Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

CE SS

AC
O AD
R 1 3 . 2m
ry
ounda
tB Gate House
Plo 2
Footprint: 8.62m
swp Sliding Folding Gate

Plot Bou
Fire
7 m
32.
Assembly

2
67
2,4

161.40°
k Point

14
bac

ndary
5264
t

14
Se
f 5m Thermoplastic paint with glass
e o 15326
Lin ST SP bead to zebra crossing to

Terrace retaining wall


ary
Concrete storm water drain with Ms Bound approval
t
grating over to detail A[42]series Plo -9100 -9150

3,000
k
SS bac
t Bolards to detail A[93]series
CE swp mS
e
AC of 5 Lawn
paved walkway
AD
e
Lin 1a
RO LAWN
Lawn 16924
M.H

Service ladders to specialist's details Sewer Line from


m Exit from
-6000
Basement 2 slab soffti
6
25.
Lawn
M.H Basement

RC Terrace retaining wall


swp 3 1

33.7m
ary

to SE's details
Bound
t
Plo

RC Terrace retaining wall


R 7.500

8000
R 7.749
600x700mm concrete planter to detail A[93]series Lawn

ck
to SE's details
ack

Line of 2m Setba
-1700
S etb Lawn
Ramp Down to
of 5m Lawn Basement 1
Boundary wall to detail L[91]series e
Lin
Lawn
(Slope 1 in 8.

Plot Bou
(Slope 2.2% away from Bldg 24.1m C.L Legth)
to torm water drain) 48 2
Fire 17,720

4575
400 305 400

paved walkway Stair

ndary
2
Footprint: 9.9m
-9.100 2a

300
m

8000
3

k
rve

ac
9.
se

tb
e

se
R
ad
1

5m
2,500 2,500 2,500 2,500 4,000 2,500 1,500 2,500 1,000 6,000 1,000

4830

5,000
Ro Fire

of
ne
Assembly

Li
-150
Point
7 6 5 4 3 2 1
50

3
8
ry
da

2,500

2500
un
Bo

Parking Epoxy & Primer Marking


ot

25,2
06 -150
Pl

Paint/Thermoplastic Paint to slot marking to 78 Paved Parking on slab 4096


9

Architect's approval
23 slots 40500 DriveWay

50

7,000
2,500

2500

6493

8000
Line of
2Sm
Parking Epoxy & Primer Marking

Plot Boundary
10

etback
9050
Paint/Thermoplastic Paint to PWD
2,500

2500

marking to Architect's approval

13350
R=625

23 22 21 20 19 18
11

48000
2500
Road

22 4
600x700mm concrete planter to detail A[93]series ,9 5

PROPOSED BUILDING
2 6500
Re

5,000
serve
BUTA D

500 2,500 Concrete storm water drain with Ms


12

5,000 7,500 800 2,500 2,500 2,500 1,500 2,500 1,500 2,500 700 7,750
2 grating over to detail A[42]series

Footprint: 2113m
Boundary
2500
Plot B
ROA

2500
Wall to Detail

600

8000
BIKA

ound

1.11 Acres 2
Bolards to detail A[93]series
13

500
Line

Car tyre stop Concrete kerb +0.000 Building


ary

2500

1,000 1,250
to detail A[43]series
Entrance
(Appx 4492m )
of

400
5m S

14

5
2500

Plot 2A, 2-4 Butabika Road.


etba

Boundary wall to detail L[91]series

Line of 2m Setback
ck

15

95
DriveWay
2500

33.3m
Road

32.9

8000
16
Re

94
2500

5100 7500 1000


serve

Plot Boundary
17

93
2500

6
36
50
50
00
12

Boundary wall to
detail L[93]series
Line

1,600
Rolling 2,915 2,444 7,470

8000
Folding gate to detail L[93]series
of
5m S

Entry DriveWay
Drainage channel with grating 13,414
to detail A[93]series and to SE's details
etba

