH AS


COMMERCIAL SPACES, KITCHEN COUNTERTOPS, AND OUTDOOR APPLICATIONS DUE TO
THEIR HARDNESS AND RESISTANCE TO SCRATCHING AND STAINING.

AESTHETIC: THEY COME IN VARIOUS COLORS AND PATTERNS, ADDING A TOUCH OF


ELEGANCE TO INTERIOR AND EXTERIOR DESIGNS.

2. NON-SLIP PORCELAIN TILES:

MATERIAL: NON-SLIP PORCELAIN TILES ARE MADE FROM PORCELAIN, A TYPE OF CERAMIC
TILE. WHAT SETS THEM APART IS THEIR TEXTURED SURFACE, WHICH ENHANCES SLIP
RESISTANCE.

58 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
USE: THESE TILES ARE IDEAL FOR AREAS PRONE TO MOISTURE AND HIGH SLIP RISK, SUCH
AS BATHROOMS, KITCHENS, AND POOL DECKS. THEY PROVIDE ADDED SAFETY IN WET
CONDITIONS.

AESTHETIC: NON-SLIP PORCELAIN TILES COME IN A WIDE RANGE OF COLORS AND STYLES,
MAKING THEM SUITABLE FOR VARIOUS DESIGN PREFERENCES.

3. CERAMIC TILES:

MATERIAL: CERAMIC TILES ARE MADE FROM CLAY THAT IS KILN-FIRED AT LOWER
TEMPERATURES THAN PORCELAIN TILES. THEY ARE AVAILABLE IN VARIOUS GRADES AND
FINISHES.

USE: CERAMIC TILES ARE VERSATILE AND CAN BE USED IN BOTH RESIDENTIAL AND
COMMERCIAL SETTINGS. THEY ARE SUITABLE FOR WALLS, FLOORS, AND COUNTERTOPS.

AESTHETIC: CERAMIC TILES OFFER ENDLESS DESIGN POSSIBILITIES WITH NUMEROUS


COLORS, SIZES, AND PATTERNS TO CHOOSE FROM.

4. WOOD TREAD TILES:

MATERIAL: WOOD TREAD TILES REPLICATE THE LOOK OF HARDWOOD BUT ARE MADE
FROM MATERIALS LIKE PORCELAIN OR CERAMIC. THEY PROVIDE THE WARMTH AND
APPEARANCE OF WOOD WITH THE DURABILITY OF TILE.

USE: WOOD TREAD TILES ARE COMMONLY USED FOR STAIRS AND STAIRCASES,
COMBINING THE BEAUTY OF WOOD WITH THE DURABILITY AND EASE OF MAINTENANCE OF
TILES.

AESTHETIC: THEY COME IN VARIOUS WOOD GRAIN PATTERNS AND FINISHES TO MATCH
DIFFERENT INTERIOR STYLES.

09300.3 EXECUTION

 SUBSTRATE PREPARATION: ENSURE THE SUBSTRATE IS CLEAN, LEVEL, AND


STRUCTURALLY SOUND BEFORE INSTALLING ANY OF THESE TILE TYPES.
 TILE INSTALLATION: FOLLOW MANUFACTURER GUIDELINES AND INDUSTRY BEST
PRACTICES FOR ADHESIVE SELECTION, MORTAR TYPES, AND PROPER ALIGNMENT
AND SPACING DURING INSTALLATION.
 GROUTING: USE APPROPRIATE GROUT TYPES AND ENSURE CONSISTENT GROUT
SPACING FOR A PROFESSIONAL FINISH. FOR NON-SLIP PORCELAIN TILES, TAKE CARE
TO MAINTAIN THE TEXTURE'S EFFECTIVENESS.
 SEALING AND MAINTENANCE: WHILE GRANITE TILES AND WOOD TREAD TILES
GENERALLY DO NOT REQUIRE SEALING, CERAMIC AND NON-SLIP PORCELAIN TILES
MAY BENEFIT FROM SEALING TO ENHANCE DURABILITY. PROVIDE GUIDELINES FOR
ONGOING MAINTENANCE SPECIFIC TO EACH TILE TYPE.
09500 CEILINGS

SCOPE

 SUBMITTALS
 QUALITY ASSURANCE
 MATERIALS
 INSTALLATION

09500.1 SUBMITTALS

A. PRIOR TO INSTALLATION, THE CONTRACTOR SHALL SUBMIT PRODUCT DATA,


MANUFACTURER'S INSTALLATION INSTRUCTIONS, AND SAMPLES FOR EACH CEILING
MATERIAL TO THE ARCHITECT FOR APPROVAL.

59 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
B. SUBMIT SHOP DRAWINGS INDICATING LAYOUT, JOINT LOCATIONS, AND FASTENING
DETAILS.

09500.2 QUALITY ASSURANCE

ALL INSTALLATION WORK SHALL BE PERFORMED BY PERSONNEL EXPERIENCED IN THE


INSTALLATION OF THE SPECIFIED CEILING MATERIALS AND IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.

09500.3 MATERIALS

A. 5 MM HARDIFLEX CEILING ON METAL FURRING:

 HARDIFLEX CEILING BOARDS SHALL BE 5 MM THICK, MADE OF FIBER-REINFORCED


CEMENT.
 METAL FURRING SHALL COMPLY WITH ASTM C635 AND BE ADEQUATELY SIZED AND
SPACED TO SUPPORT THE HARDIFLEX CEILING BOARDS.
 FASTENERS SHALL BE CORROSION-RESISTANT AND COMPATIBLE WITH THE
MATERIALS BEING JOINED.
B. PVC WOODEN PLANKS ON METAL FURRING:

 PVC WOODEN PLANKS SHALL BE OF A HIGH-QUALITY, RIGID PVC MATERIAL WITH A


WOOD GRAIN FINISH.
 METAL FURRING SHALL COMPLY WITH ASTM C635 AND BE ADEQUATELY SIZED AND
SPACED TO SUPPORT THE PVC WOODEN PLANKS.
 FASTENERS SHALL BE CORROSION-RESISTANT AND COMPATIBLE WITH THE
MATERIALS BEING JOINED.
C. 5.5-INCH THICK SAFETY GLASS ON RECTANGULAR TUBE (2X4) TRELLIS:

 SAFETY GLASS SHALL CONFORM TO SAFETY GLAZING STANDARDS AND BE 5.5 INCHES
THICK.
 RECTANGULAR TUBES (2X4) SHALL BE FABRICATED FROM STEEL OR ALUMINUM,
APPROPRIATELY SIZED AND SPACED TO SUPPORT THE SAFETY GLASS.
 FASTENERS SHALL BE CORROSION-RESISTANT AND COMPATIBLE WITH THE
MATERIALS BEING JOINED.

09500.4 INSTALLATION

A. INSTALL EACH TYPE OF CEILING MATERIAL IN ACCORDANCE WITH THE


MANUFACTURER'S INSTRUCTIONS AND APPROVED SHOP DRAWINGS.
B. ENSURE THAT ALL MATERIALS ARE SECURELY FASTENED AND PROPERLY ALIGNED.
C. COORDINATE THE INSTALLATION OF ELECTRICAL AND MECHANICAL FIXTURES WITH
THE CEILING INSTALLATION TO AVOID CONFLICTS AND ENSURE A CLEAN FINISHED
APPEARANCE.
D. FINISH ALL JOINTS AND FASTENER HEADS USING THE RECOMMENDED JOINT
COMPOUNDS OR FILLERS FOR EACH RESPECTIVE CEILING MATERIAL.
E. CLEAN THE FINISHED CEILINGS AND REMOVE ANY CONSTRUCTION DEBRIS.
F. INSPECT AND ENSURE THAT THE INSTALLED CEILINGS MEET ALL SPECIFIED
PERFORMANCE AND AESTHETIC REQUIREMENTS.
G. PROVIDE ANY NECESSARY TOUCH-UP OR REPAIRS TO ACHIEVE A FULLY FINISHED AND
FUNCTIONAL CEILING SYSTEM.
H. UPON COMPLETION, SUBMIT AS-BUILT DRAWINGS INDICATING THE LOCATION OF ALL
CEILING MATERIALS AND RELATED COMPONENTS.
09600 FLOORING

SCOPE

 GENERAL
 PRODUCTS
 EXECUTION
 WARRANTY
 TESTING AND INSPECTION

60 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
09600.1 GENERAL

DIVISION 09600 COVERS THE INSTALLATION AND SPECIFICATIONS FOR VARIOUS


FLOORING MATERIALS USED IN RESIDENTIAL, COMMERCIAL, AND INDUSTRIAL SETTINGS.
FLOORING SERVES BOTH FUNCTIONAL AND AESTHETIC PURPOSES, PROVIDING A
DURABLE AND VISUALLY APPEALING SURFACE. FLOORING MATERIALS CAN BE USED IN
VARIOUS APPLICATIONS, INCLUDING INDOOR AND OUTDOOR SPACES, HIGH-TRAFFIC
AREAS, WET AREAS, AND SPECIAL-PURPOSE ZONES.

09600.2 PRODUCTS

1. 60 X 60 CM SUPER WHITE GRANITE TILES:


MATERIAL: SUPER WHITE GRANITE TILES ARE TYPICALLY MADE FROM NATURAL STONE
AND OFFER A SLEEK AND ELEGANT APPEARANCE.

SIZE: THE SPECIFIED SIZE IS 60 X 60 CM, WHICH IS A COMMON DIMENSION FOR FLOOR
TILES.

FINISH: GRANITE TILES MAY HAVE A POLISHED, HONED, OR MATTE FINISH. THE SPECIFIC
FINISH SHOULD BE STATED IN THE PRODUCT SPECIFICATIONS.

2. 60 X 60 CM NON-SLIP PORCELAIN TILES:


MATERIAL: NON-SLIP PORCELAIN TILES ARE MADE FROM FIRED CLAY AND ARE DESIGNED
TO PROVIDE TRACTION, MAKING THEM SUITABLE FOR AREAS PRONE TO MOISTURE AND
SLIPPING.

SIZE: THE TILES ARE 60 X 60 CM, A STANDARD SIZE FOR FLOOR TILES.

TEXTURE: THESE TILES HAVE A SPECIALIZED TEXTURE OR FINISH TO ENHANCE SLIP


RESISTANCE. THE DEGREE OF SLIP RESISTANCE SHOULD BE SPECIFIED.

3. 100 X 20 CM WOOD PLANK CERAMIC TILE:


MATERIAL: WOOD PLANK CERAMIC TILES MIMIC THE APPEARANCE OF REAL WOOD BUT
ARE MADE FROM CERAMIC. THIS COMBINES THE AESTHETICS OF WOOD WITH THE
DURABILITY OF CERAMIC.

SIZE: THE SPECIFIED SIZE IS 100 X 20 CM, RESEMBLING THE DIMENSIONS OF TRADITIONAL
WOOD PLANKS.

FINISH: THE TILES SHOULD REPLICATE THE NATURAL TEXTURE AND GRAIN PATTERN OF
WOOD. FINISH OPTIONS MAY INCLUDE MATTE, GLOSSY, OR TEXTURED SURFACES.

4. 50 MM THK. MAHOGANY WOOD TREAD:


MATERIAL: MAHOGANY WOOD TREADS ARE MADE FROM SOLID MAHOGANY WOOD,
KNOWN FOR ITS DURABILITY AND RICH, REDDISH-BROWN COLOR.

THICKNESS: THE TREADS ARE 50 MM THICK, PROVIDING STRENGTH AND STABILITY FOR
STAIRCASES.

FINISH: THE FINISH MAY INCLUDE CLEAR COATINGS TO PROTECT THE WOOD'S NATURAL
BEAUTY.

09600.3 EXECUTION

 ENSURE THAT THE SUBSTRATE IS CLEAN, LEVEL, AND FREE FROM DEBRIS OR
CONTAMINANTS BEFORE INSTALLING ANY OF THE MENTIONED FLOORING PRODUCTS.
 FOLLOW MANUFACTURER-RECOMMENDED ADHESIVES AND INSTALLATION METHODS
SPECIFIC TO EACH PRODUCT. PROPER ALIGNMENT, SPACING, AND PATTERN LAYOUT
ARE ESSENTIAL.
 DEPENDING ON THE MATERIAL, SEALING AND FINISHING MAY BE REQUIRED. FOR
EXAMPLE, GRANITE AND WOOD PRODUCTS MAY NEED SEALANTS OR COATINGS TO
ENHANCE DURABILITY AND APPEARANCE.

61 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
 WHEN INSTALLING GLASS, ENSURE SAFETY MEASURES ARE FOLLOWED, AND PROPER
SUPPORT STRUCTURES ARE IN PLACE TO PREVENT ACCIDENTS.
 ADHERE TO LOCAL BUILDING CODES AND SAFETY REGULATIONS, ESPECIALLY WHEN
WORKING WITH FLOORING PRODUCTS IN COMMERCIAL OR PUBLIC SPACES.
09600.4 WARRANTY

1. MANUFACTURER'S WARRANTY: TILES MAY COME WITH A MANUFACTURER'S


WARRANTY, WHICH COVERS PRODUCT DEFECTS. THE DURATION AND TERMS OF THIS
WARRANTY SHOULD BE OUTLINED.
2. INSTALLER'S WARRANTY: THE INSTALLER MAY OFFER A WARRANTY FOR THEIR
WORKMANSHIP. THIS WARRANTY SHOULD SPECIFY THE DURATION AND CONDITIONS
FOR COVERAGE, SUCH AS PROPER INSTALLATION AND MAINTENANCE.
3. MAINTENANCE GUIDELINES: TO MAINTAIN THE WARRANTY AND THE APPEARANCE OF
THE TILED SURFACE, MAINTENANCE GUIDELINES, INCLUDING CLEANING PRODUCTS
AND FREQUENCY, SHOULD BE PROVIDED.
09600.5 TESTING AND INSPECTION:

 PROCEDURES FOR INSPECTING THE TILES BEFORE INSTALLATION TO ENSURE THEY


MEET QUALITY STANDARDS AND ARE FREE FROM DEFECTS.
 INSPECTION AND QUALITY CONTROL MEASURES DURING AND AFTER INSTALLATION TO
VERIFY THAT THE TILES ARE CORRECTLY INSTALLED AND MEET DESIGN
SPECIFICATIONS.
09700 WALL FINISHES

SCOPE

 MATERIAL SPECIFICATIONS
 INSTALLATION REQUIREMENTS
 SURFACE PREPARATION
09700.1 MATERIAL SPECIFICATIONS

1. GROOVED WALL: GROOVED WALL FINISHES ARE TYPICALLY MADE OF WOOD OR MDF
PANELS WITH GROOVES OR RIDGES CUT INTO THE SURFACE.
2. LATEX PAINT: LATEX PAINT IS A WATER-BASED PAINT COMMONLY USED FOR INTERIOR
WALL FINISHES.
3. SUAVICE STONEWORKS: SUAVICE STONEWORKS REFER TO THE USE OF NATURAL OR
ENGINEERED STONE MATERIALS FOR WALL FINISHES.
4. CERAMIC TILE: CERAMIC TILES ARE A DURABLE AND VERSATILE OPTION FOR WALL
FINISHES.
09700.2 INSTALLATION REQUIREMENTS

1. GROOVED WALL:
 ENSURE THAT GROOVED PANELS ARE SECURELY FASTENED TO THE WALL SUBSTRATE
USING APPROPRIATE FASTENERS AND ADHESIVES.
 ALIGN GROOVES ACCURATELY TO ACHIEVE THE DESIRED PATTERN OR DESIGN.
 FILL ANY GAPS OR SEAMS WITH FILLER OR PUTTY AND SAND THE SURFACE FOR A
SMOOTH FINISH.
2. LATEX PAINT:
 PREPARE THE WALL SURFACE BY CLEANING, PRIMING, AND PATCHING ANY
IMPERFECTIONS.
 APPLY THE LATEX PAINT EVENLY USING THE SPECIFIED METHOD (E.G., BRUSH,
ROLLER, OR SPRAY).
 ALLOW ADEQUATE DRYING TIME BETWEEN COATS AND FOLLOW THE
MANUFACTURER'S RECOMMENDATIONS.
3. SUAVICE STONEWORKS:
 INSTALL STONE PIECES SECURELY USING ADHESIVE OR MORTAR, ENSURING PROPER
ALIGNMENT AND SPACING.
 GROUT THE JOINTS BETWEEN STONE PIECES WITH THE SPECIFIED GROUT MATERIAL.
 SEAL THE STONE SURFACE TO PROTECT AGAINST STAINING AND MOISTURE
PENETRATION.
4. CERAMIC TILE:

62 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
 PREPARE THE WALL SURFACE BY ENSURING IT IS CLEAN, DRY, AND LEVEL.
 APPLY ADHESIVE TO THE BACK OF EACH TILE AND PRESS IT FIRMLY ONTO THE WALL.
 USE SPACERS TO MAINTAIN UNIFORM GAPS BETWEEN TILES.
 GROUT THE TILE JOINTS AND CLEAN EXCESS GROUT FROM THE TILE SURFACE.
09700.3 SURFACE PREPARATION

1. CLEANING: BEFORE APPLYING ANY WALL FINISH, THE SURFACE MUST BE


THOROUGHLY CLEANED. THIS INVOLVES REMOVING ANY DIRT, DUST, OR DEBRIS THAT
MAY HAVE ACCUMULATED ON THE WALL. COMMON CLEANING METHODS INCLUDE
WIPING DOWN THE SURFACE WITH A CLEAN, DAMP CLOTH, VACUUMING TO REMOVE
DUST, OR USING A MILD DETERGENT SOLUTION FOR MORE STUBBORN STAINS. IN
SOME CASES, IT MAY BE NECESSARY TO USE A DEGREASER TO ELIMINATE GREASE
OR OIL RESIDUES.
2. REPAIRING IMPERFECTIONS: INSPECT THE WALL SUBSTRATE FOR ANY
IMPERFECTIONS, SUCH AS CRACKS, HOLES, OR UNEVEN SURFACES. THESE
IMPERFECTIONS SHOULD BE REPAIRED BEFORE APPLYING THE FINISH.
3. MOISTURE MANAGEMENT: ENSURE THAT THE WALL SUBSTRATE IS DRY. MOISTURE
CAN ADVERSELY AFFECT MANY WALL FINISHES, CAUSING ISSUES LIKE PEELING,
BUBBLING, OR MOLD GROWTH. USE A MOISTURE METER TO VERIFY THAT THE
MOISTURE CONTENT IS WITHIN ACCEPTABLE LIMITS FOR THE CHOSEN FINISH
MATERIAL. IF EXCESSIVE MOISTURE IS PRESENT, TAKE STEPS TO ADDRESS IT, SUCH
AS IMPROVING VENTILATION OR USING A MOISTURE BARRIER.
4. PRIMING: DEPENDING ON THE TYPE OF WALL FINISH AND THE CONDITION OF THE
SUBSTRATE, APPLYING A PRIMER MAY BE NECESSARY. PRIMERS HELP THE FINISH
ADHERE BETTER TO THE SURFACE AND CAN ENHANCE THE FINISH'S DURABILITY AND
APPEARANCE. FOLLOW THE MANUFACTURER'S RECOMMENDATIONS FOR THE
APPROPRIATE PRIMER FOR THE SPECIFIC WALL FINISH BEING APPLIED.
5. SURFACE INSPECTION: AFTER CLEANING, REPAIRING, AND PRIMING (IF NECESSARY),
INSPECT THE WALL SURFACE TO ENSURE THAT IT MEETS THE DESIRED STANDARDS
FOR SMOOTHNESS, CLEANLINESS, AND READINESS FOR THE CHOSEN FINISH. ANY
REMAINING IMPERFECTIONS OR CONTAMINANTS SHOULD BE ADDRESSED BEFORE
PROCEEDING WITH THE FINISH INSTALLATION.
09900 PAINTS AND COATINGS

THE SPECIFICATION FOR "09900 PAINTS AND COATINGS" OUTLINES THE


REQUIREMENTS AND STANDARDS FOR THE SELECTION, APPLICATION, AND MAINTENANCE
OF PAINTS AND COATINGS IN CONSTRUCTION AND MAINTENANCE PROJECTS. THIS
SPECIFICATION COVERS A WIDE RANGE OF PAINTS AND COATINGS, INCLUDING PRIMERS,
FINISHES, AND SPECIALTY COATINGS, AND PROVIDES GUIDANCE ON THEIR PROPER USE
AND MAINTENANCE.

SCOPE

 SUBMITTALS
 MATERIALS
 EXECUTION
09900.1 SUBMITTALS

 PRODUCT DATA: PROVIDE DETAILED PRODUCT DATA SHEETS FOR ALL PAINTS AND
COATINGS TO BE USED. INCLUDE INFORMATION ON THE MANUFACTURER, PRODUCT
NAME, TYPE OF COATING (E.G., LATEX PAINT, EPOXY COATING), COLOR, FINISH, VOC
(VOLATILE ORGANIC COMPOUNDS) CONTENT, AND ANY SPECIAL PROPERTIES (E.G.,
FIRE RESISTANCE, ANTIMICROBIAL PROPERTIES). ENSURE THAT THE PRODUCTS
LISTED MEET OR EXCEED PROJECT SPECIFICATIONS.
 SAMPLES: SUBMIT SAMPLES OF EACH PAINT AND COATING TYPE PROPOSED FOR THE
PROJECT. SAMPLES SHOULD SHOWCASE THE SELECTED COLORS, FINISHES, AND
TEXTURES. ENSURE THAT THESE SAMPLES ACCURATELY REPRESENT THE FINAL
APPEARANCE OF THE COATINGS WHEN APPLIED TO THE PROJECT SURFACES.
 MOCK-UPS: IN SOME CASES, IT MAY BE NECESSARY TO CREATE MOCK-UPS OF
PAINTED OR COATED SURFACES FOR APPROVAL. THESE MOCK-UPS CAN HELP
VISUALIZE THE FINAL RESULT AND ENSURE THAT THE CHOSEN MATERIALS MEET

63 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
AESTHETIC AND QUALITY STANDARDS. INCLUDE MOCK-UP DETAILS, INCLUDING
SUBSTRATE PREPARATION, NUMBER OF COATS, AND APPLICATION METHODS.
 CERTIFICATES: PROVIDE CERTIFICATES OF COMPLIANCE OR TEST REPORTS,
ESPECIALLY IF THE PROJECT REQUIRES COATINGS WITH SPECIFIC PERFORMANCE
STANDARDS, SUCH AS FIRE RESISTANCE, LOW VOC EMISSIONS, OR OTHER
SPECIALIZED PROPERTIES. ENSURE THAT THE COATINGS USED MEET THE REQUIRED
CERTIFICATIONS AND STANDARDS.
09900.2 MATERIALS

PAINT TYPES: PERMACOAT SEMI-GLOSS LATEX IS A VERSATILE TYPE OF PAINT SUITABLE


FOR VARIOUS APPLICATIONS IN CONSTRUCTION AND MAINTENANCE PROJECTS. IT OFFERS
A SEMI-GLOSS FINISH, WHICH PROVIDES A SUBTLE SHEEN AND IS KNOWN FOR ITS
DURABILITY AND EASE OF MAINTENANCE.

COLOR:

 TULLE WHITE B-706


 ANTIQUE WHITE BSC-27
 BASIC BEIGE BSG-9
 MUD PIE B-7581
 WHITE MORNING B-707
VOLATILE ORGANIC COMPOUNDS (VOCS): ENSURE THAT ALL SELECTED PAINTS AND
COATINGS COMPLY WITH LOCAL, STATE, AND FEDERAL REGULATIONS REGARDING VOC
EMISSIONS.

09900.3 EXECUTION

1. WEATHER CONDITIONS
A. DO NOT PAINT IN THE RAIN, WIND, SNOW, MIST, AND FOG OR WHEN STEEL OR METAL
SURFACE TEMPERATURES ARE LESS THAN 5 DEGREES F ABOVE THE DEW POINT.
B. DO NOT APPLY PAINT WHEN THE RELATIVE HUMIDITY IS ABOVE 85% OR THE
TEMPERATURE IS ABOVE 90 DEGREES F.
C. DO NOT PAINT WHEN TEMPERATURE OF METAL TO BE PAINTED IS ABOVE 120
DEGREES F.
D. DO NOT APPLY PAINTS IF AIR OR SURFACE TEMPERATURE IS BELOW 40 DEGREES F OR
EXPECTED TO BE BELOW 40 DEGREES F WITHIN 24 HOURS.
E. DO NOT APPLY EPOXY, ACRYLIC LATEX, AND POLYURETHANE PAINTS ON AN EXTERIOR
OR INTERIOR SURFACE IF AIR OR SURFACE TEMPERATURE IS BELOW 60 DEGREES F
OR EXPECTED TO DROP BELOW 60 DEGREES F IN 24 HOURS.
2. SURFACE PREPARATION:
A. ENSURE THAT THE SURFACE TO BE PAINTED IS CLEAN, DRY, AND FREE FROM DUST,
DIRT, AND CONTAMINANTS.
B. REPAIR ANY CRACKS, HOLES, OR IMPERFECTIONS ON THE SURFACE USING SUITABLE
FILLERS OR PATCHING COMPOUNDS.
C. SAND THE SURFACE TO CREATE A SMOOTH AND EVEN SUBSTRATE, AND REMOVE ANY
LOOSE OR FLAKING PAINT.
3. PAINTING SYSTEMS
A. ALL MATERIALS OF A SPECIFIED PAINTING SYSTEM, INCLUDING PRIMER, INTERMEDIATE,
AND FINISH COATS, SHALL BE PRODUCED BY THE SAME MANUFACTURER. THINNERS,
CLEANERS, DRIERS, AND OTHER ADDITIVES SHALL BE AS RECOMMENDED BY THE PAINT
MANUFACTURER FOR THE PARTICULAR COATING SYSTEM.