2,092
ck

7
-6000 Lawn
3, 6 2 8

2
1 2 ,1 9 -3000 1 4 ,2 5

3,349
(Slope 2.2% away from Bldg -9000

39
Lawn
6 Lawn
Line of 2m Setback

3,357
Line of 2m setback
Gate House 1 Line of 2m Setback to torm water drain)

3 ,7

4,5
(Slope 2.2% away from Bldg
Footprint:12.250 m2 to torm water drain)

35
Plot Boundary swp
Bolards to detail L[93]series 44.3m Plot Boundary swp swp
31.9m
Plot Boundary

4850 8000 8000 8000 8000 8000 8000 8000 8000 3450 Concrete storm water drain with Ms
Concrete storm water drain with Ms grating over to detail A[42]series
grating over to detail A[42]series 72300
Boundary wall to detail L[91]series
L(--)00 Site Plan RC Terrace retaining wall

1 A B C D E F G H I J K
1 : 150

NOTES Revisions: Client: Project title: Architect: Drawn: Checked:


1. This drawing is copyright. 10. A single layer of 3-ply bituminous felt to be provided between rev date description ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING JULIUS CGO R.R
6. This drawing is to be read in conjunction with specifications and all DDAMULIRA
2. Do not scale off this drawing. other relevant drawings. masonry and r.c. work. REG.NO. 196 Date: Scale:
11. Drain pipes passing under tarmac, driveways, and buildings to be
3. All levels and dimensions to be checked on site before any 7. Walls below 200mm thick to be reinforced with hoop iron at every encased in 150mm thick concrete sorround.
PRAC.NO. 3101 MARCH 2020
alternate course. Location: Drawing title:
building work commences. Published: 9/10/2021 14:43:24 1 : 150 @ A1
12. All reinforced concrete work to Structural Engineer's drawings. PLOT 2A,&2-4,BUTABIKA ROAD
4. Any discrepancies to be reported to the office of the consultant. 8. Depth of foundations to be decided on site.
13. All sanitary works to the entire satisfaction of MoH. BUTABIKA,KAMPALA DISTRICT Site Plan Job no. Drawing no.
5. All work to be strictly in accordance to with the standard 9. pv denotes permanent air vents over doors and windows as
specifications and notes. 14. All roads, storm water drainage and foul sewerage to L(--)00
shown on drawings. Civil Engineer's drawings.
Tel:+256 701-650587
c c e ss
A
d
Roa
988
Sliding Folding Gate
13.2m

31
86
Plot B
109.51
°
ounda
ry 200 2020 200, to specialist's details
W7


225

46.8

200,
Boundary wall to detail L[91]series

200
ove 95
d ab

0
ry 2239 .0
e o f roa ounda 7°
Lin t B -3W01 -9100
Plo

2988

2977
Guard House

200 900 576


-3
01
Guard House to detail L[--]


.9
-3D01

200,
84

200
series
m
k -3
bac

2.7
set
02
m 200 2304 200,

8030
3 Lin
e of 5 Driveway

Plot Bou
Thermoplastic paint with glass

L[--]12
-3
bove L[--]14 03
bead to zebra crossing to
f r oad a -9100
o
Line approval

ndary
ry 16874 15576
nda -9150 -3

RC Terrace retaining wall


ou
tB 04
Bolards to detail A[93]series
Plo 300 6776 200 8100 200

to SE's details
k
bac
set -9000 RC ramp to SE's details

1200
m
e of 5
Lin
-3W02
1a

200

200
-3D02
100 100 6735 1000 565 5264
4176 1000 1400

3100

3450
6m
-3 100
Stair 1 100

.
06

200 3100
1000

5 rwp

100
100
-8850

1574
2
-3 -3

350
07 05

100 450

200
200
FHR 1
15500 Way Out

33.7m
bove

6
ad a ry

56
r o nda

12
o f ou
Line Plo
tB -3
09 Sewer Line from Basement 2 slab soffti
(Slope 1 in 8.