B. DELIVER PAINTS TO THE JOBSITE IN THE ORIGINAL, UNOPENED CONTAINERS.

4. PAINT MIXING
PREPARE MULTIPLE-COMPONENT COATINGS USING ALL OF THE CONTENTS OF THE
CONTAINER FOR EACH COMPONENT AS PACKAGED BY THE PAINT MANUFACTURER. DO
NOT USE PARTIAL BATCHES. DO NOT USE MULTIPLE-COMPONENT COATINGS THAT HAVE
BEEN MIXED BEYOND THEIR POT LIFE. PROVIDE SMALL QUANTITY KITS FOR TOUCHUP
PAINTING AND FOR PAINTING OTHER SMALL AREAS. MIX ONLY THE COMPONENTS

64 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
SPECIFIED AND FURNISHED BY THE PAINT MANUFACTURER. DO NOT INTERMIX ADDITIONAL
COMPONENTS FOR REASONS OF COLOR OR OTHERWISE, EVEN WITHIN THE SAME
GENERIC TYPE OF COATING.

5. PROCEDURES FOR THE APPLICATION OF COATINGS


A. CONFORM TO THE REQUIREMENTS OF SSPC PA-1. FOLLOW THE RECOMMENDATIONS
OF THE COATING MANUFACTURER INCLUDING THE SELECTION OF SPRAY EQUIPMENT,
BRUSHES, ROLLERS, CLEANERS, THINNERS, MIXING, DRYING TIME, TEMPERATURE
AND HUMIDITY OF APPLICATION, AND SAFETY PRECAUTIONS.
B. STIR, STRAIN, AND KEEP COATING MATERIALS AT A UNIFORM CONSISTENCY DURING
APPLICATION. APPLY EACH COATING EVENLY, FREE OF BRUSH MARKS, SAGS, RUNS,
HOLIDAYS, AND OTHER EVIDENCE OF POOR WORKMANSHIP. USE A DIFFERENT SHADE
OR TINT ON SUCCEEDING COATING APPLICATIONS TO INDICATE COVERAGE WHERE
POSSIBLE. FINISHED SURFACES SHALL BE FREE FROM DEFECTS OR BLEMISHES.
C. DO NOT USE THINNERS UNLESS RECOMMENDED BY THE COATING MANUFACTURER. IF
THINNING IS ALLOWED, DO NOT EXCEED THE MAXIMUM ALLOWABLE AMOUNT OF
THINNER PER GALLON OF COATING MATERIAL. STIR COATING MATERIALS AT ALL TIMES
WHEN ADDING THINNER. DO NOT FLOOD THE COATING MATERIAL SURFACE WITH
THINNER PRIOR TO MIXING. DO NOT REDUCE COATING MATERIALS MORE THAN IS
D. ABSOLUTELY NECESSARY TO OBTAIN THE PROPER APPLICATION CHARACTERISTICS
AND TO OBTAIN THE SPECIFIED DRY-FILM THICKNESSES.
E. REMOVE DUST, BLAST PARTICLES, AND OTHER DEBRIS FROM BLAST CLEANED
SURFACES BY DUSTING, SWEEPING, AND VACUUMING. ALLOW VENTILATOR FANS TO
CLEAN AIRBORNE DUST TO PROVIDE GOOD VISIBILITY OF WORKING AREA PRIOR TO
COATING APPLICATIONS. REMOVE DUST FROM COATED SURFACES BY DUSTING,
SWEEPING, AND VACUUMING PRIOR TO APPLYING SUCCEEDING COATS.
F. APPLY COATING SYSTEMS TO THE SPECIFIED MINIMUM DRY-FILM THICKNESSES AS
MEASURED FROM ABOVE THE PEAKS OF THE SURFACE PROFILE.
G. APPLY PRIMER IMMEDIATELY AFTER BLAST CLEANING AND BEFORE ANY SURFACE
RUSTING OCCURS, OR ANY DUST, DIRT, OR ANY FOREIGN MATTER HAS ACCUMULATED.
RECLEAN SURFACES BY BLAST CLEANING THAT HAVE SURFACE COLORED OR
BECOME MOIST PRIOR TO COATING APPLICATION.
H. APPLY A BRUSH COAT OF PRIMER ON WELDS, SHARP EDGES, NUTS, BOLTS, AND
IRREGULAR SURFACES PRIOR TO THE APPLICATION OF THE PRIMER AND FINISH COAT.
THE BRUSH COAT SHALL BE DONE PRIOR TO AND IN CONJUNCTION WITH THE SPRAY
COAT APPLICATION. APPLY THE SPRAY COAT OVER THE BRUSH COAT.
DIVISION 10 SPECIALTIES
SECTION 10000 - GENERAL DISCUSSION
THE PRODUCTS SPECIFIED IN DIVISION 10 ARE THE PIECES AND PARTS THAT MAKE UP THE
FINISHING TOUCHES OF A PROJECT. IN MANY CASES THEY MAKE THE ROOM OR SPACES
FUNCTIONAL. HIGH QUALITY, SERVICEABILITY, MAINTAINABILITY AND EXTENDED PRODUCT
LIFE ARE THE NEEDS UPON WHICH THIS SECTION IS DEVELOPED. IN SOME CASES,
QUALITATIVE STANDARDS ARE CITED FOR AN ITEM(S) AND IN OTHERS, SPECIFIC PRODUCT
NAMES AND MANUFACTURERS ARE CITED. WHEN THE PRODUCT OR ITEM IS CITED BY
NAME, IT IS THE INTENTION THAT THE NAME/ITEM(S) BE INCORPORATED INTO THE
PROJECT.
THE CONSULTANT SHOULD SELECT FROM THE RANGE OF PRODUCTS AND REVIEW AND
COORDINATE WITH THE PROJECT MANAGER AND USERS TO DETERMINE ANY SPECIAL
REQUIREMENTS OR FEATURES FOR THE PROJECT
SECTION 10200 LOUVERS AND VENTS
METAL WALL LOUVERS: LOUVERS AND VENTS FOR AIR DISTRIBUTION SYSTEMS SHOULD
BE SPECIFIED IN DIVISION 23, HEATING, VENTILATING & AIR CONDITIONING. THE HVAC
CONTRACTOR SHALL BE REQUIRED TO FURNISH AND INSTALL ALL INTERIOR LOUVERS AND
VENTS. IF SUCH ITEMS ARE AN INTEGRAL PART OF THE EXTERIOR DESIGN OF A BUILDING
AND ARE NOT CONNECTED DIRECTLY TO AN AIR DISTRIBUTION SYSTEM, SPECIFY IN
DIVISION 23, SECTION 23 37 13, DIFFUSERS, REGISTERS & GRILLS.

65 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
GENERAL
• THIS SECTION INCLUDES THE FOLLOWING:
 FIXED, EXTRUDED-ALUMINUM LOUVERS.
 FIXED, FORMED-METAL LOUVERS.
• RELATED SECTIONS INCLUDE THE FOLLOWING:
 DIVISION 7 SECTION "JOINT SEALANTS" FOR SEALANTS INSTALLED IN
PERIMETER JOINTS BETWEEN LOUVER FRAMES AND ADJOINING
CONSTRUCTION.
 DIVISION 15 SECTION "CONTROL SYSTEMS EQUIPMENT" FOR ELECTRIC,
ELECTRONIC, AND PNEUMATIC CONTROL OF ADJUSTABLE METAL LOUVERS.
 DIVISION 15 SECTIONS FOR LOUVERS THAT ARE A PART OF MECHANICAL
EQUIPMENT.
 DIVISION 16 SECTIONS FOR ELECTRICAL POWER CONNECTIONS FOR MOTOR-
OPERATED ADJUSTABLE METAL LOUVERS.
MATERIALS
• ALUMINUM EXTRUSIONS: ASTM B 221M, ALLOY 6063-T5 OR T-52.
• ALUMINUM SHEET: ASTM B 209M, ALLOY 3003 OR 5005 WITH TEMPER AS REQUIRED
FOR FORMING, OR AS OTHERWISE RECOMMENDED BY METAL PRODUCER FOR
REQUIRED FINISH.
• FASTENERS: OF SAME BASIC METAL AND ALLOY AS FASTENED METAL OR 300
SERIES STAINLESS STEEL, UNLESS OTHERWISE INDICATED. DO NOT USE METALS
THAT ARE INCOMPATIBLE WITH JOINED MATERIALS.
 USE TYPES AND SIZES TO SUIT UNIT INSTALLATION CONDITIONS.
 USE PHILLIPS FLAT-HEAD SCREWS FOR EXPOSED FASTENERS, UNLESS
OTHERWISE INDICATED.
• D. ANCHORS AND INSERTS: OF TYPE, SIZE, AND MATERIAL REQUIRED FOR
LOADING AND INSTALLATION INDICATED. USE NONFERROUS METAL OR HOT-DIP
GALVANIZED ANCHORS AND INSERTS FOR EXTERIOR INSTALLATIONS AND
ELSEWHERE AS NEEDED FOR CORROSION RESISTANCE. USE TOOTHED STEEL OR
EXPANSION BOLT DEVICES FOR DRILLED-IN-PLACE ANCHORS.
• E. BITUMINOUS PAINT: COLD-APPLIED ASPHALT MASTIC COMPLYING WITH SSPC-
PAINT 12 BUT CONTAINING NO ASBESTOS FIBERS, OR COLD-APPLIED ASPHALT
EMULSION COMPLYING WITH ASTM D 1187.
SECTION 10290 - PEST CONTROL
THE DEVICES IN THIS CATEGORY ARE TO CONTROL BIRDS, INSECTS, RODENTS, OR OTHER
PESTS. ITEMS SUCH AS BIRD SPIKES, NETTING, RETRACTABLE SCREENS, AND OTHER
INSECT SCREENS ARE STANDARDIZED UNDER THIS TOPIC.
SECTION 10300 - FIREPLACES AND STOVES
ANY TIME FIREPLACES ARE SPECIFIED, THE BUILDING'S EXISTING MECHANICAL SYSTEM'S
AIR BALANCE STATUS SHALL BE VERIFIED AND WRITTEN DEFINITION OF DESIGN IMPACTS
SHALL BE INCLUDED IN THE SPECIFICATIONS.
SECTION 10400 - IDENTIFICATION DEVICES
GENERAL

 FURNISH ALL MATERIALS, LABOR, EQUIPMENT, PLANT, TOOLS REQUIRED FOR THE
INSTALLATION OF BUILDING IDENTIFICATION LETTERS
SAMPLE AND SHOP DRAWINGS

 SUBMIT SAMPLES FOR APPROVAL OF THE ARCHITECT. FOR THE BUILDING


IDENTIFICATION, FULL SIZE LETTERING LAYOUT AND INSTALLATION METHOD SHALL
BE SUBMITTED TO THE ARCHITECT FOR APPROVAL BEFORE START OF WORK.
MAKE AVAILABLE HALF FULL SIZE PATTERS FOR THE OWNER, UPON REQUEST.

66 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
EXECUTION
INSTALL IN A SECURE AND PERMANENT MANNER AT PRESCRIBED HEIGHTS AND/OR
LAYOUT. FOR THE BUILDING IDENTIFICATION, FLOAT LETTERS AWAY FROM THE BACK WALL
WITH THE USE OF CANTILEVERED BRASS DOWELS BEHIND EACH LETTER. FOR BACK
WALLS WITH IRREGULAR SURFACE, PROVIDE DOWELS WITH DIFFERENT LENGTHS SUCH
THAT THE LETTER FACES ARE TRUE TO PLACE. EMBED DOWELS INTO THE BACK WALL BY
DRILLING APPROPRIATE SIZED HOLES AT ACCURATE POINTS. DO NOT MUTILATE THE BACK
WALL. AFTER THE DOWELS ARE POSITIONED, FILL WITH EXPANDING GROUT, OR OTHER
APPROVED FILLERS AND RETOUCH FLUSH TO THE BACK WALL SURFACE.
SECTION 10520 - FIRE PROTECTION DEVICES
FIRE EXTINGUISHERS SHALL BE PROVIDED AND INSTALLED AS A PART OF THE
CONSTRUCTION CONTRACT. TYPE SHALL BE SELECTED AS APPROPRIATE FOR THE CLASS
OF EQUIPMENT BEING SERVED.
GENERAL
• CABINETS SHALL BE LARGE ENOUGH TO CONTAIN A 10# DRY CHEMICAL TYPE
EXTINGUISHER. COORDINATE WALL THICKNESS TO UNSURE ADEQUATE DEPTH IS
PROVIDED. CABINETS SHALL BE NON-LOCKABLE TYPE.
• MOUNTING BRACKETS SHALL BE PROVIDED FOR EXTINGUISHERS NOT LOCATED IN
CABINETS.
PRODUCTS
• FIRE EXTINGUISHERS SHALL GENERALLY BE MULTI-PURPOSE DRY CHEMICAL
TYPE, UL RATED, 4-A:60-B:C, 10LB NOMINAL CAPACITY, IN ENAMELED STEEL
CONTAINER FOR CLASS A, CLASS B AND CLASS C FIRES.
• FIRE EXTINGUISHER CABINETS SHALL BE EITHER SEMI OR FULLY RECESSED TYPE
WITH ENAMELED STEEL BOX. EXPOSED TRIM, DOOR MATERIAL, DOOR STYLE AND
HARDWARE SHALL BE AS SELECTED BY THE CONSULTANT AND APPROPRIATE TO
THE DESIGN OF THE BUILDING. LOBBIES, PUBLIC SPACES, CORRIDORS AND THE
LIKE MAY HAVE UPGRADED MATERIALS IN KEEPING WITH THE BUILDING DESIGN. IN
LESS PUBLIC AREAS, POLISHED, NON-DIRECTIONAL #4 STAINLESS STEEL SHOULD
BE CONSIDERED FOR DOOR MATERIAL.
EXECUTION
• SECURELY FASTEN MOUNTINGS TO BUILDING.
• CABINETS SHALL BE IDENTIFIED WITH LETTERING SPELLING “FIRE EXTINGUISHER”.
SECTION 10530 - PROTECTIVE COVERS
THIS SECTION COVERS AWNINGS, CANOPIES, EXTERIOR FABRIC TYPES, ROADSIDE PUBLIC
SHELTERS, AND FULL-FABRIC STRUCTURES. OTHER TYPES OF OVERHEAD PROTECTIVE
COVERS ARE ALSO INCLUDED, SUCH AS PERMANENT ARCHITECTURAL FEATURES FOR
ENTRANCEWAYS.
SECTION - 10550 POSTAL SPECIALTIES
POSTAL SPECIALTIES INCLUDE PO BOX FIXTURES, CLUSTER BOX UNITS, 4C MAILBOXES,
AND OTHER MAILROOM ACCESSORIES.
POSTAL EQUIPMENT / BOXES SHALL HAVE THE FOLLOWING CHARACTERISTICS:
• CENTRAL MAIL DELIVERY BOXES
• DEPARTMENTAL MAIL BOXES
• MOVABLE EQUIPMENT SORT MODULES
• MAIL COLLECTION BOXES
SECTION 10570 - GRILLS AND SCREENS

67 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
REFER TO DIVISION 23 HVAC FOR INFORMATION REGARDING LOUVERS AND VENTS FOR
AIR DISTRIBUTION SYSTEMS. THE HVAC CONTRACTOR SHALL BE REQUIRED TO FURNISH
AND INSTALL ALL INTERIOR LOUVERS AND VENTS. IF SUCH ITEMS ARE AN INTEGRAL PART
OF THE EXTERIOR DESIGN OF A BUILDING AND ARE NOT CONNECTED DIRECTLY TO AN AIR
DISTRIBUTION SYSTEM, SPECIFY THAT THE GENERAL CONTRACTOR PURCHASE AND
INSTALL THEM.
SECTION 10600 - PARTITIONS
WITHIN THIS SECTION ARE OVERHEAD DOORS, ROLLING STEEL DOORS, AND ROLLING
GRILL DOORS. THESE ARE MEAN TO PROTECT STOREFRONTS- INDOORS AND OUT.
FOLDING WALLS, DOORS AND PANELS, WIRE OR MESH ENCLOSURES AND DOORS,
MOVEABLE GLASS PARTITIONS, AND TEMPORARY OR REMOVABLE WALL SYSTEMS ARE ALL
INCLUDED UNDER THE “PARTITIONS” CATEGORY
SECTION 10651 - OPERABLE PARTITIONS
GENERAL
• OPERABLE PARTITIONS USED TO FUNCTIONALLY AND ACOUSTICALLY SEPARATE
LARGE AREAS OF GENERAL USE SPACE, CONSISTING OF FLOOR TO CEILING
STACKABLE PANELS ON A TRACK SYSTEM SHALL MEET THE FOLLOWING:
• MINIMUM STC COMPOSITE RATING OF 50, TESTED ON 100 SF. OPENING.
• MINIMUM IN FIELD PERFORMANCE EQUAL OR BETTER THAN ASTM E336.
• INSTALLED TRACK DEFLECTION UNDER FULL LOAD NO GREATER THAN 1/360.
• MINIMUM PANEL THICKNESS SHALL BE 4 INCH, PANEL SKINS RATED CLASS A, IN
FULL PERIMETER PROTECTIVE STEEL FRAME.
• VERTICAL SOUND SEALS BETWEEN PANELS WILL BE TONGUE AND GROOVE,
CONSISTING OF STEEL ASTRAGALS INCORPORATING VINYL ACOUSTICAL SEALS.
• HORIZONTAL TOP SEALS SHALL BE TWIN‐FINGER CONTINUOUS CONTACT TYPE.
MECHANICAL BOTTOM SEALS SHALL BE MADE OF FORMED STEEL,
INCORPORATING ¼ INCH VINYL STRIPS FOR PROPER ACOUSTICAL SEAL WHEN
ACTIVATED.
• HINGES ON PANELS AND INSET PASS DOORS ARE RECESSED AND PROJECT NO
MORE THAN 1/4 INCH BEYOND PANEL FACE.
• FOOTBOLTS AND STABILIZERS SHALL BE INTERNAL AND EDGE ACTIVATED. NO
PROTRUDING FOOTBOLTS ATTACHED TO PANEL FACES ARE ALLOWED.
• SUSPENSION SYSTEM SHALL CONSIST OF A STEEL TRACK CONNECTED TO
STRUCTURAL SUPPORT BY THREADED RODS. EACH PANEL OF A PAIRED
ASSEMBLY SHALL BE SUPPORTED BY ONE CARRIER ASSEMBLY CONSISTING OF
STEEL BALL BEARING WHEELS. EACH PANEL OF AN INDIVIDUAL PANEL ASSEMBLY
SHALL BE SUPPORTED BY TWO CARRIER ASSEMBLIES CONSISTING OF STEEL BALL
BEARING WHEELS.
• PLENUM CLOSURE IS REQUIRED FOR MAXIMUM SOUND CONTROL OF THE
PARTITION AND MUST PERMIT LIFTING OUT OF HEADER PANELS TO ADJUST TRACK
HEIGHT.
PRODUCTS
• MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS
• PRODUCTS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE ONE OF
THE PRODUCTS SPECIFIED IN EACH OPERABLE PANEL PARTITION PRODUCT DATA
SHEET.
EXECUTION
• INSTALL OPERABLE PANEL PARTITIONS AND ACCESSORIES COMPLYING WITH
ASTM E 557 AFTER OTHER FINISHING OPERATIONS INCLUDING PAINTING, HAVE
BEEN COMPLETED.
• INSTALL OPERABLE PANEL PARTITIONS THAT CONFORM TO DRAWINGS AND
APPROVED SHOP DRAWINGS AND IN STRICT COMPLIANCE WITH MANUFACTURER'S
WRITTEN INSTALLATION INSTRUCTIONS.

68 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
• MATCH OPERABLE PANEL PARTITIONS FOR COLOR AND PATTERN BY INSTALLING
PARTITIONS FROM CARTONS IN SAME SEQUENCE AS MANUFACTURED AND
PACKAGED, IF SO NUMBERED. BROKEN, CRACKED, CHIPPED, OR DEFORMED
PANELS ARE NOT ACCEPTABLE.
SECTION 10670 - STORAGE SHELVING
THE STORAGE SHELVING INVOLVED IN THIS CATEGORY INCLUDES MOBILE, INDUSTRIAL,
SAFETY, AND LIBRARY STORAGE SHELVING UNITS
SECTION 10700 - EXTERIOR PROTECTION
THE EXTERIOR PROTECTION SECTION IS GEARED TOWARD ITEMS THAT PROVIDE
WEATHER PROTECTION SUCH AS SHUDDERS, WINDOW SHADES, SUN CONTROL DEVICES,
AND STORM PROTECTION WINDOW PANELS.
SECTION 10750 - TELEPHONE SPECIALTIES
THIS SECTION HAS BECOME RATHER OBSCURE OVER THE YEARS DUE TO MOBILE PHONES
AND TABLETS. HOWEVER, PHONE BOOTHS, ENCLOSURES, AND DIRECTORY UNITS ARE
STILL INCLUDED IN THE MASTERFORMAT TO THIS DAY.
SECTION 10810 - TOILET ACCESSORIES
THIS SECTION ADDRESSES THE TYPE OF ACCESSORIES WHICH ARE TO BE PROVIDED OR
ANTICIPATED FOR ALL NEW AND REMODELED RESTROOMS. REQUIREMENTS FOR TOILET
ACCESSORIES MAY VARY DEPENDING UPON WHETHER THE PROJECT IS LOCATED WITHIN
A RESIDENCE LIFE FACILITY. ALL ASSUMPTIONS SHALL BE VERIFIED WITH THE PROJECT
COORDINATOR AND THE RESPECTIVE CUSTODIAL GROUP.
CONSEQUENTLY THESE RESPECTIVE DISPENSING ELEMENTS ARE SOMETIMES SUPPLIED
BY THE VENDOR OR FM CUSTODIAL SERVICES. BELOW ARE THE REQUIREMENTS FOR
TOILETS WHICH WILL BE SERVICED AND MAINTAINED BY FACILITIES MANAGEMENT.
GENERAL
• PROVIDE AT LEAST ONE PAPER TOWEL DISPENSER FOR EVERY THREE SINKS AND
INSTALL AT HC ACCESSIBLE HEIGHT.
• ALL DISPENSING UNITS SHALL BE SURFACE MOUNTED. RECESSED ELEMENTS ARE
TO BE AVOIDED. STUD WALLS SHOULD RECEIVE APPROPRIATE BLOCKING TO
ACCOMMODATE SURFACE MOUNT ATTACHMENT.
• TRASH RECEPTACLES ARE TO BE LOCATED OR AT LEAST ANTICIPATED IN EVERY
TOILET ROOM OF THE HOUSE
• PROVIDE AN ACCESSORIES SCHEDULE IN THE SPECIFICATIONS OR ON THE
DRAWINGS LISTING EACH ROOM AND THE QUANTITY OF EACH TYPE OF
ACCESSORY REQUIRED AS WELL AS WHO PROVIDES WHAT ELEMENTS AND WHO
INSTALLS.
• CONSULTANT SHOULD ANTICIPATE AND PRESCRIBE LOCATIONS OF OWNER
FURNISHED ELEMENTS SO AS TO INSURE THAT CONFLICTS WITH CONTRACT WORK
DO NOT EXIST.
PRODUCTS
• PAPER TOWEL DISPENSERS SHALL BE SURFACE MOUNT, GEORGIA-PACIFIC ROLL
TOWEL DISPENSER, MODEL 54338, HANDS FREE PUSH PADDLE, TRANSLUCENT
SMOKE.
• SOAP DISPENSERS ARE PROVIDED BY CUSTODIAL SERVICES VIA THEIR SOAP
VENDOR AND ARE SURFACE MOUNTED WAXIE “NICE TOUCH” STOCK #380143,
WHITE, WITH EITHER ADHESIVE BACKING OR SCREW ATTACHMENT. AVOID
ATTACHING TO MIRROR.
• TOILET TISSUE DISPENSERS ARE PROVIDED BY CUSTODIAL SERVICES VIA THEIR
PAPER VENDOR AND ARE LARGE DIAMETER SURFACE MOUNTED COVERED
SPOOLS, JARIC JUMBO STAINLESS STEEL, STOCK #KD1000. HANDICAP ACCESSIBLE

69 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
TOILET STALLS USE SIDE BY SIDE, SURFACE MOUNT WAXIE “COMPACT CORELESS
TISSUE DISPENSER”, STOCK #537412, SMOKE GRAY.
• SANITARY NAPKIN/TAMPON VENDORS SHALL BE SURFACE MOUNTED AND
CONSTRUCTED OF STAINLESS STEEL. CAPACITY NOT LESS THAN 15 NAPKINS AND
20 TAMPONS. CURRENCY COST AND COIN SLOT FOR $0.25. BRAND NAME
ADVERTISING NOT ALLOWED. PROVIDE BOBRICK B-352 OR EQUAL.
• SANITARY NAPKIN DISPOSAL UNITS SHALL BE SURFACE MOUNTED AND
CONSTRUCTED OF STAINLESS STEEL. BOBRICK B-3544 OR EQUAL.
• WASTE RECEPTACLES WILL BE PROVIDED BY CUSTODIAL SERVICES AS PART OF
FFE AND WILL BE FREE STANDING UNITS.
• GRAB BARS SHALL BE STAINLESS STEEL, 18 GAUGE MINIMUM WALL THICKNESS,
1.5" MINIMUM OUTSIDE DIAMETER WITH CONCEALED MOUNTING DEVICES. INSTALL
TO PROVIDE 1.5" CLEARANCE BETWEEN WALL AND INSIDE FACE OF HANDRAIL.
• MIRRORS SHALL BE 1/4" GLASS WITH STAINLESS STEEL FRAME AND CONCEALED
FASTENERS. LOCATE AND SIZE MIRROR TO PROVIDE ADEQUATE FREE WALL
SPACE FOR SOAP DISPENSER.
• EXECUTION
• PROVIDE STUD WALL BACKING FOR ALL SURFACE MOUNTED ACCESSORIES.
• PROTECT ALL TOILET ACCESSORIES FROM DAMAGE DURING THE COURSE OF
CONSTRUCTION.
• CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS AFTER REMOVING TEMPORARY LABELS AND PROTECTIVE
COATINGS.
• MOUNT PAPER TOWEL DISPENSERS WITH LEVER AT 48” A.F.F. FOR ADA
ACCESSIBILITY.
• LAYOUT ALL ACCESSORIES TO ENSURE THAT SURFACE MOUNT ELEMENTS DO NOT
RESTRICT ACCESS TO SINKS.
SECTION 10900 WARDROBE AND CLOSET SPECIALTIES
THIS CATEGORY IS PRIMARILY FOCUSED ON RESIDENTIAL ARCHITECTURE. ITEMS SUCH AS
GARAGE DOORS, CLOSET ORGANIZERS, AND CLOSET DOORS ARE INCLUDED.
SECTION 10910 HAT AND COAT RACKS
• DESIGNS: WALL AND DOOR MOUNTED COAT HOOKS AND ALL BLOCKING SHALL BE
INCLUDED IN THE CONSTRUCTION DOCUMENTS FOR OFFICES AND CONFERENCE
AREAS.
• CONSTRUCTION COORDINATION: WITH THE EXCEPTION OF WALL AND DOOR
MOUNTED COAT HOOKS, OTHER ACCESSORY ITEMS MAY BE PROVIDED BY THE
USER.
DIVISION 11: EQUIPMENT
SUMMARY
DIVISION 11 OF THE PROPOSED 2 STOREY RESIDENTIAL BUILDING IS ALL ABOUT
EQUIPMENT. TO NARROW DOWN SUCH A WIDE-RANGING SUBJECT, THIS SECTOR
ENCOMPASSES ALL THE MACHINERY AND DEVICES THAT MIGHT BE NECESSARY FOR A
STRUCTURE, BE IT A BUILDING, A HOME, OR ANY OTHER KIND OF FACILITY. THIS
MACHINERY IS ASSESSED AND INTEGRATED INTO A BUILDING'S BLUEPRINT DURING THE
ENGINEERING PHASE OR DETERMINED AND INCORPORATED DURING CONSTRUCTION.
DIVISION 11'S AIM IS TO ESTABLISH A STANDARDIZED PROCESS THAT ENURES THE
PROCUREMENT OF EQUIPMENT REMAINS DEPENDABLE AND FORESEEABLE.

GENERAL NOTES:
1. WHEN INTERPRETING THESE DRAWINGS, THE PROVIDED DIMENSIONS MUST TAKE PRECEDENCE. DISTANCES
OR DIMENSIONS SHOULD NOT BE ADJUSTED THROUGH SCALING FOR CONSTRUCTION PURPOSES.
2. IF THERE IS A DISAGREEMENT IN SPECIFIC DETAILS OR MEASUREMENTS BETWEEN THE RCHITECTURAL AND
ENGINEERING DRAWINGS, PLEASE CONSULT THE ARCHITECT FOR THE ULTIMATE RESOLUTION.

70 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
4. ALL STRUCTURAL DETAILS UNLESS OTHERWISE SHOWN IN THE DRAWINGS SHALL FOLLOW CONSTRUCTION
NOTE DETAILS.
5. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL BUILDING CODE IN SO FAR AS THEY
DO NOT CONFLICT WITH THE LOCAL BUILDING CODE REQUIREMENTS.
6. THE CONTRACTOR IS RESPONSIBLE FOR COLLABORATING WITH THE ARCHITECT AND ELECTRICAL AND
STRUCTURAL ENGINEERS TO DETERMINE THE PRECISE DIMENSIONS AND POSITIONS OF OPENINGS THROUGH
THE FLOOR SLAB, BEAMS, AND WALLS.
7. THE PROJECT MUST ADHERE STRICTLY TO THE STANDARD CONSTRUCTION PROCEDURES OUTLINED IN THE
NATIONAL BUILDING CODE AND NATIONAL STRUCTURAL CODE FOR BUILDINGS. THE CONTRACTOR IS
OBLIGATED TO SUPPLY SHEET PILES AND IMPLEMENT PRECAUTIONARY MEASURES TO GUARANTEE THE SAFETY
OF NEARBY PROPERTIES AND OCCUPANTS.
STANDARDIZATION: THROUGH ADHERENCE TO DIVISION 11, ARCHITECTS, ENGINEERS, AND CONTRACTORS
CAN GUARANTEE THAT THEIR PROJECTS ALIGN WITH INDUSTRY STANDARDS AND REGULATORY MANDATES.
EFFICIENCY: THIS DIVISION ASSISTS PROFESSIONALS IN CONSERVING BOTH TIME AND RESOURCES BY
OFFERING A METHODICAL AND WELL-ORGANIZED APPROACH TO EQUIPMENT SPECIFICATIONS.
QUALITY CONTROL: ADHERING TO DIVISION 11 AIDS CONSTRUCTION PROFESSIONALS IN UPHOLDING QUALITY
CONTROL BY PRESENTING EXPLICIT AND SUCCINCT SPECIFICATIONS FOR EQUIPMENT INSTALLATIONS. THIS
DIVISION COVERS A DIVERSE ARRAY OF EQUIPMENT CATEGORIES AND SUBCATEGORIES TAILORED TO ADDRESS
THE UNIQUE REQUIREMENTS OF VARIOUS CONSTRUCTION PROJECTS.
SPECIFICATION PROCESS FOR DIVISION 11 EQUIPMENT
THE SPECIFICATION PROCESS FOR DIVISION 11 EQUIPMENT HOLDS A CRUCIAL ROLE IN
SECURING THE TRIUMPH OF EVERY CONSTRUCTION PROJECT. THIS SEGMENT STRIVES
TO OFFER A COMPREHENSIVE, STEP-BY-STEP DISSECTION OF THE PROCESS,
EMPHASIZING THE SIGNIFICANCE OF WELL-DEFINED AND BRIEF SPECIFICATIONS. IT ALSO
ADDRESSES THE TYPICAL OBSTACLES ENCOUNTERED BY ARCHITECTS, ENGINEERS, AND
CONTRACTORS, ALONG WITH STRATEGIES TO SURMOUNT THESE CHALLENGES AND
SIMPLIFY THE SPECIFICATION PROCEDURE.
SECTION 11310 RESIDENTIAL APPLIANCES
A. EXECUTION
113100.1.01 EXAMINATION
A. EXAMINE ROUGHING-IN FOR PLUMBING, MECHANICAL, AND ELECTRICAL
SERVICES, WITH INSTALLER PRESENT, TO VERIFY ACTUAL LOCATIONS OF
SERVICES BEFORE RESIDENTIAL APPLIANCE INSTALLATION.
1. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
BEEN CORRECTED.
113100.1.02 INSTALLATION
A.GENERAL:

 COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.


B. BUILT- IN EQUIPMENT:

 SECURELY ANCHOR UNITS TO SUPPORTING CABINETS OR COUNTERTOPS WITH


CONCEALED FASTENERS. VERIFY THAT CLEARANCES ARE ADEQUATE FOR
PROPER FUNCTIONING AND ROUGH OPENINGS ARE COMPLETELY CONCEALED.
C. FREESTANDING EQUIPMENT:

 PLACE UNITS IN FINAL LOCATIONS AFTER FINISHES HAVE BEEN COMPLETED IN


EACH AREA. VERIFY THAT CLEARANCES ARE ADEQUATE TO PROPERLY
OPERATE EQUIPMENT.
D. UTILITIES:

 REFER TO DIVISION 22 AND 26 FOR PLUMBING AND ELECTRICAL


REQUIREMENTS.

71 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
113100.1.03 ADJUSTING AND CLEANING
A. TEST EACH ITEM OF RESIDENTIAL APPLIANCES TO VERIFY PROPER OPERATION.
MAKE NECESSARY ADJUSTMENTS.
B. VERIFY THAT ACCESSORIES REQUIRED HAVE BEEN FURNISHED AND INSTALLED.
C. REMOVE PACKING MATERIAL FROM RESIDENTIAL APPLIANCES AND LEAVE UNITS
IN CLEAN CONDITION, READY FOR OPERATION.
B. RESIDENTIAL APPLIANCE SCHEDULE
2.01 APPLIANCES
A. REFRIGERATOR: NOT SPECIFIED
1. REFER TO THE INTERIOR DESIGN SPECIFICATION PLAN.
2. LOCATION:
A. KITCHEN
B. RANGE STOVE: NOT SPECIFIED
1. REFER TO THE INTERIOR DESIGN SPECIFICATION PLAN.
2.LOCATIONS:
A. KITCHEN
DIVISION 12 FURNISHINGS
12300 MANUFACTURED CASEWORK
12300.1 SPECIAL CASEWORK UNITS
A. CHEMICAL STORAGE CABINETS
1. LINE ACID STORAGE CABINETS WITH CORROSION-RESISTANT POLYETHYLENE
LINER.
2. FURNISH A HALF-WIDTH CORROSION-RESISTANT REMOVABLE SHELF.
3. LABEL CABINETS WITH HAZARD WARNING SIGNAGE ON THE DOOR IN
COMPLIANCE .
4. DO NOT USE METAL COMPONENTS IN THE INTERIOR OF THE CABINET UNLESS
THEY HAVE BEEN COATED WITH AN ACID-RESISTANT COATING.
B. FLAMMABLE LIQUID STORAGE CABINETS
CABINETS ARE NOT TO BE VENTED.
12300.2 CASEWORK INSTALLATION

 SET CASEWORK COMPONENTS PLUMB, SQUARE, AND STRAIGHT WITH NO


DISTORTION AND SECURELY ANCHORED TO THE BUILDING STRUCTURE. SHIM AS
REQUIRED USING CONCEALED SHIMS.
 ALIGN ADJOINING UNITS AND INSTALL MATCHING FILLER PIECES WHERE
EQUIPMENT ABUTS WALLS OR COLUMNS.
 BOLT CONTINUOUS CABINETS TOGETHER WITH JOINTS FLUSH, TIGHT, AND
UNIFORM.
 SECURE WALL CABINETS TO SOLID SUPPORTING MATERIAL, NOT TO PLASTER,
LATH, OR GYPSUM BOARD.
 ABUT TOP EDGE SURFACES IN ONE TRUE PLANE. PROVIDE FLUSH JOINTS NOT TO
EXCEED 1/8 INCH BETWEEN TOP UNITS. F. PROVIDE SCRIBING, CORNER, AND

72 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
INTERMEDIATE FILLERS TO FIT CABINETS TO THE SPACE PROVIDED AND TO EACH
OTHER.
 WHEN WALL HUNG CABINETS ARE INSTALLED TIGHT TO THE CEILING, PROVIDE
CONTINUOUS METAL FILLER BETWEEN THE TOP OF THE CABINET AND CEILING, TO
PERMIT THE DOOR TO SWING CLEAR OF THE CEILING.
12300.3 WORK SURFACE INSTALLATION
A. WHERE REQUIRED DUE TO FIELD CONDITIONS, SCRIBE TO ABUTTING SURFACES.
B. ONLY FACTORY-PREPARED FIELD JOINTS, SHOWN ON APPROVED SHOP
DRAWINGS, ARE PERMITTED. SECURE JOINTS IN THE FIELD, WHERE PRACTICABLE,
IN THE SAME MANNER AS IN A FACTORY, WITH DOWELS, SPLINES, ADHESIVES, OR
FASTENERS RECOMMENDED BY THE MANUFACTURER.
C. SECURE WORK SURFACES TO CASEWORK AND EQUIPMENT COMPONENTS WITH
MATERIAL AND PROCEDURES RECOMMENDED BY THE MANUFACTURER.
D. AT CHANGES IN COUNTERTOP HEIGHT, MAKE A VERTICAL TRANSITION WITH THE
SAME MATERIAL AS THE ADJACENT COUNTERTOP.
E. SEAL AROUND COUNTERTOP PENETRATIONS.
INSTALLATION
A. FURNITURE SYSTEM INSTALLATION:
1. INSTALL THE SYSTEM IN STRICT ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS.
2. SET SYSTEM COMPONENTS PLUMB, SQUARE, AND STRAIGHT WITH NO
DISTORTION AND SECURELY ANCHORED TO THE BUILDING STRUCTURE.
SHIM AS REQUIRED USING CONCEALED SHIMS.
B. INSTALL SUSPENDED CASEWORK, WORK SURFACES
ADJUSTING
A. REPAIR OR REMOVE AND REPLACE DEFECTIVE WORK, AS DIRECTED BY THE
ARCHITECT UPON COMPLETION OF INSTALLATION.
12300.4 PROTECTION OF FINISHED WORK
A. PROVIDE ALL NECESSARY PROTECTIVE MEASURES TO PREVENT EXPOSURE OF
LABORATORY FURNITURE SYSTEM AND ATTACHED COMPONENTS FROM EXPOSURE
TO OTHER CONSTRUCTION ACTIVITY.
B. ADVISE CONTRACTOR OF PROCEDURES AND PRECAUTIONS FOR THE
PROTECTION OF MATERIAL, INSTALLED LABORATORY FURNITURE SYSTEM,
CASEWORK, AND FIXTURES FROM DAMAGE BY WORK OF OTHER TRADES.
12300.5 CABINET HARDWARE
A. HINGES - STAINLESS STEEL LIFT-OFF FLAG HINGES, TACK WELDED TO BOTH
DOOR AND CASE. PROVIDE ONE PAIR OF 64 MM HIGH HINGES FOR DOORS UNDER
914 MM (36 INCHES) HIGH.
B. DRAWER GLIDES - POLYPROPYLENE CUT TO SUIT. FASTEN TO TABS ON THE
CABINET INTERIOR WITH STAINLESS STEEL SCREWS.

12300.6 DELIVERY, STORAGE, AND HANDLING

 DELIVER, STORE, AND HANDLE COUNTERTOPS IN A MANNER THAT WILL PREVENT


DAMAGE AND DISFIGUREMENT.
 PROVIDE TEMPORARY SKIDS UNDER UNITS WEIGHING MORE THAN 200
KILOGRAMS. 1.05 DESIGN A. PROVIDE FACTORY FABRICATED, PREFINISHED STEEL

73 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
COUNTERTOPS IN THE MANUFACTURER'S STANDARD SIZES AND FINISHES OF THE
TYPE, DESIGN, AND CONFIGURATION INDICATED.
1. CONSTRUCT COUNTERTOPS AS SPECIFIED AND MEET THE REQUIREMENTS.
2. ACCOMPLISH FASTENINGS TO PERMIT REMOVAL AND REPLACEMENT OF
INDIVIDUAL UNITS WITHOUT AFFECTING THE REMAINDER OF THE INSTALLATION.
3. PROVIDE COUNTERS WITH WATERTIGHT SINK RIMS WHEN INDICATED.
GENERAL
A. SUBMIT THE MANUFACTURER'S STANDARD COLOR CHARTS FOR COUNTERTOPS
SHOWING THE MANUFACTURER'S RECOMMENDED COLOR AND FINISH SELECTIONS.
B. SUBMIT MANUFACTURER'S INSTRUCTIONS FOR COUNTERTOPS INCLUDING SPECIAL
PROVISIONS REQUIRED TO INSTALL EQUIPMENT COMPONENTS AND SYSTEM PACKAGES.
INCLUDE ALL SPECIAL NOTICES DETAILING IMPEDANCES, HAZARDS, AND SAFETY
PRECAUTIONS.
C. PROVIDE THE MANUFACTURER'S STANDARD TYPE COUNTERTOPS OR AS INDICATED ON
THE DRAWINGS. ACCOMPLISH FASTENINGS TO PERMIT REMOVAL AND REPLACEMENT OF
INDIVIDUAL COUNTERTOPS WITHOUT AFFECTING THE REMAINDER OF THE INSTALLATION.
INSTALLATION
A. INSPECT MATERIAL FOR DEFECTS BEFORE INSTALLATION. ENSURE MATERIALS
THROUGHOUT BEAR LABELS WITH THE SAME BATCH NUMBER. VISUALLY INSPECT
MATERIALS USED FOR ADJACENT PIECES TO ENSURE AN ACCEPTABLE COLOR MATCH.
INSPECT LIGHTING CONDITIONS SIMILAR TO THOSE ON THE PROJECT. REPAIR OR
SATISFACTORILY REPLACE DAMAGED MATERIALS.
D. SUBMIT INSTALLATION DRAWINGS FOR COUNTERTOPS. DRAWINGS MUST INCLUDE THE
LOCATION OF CABINETS, DETAILS OF CABINETS RELATED AND DIMENSIONAL POSITIONS,
AND LOCATIONS FOR ROUGHING IN PLUMBING, INCLUDING SINKS, FAUCETS, STRAINERS,
AND COCKS.
E. PRELIMINARY INSTALLATION AND ADJUSTMENT

 INSTALL MATERIALS BY THE MANUFACTURER'S RECOMMENDATIONS. LIFT


AND PLACE TO AVOID BREAKAGE.
 POSITION MATERIALS TO VERIFY THAT MATERIALS ARE CORRECTLY SIZED
AND PREPARED. MAKE NECESSARY ADJUSTMENTS.
A. IF JOB SITE CUTTING, GRINDING, OR POLISHING IS REQUIRED, USE WATER-
COOLED TOOLS. PROTECT THE JOB SITE AND SURFACES AGAINST DUST AND
WATER. PERFORM WORK AWAY FROM THE INSTALLATION SITE IF POSSIBLE.
B. GYPSUM DRYWALL BACK WALLS THAT ARE NOT FIRE OR ACOUSTICALLY RATED
MAY BE ROUTED UP TO HALF THE THICKNESS OF THE DRYWALL TO ALLOW THE
COUNTERTOP TO FIT.
C. SHIM COUNTERTOP DRAINAGE ADJACENT TO SINKS AND WHERE DRAINAGE IS
REQUIRED, SLIGHTLY TO ENSURE POSITIVE DRAINAGE.
12700 SYSTEMS FURNITURE
SCOPE OF WORK
A. THIS SECTION INCLUDES THE OWNER’S FURNITURE SYSTEMS FOR THE NEW OFFICE
SPACE WHICH ARE TO BE COORDINATED WITH THE CONTRACTOR.
B. MEETINGS TO DISCUSS FURNITURE WILL BE IN THE FUTURE.
C. WORKSTATION SPECIFICATION GUIDE

74 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
1. THIS SPECIFICATION ESTABLISHES THE MINIMUM REQUIREMENTS FOR THE
ACQUISITION AND INSTALLATION OF A COMPLETE AND USABLE SYSTEM OF
WORKSTATIONS COMPOSED OF PANELS, STACKING PANEL FRAMES, SPINE WALLS,
FREESTANDING WORK SURFACES OR BASE UNITS, SUPPORTING COMPONENTS,
ELECTRICAL HARDWARE, COMMUNICATIONS, SPECIAL ELECTRICAL FEATURES, AND
ACCESSORIES.
2. WORKSTATION REQUIREMENTS AND CONFIGURATIONS SHALL BE BY THE
FURNITURE LAYOUT AND TYPICAL WORKSTATION TYPES SHOWN IN DRAWINGS AND
SPECIFIED HEREIN. PROVIDE COMPONENTS AND HARDWARE FROM A SINGLE
MANUFACTURER; THEY SHALL BE STANDARD PRODUCTS AS SHOWN IN THE MOST
RECENT PUBLISHED PRICE LISTS OR AMENDMENTS.
3. ELECTRICAL COMPONENTS SHALL BE PRODUCTS OF A SINGLE MANUFACTURER
TO THE EXTENT PRACTICABLE (DIFFERENT TYPES OF COMPONENTS MAY BE OF
DIFFERENT MANUFACTURERS, BUT ALL UNITS OF A GIVEN COMPONENT SHALL BE
FROM A SINGLE SOURCE). THE COMPLETED INSTALLATION SHALL COMPLY WITH
NFPA 70 AND NFPA 101.
4. COORDINATE THE WORK OF THIS SECTION WITH THAT TO BE PERFORMED
UNDER OTHER SECTIONS. THIS SPECIFICATION MAY INCLUDE ITEMS THAT ARE NOT
MANUFACTURED BY THE FURNITURE MANUFACTURER; PROVIDE ANY SUCH ITEMS
UNDER THIS SECTION
DIVISION 13 – SPECIAL CONSTRUCTION

13280 HAZARDOUS MATERIAL REMEDIATION

GENERAL CONTRACTOR HEALTH & SAFETY HAZARDOUS MATERIALS DISCLOSURE

PART 1 – GENERAL
1.1 DESCRIPTION
A. PURPOSE: THIS SECTION IS PROVIDED TO COMMUNICATE THE FOLLOWING:
1. THE PRESENCE OF REGULATED ENVIRONMENTAL MATERIALS AT THE
SUBJECT PROJECT SITE;
2. THE INTENT OF THE DISTRICT THAT ALL NON-ABATEMENT TRADES (I.E.
DEMOLITION, ELECTRICAL, MECHANICAL, PLUMBING CONTRACTORS, ETC.) MAY
NOT ABATE, REMOVE, DISTURB OR OTHERWISE ACCOMPLISH VARIOUS
CONSTRUCTION TASKS IN, ON OR AROUND ASBESTOS AND/OR LEAD
CONTAINING CONSTRUCTION MATERIALS IN A MANNER WHICH MAY CAUSE
DISTURBANCE OF SUCH MATERIALS.
3. TECHNICAL DETAILS OF THE TYPE, LOCATION AND ESTIMATED
QUANTITIES OF REGULATED ENVIRONMENTAL MATERIALS CAN BE OBTAINED BY
REVIEWING THE FOLLOWING: HAZARDOUS MATERIALS PLANS, SECTIONS 02010,
02080, 02090 AND 02095 OF THIS DOCUMENT.
1.2 EXISTING CONDITIONS
A. OWNER’S KNOWLEDGE - EXISTING CONDITIONS ARE REFLECTED
CORRECTLY TO THE BEST OF OWNER’S KNOWLEDGE. SHOULD MINOR
CONDITIONS BE ENCOUNTERED WHICH ARE NOT EXACTLY AS INDICATED,
MODIFICATION TO NEW WORK SHALL BE MADE AS REQUIRED AT NO ADDITIONAL
EXPENSE TO OWNER.
B. SUMMARY OF REGULATED MATERIALS - RESULTS OF TESTS OF
HAZARDOUS MATERIALS ARE AVAILABLE UPON REQUEST. CONTRACTOR IS
CAUTIONED THAT, SHOULD INTERPRETATIONS TO BE MADE, OPINIONS BE
FORMED, AND CONCLUSIONS BE DRAWN AS A RESULT OF EXAMINING THE TEST
RESULTS, THOSE INTERPRETATIONS, OPINIONS, AND CONCLUSIONS WILL BE
THOSE MADE, FORMED AND DRAWN SOLELY BY CONTRACTOR.
C. REPRESENTATIONS - OWNER MAKES NO REPRESENTATION,
WARRANTY, OR GUARANTY THAT THE CONDITIONS INDICATED BY THE TEST
REPORTS EITHER ARE REPRESENTATIVE OF THOSE CONDITIONS EXISTING
THROUGHOUT THE AREA, OR THAT UNFORESEEN DEVELOPMENTS MAY NOT

75 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
OCCUR, OR THAT MATERIALS OTHER THAN, OR IN PROPORTIONS DIFFERENT
FROM THOSE INDICATED MAY NOT EXIST.
PART 2 –
PRODUCTS NOT
USED.
PART 3 –
EXECUTION
NOT USED.
HAZARDOUS MATERIAL SUMMARY OF WORK

PART 1 - GENERAL
1.1 SCOPE OF WORK
A. PROJECT BACKGROUND:
THE WORK UNDER THIS SPECIFICATION WILL INVOLVE THE
DISTURBANCE AND/OR REMOVAL, HANDLING, TRANSPORTATION OR
DISPOSAL OF LEAD-BASED PAINT (LBP), LEAD-CONTAINING
CONSTRUCTION MATERIALS; IT MAY INVOLVE THE DISTURBANCE AND/OR
REMOVAL, HANDLING, TRANSPORTATION OR DISPOSAL OF ASBESTOS
CONTAINING MATERIALS (ACM), AND PCB LIGHTING BALLASTS AND
RELATED REGULATED COMPONENTS (INCLUDING BUT NOT LIMITED TO
RADIOACTIVE CONTAINING EMERGENCY EXIT SIGNS, MERCURY-
CONTAINING THERMOSTATS) .
THIS SPECIFICATION IS MEANT TO BE PERFORMANCE BASED BUT
PROVIDES GUIDELINES FOR THE CONTRACTOR. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR REVIEWING ALL SPECIFICATIONS,
DRAWINGS, ADDENDA, HAZARDOUS MATERIALS REPORTS (INCLUDED AS
AN ATTACHMENT TO THIS DOCUMENT) OR OTHER INFORMATION TO
DETERMINE THE IMPACT OF CONSTRUCTION ACTIVITIES ON DESIGNATED
OR SUSPECT HAZARDOUS CONTAINING BUILDING MATERIALS. SUCH
HAZARDS SHALL INCLUDE, BUT MAY NOT BE LIMITED TO ASBESTOS
CONTAINING MATERIALS (ACM), LEAD- BASED PAINT (LBP), PCB LIGHTING
BALLASTS OR OTHER NON SPECIFIED MATERIALS.
THE CONTRACTOR SHALL REFER TO THIS SECTION 02010, THE
PRE-DEMOLITION SURVEY REPORT, HAZARDOUS MATERIAL PLANS AND
THE PROJECT MANUAL FOR DETAILS ON MATERIALS, QUANTITIES,
LOCATIONS AND WORK REQUIREMENTS. SHOULD ANY CONFLICTS EXIST,
THE CONTRACTOR SHALL BASE ITS BID ON THE HIGHER VALUE SCOPE
(I.E. INCREASED QUANTITY/SCOPE OF WORK).
SHOULD THE CONTRACTOR SUSPECT, ENCOUNTER OR HAVE
KNOWLEDGE OF ANY HAZARDS NOT LISTED OR DESCRIBED IN THE
CONTRACT DOCUMENTS, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR INFORMING THE OWNER VIA THE CONSTRUCTION MANAGER AND
THE ENVIRONMENTAL CONSULTANT FOR THE OWNER (OWNER’S
REPRESENTATIVE), IMMEDIATELY AND PRIOR TO DISTURBING OR
CAUSING ANY ACTION WHICH COULD RESULT IN A RELEASE OF ANY
SUSPECTED OR CONFIRMED HAZARDOUS MATERIAL.
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
DETERMINING QUANTITIES THAT ARE ACTUALLY IMPACTED OR MAY BE
IMPACTED DURING THE RENOVATION OR DEMOLITION ACTIVITIES
DESCRIBED IN THE CONTRACT DOCUMENTS. IT IS THE RESPONSIBILITY
OF THE CONTRACTOR TO BE KNOWLEDGEABLE OF ALL FEDERAL, STATE
OR LOCAL REGULATIONS AND REQUIREMENTS AND COMPLY WITH THE
MOST STRINGENT PORTIONS OF THOSE REGULATIONS AND
REQUIREMENTS.
B. WORK INCLUDED -
ABATEMENT SUB-CONTRACTOR (CONTRACTOR) SHALL FURNISH
ALL LABOR, MATERIALS, SERVICES, PERMITS, INSURANCE (SPECIFICALLY
COVERING THE HANDLING AND TRANSPORTATION OF ASBESTOS-
CONTAINING MATERIAL, ASBESTOS-CONTAINING CONSTRUCTION