6
56
Driveway

12
24.1m C.L Legth)

8500

8000
-9000
600x700mm concrete planter above to detail A[93]series 80
ove 00 -3 Driveway
d ab

80
oa 08
r paved walkway

11100
of 7500

00
Line bac
k

41
set

31
f 5m
eo
Lin

1750
20
28750

00

Plot Bou
Ramp Down up to 54 53 52 51 50 49 2
above

Basement 2 Back-up-Generator

3m
200 4550 200 23800 200

3000
-3

Line of 2m setback
200 2800

3300
ndary
area 10 -3

. 1920 7000 07

19
f road

200 1850 200

200

200

200
200
Stair 2
2a
Line o

-3
11

4700
-8850

8800

8800
200 100 200
4000
4550

Air extraction vent Driveway PC kerb to detail A[93]series


700 2500

4500
2525 450 2525 2500 2475 500 2525 2500 2500 500 2500 2500 2525 450 2525 2500 2525 450
-3
-8850 12 2500 2500 2525 450 2525 2500 2500 -9000

FHR
-3D04
200

29
3
200

30 31 32 33 34 35 36 37 38 39 40 41 42

800
ry

63206
250 1000 800
da
un

Change in level
2750

43 44 45 46 47 48
Bo

Parking Epoxy & Primer Marking Level transition ramp Paved walkway to detail A[93]series
ot

sample to approval
Pl

Paint/Thermoplastic Paint to parking slot


k

28
ac

-9000 -9000 -9000


tb

marking to Architect's approval


se

Slab sloped 2% to drains


5m

39800
Driveway Driveway -3

-3D04b
-3D04a
-9.000

8000
2500

07
of

-3
ne

07
Li

L[--]11
27

Plot Boundary
2 hour fire rated steel sliding door to opening schedule

Line of 2m setback
L[--]13

51450
51800
L[--]15
Column protection to be a pplied to all exposed columns to detail A[42]series
2525

Slab sloped 2% to drains Slab sloped 2% to drains


26

4
450

73 74 75 76 77 78 79 L[21]02 80 81 82 83 84 85 86 87 88 89 90
Line

200 100200
2525

L[21]03
of

L[21]04
Concrete storm water drain with Ms
25

PARKING
5m s

grating over to detail A[93]series


Plot B

Bolards to detail A[93]series


(93 slots)
etba
ove

24050

7500

8000
2500
ck
ound
ad ab

24

33.3m
ary

37200
r o

-3 L[21]08
Driveway
f

18
o

2525

Driveway
Line

23

5
450

5000 8000 2500 2500 2525 450 2525 2500 2500 500 2500 2500 2525 450 2525 2500 2525 450 2525 2500 2525 450 2525 2500 2525 7975
2525

2525
72 71 70 69 68 67 66 65 64 63 62 61 60 59 58 57 56 55
Boundary wall to detail L[91]series
L[21]05
22

93
Column protection to be a pplied to all exposed columns to detail A[42]series

8000
32.9

2500

2500
L[--]10 Driveway Driveway Thermoplastic paint with glass L[--]10
bead

-3D05b
-3D05a
-9000 -9000 -9000
21

92
-3 -3 -3
to zebra crossing to approval
m

07 07 07

Car tyre stop Concrete kerb to detail A[43]series 200 2050

2500
2525

Level transition ramp

Plot Boundary
91
Slab sloped 2% to drains Change in level
Slab sloped 2% to drains
6331000 617
20

500

200

200
6
200

16 15 14 13 -3D05 12 11 10 9 8 7 6 5 4

1000 630
-8850
-3D05a
-3 200 2450 300 -8850 2450 200

1900
-3 Change in level

-3D11
16
15 2525 2500 2525 450 2525 2500 2525 2525 2500 2525

3000
Lobby 1 702 1000 798 770 1260 1540 1260 770 Level transition ramp -3
Lift Lobby 23 Boundary wall to
L[21]06

FHR
-3

8100
14 -8850 Stair 4 detail L[93]series
200

134
2525 2500 2525 500 5000
PWD parking slot marking to
FHR

Architect's approval 19 18 17 3 2 1

2016
2000

Lift 1 Lift 2
Line

Lobby 2

237
2750 2500 2500 300

8100

8000
250 -3D06

-3W11
800 200
300

200
7800

2500 2500 2500


200

-3
2179

L[--]11
of

17

200
1000
-3D09
-3W05 -3D07 200 2450 300 2450 200 -3W06 -3W07 -3W08 -3W09 -3W10
5m s

-3W03 -3W04
200

2550 200

6870
All staircases to detail L[44]series
Services

1000
-3D10
1700 2000 2700 2000 2700 2000 2700 2000 2700 2000 1700

1063
etba

1000

1700 2000 2050 2000 2050 2000 1900


3500

3500
-3 Room
2550

100
200 Utility 13300 -3 200 19 -3
ck

-3 -3W06a Utility 24
13 Stair 3 -3 1000 285 -3
200

Store 1

1450
1443

18 20 21 Store 2
-3D08 -3W10a
7
200

200

200

200
200
200 900 1650 -9.100
bove

301 Lawn 23350 -3 200


200 2550 22
Line of 2m setback
L(--)01 Basement 3 Line of 2m setback Line of 2m setback
road a

200 21550 200 6150 200 27750 200 8050 200 3100 200
L[21]07

4700 67800
1
1 : 150
e of

Plot Boundary Plot Boundary


44.3m 31.9m
Lin

4850 8000 8000 8000 8000 8000 8000 8000


Plot8000
Boundary 3450
L[--]12

72300 L[--]16 Concrete storm water drain with Ms


grating over to detail A[42]series
A B C D E F G H I J K
RC Terrace retaining wall

NOTES Revisions: Client: Project title: Architect: Drawn: Checked:


1. This drawing is copyright. 10. A single layer of 3-ply bituminous felt to be provided between rev date description ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING JULIUS CGO R.R
6. This drawing is to be read in conjunction with specifications and all DDAMULIRA
2. Do not scale off this drawing. other relevant drawings. masonry and r.c. work. REG.NO. 196 Date: Scale:
11. Drain pipes passing under tarmac, driveways, and buildings to be
3. All levels and dimensions to be checked on site before any 7. Walls below 200mm thick to be reinforced with hoop iron at every encased in 150mm thick concrete sorround.
PRAC.NO. 3101 MARCH 2020
alternate course. Location: Drawing title:
building work commences. Published: 9/10/2021 14:43:29 1 : 150 @ A1
12. All reinforced concrete work to Structural Engineer's drawings. PLOT 2A,&2-4,BUTABIKA ROAD
4. Any discrepancies to be reported to the office of the consultant. 8. Depth of foundations to be decided on site.
13. All sanitary works to the entire satisfaction of MoH. BUTABIKA,KAMPALA DISTRICT Basement 3 Job no. Drawing no.
5. All work to be strictly in accordance to with the standard 9. pv denotes permanent air vents over doors and windows as
specifications and notes. 14. All roads, storm water drainage and foul sewerage to L(--)01
shown on drawings. Civil Engineer's drawings.
Tel:+256 701-650587
Plot B
ounda
ry
1 3 . 2m
elow
f road b 2,499
o
Line rwp
e low
ad b
ine of ro

3,476
L

3,490
Gate House 2 roof to detail L[--] series

Plot Bou
7
32.
k
bac
set
swp of 5
m 2,808
e
Lin

ndary
L[--]12
L[--]14
ary
Bound
t
Plo

RC Terrace retaining wall


to SE's details
69150
-2W01
1a

200
200

200
250 23750 200 8100 200 7750 200
-2
-2 01

3100
3100
-6000

3150

3450
RC Terrace retaining wall
02Stair 1
rwp
-5850 rwp

-2D01

200
200
200
1

200
to SE's details
FHR

m
RWP(Fulbora outlet)