76 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
MATERIAL, ASBESTOS-CONTAINING WASTE MATERIAL, LEAD-BASED
PAINT, LEAD CONTAINING WASTE MATERIALS, PCB CONTAINING
FLUORESCENT LIGHT BALLASTS, AND FLUORESCENT LIGHT TUBES), AND
EQUIPMENT WHICH IS SPECIFIED, SHOWN, OR REASONABLY IMPLIED FOR
THE FOLLOWING ACTIVITIES :
1. THE REMOVAL AND DISPOSAL, OF, THE FOLLOWING ASBESTOS-
CONTAINING MATERIAL(S), INCLUDING ANY EXISTING DEBRIS:
A. ROOF PENETRATION MASTIC: LOCATED AT/ON
ROOFING COMPONENTS THROUGHOUT ROBIN’S NEST BUILDINGS,
ADMINISTRATION, MULTI-PURPOSE BUILDING, CLASSROOM
BUILDINGS 1 & 2, MARIN DAY SCHOOL AND ALL ASSOCIATED
PORTICO ROOFING SYSTEMS. ESTIMATED QUANTITY: 500 SQUARE
FEET.
B. 9” FLOOR TILE AND ASSOCIATED MASTIC: LOCATED IN
THE HALLWAY CLOSETS AT CLASSROOM BUILDINGS 1 & 2.
ESTIMATED QUANTITY: 500 SQUARE FEET.
C. FLOOR TILE MASTIC REMNANTS: THIS MATERIAL HAS
BEEN OBSERVED INTERMITTENTLY. THE OBSERVED MASTIC IS
LIKELY REMNANTS FROM PAST FLOORING
REPLACEMENT/ABATEMENT PROJECTS. FOR PLANNING AND
BUDGETING PURPOSES, THE ESTIMATED QUANTITY IS 4,500
SQUARE FEET. THE BASE BID SHALL PROVIDE FOR THIS
QUANTITY; AN ADD/DEDUCT UNIT PRICE WILL BE REQUIRED TO
ACCOUNT FOR SUBSTANTIAL (>20%) VARIATIONS IN MATERIAL
QUANTITIES.
DIVISION 14 – CONVEYING SYSTEMS
14800 SCAFFOLDING
GENERAL PROVISIONS.

2.1 GENERAL REQUIREMENTS


2.1.1 EVERY SCAFFOLD SHALL BE OF GOOD CONSTRUCTION OF SOUND
MATERIALS AND STRENGTH FOR THE PURPOSE FOR WHICH IT IS
INTENDED;
2.1.2 TIMBER USED FOR SCAFFOLDS SHALL BE IN GOOD CONDITION, THE
BARK COMPLETELY STRIPPED OFF, AND NOT PAINTED OR TREATED
IN ANY MANNER THAT DEFECTS CANNOT BE EASILY SEEN; AND
2.1.3 ALL MATERIALS AND PARTS OF SCAFFOLD NOT IN USE OR INTENDED
FOR RE USE SHALL BE KEPT UNDER GOOD CONDITION AND
SEPARATE FROM OTHER MATERIALS UNSUITABLE FOR SCAFFOLDS.
2.2 SPECIFIC REQUIREMENTS
2.2.1 TIMBER/BAMBOO SCAFFOLDS SHALL BE LIMITED TO A HEIGHT OF 6
METERS FROM THE GROUND OR BASE. FOR OVER 6 METERS HEIGHT,
STEEL SCAFFOLDS SHALL BE USED.
2.2.2 STRUCTURAL STEEL WHEN USED AS LOAD BEARING MEMBERS OF
SCAFFOLDING SHALL BE DESTRESSED AT WELDED OR BENT JOINTS
AND DESIGN CONSTRUCTION APPROVED BY THE APPROPRIATE
AUTHORITY.
2.2.3 ALL MANUFACTURED SCAFFOLDS AND ITS ACCESSORIES SHALL
FOLLOW THE MANUFACTURERS' DESIGNS AND SPECIFICATION.
TECHNICAL PROPERTIES AND DATA OF SUCH MANUFACTURED
SCAFFOLDS SHALL BE CERTIFIED TRUE BY A QUALIFIED TESTING
LABORATORY. FOR MANUFACTURED SCAFFOLDS MORE THAN 6
METERS IN HEIGHT SHALL BE DESIGNED BY STRUCTURAL ENGINEER
AND APPROVED BY APPROPRIATE AUTHORITY.
2.2.4 ALL SITE FABRICATED/CONVENTIONAL SUPPORTED SCAFFOLDS
EXCEEDING 6 METERS IN HEIGHT OR A WORKING LOAD OF 150 KG/M 2
SHALL BE DESIGNED AND INSPECTED BY THE STRUCTURAL
ENGINEER AND APPROVED BY THE APPROPRIATE AUTHORITY.

77 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
2.1.1
ALL SUSPENDED SCAFFOLDS SHALL BE DESIGNED AND INSPECTED
BY A STRUCTURAL ENGINEER IF SITE FABRICATED.
2.1.2 NO SCAFFOLD SHALL BE ERECTED, MOVED, DISMANTLED OR
ALTERED EXCEPT UNDER THE SUPERVISION OF A COMPETENT
PERSON.
2.1.3 A FALL PROTECTION EQUIPMENT SHALL BE USED WHEN WORKING IN
A HEIGHT OF 2 METERS AND ABOVE. FOR WORK HEIGHT OF 10
METERS, WORKERS ARE REQUIRED TO USE FALL ARREST
EQUIPMENT.
2.1.4 ALL PERSONNEL INVOLVED IN SCAFFOLDING ACTIVITIES SHALL HAVE
APPROPRIATE TRAINING AND CERTIFICATION. MANUFACTURERS'
TRAINING CERTIFICATION SHALL BE LIMITED TO THE ERECTION OF
MANUFACTURERS' EQUIPMENT ONLY.
2.1.5 EACH PLATFORM ON ALL WORKING LEVELS OF SCAFFOLDS SHALL BE
FULLY PLANKED OR DECKED BETWEEN THE FRONT UPRIGHTS AND
THE GUARDRAIL SUPPORTS AS FOLLOW.
2.1.6 EACH PLATFORM UNIT (E.G., SCAFFOLD PLANK, FABRICATED PLANK,
FABRICATED DECK, OR FABRICATED PLATFORM) SHALL BE
INSTALLED SO THAT THE SPACE BETWEEN ADJACENT UNITS AND
THE SPACE BETWEEN THE PLATFORM AND THE UPRIGHTS IS NO
MORE THAN 1 INCH (2.5 CM) WIDE.
2.1.7 EACH SCAFFOLD PLATFORM AND WALKWAY SHALL BE AT LEAST 18
INCHES (46 CM) WIDE.
2.1.8 EACH END OF A PLATFORM, UNLESS CLEATED OR OTHERWISE
RESTRAINED BY HOOKS OR EQUIVALENT MEANS, SHALL EXTEND
OVER THE CENTERLINE OF ITS SUPPORT AT LEAST 6 INCHES (15 CM).
2.1.9 EACH END OF A PLATFORM 10 FEET OR LESS IN LENGTH SHALL NOT
EXTEND OVER ITS SUPPORT MORE THAN 12 INCHES (30 CM) UNLESS
THE PLATFORM IS DESIGNED AND INSTALLED SO THAT THE
CANTILEVERED PORTION OF THE PLATFORM IS ABLE TO SUPPORT
EMPLOYEES AND/OR MATERIALS WITHOUT TIPPING, OR HAS
GUARDRAILS WHICH BLOCK EMPLOYEE ACCESS TO THE
CANTILEVERED END.
2.1.10 EACH PLATFORM GREATER THAN 10 FEET IN LENGTH SHALL NOT
EXTEND OVER ITS SUPPORT MORE THAN 18 INCHES (46 CM), UNLESS
IT IS DESIGNED AND INSTALLED SO THAT THE CANTILEVERED
PORTION OF THE PLATFORM IS ABLE TO SUPPORT EMPLOYEES
WITHOUT TIPPING, OR HAS GUARDRAILS WHICH BLOCK EMPLOYEE
ACCESS TO THE CANTILEVERED END.
2.1.11 ON SCAFFOLDS WHERE SCAFFOLD PLANKS ARE ABUTTED TO
CREATE A LONG PLATFORM, EACH ABUTTED END SHALL REST ON A
SEPARATE SUPPORT SURFACE. THIS PROVISION DOES NOT
PRECLUDE THE USE OF COMMON SUPPORT MEMBERS, SUCH AS 'T'
SECTIONS, TO SUPPORT ABUTTING PLANKS, OR HOOK ON
PLATFORMS DESIGNED TO REST ON COMMON SUPPORTS.
2.1.12 ON SCAFFOLDS WHERE PLATFORMS ARE OVERLAPPED TO CREATE A
LONG PLATFORM, THE OVERLAP SHALL OCCUR ONLY OVER
SUPPORTS, AND SHALL NOT BE LESS THAN 12 INCHES (30 CM)
UNLESS THE PLATFORMS ARE NAILED TOGETHER OR OTHERWISE
RESTRAINED TO PREVENT MOVEMENT.
2.1.13 AT ALL POINTS OF A SCAFFOLD WHERE THE PLATFORM CHANGES
DIRECTION, SUCH AS TURNING A CORNER, ANY PLATFORM THAT
RESTS ON A BEARER AT AN ANGLE OTHER THAN A RIGHT ANGLE
SHALL BE LAID FIRST, AND PLATFORMS WHICH REST AT RIGHT
ANGLES OVER THE SAME BEARER SHALL BE LAID SECOND, ON TOP
OF THE FIRST PLATFORM.
1414.03: DESIGN AND STABILITY.

3.1 DESIGN
3.1.1 A DESIGN INSTRUCTION, INCLUDING ALL DATA RELEVANT TO THE

78 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
DESIGN OF THE SCAFFOLD, SHALL BE PREPARED BY THE END USER
TO SERVE AS THE STARTING POINT FOR SUBSEQUENT WORK
DECISIONS, DESIGN WORK, CALCULATIONS, AND DRAWINGS;
3.1.2 THE DESIGN SHALL BE IN ACCORDANCE WITH RECOGNIZED
ENGINEERING PRINCIPLES TAKING INTO CONSIDERATION THE
VARIABILITY OF MATERIALS, WORKMANSHIP, METHODS OF
CONSTRUCTION, SITE CONDITIONS, CONSTRUCTION TOLERANCES
AND THE SPACE FOR SCAFFOLDS;
3.1.3 SCAFFOLDS SHALL BE DESIGNED WITH REGARD TO EASE AND
SAFETY OF ERECTION AND DISMANTLING;
3.1.4 SUPPORTED SCAFFOLDS AND THEIR COMPONENTS SHALL BE
CAPABLE OF SUPPORTING WITHOUT FAILURE AT LEAST FOUR (4)
TIMES THE MAXIMUM INTENDED LOAD, WHILE SUSPENDED
SCAFFOLDS SHALL HAVE SIX (6) TIMES FACTOR OF SAFETY; AND
3.1.5 ALL SCAFFOLDS DESIGNED BY A STRUCTURAL ENGINEER SHALL BE
APPROVED BY APPROPRIATE AUTHORITY.
3.2 STRENGTH AND STABILITY OF SCAFFOLDS
3.2.1 ALL SCAFFOLDS SHALL HAVE VERTICAL MEMBERS (POSTS)
DIAGONALLY AND HORIZONTALLY BRACED TO PREVENT LATERAL
MOVEMENT;
3.2.2 ALL SCAFFOLDS SHALL HAVE NO SPLICES BETWEEN THE POINTS OF
SUPPORT OF LOAD CARRYING HORIZONTAL MEMBERS AND
SECURED TO PREVENT LATERAL MOVEMENT;

3.2.3 THE FOOTING, SILLS OR ANCHORAGE FOR SCAFFOLDS SHALL BE


SOUND, RIGID, AND CAPABLE OF CARRYING TWICE THE MAXIMUM
INTENDED LOAD WITHOUT SETTLING OR DISPLACEMENT. UNSTABLE
OBJECTS SUCH AS BARRELS, BOXES, LOOSE BRICK, OR CONCRETE
BLOCKS SHALL NOT BE USED TO SUPPORT SCAFFOLDS;
3.2.4 SCAFFOLD POSTS SHALL BEAR ON A FOUNDATION OF SUFFICIENT
SIZE AND STRENGTH TO SPREAD THE LOAD FROM THE POSTS OVER
A SUFFICIENT AREA TO PREVENT SETTLEMENT. ALL POSTS SHALL
BE SET PLUMB;
3.2.5 ANY DAMAGED OR WEAKENED SCAFFOLD MEMBERS FROM ANY
CAUSE SHALL BE IMMEDIATELY REPAIRED, REPLACED OR
DISCARDED;
3.2.6 SCAFFOLDS SHALL NOT BE LOADED IN EXCESS OF THE WORKING
LOAD FOR WHICH THEY ARE INTENDED;
3.2.7 SCAFFOLDS SHALL BE ANCHORED OR SECURED TO PERMANENT OR
RIGID STRUCTURES. IN THE ABSENCE OF PERMANENT
STRUCTURES, GUYS AND SWAY BRACING AND/OR OUTRIGGER
SHALL BE USED;
3.2.8 SCAFFOLD COMPONENTS PRODUCED BY DIFFERENT
MANUFACTURERS SHALL NOT BE INTERMIXED UNLESS THE
COMPONENTS FIT TOGETHER WITHOUT FORCE AND THE
SCAFFOLD'S STRUCTURAL INTEGRITY IS MAINTAINED BY THE USER.
IT SHALL LIKEWISE NOT BE MODIFIED IN ORDER TO INTERMIX THEM
UNLESS DESIGNED BY THE STRUCTURAL ENGINEER; AND
3.2.9 FRONT-END LOADERS AND SIMILAR TYPES OF EQUIPMENT SHALL
NOT BE USED TO SUPPORT SCAFFOLD PLATFORMS UNLESS THEY
HAVE BEEN SPECIFICALLY DESIGNED BY THE MANUFACTURER FOR
SUCH USE. FORK LIFTS SHALL NOT BE USED TO SUPPORT
SCAFFOLD PLATFORMS.

1414.04: INSPECTION OF SCAFFOLD COMPONENTS BEFORE ERECTION.

4.1 ALL SCAFFOLD MATERIAL DELIVERED ON SITE SHALL BE VISUALLY


INSPECTED EITHER UPON DELIVERY OR BEFORE IT IS ERECTED/INSTALLED.
ANY DEFECTIVE MATERIAL SHALL BE REPAIRED, REPLACED OR DISCARDED.
4.2 LUMBER WITH TWO (2) NAIL HOLES ALIGNED CROSSWISE OR FOUR (4) NAIL

79 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
HOLES ALONG ITS LENGTH SHALL NOT BE USED AS HORIZONTAL LOAD
BEARING MEMBER OF SCAFFOLDS.

1414.05: SITE INSPECTION AND PREPARATION.


5.1 SITE INSPECTION SHALL BE CARRIED OUT BEFORE ACTUAL ERECTION TO
CHECK GROUND CONDITIONS, OVERHEAD WIRES, OBSTRUCTIONS, CHANGES
IN SURFACE ELEVATION, AND STRUCTURAL SUPPORT.
5.2 SITE PREPARATION SHALL BE PERFORMED TO ENSURE THAT THE SOIL ARE
LEVEL AND FIRM, MUD AND SOFT SOIL ARE REPLACED WITH COMPACTED
GRAVEL OR CRUSHED STONE, AND ON SLOPING GROUNDS, THE AREA WHERE
MUDSILLS REST SHALL BE LEVELED BY EXCAVATING RATHER THAN
BACKFILLING.
1414.06: SCAFFOLD ERECTION.

1. NO SCAFFOLD WORK SHALL BE


UNDERTAKEN WITHOUT THE DIRECT SUPERVISION
OF A COMPETENT/QUALIFIED PERSON AS THE CASE MAY BE.
2. ALL POSTS SHALL BE MAINTAINED PLUMB REGARDLESS OF
CONNECTION.
3. ALL POSTS SPACING AND MATERIALS SHALL CONFORM TO THE
DESIGNER'S SPECIFICATION.
4. ALL RUNNERS SHALL BE PERPENDICULAR TO THE POSTS IN ALL
SITUATIONS. SPACING OF THE RUNNERS SHALL CONFORM TO THE
DESIGNED SCAFFOLD.
5. DIAGONAL BRACE SHALL EXTEND FROM ONE CONNECTION TO
ANOTHER. IT SHALL BE CONNECTED TO THE POST WITHIN 150
MILLIMETERS FROM THE POINT OF CONNECTION.
6. DIAGONAL BRACES SHALL NOT EXCEED AN ANGLE OF 60 DEGREES
FROM HORIZONTAL
7. DIAGONAL BRACES SHALL BE INSTALLED IMMEDIATELY AS THE
SCAFFOLD RISES TO MAINTAIN PLUMBNESS OF THE SYSTEM.
8. ALL POSTS SHALL BE JOINED OR CONNECTED BY MEANS OF JOINT PIN,
SPIGOT OR ANY APPROPRIATE MEANS OF CONNECTIONS. NO LAP
CONNECTION SHALL BE ALLOWED.
9. ALWAYS MAINTAIN THE BASE WIDTH TO HEIGHT RATIO OF 1:4 DURING
ERECTION FOR STABILITY. IF THE HEIGHT EXCEEDS WHAT IS ALLOWED,
REFER TO SECTION 3.2.7.
10. NO SCAFFOLD ACTIVITY SHALL BE UNDERTAKEN IF THE WIND VELOCITY
EXCEEDS 48 KPH. FOR ERECTED SCAFFOLD, ADDITIONAL PRECAUTION
SHALL BE CONSIDERED DURING TYPHOON.
11. NO OTHER WORK SHALL BE ALLOWED TO COMMENCE BELOW THE
SCAFFOLD DURING ERECTION PHASE.
12. WORKING PLATFORM SHALL BE PROVIDED PER LEVEL DURING
ERECTION. THIS WORKING PLATFORM SHALL NOT BE REMOVED UNLESS
THE SUCCEEDING LEVEL IS INSTALLED.
13. SCAFFOLDS OF MORE THAN 6 METERS IN HEIGHT SHALL BE DESIGNED
BY A STRUCTURAL ENGINEER AND SHALL BE ERECTED, INSTALLED AND
DISMANTLED BY TESDA CERTIFIED ERECTORS.
14. SCAFFOLD SHALL BE ERECTED, ADDED, ALTERED OR DISMANTLED
ONLY UNDER THE SUPERVISION OF THE COMPETENT/QUALIFIED
PERSON IN THE CONSTRUCTION.
6.1 TOOLS, EQUIPMENT AND MATERIALS
TOOLS, EQUIPMENT AND MATERIALS FOR ERECTION, INSTALLATION AND
DISMANTLING SHALL BE APPROPRIATE FOR ITS USAGE ON THE TYPE OF
SCAFFOLD, PROPERLY INSPECTED AND SAFE FOR USE.

80 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
6.2 MATERIAL AND PERSONNEL ACCESS
6.2.1 SCAFFOLD WITH ONE SECTION HEIGHT SHALL BE PROVIDED WITH
SAFE ACCESS.
6.2.2 SUPPORTING MEMBERS USED IN THE CONSTRUCTION OF RUNWAYS,
RAMPS, STAIRS AND LADDERS SHALL BE SECURELY FASTENED AND
BRACED.
6.2.3 WHEN HOOKED-ON LADDER IS USED, A REST PLATFORM WITH A
MINIMUM WIDTH OF 60CM (2 FT) SHALL BE PROVIDED EVERY 4M IN
HEIGHT.
6.2.4 LADDERS USED FOR ACCESS SHALL PROTRUDE AT LEAST 1M ABOVE
THE LANDING PLACE.
6.2.5 WHEN MAJOR COMPONENTS ARE REMOVED FOR THE PURPOSES OF
ACCESS IT SHALL BE DESIGNED.
6.3 SUPPORTED SCAFFOLD
6.3.1 FRAME SCAFFOLDS:
a) WHEN MOVING PLATFORMS TO THE NEXT LEVEL, THE
EXISTING PLATFORM SHALL BE LEFT UNDISTURBED UNTIL THE
NEW END FRAMES HAVE BEEN SET IN PLACE AND BRACED
PRIOR TO RECEIVING THE NEW PLATFORMS.
b) FRAMES SHALL BE BRACED BY A CROSS, HORIZONTAL, OR
DIAGONAL BRACES, OR COMBINATION THEREOF, WHICH
SECURE VERTICAL MEMBERS TOGETHER LATERALLY. THE
CROSS BRACES SHALL BE OF SUCH LENGTH AS WILL
AUTOMATICALLY SQUARE AND ALIGN VERTICAL MEMBERS SO
THAT THE ERECTED SCAFFOLD IS ALWAYS PLUMB, LEVEL,
AND SQUARE. ALL BRACE CONNECTIONS SHALL BE SECURED.
c) FRAMES SHALL BE JOINED TOGETHER VERTICALLY BY
COUPLING OR STACKING PINS.
d) WHERE UPLIFT CAN OCCUR WHICH WOULD DISPLACE
SCAFFOLD END FRAMES, THE FRAMES SHALL BE LOCKED
TOGETHER VERTICALLY BY PINS OR EQUIVALENT MEANS.
e) BRACKETS USED TO SUPPORT CANTILEVERED LOADS SHALL:
i. BE SEATED WITH SIDE-BRACKETS PARALLEL TO THE
FRAMES AND END-BRACKETS AT 90 DEGREES TO THE
FRAMES;
ii. NOT BE BENT OR TWISTED FROM THESE POSITIONS; AND
iii. BE USED ONLY TO SUPPORT PERSONNEL, UNLESS THE
SCAFFOLD HAS BEEN DESIGNED FOR OTHER LOADS BY
A QUALIFIED ENGINEER AND BUILT TO WITHSTAND THE
TIPPING FORCES CAUSED BY THOSE OTHER LOADS
BEING PLACED ON THE BRACKET-SUPPORTED SECTION
OF THE SCAFFOLD.
1414.07: SCAFFOLD INSPECTION AND TAGGING.
ALL SCAFFOLDINGS SHALL BE INSPECTED PRIOR TO USE. INSPECTION AND
TAGGING SHALL BE PERFORMED BY A QUALIFIED OR COMPETENT PERSON
AS THE CASE MAY BE. ALL MANUFACTURED SCAFFOLDS SHALL FOLLOW THE
MANUFACTURERS' RECOMMENDATIONS.
1. DIRECT CONNECTIONS SHALL BE EVALUATED BY A QUALIFIED OR
COMPETENT PERSON WHO SHALL CONFIRM, BASED ON THE
EVALUATION, THAT THE SUPPORTING SURFACES ARE CAPABLE OF
RESISTING THE LOADS TO BE IMPOSED.
2. INSPECTIONS SHOULD BE CARRIED OUT DAILY AND EVERY SHIFT. ALL
SITE FABRICATED/CONVENTIONAL SUPPORTED SCAFFOLDS EXCEEDING
6 METERS IN HEIGHT OR A WORKING LOAD OF 150 KG/M2 SHALL BE
EVALUATED, TESTED AND APPROVED BY A QUALIFIED PERSON.
3. ALL SCAFFOLD IDENTIFICATION TAGS SHALL BE OF A SOLID GREEN,
YELLOW, OR RED COLOR WITH BLACK LETTERING. ALL SCAFFOLD TAGS

81 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
SHALL BE HANGED IN EVERY SCAFFOLD ACCESS POINTS.
• GREEN TAGS SHALL BE HANGED AT EACH SCAFFOLDS
ACCESS THAT HAVE BEEN INSPECTED AND ARE SAFE FOR
USE.
• YELLOW TAGS SHALL BE PLACED WHENEVER SPECIAL
REQUIREMENTS FOR SAFE USE ARE REQUIRED. SITUATION
REQUIRING YELLOW TAGS MAY INCLUDE WHENEVER
SCAFFOLD HAS BEEN MODIFIED TO MEET WORK
REQUIREMENTS, AND AS A RESULT COULD PRESENT A
HAZARD TO THE USER. SITUATION REQUIRING YELLOW
TAGS SHALL BE CLOSELY SUPERVISED.

RED "DANGER - UNSAFE FOR USE" TAGS SHALL BE USED
DURING ERECTION AND DISMANTLING WHEN THE SCAFFOLD
IS LEFT UNATTENDED. RED TAG SHALL BE USED WHEN ALL
GREEN OR YELLOW TAGS HAS BEEN REMOVED.
4. ALL THE RECORDS OF THE INSPECTIONS SHALL BE AVAILABLE ON SITE
AND MADE AVAILABLE TO PROPER AUTHORITY UPON REQUEST.
1414.08: MAINTENANCE DURING USE.

1.
ALL SCAFFOLDS SHALL BE PROPERLY MAINTAINED AND EVERY PART
SHALL BE KEPT, FIXED AND SECURED IN POSITION TO PREVENT
DISPLACEMENT.
2. NO PARTLY DISMANTLED SCAFFOLD SHALL BE USED UNLESS IT IS
RENDERED STABLE, STRONG AND SAFE FOR THE PURPOSE.
3. SCAFFOLDINGS LEFT STANDING FOR FOUR (4) MONTHS SHALL NOT BE
USED UNTIL DAMAGED MEMBERS ARE REPLACED AND THE WHOLE
STRUCTURE RETURNED TO ITS ORIGINAL STRENGTH.
1414.09: SCAFFOLD DISMANTLING.
1. DURING DISMANTLING, NO COMPONENT, WHICH ENDANGERS THE
STABILITY OF THE REMAINING STRUCTURE, SHOULD BE REMOVED.
2. IF DISMANTLING HAS REACHED THE STAGE AT WHICH A CRITICAL
MEMBER HAS TO BE REMOVED, (E.G. A TIE OR A BRACE) THE STABILITY
OF THE STRUCTURE SHOULD BE ASSURED BY FIXING A SIMILAR OR
OTHERWISE ADEQUATE MEMBER IN PLACE BEFORE THE MEMBER TO BE
TAKEN OUT IS REMOVED.
3. IF CHANGES ARE MADE IN THE SCAFFOLD STRUCTURE DURING ITS
WORKING LIFE, IT IS NOT SAFE TO ASSUME THAT DISMANTLING CAN BE
CARRIED OUT IN THE REVERSE ORDER TO THE ERECTION, HENCE, TIES
AND BRACES SHALL BE INSPECTED PRIOR TO DISMANTLING.
4. MATERIALS SHOULD BE LOWERED TO THE GROUND AND NOT STORED
ON THE SCAFFOLD. COMPONENTS SHOULD NOT BE THROWN ON THE
GROUND; THEY SHOULD BE LOWERED HAND-TO-HAND IN AN ORDERLY
MANNER OR BROUGHT DOWN BY CRANE, PULLEY OR OTHER SUITABLE
MEANS.
9.1 PROGRESSIVE DISMANTLING:
1. SCAFFOLDS, WHICH ARE TO BE PROGRESSIVELY DISMANTLED DURING
THE DEMOLITION OF A BUILDING, SHOULD NOT BE LEFT PROJECTING
ABOVE THE RESIDUAL HEIGHT OF THE WALLS MORE THAN IS
NECESSARY. STABILIZING TIES SHOULD BE MAINTAINED, ESPECIALLY
WITH SHEETED SCAFFOLDS.
2.
SCAFFOLDS, WHICH ARE TO REMAIN IN USE WHILE PARTLY DISMANTLED,
SHOULD BE FITTED WITH END GUARDRAILS AND TOE BOARDS AT THE
END OF THE PORTION IN USE.
3. IF ACCESS IS POSSIBLE ON TO A PARTLY DISMANTLED SCAFFOLD,
WARNING NOTICES SHOULD BE FIXED.
1414.10: MAINTENANCE AND STORAGE.

82 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
ALL SCAFFOLDS SHALL BE PROPERLY MAINTAINED AND SHALL BE KEPT,
CLEAN, AND FREE OF DAMAGE. SCAFFOLDS ACCESSORIES REQUIRING
LUBRICATION SHALL BE OILED PRIOR TO STORAGE IN A COVERED OR
CLOSED CONTAINER, OR AS PER MANUFACTURER'S RECOMMENDATION.
1414.11: LOADING/ UNLOADING AND TRANSPORT.
ALL LOADING AND UNLOADING OPERATIONS, INCLUDING TRANSPORT OF
SCAFFOLDS, SHALL BE PROPERLY PLANNED BY A COMPETENT PERSON,
APPROPRIATELY SUPERVISED AND CARRIED OUT IN A SAFE MANNER.
11.1 PLANNING
DURING LOADING/UNLOADING AND TRANSPORT OF SCAFFOLDS, THE
FOLLOWING SHALL BE CONSIDERED:
1. INFORMATION ON SCAFFOLDS TO BE HANDLED AS PROVIDED BY
MANUFACTURERS, E.G. WEIGHT, SHAPE AND CENTRE OF GRAVITY OF
MATERIAL COMPONENTS/BUNDLES OF MATERIAL;
2. SELECTION OF MOST APPROPRIATE VEHICLE AND CERTIFIED DRIVER
AS APPLICABLE;
3. LOADING/UNLOADING OPERATION
i. LOCATION
ii. METHODOLOGY
iii. PROVISION OF SPACER DURING LOADING OF SCAFFOLDS
iv. SAFE LOADING AND UNLOADING SEQUENCE
4. PROVISION OF SAFE ACCESS TO THE VEHICLE
5. ANY MANUAL HANDLING, INCLUDING REQUIRED PPE
6. HAZARDS FOR THE STOCK YARD WORKERS, SLINGERS/RIGGERS AND
DRIVER
7. ALL LOOSE PARTS SHALL BE STRAPPED OR SECURED PRIOR TO
TRANSPORT. SMALL PARTS SHALL BE PLACED ON A BOX OR BAG
INDICATING THE TOTAL WEIGHT BEFORE LOADING.
11.2 DURING TRANSPORT THE FOLLOWING SHALL BE CONSIDERED:

RED "DANGER - UNSAFE FOR USE" TAGS SHALL BE USED
DURING ERECTION AND DISMANTLING WHEN THE SCAFFOLD
IS LEFT UNATTENDED. RED TAG SHALL BE USED WHEN ALL
GREEN OR YELLOW TAGS HAS BEEN REMOVED.
5. ALL THE RECORDS OF THE INSPECTIONS SHALL BE AVAILABLE ON SITE
AND MADE AVAILABLE TO PROPER AUTHORITY UPON REQUEST.
1414.08: MAINTENANCE DURING USE.

4.
ALL SCAFFOLDS SHALL BE PROPERLY MAINTAINED AND EVERY PART
SHALL BE KEPT, FIXED AND SECURED IN POSITION TO PREVENT
DISPLACEMENT.
5. NO PARTLY DISMANTLED SCAFFOLD SHALL BE USED UNLESS IT IS
RENDERED STABLE, STRONG AND SAFE FOR THE PURPOSE.
6. SCAFFOLDINGS LEFT STANDING FOR FOUR (4) MONTHS SHALL NOT BE
USED UNTIL DAMAGED MEMBERS ARE REPLACED AND THE WHOLE
STRUCTURE RETURNED TO ITS ORIGINAL STRENGTH.
1414.09: SCAFFOLD DISMANTLING.
5. DURING DISMANTLING, NO COMPONENT, WHICH ENDANGERS THE
STABILITY OF THE REMAINING STRUCTURE, SHOULD BE REMOVED.
6. IF DISMANTLING HAS REACHED THE STAGE AT WHICH A CRITICAL
MEMBER HAS TO BE REMOVED, (E.G. A TIE OR A BRACE) THE STABILITY
OF THE STRUCTURE SHOULD BE ASSURED BY FIXING A SIMILAR OR
OTHERWISE ADEQUATE MEMBER IN PLACE BEFORE THE MEMBER TO BE
TAKEN OUT IS REMOVED.
7. IF CHANGES ARE MADE IN THE SCAFFOLD STRUCTURE DURING ITS
WORKING LIFE, IT IS NOT SAFE TO ASSUME THAT DISMANTLING CAN BE
CARRIED OUT IN THE REVERSE ORDER TO THE ERECTION, HENCE, TIES

83 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
AND BRACES SHALL BE INSPECTED PRIOR TO DISMANTLING.
8. MATERIALS SHOULD BE LOWERED TO THE GROUND AND NOT STORED
ON THE SCAFFOLD. COMPONENTS SHOULD NOT BE THROWN ON THE
GROUND; THEY SHOULD BE LOWERED HAND-TO-HAND IN AN ORDERLY
MANNER OR BROUGHT DOWN BY CRANE, PULLEY OR OTHER SUITABLE
MEANS.
9.2 PROGRESSIVE DISMANTLING:
1. SCAFFOLDS, WHICH ARE TO BE PROGRESSIVELY DISMANTLED DURING
THE DEMOLITION OF A BUILDING, SHOULD NOT BE LEFT PROJECTING
ABOVE THE RESIDUAL HEIGHT OF THE WALLS MORE THAN IS
NECESSARY. STABILIZING TIES SHOULD BE MAINTAINED, ESPECIALLY
WITH SHEETED SCAFFOLDS.
2.
SCAFFOLDS, WHICH ARE TO REMAIN IN USE WHILE PARTLY DISMANTLED,
SHOULD BE FITTED WITH END GUARDRAILS AND TOE BOARDS AT THE
END OF THE PORTION IN USE.
3. IF ACCESS IS POSSIBLE ON TO A PARTLY DISMANTLED SCAFFOLD,
WARNING NOTICES SHOULD BE FIXED.
1414.10: MAINTENANCE AND STORAGE.
ALL SCAFFOLDS SHALL BE PROPERLY MAINTAINED AND SHALL BE KEPT,
CLEAN, AND FREE OF DAMAGE. SCAFFOLDS ACCESSORIES REQUIRING
LUBRICATION SHALL BE OILED PRIOR TO STORAGE IN A COVERED OR
CLOSED CONTAINER, OR AS PER MANUFACTURER'S RECOMMENDATION.
1414.11: LOADING/ UNLOADING AND TRANSPORT.
ALL LOADING AND UNLOADING OPERATIONS, INCLUDING TRANSPORT OF
SCAFFOLDS, SHALL BE PROPERLY PLANNED BY A COMPETENT PERSON,
APPROPRIATELY SUPERVISED AND CARRIED OUT IN A SAFE MANNER.
11.3 PLANNING
DURING LOADING/UNLOADING AND TRANSPORT OF SCAFFOLDS, THE
FOLLOWING SHALL BE CONSIDERED:
1. INFORMATION ON SCAFFOLDS TO BE HANDLED AS PROVIDED BY
MANUFACTURERS, E.G. WEIGHT, SHAPE AND CENTRE OF GRAVITY OF
MATERIAL COMPONENTS/BUNDLES OF MATERIAL;
2. SELECTION OF MOST APPROPRIATE VEHICLE AND CERTIFIED DRIVER
AS APPLICABLE;
3. LOADING/UNLOADING OPERATION
i. LOCATION
ii. METHODOLOGY
iii. PROVISION OF SPACER DURING LOADING OF SCAFFOLDS
iv. SAFE LOADING AND UNLOADING SEQUENCE
4. PROVISION OF SAFE ACCESS TO THE VEHICLE
5. ANY MANUAL HANDLING, INCLUDING REQUIRED PPE
6. HAZARDS FOR THE STOCK YARD WORKERS, SLINGERS/RIGGERS AND
DRIVER
7. ALL LOOSE PARTS SHALL BE STRAPPED OR SECURED PRIOR TO
TRANSPORT. SMALL PARTS SHALL BE PLACED ON A BOX OR BAG
INDICATING THE TOTAL WEIGHT BEFORE LOADING.
11.4 DURING TRANSPORT THE FOLLOWING SHALL BE CONSIDERED:

1. SITE RESTRICTIONS, E.G. SPEED LIMITS, REVERSING CONSTRAINTS,


DANGER AREAS.

2. DUTIES OF DRIVER IN RESPECT OF THE PROCESS, E.G. DE-


SHEETING, STRAPPING, CHECKING, ETC.

3. INSPECTION OF LOADS TO CHECK STABILITY AFTER TRANSPORT


FROM STOCKYARD TO WORK SITE AND VICE VERSA.

84 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
1414.12: FALL PROTECTION.
12.1 FOR SUPPORTED SCAFFOLD
FALL PROTECTION EQUIPMENT SHALL BE PROVIDED ON ANY SCAFFOLD 2M (6
FEET) OR MORE ABOVE GROUND. PERSONNEL PERFORMING WORK FROM A
SUPPORTED SCAFFOLD SHALL BE PROTECTED BY GUARDRAIL FROM FALLING
FROM ALL OPEN SIDES AND ENDS OF THE SCAFFOLD. OPEN SIDES AND ENDS
SHALL BE ALLOWED WHEN THE SCAFFOLD DISTANCE IS 25 CM (10 IN) OR LESS
FROM THE STRUCTURE BEING WORKED ON.

12.1.1 FALL ARREST SYSTEM


a) PERSONAL FALL-ARREST SYSTEMS USED ON SCAFFOLDS ARE
TO BE ATTACHED BY LANYARD TO A VERTICAL LIFELINE,
HORIZONTAL LIFELINE, OR ANY RIGID STRUCTURAL MEMBER.
b) WHEN VERTICAL LIFELINES ARE USED, THEY SHALL BE
FASTENED TO A FIXED SAFE POINT OF ANCHORAGE,
INDEPENDENT OF THE SCAFFOLD, AND BE PROTECTED FROM
SHARP EDGES AND ABRASION. SAFE POINTS OF ANCHORAGE
INCLUDE STRUCTURAL MEMBERS OF BUILDINGS, BUT NOT
STANDPIPES, VENTS, ELECTRICAL CONDUIT, ETC., WHICH MAY
GIVE WAY UNDER THE FORCE OF A FALL. TWO OR MORE
VERTICAL LIFELINES SHALL NOT BE ATTACHED TO EACH
OTHER, OR TO THE SAME POINT OF ANCHORAGE.
c) WHEN HORIZONTAL LIFELINES ARE USED, THEY SHALL BE
SECURED TO TWO OR MORE STRUCTURAL MEMBERS. LIFE
LINES SHALL BE MADE OF GOOD QUALITY MANILA ROPE OF AT
LEAST 1.9 CM (3/4 IN.) DIAMETER OR EQUIVALENT MATERIAL
SUCH AS NYLON ROPE OF AT LEAST 1.27 CM (1/2 IN) DIAMETER
AND SHALL BE OF SUFFICIENT STRENGTH TO SUPPORT A
WEIGHT OF 1140 KGS (2500 LBS) WITHOUT BREAKING.
12.1.2 GUARDRAIL SYSTEM

a) GUARDRAIL SYSTEMS SHALL BE INSTALLED ALONG ALL OPEN


SIDES AND ENDS OF PLATFORMS, AND MUST BE IN PLACE
BEFORE THE SCAFFOLD IS RELEASED FOR USE BY
PERSONNEL OTHER THAN ERECTION/ DISMANTLING CREWS.
b) WALKWAYS LOCATED WITHIN A SCAFFOLD SHALL HAVE
GUARDRAIL SYSTEMS INSTALLED WITHIN 24CM (9½ IN.) OF
AND ALONG AT LEAST ONE SIDE OF THE WALKWAY.
c) EACH TOPRAIL OR EQUIVALENT MEMBER OF A GUARDRAIL
SYSTEM SHALL BE ABLE TO WITHSTAND A FORCE OF AT
LEAST 100 KG (220 POUNDS) APPLIED IN ANY DOWNWARD
OR HORIZONTAL DIRECTION, AT ANY POINT ALONG ITS TOP
EDGE. THE HEIGHT OF TOPRAILS ON SUPPORTED SCAFFOLDS
SHALL BE 91 CM (36 IN.).
d) MIDRAILS, SCREENS, MESH, INTERMEDIATE VERTICAL
MEMBERS, SOLID PANELS, ETC., SHALL BE ABLE TO
WITHSTAND A FORCE OF AT LEAST 68 KG (150 POUNDS)
APPLIED IN ANY DOWNWARD OR HORIZONTAL DIRECTION, AT
ANY POINT ALONG THE MIDRAIL OR OTHER MEMBER.
i. WHEN MIDRAILS ARE USED, THEY SHALL BE INSTALLED
AT A HEIGHT APPROXIMATELY MIDWAY BETWEEN THE
TOPRAIL OF THE GUARDRAIL SYSTEM AND THE
PLATFORM SURFACE.
ii. WHEN SCREENS AND MESH ARE USED, THEY
SHALL EXTEND FROM THE TOPRAIL OF THE
GUARDRAIL SYSTEM TO THE SCAFFOLD PLATFORM, AND
ALONG THE ENTIRE OPENING BETWEEN THE SUPPORTS.
iii. WHEN INTERMEDIATE MEMBERS (SUCH AS BALUSTERS

85 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
OR ADDITIONAL RAILS) ARE USED, THEY SHALL BE NO
MORE THAN 48 CM (19 INCHES) APART.
e) GUARDRAILS SHALL NOT BE ROUGH TO PREVENT PUNCTURES
OR LACERATIONS TO PERSONNEL AND TO PREVENT
SNAGGING OF CLOTHING, WHICH MAY CAUSE PERSONNEL TO
LOSE THEIR BALANCE.
f) ENDS OF RAILS SHALL NOT EXTEND BEYOND THEIR TERMINAL
POSTS, UNLESS THEY DO NOT CONSTITUTE A PROJECTION
HAZARD TO PERSONNEL.
g) CROSSBRACING MAY SERVE AS A MIDRAIL WHEN ITS
CROSSING POINT IS BETWEEN 50 AND 75 CM (20 AND 30 IN)
ABOVE THE WORK PLATFORM AND INSTALL TOPRAIL
h) CROSSBRACING MAY SERVE AS A TOPRAIL WHEN ITS
CROSSING POINT IS BETWEEN 96 AND 122 CM (38 AND 48 IN.)
ABOVE THE WORK PLATFORM AND INSTALL MIDRAIL
12.2.1.1 FALL ARREST SYSTEM
a) PERSONAL FALL-ARREST SYSTEMS USED ON SUSPENDED
SCAFFOLDS SHALL BE ATTACHED BY LANYARD TO A
VERTICAL LIFELINE, HORIZONTAL LIFELINE, OR ANY RIGID
STRUCTURAL MEMBER.
i. VERTICAL LIFELINES MAY NOT BE USED ON TWO-POINT
ADJUSTABLE SUSPENDED SCAFFOLDS THAT HAVE
OVERHEAD COMPONENTS SUCH AS OVERHEAD
PROTECTION OR ADDITIONAL PLATFORM LEVELS.
ii. WHEN VERTICAL LIFELINES ARE USED, THEY SHALL
BE FASTENED TO A FIXED SAFE POINT OF ANCHORAGE,
INDEPENDENT OF THE SCAFFOLD, AND BE PROTECTED
FROM SHARP EDGES AND ABRASION. SAFE POINTS OF
ANCHORAGE INCLUDE STRUCTURAL MEMBERS OF
BUILDINGS, BUT NOT STANDPIPES, VENTS, ELECTRICAL
CONDUIT, ETC., WHICH MAY GIVE WAY UNDER THE
FORCE OF A FALL.
iii. TWO OR MORE VERTICAL LIFELINES SHALL NOT BE
ATTACHED TO EACH OTHER, OR TO THE SAME POINT OF
ANCHORAGE.
iv. WHEN HORIZONTAL LIFELINES ARE USED, THEY
SHALL BE SECURED TO TWO OR MORE STRUCTURAL
MEMBERS.
v. WHEN LANYARDS ARE CONNECTED TO HORIZONTAL
LIFELINES OR STRUCTURAL MEMBERS, THE SCAFFOLD
SHALL HAVE ADDITIONAL INDEPENDENT SUPPORT LINES
AND AUTOMATIC LOCKING DEVICES CAPABLE OF
STOPPING THE FALL OF THE SCAFFOLD IN CASE ONE OR
BOTH OF THE SUSPENDED ROPES FAIL. THESE
INDEPENDENT SUPPORT LINES SHALL BE EQUAL IN
NUMBER AND STRENGTH TO THE SUSPENDED ROPES.
b) ON SUSPENDED SCAFFOLDS WITH HORIZONTAL LIFELINES
THAT MAY BECOME VERTICAL LIFELINES, THE DEVICES USED
TO CONNECT TO THE HORIZONTAL LIFELINE SHALL BE
CAPABLE OF LOCKING IN BOTH DIRECTIONS.

12.2 ERECTORS AND DISMANTLERS


EMPLOYERS SHALL PROVIDE FALL PROTECTION FOR PERSONNEL ERECTING,
INSTALLING OR DISMANTLING SCAFFOLDS, WHERE IT IS FEASIBLE AND WHEN
USING IT DOES NOT CREATE A GREATER HAZARD.
12.3 COMPETENT PERSON

DIVISION 15 MECHANICAL

86 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
15050 BASIC MECHANICAL MATERIALS AND METHODS
GENERAL

 ALL PIPING AND DUCTWORK IN FINISHED AREAS SHALL BE CONCEALED IN CEILING


SPACES, SHAFTS, OR CHASES.
 ELECTRICAL CONDUITS SHALL NOT TOUCH OR BE SUPPORTED VIA PIPES OR
DUCTS.
 ENSURE FIRE AND SMOKE SEPARATION RATING OF WALLS AND FLOORS IS
MAINTAINED FOLLOWING PENETRATION.
 ALL ELECTRICAL WORK ASSOCIATED WITH DIVISION 15 SHALL COMPLY WITH
REQUIREMENTS OF DIVISION 16.
PRODUCTS
A. VALVES
a. SIZES 6" AND ABOVE SHALL HAVE GEAR OPERATOR BALL CHAIN IF LOCATED MORE
THAN 7 FT. ABOVE FLOOR.
b. PROVIDE ISOLATION BALL VALVES - 100% FULL-PORT, FULL-LINE SIZE, BRONZE-
BODY, THREADED CONNECTIONS AT ALL EQUIPMENT AND ON ALL MAIN BRANCH
TAKE-OFFS.
c. PROVIDE BRASS VALVE TAGS MARKED FOR THE SERVICE. SEE PERTINENT
SERVICE SPECIFICATION FOR VALVE TYPE.
d. BUTTERFLY VALVES SHALL BE 100% BUBBLE-TIGHT SHUT-OFF. LUG TYPE ONLY.
IRON BODY WITH BRONZE DISK. USE FOR THROTTLING/BALANCING. PREFERRED
BRANDS ARE 4MATIC VALVE AUTOMATION, CITIZEN METALS PVT. LTD, AND
REINESSANCE FITTINGS & PIPING INC.
B. PIPING LABELS
a. PROVIDE AT DIRECTIONAL CHANGES AND/OR EACH 20 FT. LABELS TO BE PRE-
MANUFACTURED SNAP-ON PLASTIC WRAPAROUND TYPE SIZED TO COVER ENTIRE
CIRCUMFERENCE OF PIPING AND INSULATION.
b. LABELS TO HAVE INTEGRAL COLOR IDENTIFICATION
c. LETTERING SHALL BE SIZED TO BE EASILY LEGIBLE. DIRECTIONAL ARROWS SHALL
INDICATE DIRECTION OF FLOW AND SHALL BE LOCATED TO POINT AWAY FROM
LETTERING.
C. PIPE SLEEVES / CONCRETE WALLS & FLOORS ABOVE GRADE
a. SHALL BE SCHEDULE 40 STEEL.
b. SIZED FOR FULL DIMENSIONS OF INSULATION AND FIRE CAULKED WHERE
REQUIRED.
c. INSTALL IN ALL EXTERIOR WALLS, FIRE WALLS AND FLOORS.
d. FLOOR SLEEVES TO EXTEND 1” ABOVE FLOOR SURFACE.
D. PIPE HANGERS
a. PIPES ON TRAPEZE TYPE HANGERS SHALL BE FIRMLY SECURED.
b. USE VIBRA-ZORB CUSHIONED SUPPORTS ON 1 ¼” PIPE AND SMALLER WHICH IS
CONNECTED TO VIBRATING EQUIPMENT.
c. PROVIDE PIPING SUPPORT HANGERS TO ENSURE THAT NO SAGS OCCUR. MINIMUM
HANGER ROD SIZING AND MAXIMUM
d. HANGER SPACING SHALL CONFORM TO FOLLOWING TABLE:

PIPE SIZE SPACING HANGER ROD


STEEL PIPE ½” 6'-0" 3/8"
¾' THROUGH 1-¼° 8'-0" 3/8"
1-½, 2" 10'-0" 3/8"
2-½" 10'0" 3/8"
3" 12'-0" 3/8"
4" 12'-0" 3/8"
5" 12'-0" 1/2"
6" 12'-0" 1/2"
8-12" 12'-0" 5/8"
COPPER PIPE ½” 0" 8"
¾" 8'-0" 3/8"

87 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
1" 10'-0" 3/8"
1-¼ THROUGH 4" 12'-0" 1/2"
5"-6" 12'-0" 5/8"
8"AND ABOVE
CAST IRON 1½"-2" 1 EA. JOINT 8"
3" 1 EA. JOINT 1/2"
4" THROUGH 6" 1 EA. JOINT 1/2"
8" AND ABOVE 1 EA. JOINT 5/8"

EXECUTION
a. WORKMANSHIP
b. PIPING TO RUN PARALLEL TO BUILDING LINES.
c. LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER, SPACED TO PERMIT VALVE
SERVICING.
d. PARTICULAR ATTENTION MUST BE PAID TO THE PROXIMITY OF MECHANICAL PIPING
AND EQUIPMENT TO ELECTRICAL CONDUIT AND CABLE.
e. ALL UNDERGROUND UTILITY PIPE SHALL HAVE A TRACING WIRE THAT IS
ELECTRICALLY CONTINUOUS. THE WIRE SHALL BE 14TW AWG STRANDED (GREEN)
WRAPPED AROUND OR BURIED ALONGSIDE THE PIPE. THE WIRE SHALL BE
TERMINATED AT EITHER END IN A BOX FLUSH WITH THE GROUND WITH 3 FEET OF
COILED WIRE IN THE BOX.
f. PIPING TO BE INSPECTED AND PRESSURE TESTED PRIOR TO INSULATION.
g. PIPING TO BE ROUTED TO ALLOW ACCESS TO EQUIPMENT.
15100 BUILDING SERVICES PIPING
GENERAL
1. ALL UNDERGROUND UTILITY LINES REQUIRE A TRACE WIRE MOUNTED UNDER
THE LINE WITH NO BREAKS FROM POINT TO POINT. DATA TRACE WIRES SHOULD BE
INSTALLED WITHIN THE CONDUIT.
2. VICTAULIC PIPING IS PERMITTED IN EXPOSED AREAS, BUT NOT IN CONCEALED
SPACES.
3. STEAM AND CONDENSATE PIPING SHALL BE SCHEDULE 80.
4. UNDERGROUND STEAM AND CONDENSATE PIPING SHALL HAVE 3/8-INCH PVC
JACKET WITH MINIMUM 3" FOAM GLASS INSULATION, INSUL 800 BY ROVANCO OR
APPROVED EQUAL.
5. PROVIDE LINK SEALS WHERE UNDERGROUND PIPING ENTERS A BUILDING.
6. BALANCING VALVES ARE PREFERRED OVER GATE VALVES AT ALL SIZES, FOR
BALANCING.
7. VALVES 2” AND LARGER SHALL BE FLANGED. VALVES UNDER 2” SHALL BE
SCREWED.
8. PVC PIPING IS ACCEPTABLE FOR DRAIN LINES AND SEWER LINES.
9. PVC PIPING IS NOT ACCEPTABLE FOR HEATING PIPE OR TEMPERED WATER PIPE
OR ANY PRESSURIZED SYSTEM.
10. AVOID BALL JOINTS ON STEAM SYSTEMS.
11. FLEXIBLE CONNECTIONS FOR PIPE TO EQUIPMENT SHALL BE STAINLESS STEEL
BRAIDS.
12. BACKFLOW PREVENTERS SHALL BE PROVIDED ON ALL NEW WATER AND FIRE
MAINS TO BUILDINGS.

88 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
13. PROVIDE ISOLATION VALVES ON ALL PIECES OF EQUIPMENT AND ON BRANCH
PIPING.
14. PROVIDE ASHKROFT GAGES AND SNUBBERS ON GAGES.
15. PROVIDE BYPASS PIPING ON CRITICAL SERVICE PIPING.
16. PROVIDE WATER TREATMENT ON ALL SYSTEMS. PROVIDE EMERGENCY
EYEWASH AND SHOWER AT ALL CHEMICAL TREATMENT FEED STATIONS.
17. POWER PRESSURE PUMPS ARE PREFERRED OVER ELECTRIC CONDENSATE
PUMPS.
18. PROVIDE PROTECTION OF PIPING AT JOB SITE. TEMPORARILY SEAL ENDS.
19. PROVIDE LARGE ELBOW SWEEPS FOR PIPING FROM ROOF DRAINS. PROVIDE
FOR OVERFLOW.
VALVES
A. WATER SYSTEMS (HOT/COLD DOMESTIC WATER, CHILLED WATER, CONDENSER
WATER, ETC.):
USE FULL PORT BALL VALVES WITH THREADED/FLANGED ENDS FOR
ISOLATION/SHUTOFF. PROVIDE STEM EXTENSIONS, AS NECESSARY, TO
ACCOMMODATE PIPING INSULATION. OPERATING PRESSURE SHALL NOT
EXCEED 80% OF THE VALVE PRESSURE CLASS. PROVIDE MANUAL GEAR
OPERATORS FOR VALVES 6” AND LARGER. SEE TABLE AND
ACCOMPANYING DESCRIPTIONS BELOW FOR SPECIFICS.
B. STEAM/CONDENSATE SYSTEMS:
WHEN THE OPERATING PRESSURE IS 80 PSI AND ABOVE, THE SYSTEM
SHALL BE CONSIDERED HIGH PRESSURE. WHERE OPERATING PRESSURES
IS BETWEEN 15 – 79 PSI, THE SYSTEM SHALL BE CONSIDERED MEDIUM
PRESSURE. WHEN THE OPERATING PRESSURE IS BELOW 15 PSI, THE
SYSTEM SHALL BE CONSIDERED LOW PRESSURE. IN ORDER TO IMPROVE
STANDARDIZATION AND QUALITY, STEAM/CONDENSATE SYSTEM VALVES,
OPERATING IN THE MEDIUM AND LOW PRESSURE CLASS, SHALL UTILIZE
THE SAME TYPE OF VALVES PER THE FOLLOWING SIZE/APPLICATION
SCHEDULE:
TYPES OF VALVE:
A. VALVE TYPE A1:
ISOLATION/SERVICE VALVES USED FOR STEAM/CONDENSATE
SERVICE IN ¼” – 2” PIPE SIZES, SHALL BE SCREWED END, GATE
TYPE. FOR STEAM/CONDENSATE SERVICE 80 PSI & ABOVE, VALVE
SHALL BE ALL BRONZE, 300# HEAVY DUTY OR INDUSTRIAL SERVICE
RATED, WITH SOLID WEDGE DISC, NON-RISING STEM AND STAINLESS
STEEL SEAT. THREADED PIPE AND FITTINGS SHALL BE COATED WITH
TEFLON IMPREGNATED NEVER-SEIZE, ON MALE THREADS ONLY,
PRIOR TO ASSEMBLY.
B. VALVE TYPE A2:
ISOLATION/SERVICE VALVES USED FOR STEAM/CONDENSATE
SERVICE IN ¼” – 2” PIPE SIZES, SHALL BE SCREWED END, GATE
TYPE. FOR STEAM/CONDENSATE SERVICE BELOW 80 PSI, VALVE
SHALL BE ALL BRONZE, 150# HEAVY DUTY OR INDUSTRIAL SERVICE
RATED, WITH SOLID WEDGE DISC AND NON-RISING STEM.
THREADED PIPE AND FITTINGS SHALL BE COATED WITH TEFLON
IMPREGNATED NEVER-SEIZE, ON MALE THREADS ONLY, PRIOR TO
ASSEMBLY.

89 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
C. VALVE TYPE B1:
ISOLATION/SERVICE VALVES FOR STEAM/CONDENSATE SERVICE IN
2-½” – 12” PIPE SIZES, SHALL BE FLANGED END, GATE TYPE. FOR
STEAM/CONDENSATE SERVICE 80 PSI & ABOVE, VALVE SHALL BE
300# CAST STEEL, CARBON STEEL OR FORGED STEEL (HEAVY DUTY
OR INDUSTRIAL SERVICE RATED), WITH RISING OR NON-RISING
STEM. FLANGE GASKETS SHALL BE METALLIC TYPE SUITABLE FOR
RAISED FACE OR FLAT FACE FLANGES AS APPLICABLE, EQUAL TO
FLEXITALLIC BRAND. BOLTS OR STUDS, OF GRADE 5 OR BETTER,
ARE TO BE FULL SIZED PER VALVE MANUFACTURER TO FULLY FIT
THE FLANGE HOLE. THREADS SHALL BE COATED WITH TEFLON
IMPREGNATED NEVER-SEIZE, AND INSTALLED BOLT SHALL HAVE A
MAXIMUM OF 2-4 THREADS SHOWING WHEN VALVE FLANGES ARE
PULLED DOWN TO RECOMMENDED TORQUE.
D. VALVE TYPE B2:
ISOLATION/SERVICE VALVES FOR STEAM/CONDENSATE SERVICE IN
2-½” – 12” PIPE SIZES, SHALL BE FLANGED END, GATE TYPE. FOR
STEAM/CONDENSATE SERVICE BELOW 80 PSI, VALVE SHALL BE 150#
CAST STEEL, CARBON STEEL OR FORGED STEEL (HEAVY DUTY OR
INDUSTRIAL SERVICE RATED), WITH RISING OR NON-RISING STEM.
FLANGE GASKETS SHALL BE METALLIC TYPE SUITABLE FOR RAISED
FACE OR FLAT FACE FLANGES AS APPLICABLE, EQUAL TO
FLEXITALLIC BRAND. BOLTS OR STUDS, OF GRADE 5 OR BETTER,
ARE TO BE FULL SIZED PER VALVE MANUFACTURER TO FULLY FIT
THE FLANGE HOLE. THREADS SHALL BE COATED WITH TEFLON
IMPREGNATED NEVER-SEIZE, AND INSTALLED BOLT SHALL HAVE A
MAXIMUM OF 2-4 THREADS SHOWING WHEN VALVE FLANGES ARE
PULLED DOWN TO RECOMMENDED TORQUE.
E. VALVE TYPE C1:
SPECIAL…CONSULT WITH FACILITIES SERVICES FOR BUBBLE
TIGHT VALVE SPEC.
F. VALVE TYPE C2:
SPECIAL…CONSULT WITH FACILITIES SERVICES FOR BUBBLE
TIGHT VALVE SPEC.
G. VALVE TYPE D1:
ISOLATION/SERVICE VALVES USED THROUGHOUT DOMESTIC
WATER SYSTEM SHALL BE FULL PORT BALL TYPE. FOR
VALVES ¼” - 3” OPERATING 125 PSI & ABOVE, USE 300# CLASS,
STAINLESS STEEL, BALL VALVES WITH THREADED ENDS.
PROVIDE STEM EXTENSIONS, AS NECESSARY, TO
ACCOMMODATE PIPING INSULATION.
H. VALVE TYPE D2:
ISOLATION/SERVICE VALVES USED THROUGHOUT DOMESTIC
WATER SYSTEM SHALL BE FULL PORT BALL TYPE. FOR
VALVES ¼” - 3” OPERATING BELOW 125 PSI, USE 600 WOG –
150 SWP CLASS, FORGED BRASS, BALL VALVES WITH
THREADED ENDS. PROVIDE STEM EXTENSIONS, AS
NECESSARY, TO ACCOMMODATE PIPING INSULATION.
I. VALVE TYPE E1:
ISOLATION/SERVICE VALVES USED THROUGHOUT DOMESTIC
WATER SYSTEM SHALL BE FULL PORT BALL TYPE. FOR

90 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
VALVES 4” AND LARGER, OPERATING 125 PSI & ABOVE, USE
300# CLASS, STAINLESS STEEL, FLANGED BALL VALVES
SUITABLE FOR POTABLE WATER SERVICE.
J. VALVE TYPE E2:
ISOLATION/SERVICE VALVES USED THROUGHOUT DOMESTIC
WATER SYSTEM SHALL BE FULL PORT BALL TYPE. FOR
VALVES 4” AND LARGER, OPERATING BELOW 125 PSI, 125#
CLASS, EPOXY COATED CAST IRON OR 150# CLASS,
STAINLESS STEEL, FLANGED BALL VALVES SUITABLE FOR
POTABLE WATER SERVICE.
K. VALVE TYPE F1:
ISOLATION/SERVICE VALVES USED CHILLED WATER (12” & UP)
AND CONDENSER WATER (4” & UP) SHALL BE 200#,
INDUSTRIAL DUTY BUTTERFLY VALVE, CAST/DUCTILE IRON,
LUG TYPE BODY, WITH 316 STAINLESS STEEL DISC, AND
EPDM SLEEVE/SEAL/SEAT MATERIALS. PROVIDE MANUAL
GEAR OPERATOR FOR VALVES 6” AND ABOVE.
PIPE FITTINGS
GENERAL:
A. ALL PIPING SYSTEMS MUST BE CLEANED, TESTED, AND ACCEPTED BY
FACILITIES SERVICES PRIOR TO BEING PLACED IN SERVICE.
B. REFER TO INDIVIDUAL PIPING SYSTEM SPECIFICATIONS SECTIONS FOR
PIPE AND FITTING MATERIAL AND JOINING METHODS.
PIPING SPECIALTIES:
A. DIELECTRIC UNIONS ARE TO BE USED AT ALL JUNCTIONS OF DISSIMILAR PIPING.
PROVIDE ISOLATION VALVES UPSTREAM OF DIELECTRIC UNION.
B. PIPE ESCUTCHEONS: CHROME PLATED, STAMPED STEEL, HINGED, SPLIT-RING
ESCUTCHEON, WITH SET SCREW OR SNAP-ON TYPE. INSIDE DIAMETER SHALL
CLOSELY FIT PIPE OUTSIDE DIAMETER OR OUTSIDE OF PIPE INSULATION WHERE
PIPE IS INSULATED. OUTSIDE DIAMETER SHALL COMPLETELY COVER THE
OPENING IN FLOORS, WALLS, OR CEILINGS. IN EXTERIOR, DAMP, OR CORROSIVE
ENVIRONMENTS, USE STAINLESS STEEL ESCUTCHEONS.
C. DIELECTRIC WATERWAY FITTINGS: ELECTROPLATED STEEL OR BRASS NIPPLE,
WITH AN INERT AND NON-CORROSIVE, THERMOPLASTIC LINING.
D. DIELECTRIC UNIONS: PROVIDE DIELECTRIC UNIONS WITH APPROPRIATE END
CONNECTIONS FOR THE PIPE MATERIALS IN WHICH INSTALLED (SCREWED,
SOLDERED, OR FLANGED), WHICH EFFECTIVELY ISOLATES DISSIMILAR METALS,
PREVENTS GALVANIC ACTION, AND STOPS CORROSION.
E. UNIONS: MALLEABLE IRON, CLASS 150 FOR LOW PRESSURE SERVICE AND
CLASS 250 FOR HIGH PRESSURE SERVICE; HEXAGONAL STOCK, WITH BALL AND
SOCKET JOINTS, METAL TO METAL BRONZE SEATING SURFACES; FEMALE
THREADED ENDS.
PIPING
CHILLED WATER SYSTEMS:
CHW PIPING SHALL BE PRE-INSULATED PIPING CONSISTING OF A HDPE
CARRIER PIPE (RATED FOR 150# OPERATING PRESSURE) FOLLOWED BY 2"
THICK POLYURETHANE FOAM INSULATION WITH A STANDARD HDPE JACKET.
DISTRIBUTION PIPING LARGER THAN 10" ID. SHALL BE NON-INSULATED

91 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
HDPE RATED FOR 150# OPERATING PRESSURE. IN THE MANHOLES, THE
PIPING SHALL BE SCHEDULE 40 BLACK STEEL, FIELD FABRICATED/WELDED
FOLLOWED BY 2" CLOSED CELLULAR GLASS INSULATION WITH KRAFT
PAPER ALL SERVICE JACKET WITH VAPOR BARRIER FOLLOWED BY 2
LAYERS OF 15# BUILDING FELT PAPER, WITH JOINTS OVERLAPPING A
MINIMUM OF 3". PAPER LAYERS SHALL BE HELD IN PLACE WITH 16 GAUGE
COPPER WIRE, 8" ON CENTER, FOLLOWED BY A 0.020" THICK ALUMINUM, OR
0.016" THICK STAINLESS STEEL JACKET STRAPPED WITH 0.75" BANDS 18" ON
CENTER.
STEAM AND CONDENSATE SPECIALITIES:
MATERIALS: STEEL PIPE SHALL BE ASTM A106, SCHEDULE 80, SEAMLESS,
BLACK STEEL WITH BEVELED ENDS. PIPE SHALL BE DOMESTICALLY
PRODUCED AND A MILL CERTIFICATION SHALL BE PROVIDED.
DELIVERY, STORAGE, AND HANDLING
A. TRANSPORT AND HANDLE PRODUCTS IN COMPLIANCE WITH THE
REQUIREMENTS OF SECTION 01600.
B. STORE AND PROTECT PRODUCTS IN COMPLIANCE WITH THE REQUIREMENTS OF
SECTION 01600.
C. PRODUCT DELIVERY:
1. OWNER’S SUPPLIER WILL DELIVER OWNER FURNISHED PRODUCTS TO
SITE TO BE RECEIVED BY CONTRACTOR. CONTACT OWNER’S SUPPLIER TO
COORDINATE PRODUCT DELIVERY AND INSTALLATION.
2. SCHEDULE DELIVERY OF ITEMS TO INSTALLATION AREAS THAT ARE IN
PROPER CONDITION TO RECEIVE THEM. PLACE ITEMS NEATLY AND
SYSTEMATICALLY TO AVOID DAMAGE, STORE IN CLEAN, DRY, ENCLOSED,
AND SECURE STORAGE AREA.
3. RECEIVE OWNER FURNISHED PRODUCTS
D. ACCEPTANCE AT SITE:
1. INSPECT OWNER FURNISHED PRODUCTS UPON DELIVERY OF PRODUCTS
TO SITE TO VERIFY QUANTITY OF PRODUCTS FURNISHED AND REPORT TO
OWNER DISCREPANCIES IN QUANTITY DELIVERED OR OBVIOUS DAMAGE TO
PRODUCTS DELIVERED TO THE SITE.
2. INSPECT MATERIALS DELIVERED AND REJECT THOSE NOT QUALIFYING
WITH REQUIREMENTS, THOSE DAMAGED IN TRANSIT, OR THOSE THAT
APPEAR OTHERWISE UNSATISFACTORY.
WATER PIPING SPECIALITIES INSTALLATION
A. INSTALL BACKFLOW PREVENTERS IN EACH WATER SUPPLY TO MECHANICAL
EQUIPMENT AND SYSTEMS AND TO OTHER EQUIPMENT WHERE SHOWN AND
WATER SYSTEMS THAT MAY BE SOURCES OF CONTAMINATION. COMPLY WITH
AUTHORITIES HAVING JURISDICTION.
1. LOCATE BACKFLOW PREVENTERS IN SAME ROOM AS CONNECTED
EQUIPMENT OR SYSTEM.
2. INSTALL DRAIN FOR BACKFLOW PREVENTERS WITH ATMOSPHERIC-VENT
DRAIN CONNECTION WITH AIR-GAP FITTING, FIXED AIR GAP FITTING, OR
EQUIVALENT POSITIVE PIPE SEPARATION OF AT LEAST TWO PIPE
DIAMETERS IN DRAIN PIPING AND PIPE TO FLOOR DRAIN. LOCATE AIR-GAP
DEVICE ATTACHED TO OR UNDER BACKFLOW PREVENTER. SIMPLE AIR
BREAKS ARE NOT ACCEPTABLE FOR THIS APPLICATION.

92 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
3. DO NOT INSTALL BYPASS PIPING AROUND BACKFLOW PREVENTERS.
B. INSTALL WATER REGULATORS WITH INLET AND OUTLET SHUTOFF VALVES.
INSTALL PRESSURE GAGES ON INLET AND OUTLET.
C. INSTALL BALANCING VALVES IN LOCATIONS WHERE THEY CAN EASILY BE
ADJUSTED.
D. INSTALL TEMPERATURE-ACTUATED WATER MIXING VALVES WITH CHECK STOPS
OR SHUTOFF VALVES ON INLETS AND WITH SHUTOFF VALVE ON OUTLET.
1. INSTALL THERMOMETERS AND WATER REGULATORS IF SPECIFIED.
2. INSTALL CABINET-TYPE UNITS RECESSED IN OR SURFACE MOUNTED ON
WALL AS SPECIFIED.
ADJUSTING
A. SET FIELD-ADJUSTABLE PRESSURE SET POINTS OF WATER PRESSURE-
REDUCING VALVES.
B. SET FIELD-ADJUSTABLE FLOW OF BALANCING VALVES.
C. SET FIELD-ADJUSTABLE TEMPERATURE SET POINTS OF TEMPERATURE-
ACTUATED WATER MIXING VALVES.
PROTECTION
A. PROTECT DRAINS DURING REMAINDER OF CONSTRUCTION PERIOD TO AVOID
CLOGGING WITH DIRT OR DEBRIS AND TO PREVENT DAMAGE FROM TRAFFIC OR
CONSTRUCTION WORK.
D. PLACE PLUG
WORK STOPS.
15400 PLUMBING FIXTURES AND EQUIPMENT
GENERAL DESCRIPTION
THE EXTENT OF PLUMBING FIXTURES AND EQUIPMENT WORK IS INDICATED ON
THE DRAWINGS AND BY THE REQUIREMENTS OF THIS SECTION.
THE TYPES OF FIXTURES AND EQUIPMENT REQUIRED FOR THE PROJECT INCLUDE
BUT ARE NOT LIMITED TO THE FOLLOWING:
1. FLOOR DRAINS
2. CLEANOUTS FOR PIPES
3. HOT WATER GENERATORS (STORAGE TYPE) (EWH).
4. WATER CLOSET, EUROPEAN
5. LAVATORIES
QUALITY ASSURANCE
MANUFACTURERS: FIRMS REGULARLY ENGAGED IN MANUFACTURE OF PLUMBING
FIXTURES AND EQUIPMENT OF THE TYPES, STYLES AND CONFIGURATIONS
REQUIRED, WHOSE PRODUCTS HAVE BEEN IN SATISFACTORY USE IN SIMILAR
SERVICE FOR NOT LESS THAN 5 YEARS.
PRODUCT DELIVERY, STORAGE AND HANDLING
a. DELIVER FIXTURES INDIVIDUALLY WRAPPED IN FACTORY-FABRICATED
FIBREBOARD TYPE CONTAINERS OR WOODEN CRATES.
b. HANDLE FIXTURES CAREFULLY TO PREVENT BREAKAGE, CHIPPING, DENTING, AND
SCORING ITEMS; REPLACE AND RETURN DAMAGED UNITS TO EQUIPMENT
MANUFACTURER.

93 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
PRODUCTS
GENERAL
EXCEPT AS OTHERWISE INDICATED, PROVIDES MANUFACTURER'S STANDARD
MATERIALS AND COMPONENTS AS INDICATED BY PUBLISHED PRODUCT
INFORMATION AND AS REQUIRED FOR A COMPLETE INSTALLATION. ALL EXPOSED
PIPES, FITTINGS AND ACCESSORIES SHALL BE CHROME PLATED. PLUMBING
FIXTURES DESIGN, STYLE AND SHAPE SHALL BE SUBJECT TO APPROVAL BY THE
ENGINEER.
PLUMBING FIXTURES AND EQUIPMENT
FLOORDRAINS:
1. FLOOR DRAIN: SHALL BE MADE OF UPVC MATERIAL. SHALL HAVE ONE
VERTICAL OUTLET OF 50 MM DIAMETER. STRAINER SHALL BE MADE OF
CHROME PLATED CAST BRASS OR PLASTIC MATERIAL.
CLEANOUT: CLEANOUTS ON CONCEALED PIPING SHALL BE EXTENDED
THROUGH AND TERMINATE FLUSH WITH FINISHED WALL OR FLOOR PITS OR
CHAPS MAY BE LEFT IN THE WALL OR FLOOR, PROVIDED THEY ARE OF
SUFFICIENT SIZE TO PERMIT REMOVAL OF THE CLEANOUT PLUG AND
PROPER CLEANING OF THE SYSTEM. WHERE IT IS NECESSARY TO CONCEAL
A CLEANOUT PLUG A CHROME PLATED BRASS COVER PLATE OR PLASTIC
PLATE OR STAINLESS STEEL AS REQUIRED FOR EACH BUILDING SHALL BE
PROVIDED WHICH WILL PERMIT READY ACCESS TO THE PLUG. CLEANOUTS
SHALL BE OF THE SAME NOMINAL SIZE AS THE PIPES UP TO 100 MM
DIAMETER AND NOT LESS THAN 100 MM FOR LARGER PIPING.
ELECTRIC WATER HEATER:
1. HOT WATER HEATERS SHALL BE HORIZONTAL TYPE INSTALLED ABOVE
FALSE CEILING SHOWN ON DRAWINGS. HEATERS SHALL BE FITTED WITH
IMMERSION HEATER TO GIVE THE MAXIMUM OUTPUT KW. VESSEL SHALL BE
CONSTRUCTED OF THICK STEEL PRESSURE TESTED AT 12 BARS. VESSEL
SHALL BE GLASS-LINED WITH TITANIUM OR MAGNESIUM ANODE
PROTECTION. ENTIRE VESSEL AND ELECTRICAL CONTROLS SHALL BE
ENGAGED IN A RECTANGULAR OR CYLINDRICAL SHEET METAL ENCLOSURE
WITH BAKED ENAMEL FINISH.
WATER CLOSETS:
1. WATER CLOSET: WATER CLOSET SHALL BE WALL MOUNTED TYPE,
MADE OF HEAVY DUTY VITREOUS CHINA. IT SHALL BE PROVIDED
WITH BUILT-IN “P” TRAP, PLASTIC SEAT, BRASS HOLDING BOLTS,
WASHERS, NUTS, CHINA CAPS. THE UNIT SHALL COME WITH THE
FOLLOWING TRIM AND ACCESSORIES. CONCEALED FLUSHING
CISTERN 4.5-9 LIT., INTERRUPTIBLE FLUSH CYCLE MADE OF SOUND-
INSULATING EPS MODULE FOR MASONRY-IN, REMOVABLE FRONT
PLATE FOR INSPECTION, WC FIXING BOLTS, PE OUTLET BEND DN 80,
REDUCING PIECE Ø80/100MM, 15MM CHROME PLATED ANGLE VALVE.
2. LAVATORY SHALL BE MADE OF HEAVY DUTY WHITE COLORED
VITREOUS CHINA. IT SHALL HAVE AN OVAL SHAPE FOR FIXING INTO
COUNTERTOP, SIZE TO SUIT DIMENSIONS SHOWN ON DRAWINGS.
EXECUTION INSPECTION
THE CONTRACTOR SHALL EXAMINE THE INSTALLATION OF DOMESTIC WATER AND
SOIL PIPING STUBS AND TERMINATIONS TO VERIFY ACTUAL LOCATIONS, AND
SHALL EXAMINE AREAS AND CONDITIONS UNDER WHICH PLUMBING FIXTURES
SHALL BE INSTALLED. WATER OR DRAIN PIPES (CONNECTED WITH THE FIXTURES)

94 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
FOUND TO BE WRONGLY INSTALLED, SHALL BE CORRECTED BEFORE INSTALLING
FIXTURES.
INSTALLATION
GENERAL: INSTALL PLUMBING FIXTURES AND EQUIPMENT IN ACCORDANCE WITH
MANUFACTURER'S WRITTEN INSTRUCTIONS AND IN ACCORDANCE WITH THE
APPLICABLE REGULATION AND RECOGNIZED INDUSTRY PRACTICES TO INSURE
THAT PRODUCTS SERVE THE INTENDED FUNCTION.
COORDINATE WITH OTHER WORK, INCLUDING WATER AND DRAIN PIPING AS
NECESSARY TO INTERFACE INSTALLATION OF PLUMBING FIXTURES, PROPERLY
WITH OTHER WORK.
SUPPORTS
a. ALL FIXTURES AND EQUIPMENT SHALL BE MOUNTED LEVEL, SURE, RIGID AND
FLUSH WITH WALL OR FLOOR AS REQUIRED.
b. DRILL HOLES CAREFULLY TO AVOID CHIPPING BLOCK OR TILE.
c. ALL SUPPORTS SHALL BE CONCEALED UNLESS NOTED OTHERWISE.
d. FURNISH AND SET ALL HANGERS, SUPPORTS, BRACKETS, ETC., FOR PROPER
INSTALLATION OF ALL FIXTURES AND EQUIPMENT. SUPPORTS SHALL BE IN
ACCORDANCE WITH RECOMMENDATIONS OF FIXTURE MANUFACTURER, AND IF
BUILT INTO PARTITIONS OR WALLS, SHALL BE SET AS WALL CONSTRUCTION
PROGRESSES. CONTRACTOR SHALL BE RESPONSIBLE FOR STABILITY OF ALL
FIXTURES AND FURNISHING ALL CHAIR CARRIERS OR OTHER MATERIALS
NECESSARY TO ACCOMPLISH THIS. EXACT MOUNTING HEIGHT SHALL BE AS
APPROVED BY THE ENGINEER.
e. IF NOT FACTORY PRIMED OR COATED, PRIME ALL CONCEALED SUPPORTS WITH
ONE COAT OF RUST-RESISTANT PRIMER.
FIXTURES
a. LOCATE, PLACE, LEVEL AND SECURE ALL PLUMBING FIXTURES AND TRIM
SPECIFIED IN THIS SECTION AND MAKE ALL CONNECTIONS TO DRAINAGE SYSTEM,
HOT WATER SUPPLY SYSTEM, AND COLD WATER SUPPLY SYSTEM.
b. MAKE ADEQUATELY SIZED CONNECTIONS TO ALL SUPPLY LINES AND DRAINS AND
MAKE ALL REQUIRED REDUCTIONS AND INCREASES IN PIPE OR TUBING SIZE AS
REQUIRED TO MAKE CONNECTIONS TO FAUCETS, P-TRAPS, AND PIPING SYSTEMS.
c. WATER SUPPLIES TO ALL FIXTURES SHALL BE VALVED AT FIXTURE.
d. ALL FIXTURES SHALL BE LEFT THOROUGHLY CLEAN AND FREE FROM ALL MARKS
AND FOREIGN SUBSTANCES.
e. PLACE AND INSTALL BASINS AND SEAL AROUND EDGES WITH SUITABLE SILICONE
SEALANT. CONTRACTOR SHALL REPLACE ALL LEAKY FAUCETS AND VALVES PRIOR
TO FINAL INSPECTION.
f. ADJUST ALL FLUSH VALVES FOR QUIET OPERATION, MINIMUM PRESSURE
REQUIRED TO CLEANSE BOWLS, AND PERIOD OF FLUSH.
g. ALL FAUCETS SHALL HAVE VISIBLE INDICES. ALL TRIM SHALL BE PERMANENTLY
STAMPED WITH MANUFACTURER'S IDENTIFICATION CLEARLY VISIBLE AFTER
INSTALLATION.
h. CAULK AROUND ALL FIXTURES AND ADJACENT SURFACES WITH A WHITE SILICONE
SEALANT, FUNGICIDAL TYPE.
15700. HEATING, VENTILATING, AND AIR CONDITIONING EQUIPMENT
GENERAL
A. PROVIDE AND INSTALL AIR CONDITIONING, HEATING AND VENTILATING
EQUIPMENT AS INDICATED ON THE DRAWINGS AND AS SPECIFIED HEREIN.
PRODUCT A/C UNITS (ELECTRIC COOLING/ GAS HEAT AND DEHUMIDIFICATION CYCLE)
FURNISH AND INSTALL COMPLETE FACTORY ASSEMBLED, PIPED, WIRED, TESTED AND
SHIPPED IN ONE PIECE WITH SINGLE POINT POWER CONNECTION. UNITS SHALL MEET OR
EXCEED COOLING/HEATING CAPACITIES AND OPERATIONAL CHARACTERISTICS AS
SCHEDULED ON THE CONTRACT DOCUMENTS AND AS SPECIFIED HEREIN.

95 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
A. OUTSIDE AIR SYSTEM, FILTERS, SWITCHES AND ALL STANDARD OPERATING
SAFETY CONTROLS SHALL BE FURNISHED AND FACTORY INSTALLED. UNITS SHALL
BE SPECIFICALLY DESIGNED FOR OUTDOOR CURB MOUNTING.
B. UNITS SHALL HAVE DECALS AND TAGS TO INDICATE CAUTION AREAS AND AID UNIT
SERVICE. AN ELECTRICAL DIAGRAM SHALL BE ATTACHED TO CONTROL PANELS.
INSTALLATION AND MAINTENANCE BULLETINS SHALL BE SUPPLIED WITH EACH
UNIT.
D. UNIT CABINET SHALL BE CONSTRUCTED FROM HEAVY-GAUGE
GALVANIZED STEEL WITH A BAKED ACRYLIC ENAMEL FINISH. UNIT SHALL
BE EQUIPPED WITH INDIVIDUALLY REMOVABLE EXTERIOR PANELS AND AN
ELECTRIC COMPARTMENT HINGED ACCESS PANEL WITH QUICK RELEASE
FASTENERS. THE UNIT BASE SHALL OVERHANG THE ROOF CURB FOR
WATER RUN-OFF AND SHALL HAVE A FORMED RECESS THAT SEATS ON THE
ROOF CURB GASKET TO PROVIDE A POSITIVE WATERTIGHT SEAL.
E. ALL UNITS SHALL BE DESIGNED FOR BOTTOM SUPPLY AND RETURN DUCT
CONNECTIONS. MINIMUM 1-INCH THICK, LB. DENSITY NEOPRENE FACED
FIBERGLASS INSULATION SHALL BE PERMANENTLY FASTENED TO THE
CABINET INTERIOR.
F. EACH UNIT SHALL BE FURNISHED WITH A DIRECT EXPANSION
REFRIGERATION SYSTEM INCLUDING A FACTORY CHARGE OF R-410A, COILS
FABRICATED OF ALUMINUM FINS BONDED TO SEAMLESS COPPER TUBES,
REFRIGERANT METERING DEVICE AND LIQUID LINE FILTER--DRIER
COMPRESSORS SHALL BE HEAVY-DUTY RECIPROCATING, FULL HERMETIC
TYPE WITH INTERNAL OVERLOAD PROTECTION, CRANKCASE HEATERS AND
HIGH AND LOW PRESSURE CONTROLS.
G. REFRIGERATION CONTROLS SHALL INCLUDE A MINIMUM HIGH AND LOW
PRESSURE CONTROL, COMPRESSOR WINDING THERMOSTAT AND
OVERLOAD, LOCKOUT CIRCUIT WITH RESET AT THE UNIT CONTROL PANEL,
CONTACTORS FOR CONDENSER/EVAPORATOR FANS AND COMPRESSOR,
AND CONTROL POWER TRANSFORMER.

EXECUTION
A. ALL EQUIPMENT SHALL BE INSTALLED AS SHOWN ON PLANS AND IN ACCORDANCE
WITH THE MANUFACTURER'S RECOMMENDATIONS.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL FILTERS UNTIL
THE FINAL INSPECTION. THE UNITS SHALL NOT BE OPERATED WITHOUT AIR
FILTERS AT ANY TIME. FILTERS SHALL NOT BE ALLOWED TO BE OVERLOADED
WITH DUST OR DIRT.
C. UPON COMPLETION OF THE PROJECT AND IMMEDIATELY PRIOR TO ACCEPTANCE BY
THE OWNER, THE UNITS SHALL BE PROVIDED WITH CLEAN FILTERS. PROVIDE A
MINIMUM OF TWELVE (12) MONTHS OF FILTERS FOR EACH UNIT.
D. PROVIDE FACTORY START UP ON ALL MAJOR PIECES OF EQUIPMENT
E. ALL EQUIPMENT SHALL BE THOROUGHLY CLEANED BEFORE PLACING IN SERVICE
AFTER INITIAL TEST RUNS BEFORE OWNER OCCUPANCY.
15800 AIR DISTRIBUTION
GENERAL
ITEMS INCLUDED
A. DUST SYSTEM
a. SUPPLY AND INSTALL A COMPLETE DUST COLLECTION SYSTEM AS INDICATED AND
SPECIFIED HEREIN.

B. DUST SYSTEM: THIS SYSTEM SHALL BE CONSTRUCTED OF GALVANIZED


IRON AND SHALL BE FREE FROM ANY OBSTRUCTIONS INCLUDING BURRS
AND THE LIKE. GENERALLY, THE SYSTEM INSTALLATION SHALL COMPLY
WITH THE FOLLOWING:
1. UP TO 200 MM IN THE LARGEST DIMENSION-0.85-MM .2
2. 25 MM TO 450 MM IN THE LARGEST DIMENSION -1.0 MM.
3. 475 MM TO 750 MM IN THE LARGEST DIMENSION -1.3 MM.

96 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
4. ALL JOINTS SHALL BE COMPRESSION FIT TYPE WITH 25-MM LAP UP TO
AND INCLUDING 450-MM DIAMETER DUCTS AND 32 MM LAPS FOR DUCTS
OF 475 MM IN DIAMETER AND OVER.
5. ALL ELBOWS SHALL HAVE RADII EQUAL TO TWO DUCT
DIAMETERS AND SHALL BE ONE GAUGE HEAVIER THAN THE
CONNECTING STRAIGHT SECTIONS. ELBOWS 150 MM IN DIAMETER
AND SMALLER SHALL BE FIVE SECTION ELBOWS AND DUCTS OVER 150
MM IN DIAMETER SHALL BE 7 SECTIONS. PREFABRICATED ELBOWS OF
SMOOTH CONSTRUCTION MAY BE USED IN LIEU OF THE ABOVE.
6. HIGH-PRESSURE FLEXIBLE CONNECTIONS AT FAN INLET AND OUTLET.
7. TRANSITIONS NOT TO BE LESS THAN 125 MM OF RUN FOR EACH 25 MM
CHANGE IN DIAMETER.
8. NO TWO BRANCH DUCTS MAY CONNECT TO THE MAIN AT THE SAME
POINT.
9 A MINIMUM OF 300 MM OF STRAIGHT DUCT SHALL BE INSTALLED
BETWEEN ANY TWO INCREASES OR CONNECTORS.
10 CONNECTIONS SHALL BE MADE AT A 30-DEGREE ANGLE.
11. PROVIDE DEAD END CAPS WITHIN 150 MM OF THE END OF EACH MAIN.
B. FILTER SECTIONS
1. ALL AIR SYSTEMS SHALL BE PROVIDED WITH FILTER SECTIONS TO
CLEAN THE AIR AND PROTECT SYSTEM COMPONENTS.
2.FILTER INSTALLATIONS SHALL INCLUDE PREFILTERS TO KEEP
SYSTEM COMPONENTS CLEAN AND FINAL FILTERS FOR SUPPLY AIR
SYSTEMS TO ENSURE VENTILATION AIR CLEANLINESS.
3. FILTERS ROWS SHALL HAVE SEPARATE HOLDING FRAMES WITH SIDE
ACCESS PROPERLY SIZED IN ACCORDANCE WITH THE FILTER
MANUFACTURER'S GUIDELINES. INSTALLATION SHALL PERMIT EASY
REMOVAL OF ALL FILTERS FOR FILTER REPLACEMENT
C. KITCHEN EXHAUST FANS
1. PROVIDE FANS TO MEET NFPA AND ULC REQUIREMENTS COMPLETE
WITH NFPA AND ULC APPROVED ROOF CURBS.
2. SUPPLY AND INSTALL NON-OVERLOADING TYPE CENTRIFUGAL UP
BLAST EXHAUST FAN
WITH STEEL OR ALUMINUM ENCLOSURE, BACK DRAFT DAMPER,
PULLEYS, BELTS AND MOTOR.
3. FAN DISCHARGE SHALL BE 1000 MM (40") ABOVE ROOF.
4. SUPPLY AND INSTALL CENTRIFUGAL BACKWARD CURVE SISW FAN WITH
WEATHERPROOF MOTOR AND DRIVE ENCLOSURE, MOTOR, DRIVES,
BELTS, AND BDD CLEANOUT DOOR AND DRAIN TO DISCHARGE
EQUIPMENT INSTALLATION:
A. SEE SECTION 15100, BASIC MATERIALS AND METHODS - MECHANICAL.
B. EQUIPMENT SHALL BE INSTALLED, COMPLETE WITH ACCESSORIES, IN STRICT
ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.
C. ALL EQUIPMENT SHALL BE ARRANGED FOR EASE IN SERVICING FILTERS, OIL
AND GREASE POINTS, BELTS, MOTORS, ETC.
D. NECESSARY DISCONNECT SWITCHES, MOTOR STARTERS, AND CONTROL
DEVICES MOUNTED/INSTALLED SEPARATELY FROM EQUIPMENT SHALL BE
PROPERLY PROVIDED AND INSTALLED.
SYSTEM OPERATING AND BALANCING:
A. UPON COMPLETION OF INSTALLATIONS, CONTRACTOR SHALL HAVE AN
INDEPENDENT TEST AND BALANCE AGENCY, BALANCE AND TEST ALL SYSTEMS.
B. USING STANDARD AIR BALANCE EQUIPMENT AND DEVICES, MEASURE AND
ADJUST ALL AIR OUTLETS AND INLETS TO WITHIN 5% OF THE DESIGN FLOW
INDICATED.

97 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
C. RECORD CFM MEASURED AT FINAL BALANCE FOR EACH NEW AIR SUPPLY AND
EXHAUST DEVICE. PROVIDE REPORT OF AIR BALANCE IN TRIPLICATE TO OWNER'S
REPRESENTATIVE. SHOW BOTH DESIGN AND MEASURED AIR FLOW ON AIR
BALANCE.
15900 HVAC INSTRUMENTATION AND CONTROLS
SECTION INCLUDES
A. CONTROL PANELS
B. CONTROL VALVES
PRODUCTS
A. CONTROL PANELS
a. PROVIDE ALL REQUIRED CABINETS FOR AUTOMATIC CONTROLS FOR ALL
SYSTEMS. PANELS SHALL HOUSE RELAYS, POWER SOURCES, CONTROLLERS AND
ASSOCIATED CONTROL DEVICES REQUIRED FOR COMPLETE AND OPERABLE
SYSTEMS. MOUNT TEMPERATURE INDICATORS, PRESSURE GAGES, PILOT LIGHTS,
PUSH BUTTONS AND SWITCHES FLUSH ON CABINET PANEL FACE.
b. THE MAIN CONTROL PANEL, LOCATED IN THE BASEMENT MECHANICAL ROOM,
SHALL REQUIRE A SINGLE POINT, 110V POWER SUPPLY. PANEL SHALL INTERFACE
WITH THE EXISTING CAMPUS ANDOVER SYSTEM AND SHALL BE CAPABLE OF
SENDING AND RECEIVING SIGNALS FROM ALL HVAC SYSTEMS FOR MONITORING
AND CONTROL PURPOSES.
c. PROVIDE COMMON KEYING FOR ALL PANEL
B. CONTROL VALVES
A. PROVIDE AUTOMATIC CONTROL VALVES FOR THE SPECIFIED CONTROLLED
MEDIA, STEAM OR WATER. EQUIP CONTROL VALVES WITH ACTUATORS OF
REQUIRED INPUT POWER TYPE AND CONTROL SIGNAL TYPE TO ACCURATELY
POSITION THE FLOW CONTROL ELEMENT AND PROVIDE SUFFICIENT FORCE TO
ACHIEVE REQUIRED LEAKAGE SPECIFICATION.
B. CONTROL VALVES SHALL MEET THE HEATING AND COOLING LOADS SPECIFIED
AND SHALL CLOSE OFF AGAINST THE DIFFERENTIAL PRESSURE CONDITIONS
WITHIN THE APPLICATION. VALVES SHALL BE SIZED TO OPERATE ACCURATELY
AND WITH FROM 10% TO 100% OF THE MAXIMUM DESIGN FLOW.
C. TRIM MATERIAL SHALL BE STAINLESS STEEL FOR ALL APPLICATIONS.
D. PROVIDE VALVES CONSISTENT WITH PIPING SPECIFICATION SECTIONS.
EXAMINATION
A. VERIFY CONDITIONS BEFORE STARTING WORK.
B. VERIFY THAT SYSTEMS ARE READY TO RECEIVE WORK.
C. BEGINNING OF INSTALLATION MEANS INSTALLER ACCEPTS EXISTING
CONDITIONS.
D. SEQUENCE WORK TO ENSURE INSTALLATION OF COMPONENTS IS
COMPLEMENTARY TO INSTALLATION OF SIMILAR COMPONENTS IN OTHER
SYSTEMS.
E. COORDINATE INSTALLATION OF SYSTEM COMPONENTS WITH INSTALLATION OF
MECHANICAL SYSTEMS EQUIPMENT, SUCH AS, AIR HANDLING UNITS.
F. ENSURE INSTALLATION COMPONENTS ARE COMPLEMENTARY TO INSTALLATION
OF SIMILAR COMPONENTS.
INSTALLATION

98 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
A. INSTALL IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS.
B. INSTALL INSTRUMENTATION WHERE SHOWN ON THE DRAWINGS, INDICATED IN
THE SPECIFICATIONS AND AS REQUIRED FOR A COMPLETE AND OPERABLE
SYSTEM.
C. CHECK AND VERIFY LOCATION OF THERMOSTATS AND OTHER EXPOSED
CONTROL SENSORS WITH PLANS AND ROOM DETAILS BEFORE INSTALLATION.
D. PROVIDE SEPARABLE SOCKETS FOR LIQUIDS AND FLANGES FOR AIR BULB
ELEMENTS.
E. PROVIDE CONDUIT AND ELECTRICAL WIRING IN ACCORDANCE WITH DIVISION 16.

DIVISION 16: ELECTRICAL


16050 BASIC ELECTRICAL MATERIALS AND METHODS
16050.1.1 GENERAL
A. THE INTENT OF DIVISION 16 SPECIFICATIONS AND THE ACCOMPANYING
DRAWINGS IS TO PROVIDE A COMPLETE AND WORKABLE FACILITY WITH COMPLETE
SYSTEMS AS SHOWN, SPECIFIED AND REQUIRED BY APPLICABLE CODES. INCLUDE ALL
WORK SPECIFIED IN DIVISION 16 AND SHOWN ON THE ACCOMPANYING DRAWINGS,
INCLUDING APPURTENANCES, CONNECTIONS, ETC., IN THE FINISHED JOB.
B. THE DIVISION 16 SPECIFICATIONS AND THE ACCOMPANYING DRAWINGS ARE
COMPLEMENTARY AND WHAT IS CALLED FOR BY ONE SHALL BE AS BINDING AS IF
CALLED FOR BY BOTH. ITEMS SHOWN ON THE DRAWINGS ARE NOT NECESSARILY
INCLUDED IN THE SPECIFICATIONS AND VICE VERSA.
C. IMPERATIVE LANGUAGE IS FREQUENTLY USED IN DIVISION 16 SPECIFICATIONS.
EXCEPT AS OTHERWISE SPECIFIED, REQUIREMENTS EXPRESSED IMPERATIVELY ARE TO
BE PERFORMED BY THE CONTRACTOR.
E. CLEARLY AND PROPERLY IDENTIFY THE COMPLETE ELECTRICAL SYSTEM TO
INDICATE THE LOADS SERVED OR THE FUNCTION OF EACH ITEM OF EQUIPMENT
CONNECTED UNDER THIS WORK.
16050.1.2 SITE VISITATION

THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING AND BECOME
FAMILIAR WITH EXISTING
CONDITIONS AND ALL OTHER FACTORS THAT MAY AFFECT THE EXECUTION OF THE WORK.
INCLUDE ALL RELATED
COSTS IN THE INITIAL BID PROPOSAL.

16050 1.3 COORDINATION OF WORK

A. CONDUCT WORK IN A MANNER TO COOPERATE WITH ALL OTHER TRADES FOR


PROPER INSTALLATION OF ALL ITEMS OF EQUIPMENT. CONSULT THE DRAWINGS OF ALL
OTHER TRADES OR CRAFTS TO AVOID CONFLICTS WITH CABINETS, COUNTERS,
EQUIPMENT, STRUCTURAL MEMBERS, ETC. IN GENERAL, THE ARCHITECTURAL
DRAWINGS GOVERN BUT CONFLICTS SHALL BE RESOLVED WITH THE ARCHITECT PRIOR
TO ROUGH-IN.
B. VERIFY THE PHYSICAL DIMENSION OF EACH ITEM OF ELECTRICAL EQUIPMENT
TO FIT THE AVAILABLE SPACE. COORDINATION OF THE EQUIPMENT TO FIT INTO THE
AVAILABLE SPACE AND THE ACCESS ROUTES THROUGH THE CONSTRUCTION SHALL BE
THE CONTRACTOR’S RESPONSIBILITY.
C. PREPARE DETAILED LAYOUT DRAWINGS FOR PANEL LAYOUTS IN ELECTRIC
ROOMS OR CLOSETS, UTILIZING DIMENSIONED SHOP DRAWING DATA OF EQUIPMENT TO
BE FURNISHED. PROVIDE ADDITIONAL WIRING DETAILS AT SWITCHBOARDS, MOTOR
CONTROL CENTERS, AND OTHER AREAS WHERE WORK IS OF SUFFICIENT COMPLEXITY
TO WARRANT ADDITIONAL DETAILING FOR COORDINATION. SUBMIT LAYOUT DRAWINGS

99 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
FOR APPROVAL PRIOR TO COMMENCING FIELD INSTALLATION AND SHALL BE INCLUDED
WITH SHOP DRAWINGS.
D. COORDINATE ROUGH-IN AND WIRING REQUIREMENTS FOR ALL EQUIPMENT
PROVIDED UNDER OTHER
DIVISIONS OF THE WORK AND REQUIRING ELECTRICAL CONNECTIONS WITH
EQUIPMENT SUPPLIER AND
INSTALLER. MAKE INSTALLATION AND CONNECTIONS IN ACCORDANCE WITH
ROUGH-IN AND WIRING DIAGRAMS PROVIDED FOR CONTRACTOR’S USE. ARRANGE
RACEWAYS, WIRING, AND EQUIPMENT TO PERMIT READY ACCESS TO SWITCHES,
MOTORS, AND CONTROL COMPONENTS. DOORS AND ACCESS PANELS SHALL BE KEPT
CLEAR.
16050.1.4 ELECTRICAL DRAWINGS

A. THE DRAWINGS THAT ACCOMPANY THE DIVISION 16 SPECIFICATIONS ARE


DIAGRAMMATIC. THEY DO NOT SHOW ALL OFFSETS, FITTINGS, OR ACCESSORIES THAT
MAY BE REQUIRED TO INSTALL WORK IN THE SPACE PROVIDED AND AVOID
CONFLICTS. FOLLOW THE DRAWING AS CLOSELY AS IS PRACTICAL AND INSTALL
ADDITIONAL BENDS, OFFSETS, FITTINGS, AND ACCESSORIES WHERE REQUIRED BY LOCAL
CONDITIONS FROM MEASUREMENTS TAKEN AT THE JOBSITE. THE RIGHT IS RESERVED TO
MAKE MINOR \FIELD ORDER CHANGES IN OUTLET LOCATION PRIOR TO ROUGHING-IN
WITHOUT ADDITIONAL COST TO THE OWNER.
 THE INTENT OF THE BRANCH CIRCUITING AND SWITCHING SHOWN SHALL NOT
BE CHANGED NOR HOMERUNS COMBINED WITHOUT THE APPROVAL OF THE ARCHITECT.
FEEDER RUNS ARE NOT TO BE COMBINED OR CHANGED.
C. WHERE MC CABLE IS USED, PROVIDE CABLE CONFIGURATIONS TO ACCOMPLISH
THE CIRCUITING INDICATED.
16050.1.5 SUBMITTALS
A. INCLUDE MANUFACTURER’S DETAILED SPECIFICATIONS AND DATA SHEETS TO
FULLY DESCRIBE EQUIPMENT FURNISHED. ASSURE THAT ALL DEVIATIONS FROM THE
DRAWINGS AND SPECIFICATIONS ARE SPECIFICALLY NOTED IN THE SUBMITTALS. FAILURE
TO COMPLY WILL AUTOMATICALLY VOID ANY IMPLIED APPROVAL FOR USE OF THE
EQUIPMENT ON THIS PROJECT.
B. REVIEW AND RECOMMENDATIONS BY THE ARCHITECT OR ENGINEER ARE NOT
TO BE CONSTRUED AS CHANGE AUTHORIZATIONS. IF DISCREPANCIES BETWEEN THE
MATERIALS OR EQUIPMENT SUBMITTED AND THE CONTRACT DOCUMENTS ARE
DISCOVERED EITHER PRIOR TO OR AFTER THE DATA IS PROCESSED, THE CONTRACT
DOCUMENTS WILL GOVERN.
C. ENGINEER’S REVIEW IS FOR GENERAL CONFORMANCE WITH THE DESIGN
CONCEPT OF THE PROJECT AND THE INFORMATION GIVEN IN THE CONSTRUCTION
DOCUMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR, AND THIS REVIEW DOES
NOT INCLUDE: CONFIRMING AND CORRELATING ALL QUANTITIES AND DIMENSIONS;
SELECTING FABRICATION PROCESSES AND TECHNIQUES OF CONSTRUCTION;
COORDINATING THE WORK WITH THAT OF OTHER TRADES AND PERFORMING ALL WORK IN
SAFE AND SATISFACTORY MANNER. CORRECTIONS OR COMMENTS MADE ON THE
SUBMITTAL DURING REVIEW DO NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE
WITH THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS OR WITH ITS
RESPONSIBILITIES LISTED HEREIN.
D. THE INSTALLATION DRAWINGS CALLED FOR UNDER SUBMITTALS SHALL SHOW
ALL OUTLETS, DEVICES, TERMINAL
CABINETS, CONDUITS, WIRING, AND CONNECTIONS REQUIRED FOR THE COMPLETE
SYSTEM DESCRIBED.
PRINTS OF THESE DRAWINGS SHALL BE SUBMITTED PRIOR TO STARTING
INSTALLATION. THE CONTRACTOR
SUBMITTED DRAWINGS WILL THEN FORM THE BASIS FOR INSTALLATION.
E. RECORD IN-PROGRESS DRAWINGS SHALL BE KEPT UP TO DATE AS THE WORK
PROGRESSES SHOWING ALL CHANGES, DEVIATIONS, ADDENDUM ITEMS, CHANGE
ORDERS, CORRECTIONS, OR OTHER VARIATIONS FROM THE CONTRACT DRAWINGS.
F. THE MARKED UP DRAWINGS SHALL BE KEPT AT THE JOBSITE AND AVAILABLE
FOR THE ARCHITECT’S REVIEW. AT THE COMPLETION OF THE WORK, ALL DEVIATIONS

100 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
FROM THE INSTALLATION DRAWINGS SHALL BE INCORPORATED ON THE REPRODUCIBLES
TO INDICATE “AS-BUILT” CONDITIONS. THE DRAWINGS SHALL THEN BE SUBMITTED TO THE
ARCHITECT AS RECORD DRAWINGS FOR THE SYSTEM.
16050.PRODUCTS
16050 1.6 MATERIALS

A. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED FOR THE
LOCATION AND PURPOSES
B. ALL FLUORESCENT LAMPS SHALL BE PROVIDED WITH PRE-HEAT POWER
FACTOR BALLAST
AND SPRING LOADED LAMP HOLDER.
C. ALL LIGHT CONTROLLED SWITCHES SHALL BE RATED 15 AMPS, 230V AC ONLY.
SWITCHES SHALL BE INSTALLED FOR OPERATION WITH VERTICAL MOTION.
D. ALL PANEL BOARDS SHALL BE PROVIDED WITH GROUND BUS BAR AND NEUTRAL
BUS BAR.
E. MOUNTING HEIGHT NOT SHOWN SCHEDULE ARE AS FOLLOWS:
1. LIGHT CONTROLLED SWITCHES - 1.40 METER ABOVE FLOOR FINISH AND
CENTER.
2. CONVENIENCE, TELEPHONE AND CABLE OUTLETS- 0.30 METER ABOVE
FLOOR FINISH AND CENTER.
3. PANEL BOARDS - 1.4 METER ABOVE FLOOR FINISH AND CENTER. UNLESS
OTHERWISE INDICATED BY THE FIELD CONDITION.
F. ELECTRICAL PRODUCTS INSTALLED IN THIS PROJECT SHALL BE LISTED BY A
RECOGNIZED TESTING LABORATORY OR APPROVED IN WRITING BY THE LOCAL
INSPECTION AUTHORITY AS REQUIRED BY GOVERNING CODES AND ORDINANCES.
G. ALL MATERIALS:
1. LED FLOOD LAMP 40W
2. SURFACE LED DOWNLIGHT 6W (SQUARE)
3. SUSPENDED LIGHTS
4. PANEL BOARD
5. LED TUBE & BOX TYPE 18W
6. LED TUBE & BOX TYPE 7W
7. WALL LAMP WITH LED BULB 5W
8. SURFACE LED DOWNLIGHT 40W (SQUARE)
9. CHANDELIER LIGHT
10. CONVENIENCE OUTLET CIRCUIT
11. 2 – CONVENIENCE OUTLET
12. 2 – WEATHER PROOF OUTLET
13. AC OUTLET
14. TELEPHONE
15. ROUTER/WIFI
16. POWER METER
17. CIRCUIT BREAKER
16050 EXECUTION
16050.1.8 INSTALLATION
PROVIDE A COMPLETE PROPERLY OPERATING SYSTEM FOR EACH ITEM OF
EQUIPMENT CALLED FOR UNDER THIS WORK. INSTALLATIONS SHALL BE IN ACCORD WITH
THE EQUIPMENT MANUFACTURER’S INSTRUCTIONS, THE BEST INDUSTRY PRACTICES AND
THE CONTRACT DOCUMENTS. WHERE A CONFLICT IN THESE GUIDES APPEAR, THE
ARCHITECT SHALL BE REQUESTED TO PROVIDE PROPER CLARIFICATION BEFORE WORK IS
ROUGHED IN AND THE ARCHITECT’S DECISION WILL BE FINAL. WORK INSTALLED WITHOUT
SUCH CLARIFICATION SHALL BE
REMOVED AND CORRECTED BY THE CONTRACTOR AT NO COST TO THE OWNER

101 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
16050.1.9 NOISE CONTROL
A. OUTLET BOXES AT OPPOSITE SIDES OF PARTITIONS SHALL NOT BE PLACED
BACK TO BACK NOR STRAIGHT THROUGH BOXES BE EMPLOYED, EXCEPT WHERE
SPECIFICALLY PERMITTED ON THE DRAWINGS BY NOTE TO MINIMIZE TRANSMISSION OF
NOISE BETWEEN OCCUPIED SPACES.
B. CONDUIT SHALL BE ROUTED ALONG CORRIDORS OR OTHER “NONCRITICAL”
SPACE TO MINIMIZE PENETRATIONS THROUGH SOUND RATED WALLS. ALL PENETRATIONS
THROUGH SOUND RATED PARTITIONS SHALL BE GROUTED SOLID AND AIRTIGHT. CONDUIT
AND ITS ASSOCIATED ATTACHMENT SHALL NOT RIGIDLY CONNECT (I.E.,BRIDGE)
INDEPENDENT WALL STRUCTURES. FLEXIBLE CONNECTIONS OR ATTACHMENTS ARE
REQUIRED.
C. CONTACTORS, TRANSFORMERS, STARTERS, AND SIMILAR NOISE PRODUCING
DEVICES SHALL NOT BE PLACED ON WALLS WHICH ARE COMMON TO OCCUPIED SPACES
UNLESS SPECIFICALLY CALLED FOR ON THE DRAWINGS. WHERE SUCH DEVICES MUST BE
MOUNTED ON WALLS COMMON TO OCCUPIED SPACES, THEY SHALL BE SHOCK MOUNTED
OR ISOLATED IN SUCH A MANNER AS TO EFFECTIVELY PREVENT THE TRANSMISSION OF
THEIR INHERENT NOISE TO THE OCCUPIED SPACE.
16050.2.0 ALLIGNMENT

A. INSTALL PANELS, CABINETS, AND EQUIPMENT LEVEL AND PLUMB, PARALLEL


WITH STRUCTURAL BUILDING LINES. SWITCHGEAR PANELS AND ALL ELECTRICAL
ENCLOSURES SHALL FIT NEATLY WITHOUT GAPS, OPENINGS, OR DISTORTION. PROPERLY
AND NEATLY CLOSE ALL UNUSED OPENINGS WITH APPROVED DEVICES.
B. FIT SURFACE PANELS, DEVICES, AND OUTLETS WITH NEAT, APPROPRIATE
TRIMS, PLATES, OR COVERS WITHOUT OVERHANGING EDGES, PROTRUDING CORNERS,
OR RAW EDGES TO LEAVE A FINISHED APPEARANCE.
16050.2.1 PROTECTION OF WORK

A. PROTECT ALL ELECTRICAL WORK AND EQUIPMENT INSTALLED UNDER THIS


DIVISION AGAINST DAMAGE BY OTHER TRADES, WEATHER CONDITIONS, OR ANY OTHER
CAUSES. EQUIPMENT FOUND DAMAGED OR IN OTHER
THAN NEW CONDITION WILL BE REJECTED AS DEFECTIVE.
B. SWITCHGEAR, TRANSFORMERS, PANELS, LUMINAIRES, AND ALL ELECTRICAL
EQUIPMENT SHALL BE KEPT COVERED OR CLOSED TO EXCLUDE DUST, DIRT, AND
SPLASHES OF PLASTER, CEMENT, OR PAINT AND SHALL BE FREE OF ALL SUCH
CONTAMINATION BEFORE ACCEPTANCE. ENCLOSURES AND TRIMS SHALL BE IN NEW
CONDITION, FREE OF RUST, SCRATCHES, AND OTHER FINISH DEFECTS. PROPERLY
REFINISH IN A MANNER
ACCEPTABLE TO THE ARCHITECT, IF DAMAGED.

16050.2.2 MAINTENANCE OF SERVICE

ELECTRICAL SERVICE SHALL BE MAINTAINED TO ALL FUNCTIONING PORTIONS OF


THE BUILDING THROUGHOUT CONSTRUCTION, EXCEPT AS NOTED BELOW, DURING ALL
NORMAL WORKING HOURS OF THE BUILDING
OCCUPANTS. OUTAGES TO OCCUPIED AREAS SHALL BE KEPT TO A MINIMUM AND BE PRE-
ARRANGED WITH
THE ARCHITECT OR OWNER’S REPRESENTATIVE. THIS CONTRACTOR WILL BE LIABLE FOR
ANY DAMAGES
RESULTING FROM UNSCHEDULED OUTAGES OR FOR THOSE NOT CONFINED TO THE PRE-
ARRANGED TIMES.

16100 WIRING METHODS

16100.1.1 GENERAL

THIS SECTION PROVIDES WIRING METHODS.

16100.1.2 SUBMITTALS

PRODUCT DATA.

102 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
16100 1.3 MATERIALS

A. WIRING DEVICES SHALL BE SPECIFICATION GRADE, WITH SPECIAL DEVICES AS


NOTED ON THE DRAWINGS. SHOULD THE DRAWINGS INDICATE A DEVICE OTHER THAN
THOSE LISTED HEREIN WITHOUT REFERENCE TO CATALOG NUMBER, SUCH DEVICE SHALL
BE OF SAME GRADE AND MANUFACTURE AS SPECIFIED BELOW.
B. ALL LIGHTING SWITCHES AND DUPLEX RECEPTACLES INSTALLED SHALL HAVE
SIMILAR APPEARANCE CHARACTERISTICS UNLESS NOTED OTHERWISE.
C. WIRING METHOD SHALL BE DONE IN INTERMEDIATE METALLIC CONDUIT FOR
LIGHTING, POWER AND AUXILIARY SYSTEM, AND PVC PIPE FOR ALL EMBEDDED CONDUIT.
16100 1.4 SWITCH

A. ALL LIGHT CONTROLLED SWITCHES SHALL BE RATED 15 AMPS, 230V AC ONLY.


SWITCHES SHALL BE INSTALLED FOR OPERATION WITH VERTICAL MOTION.
16100 EXECUTION

16100 1.6 INSTALLATION

A. DEVICES AND FINISH PLATES TO BE INSTALLED PLUMB WITH BUILDING LINES.


WALL MOUNTED RECEPTACLES SHALL BE INSTALLED VERTICALLY AT CENTERLINE HEIGHT
SHOWN ON THE DRAWINGS.
B. FINISH PLATES AND DEVICES ARE NOT TO BE INSTALLED UNTIL FINAL PAINTING
IS COMPLETE. SCRATCHED OR SPLATTERED FINISH PLATES AND DEVICES WILL NOT BE
ACCEPTED.
C. PROVIDE WEATHERPROOF DEVICE COVERS ON DEVICES AT ALL EXTERIOR
LOCATIONS AND DAMP OR WET LABEL AREAS.
D. LOCATIONS OF ALL OCCUPANCY SENSORS SHALL BE PER MANUFACTURER’S
RECOMMENDATIONS AND INSTALLATION REQUIREMENTS FOR OPTIMAL COVERAGE.
REFERENCE TO ARCHITECTURAL DRAWINGS AND
INTERIOR DESIGN DRAWING IS REQUIRED. COORDINATION OF DEVICE PLACEMENT WITH
FURNISHINGS IS REQUIRED TO ASSURE DESIRED OPERATION.
16100 1.7 COORDINATION

A. THE ELECTRICAL DRAWINGS INDICATE THE APPROXIMATE LOCATION OF ALL


DEVICES. REFER TO
ARCHITECTURAL ELEVATIONS, SECTIONS AND DETAILS FOR EXACT LOCATIONS.
B. COORDINATE WITH EQUIPMENT INSTALLER THE LOCATIONS AND METHODS OF
CONNECTION TO DEVICES MOUNTED IN CABINETS, COUNTERS, WORK BENCHES, SERVICE
PEDESTALS AND SIMILAR EQUIPMENT.
16200 ELECTRICAL POWER

16200.1.1 GENERAL

A. THE ELECTRICAL POWER SHALL BE CARRIED OUT BY AN ELECTRICAL SUB-


CONTRACTOR WHO IS ON THE APPROVED LIST OF ELECTRICAL CONTRACTOR.
B. THE ELECTRICAL SUB-CONTRACTOR MUST HAVE, DURING THE ENTIRE
DURATION OF THE CONTRACT, QUALIFIED ELECTRICAL ENGINEER AND ELECTRICAL
SUPERVISOR FOR ENSURING PROPER EXECUTION AND SUPERVISION OF WORK. THE
ELECTRICAL ENGINEER SHOULD BE LICENSED & REGISTERED WITH THE LOCAL
ENGINEER’S ASSOCIATION AND HIS NAME, QUALIFICATIONS AND EXPERIENCE SHOULD BE
SUBMITTED FOR APPROVAL. THE ELECTRICAL ENGINEER AND SUPERVISOR SHOULD BE
AVAILABLE AT SITE DURING ALL WORKING HOURS.

16200 1.2 SCOPE

THE WORK INCLUDED IN THESE SPECIFICATIONS IS FOR THE COMPLETE


ELECTRICAL SERVICES FOR THE PROJECT. THE WORK DESCRIBED AND INCLUDED IN THIS
SPECIFICATION IS FOR THE MANUFACTURE WORKS, TESTING, SUPPLY, DELIVERY TO SITE,
ERECTION, CONNECTION, SITE TESTING, DEMONSTRATING, COMMISSIONING AND
MAINTAINING FOR REQUIRED DURATION, ALL EQUIPMENT AND INSTALLATION AS
DESCRIBED IN THIS SPECIFICATIONS AND SHOWN ON CONTRACT DRAWINGS.

103 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
ADDITIONALLY ALL EQUIPMENT AND INSTALLATION SHALL CONFORM TO LOCAL

AUTHORITIES SPECIFICATIONS.
16200 1.3 REGULATIONS

THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY REQUIREMENTS AND


REGULATIONS ISSUED BY THE LOCAL AUTHORITIES WITHIN WHOSE AREA OF
JURISDICTION THE SITE IS CONTAINED.
THE CONTRACTOR SHALL ALSO COMPLY WITH THE RELEVANT "CODES OF PRACTICE"
ISSUED BY THE BRITISH STANDARDS INSTITUTION AND THE LATEST EDITION OF THE
"REGULATIONS FOR THE ELECTRICAL EQUIPMENT OF BUILDINGS" ISSUED BY THE
INSTITUTION OF ELECTRICAL ENGINEERS, AND ANY SUPPLEMENTS THERETO.

16200 1.4 COMPUTATION

16200.1.5 CAPACITIES

THE CAPACITIES AND RATINGS OF THE EQUIPMENT, ELECTRICAL COMPONENTS


AND ACCESSORIES SHALL BE SUFFICIENT TO GIVE SATISFACTORY SERVICE IN THE
ENVIRONMENTS CONDITIONS STATED HEREIN BEFORE.

16200 1.6 FUSING AND PROTECTION

THE RATING (IN AMPERES) OF CIRCUIT BREAKERS, SWITCH FUSES AND CIRCUIT
WAYS OF DISTRIBUTION BOARDS GIVEN ON DIAGRAMS OR DRAWINGS ARE THE MAXIMUM
NORMAL (OPERATING) RATING PERMISSIBLE FOR SUCH CIRCUIT.
ON COMPLETION OF THE INSTALLATION IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO SET THE OVERLOAD PROTECTION APPROPRIATE TO THE ACTUAL
LOADING ON EACH CIRCUIT.
THE CONTRACTOR SHALL BE HELD LIABLE TO MAKE GOOD ANY DAMAGE RESULTING FROM
OVERLOADING SHOULD IT BE DISCOVERED THAT OVERLOADS WHERE IMPROPERLY SET
OR FUSED INCORRECTLY RATED.

16200 PRODUCT AND MATERIALS

A. ALL EQUIPMENT AND MATERIALS USED IN THE ELECTRICAL INSTALLATION WORK


SHALL BE NEW AND OF THE HIGHEST QUALITY. THEY SHALL BE SUITABLE FOR OPERATION
THE STANDARD VOLTAGE AND FREQUENCY IN THE AREA OF THE PROJECT.

104 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
B. IF STANDARDS MENTIONED ABOVE CONTRADICT WITH THIS SPECIFICATION,
THEN THE REQUIREMENTS OF THIS SPECIFICATION SHALL PREVAIL.

C. THE DETAILS OF EQUIPMENT AND MATERIALS SHALL INCLUDE THE FOLLOWING:


1. FULL TECHNICAL SPECIFICATIONS OF EQUIPMENT INCLUDING
CONSTRUCTION, MATERIALS, DEGREE OF PROTECTION, CHARACTERISTICS, CURVES,
DIAGRAMS, RATINGS, DIMENSIONS, FIXING DETAILS.
2. RELEVANT SHEETS OF MANUFACTURER'S CATALOGUES,
SPECIFICATIONS, TECHNICAL DATA
3. CONFIRMATION THAT EQUIPMENT AND MATERIALS OFFERED COMPLIES
FULLY WITH RELEVANT CLAUSES OF THE SPECIFICATION AND, IN CASE OF DEVIATION
FROM THE SPECIFICATION, A SCHEDULE OF DEVIATIONS LISTING ALL POINTS NOT
CONFORMING TO THE SPECIFICATION.
4. SHORT CIRCUIT STUDY INCLUDING ALL COMPONENTS SHOWN ON THE
SCHEMATIC DIAGRAMS.

D. SUBMIT, AT THE REQUEST OF THE ENGINEER, A SAMPLE OF ANY EQUIPMENT OR


MATERIAL FOR FURTHER STUDY BEFORE APPROVAL.
E. MANUFACTURERS SPECIFIED BY NAME ARE NOT RELIEVED OF THE
RESPONSIBILITY FOR MEETING SPECIFICATION REQUIREMENTS AND SUBMITTAL FOR
APPROVAL.

16500 - LIGHTING

SECTION INCLUDES:

GENERAL: WORK INCLUDED


RELATED WORKS IN OTHER SECTIONS
SUBMITTALS
QUALITY ASSURANCE
MATERIALS
INSTALLATION

16500.1 - GENERAL: WORK INCLUDED

A. IF THE DRAWINGS INDICATE A LIGHTING OUTLET WITH A SPECIFIC TYPE DESIGNATION,


YOU SHOULD INSTALL A LIGHT THAT MATCHES THAT DESIGNATION AT THAT LOCATION. IF
THE DRAWINGS SHOW A LIGHTING OUTLET WITHOUT A TYPE DESIGNATION, YOU SHOULD
INSTALL A LIGHT THAT IS SIMILAR TO THE FIXTURES USED IN AREAS WITH A SIMILAR
PURPOSE OR AESTHETIC.THE GOAL IS TO ENSURE UNIFORMITY IN LIGHTING DESIGN
THROUGHOUT THE BUILDING, BOTH IN TERMS OF FUNCTIONALITY AND AESTHETICS.

B. REQUEST CLARIFICATION FROM THE ENGINEER AND DELIVER AN APPROPRIATE LIGHT


TYPE AS INSTRUCTED IN CASES WHERE A LIGHT TYPE DESIGNATION HAS BEEN
ELIMINATED AND THE CONTRACTOR IS UNABLE TO DETERMINE IT.

C. INSTALLING LIGHTS SHOULD BE COORDINATED WITH INSTALLING THE CEILING AND ALL
OTHER TRADES TO CREATE A SYSTEM THAT LOOKS CLEAN AND WELL-ORGANIZED.
16500.2 RELATED WORKS IN OTHER SECTIONS
A. SECTION 16050 - BASIC ELECTRICAL MATERIALS AND METHODS
B.SECTION 16100 - WIRING METHODS

16500.3 - SUBMITTALS
THE FOLLOWING MUST BE SUBMITTED IN COMPLIANCE WITH SECTION 16050:

A. PRODUCT DATA
B. ON DEMAND OPERATIONAL SAMPLE
C. MAINTENANCE OPERATIONS AND DATA

16500. 4 - QUALITY ASSURANCE

105 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
A. CONSTRUCTION
- RIGIDITY
- WORKMANSHIP
- PERMANENCE OF MATERIALS AND FINISHES

B. PERFORMANCE
- VISUAL COMFORT
- AVERAGE BRIGHTNESS TO MAXIMUM BRIGHTNESS
- UTILIZATION
- SPACING TO MOUNTAIN HEIGHT RATIO

C. APPEARANCE
- COMPLIANCE TO THE DESIGN INTENT
- LIGHT TIGHTNESS
- NEAT, TRIM STYLING.

D. MAINTENANCE
- RELAMPING WITHOUT DIFFICULTY.
- CHANGING OUT THE LAMP SOCKETS.

16500.5 - PRODUCTS
TRIMS FOR RECESSED LIGHTS MUST NEATLY AND SECURELY FIT THE SURFACES WHERE
THEY ARE MOUNTED WITHOUT LEAKS OR GAPS. INSTALL HEAT-RESISTANT NON-RUBBER
GASKETS WHERE NECESSARY TO STOP MOISTURE FROM GETTING BETWEEN THE TRIM OF
THE LIGHTS AND THE SURFACE TO WHICH THEY ARE ATTACHED.

16500.6 - MATERIALS

A. CHANDELIER LIGHT - THERE IS FLEXIBILITY IN PICKING A CHANDELIER THAT MEETS


YOUR UNIQUE NEEDS AND TASTES BECAUSE THEY COME IN A BROAD VARIETY OF
DESIGNS, SIZES, AND MATERIALS. YOU MAY ALSO ALTER THE AMBIENCE TO YOUR
PREFERENCES BY CHANGING THE QUALITY AND COLOR OF THE LIGHT THE CHANDELIER
GENERATES BY CHANGING THE TYPE OF BULBS USED IN IT.

B. SURFACE LED DOWNLIGHT - CONVENTIONAL VOLTAGES LIKE 120V OR 220-240V AC ARE


TYPICALLY USED BY LED FIXTURES.

C. LED T5 TUBE & BOXTYPE - THE TUBE'S SIZE AND FORM ARE DESCRIBED BY THE
DESIGNATION. THE DIAMETER OF T5 TUBES IS ROUGHLY 5/8 INCH (16 MM). THEY ARE
FREQUENTLY OFFERED IN A VARIETY OF LENGTHS TO FIT T5 FLUORESCENT TUBE
FIXTURES THAT ARE MORE COMMON.

D. T5 LIGHT - IS A CLASS OF FLUORESCENT LIGHTING THAT'S FREQUENTLY EMPLOYED FOR


A NUMBER OF INDOOR LIGHTING APPLICATIONS. DUE TO ITS TUBULAR DESIGN AND 5/8-
INCH (16-MILLIMETER) DIAMETER, IT BELONGS TO THE FLUORESCENT LAMP FAMILY
KNOWN AS "T5".

16500.7 - INSTALLATION

A. DETERMINE THE TYPES OF CEILINGS IN EACH LOCATION AND OFFER THE


APPROPRIATE MOUNTING FRAMES AND ACCESSORIES FOR RECESSED LIGHT AS
NEEDED.

B. REGARDING THE PRECISE POSITIONING OF THE LIGHTS IN THE CEILING, THE


ARCHITECTURAL REFLECTED CEILING PLANS SHALL BE GIVEN PROMINENCE.

C. THE ARCHITECTURAL ELEVATIONS AND REFLECTED CEILING PLAN SHOULD BE


FOLLOWED WHILE LEVELING THE LIGHTS, ALIGNING THEM IN STRAIGHT LINES, AND
PLACING THEM. THE ARCHITECT WILL MAKE THE ULTIMATE DETERMINATION ABOUT
THE SUFFICIENCY OF SUPPORT AND ALIGNMENT. THE FIXTURES MUST BE

106 | P a g e
JHTL ARCHITECTS
DESIGN + CONSTRUCTION
jhartzerlagatgmail.com
SUPPORTED INDEPENDENTLY FROM THE BUILDING STRUCTURE AND NOT BY THE
PIPES, DUCTING, OR OTHER SYSTEMS FOUND IN THE CEILING.

107 | P a g e

You might also like