6
25.
RWP(Fulbora outlet) Change in level

33.7m
Level transition ramp
15500
ary 6518 1000 982
ound
Plo
t B Sewer Line from Basement 2 slab soffti

6300
6
56
-2 Driveway

14600

12
03 -6000

8000
8500
-2
80 04
600x700mm concrete planter above to detail A[93]series
00 Driveway

80
11100
11100

00
k
bac

41
set (Slope 1 in 8.

31
m
e of 5 24.1m C.L Legth)
Lin

1500

Plot Bou
28750 Ramp Down up to 55 54 53 52 51 50 2
2525 2500 2525 450 2525 2500 2525
200 4550 200 23800 Basement 1 200 -2

Line of 2m setback

3300
05

ndary
L[21]01

200
200

200

2a
m
Stair 2 -2

3
06

9.
-5850

8800
1
4000

Air extraction vent

4700
700 Driveway
2500 2525 450 2525 2500 2525 450 2525 2500 2500 500 2500 2500 2525 450 2525 2500 2525 450 2525 2500 2525 450 2525 2500 2500
4550

-2
-5850 07

FHR
-2D02
200

29
3
200

30 31 32 33 34 35 36 37 38 39 40 41 42
ry
da

800
2501000
un

Change in level
2750

43 44 45 46 47 48
Bo

Level transition ramp


Parking Epoxy & Primer Marking
ot
Pl

Paint/Thermoplastic Paint to parking slot


k

28
ac

-6000 -6000
tb

marking to Architect's approval


se
5m

39750
Driveway Driveway

-2D02b
-2D02a
-6.000
2500

8000
of
ne

-2 -2 -2
Li

03 03 03
L[--]11
27

Plot Boundary
2 hour fire rated steel sliding door to opening schedule

Line of 2m setback
L[--]13

51450
51800

L[--]15
Column protection to be a pplied to all exposed columns to detail A[42]series
2525

Slab sloped 2% to drains Slab sloped 2% to drains


26

4
450

70 71 72 73 74 75 76 L[21]02 77 78 79 80 81 82 83 84 85 86 87
2525

L[21]03
PARKING

L[21]04
1000mm high concrete blockwall with
25

(87 slots) coping to detail A[34] series


Line
Plot

Bolards to detail A[93]series


of

2500

8000
Boun

5m s

24
dary

etba
ck

Driveway L[21]08
2525
24050

Driveway -2
03 2525 2500 2525 450 2525 2500 2500 500 2500 2500 2525 450 2525 2500 2525 450 2525 5025 450 2525 2500 2525
23

5
450

22
2525

69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52
L[21]05

33.3m
Column protection to be a pplied to all exposed columns to detail A[42]series
32.9

2500

8000
L[--]10 Driveway Driveway L[--]10

-2D03b
-2D03a
21

-6000 Slab sloped 2% to drains -6000 -6000


m

2525

-2 -2 Level transition ramp -2 -2 500

Plot Boundary
Car tyre stop Concrete kerb to detail A[43]series 03 03 03 Slab sloped 2% to drains 03
Change in level RWP(Fulbora outlet) RWP(Fulbora outlet)
633 1000 617
20

200
6
275

1000 630
200

16 15 14 13 -5850 12 11 10 9 8 7 6 5 4 -5850
Lobby 1 -2D03 Lift Lobby
-2D03a

Change in level

-2D10
200 2450 300 2500 150
1900

2525 2500 2525 450 3550 1500

3000
Level transition ramp -2
2525 2500 2525 450 2525 2500 2525 450 2525 2500 2525
770 1260 1540 1260 770 -6000 17
PWD parking slot marking to L[21]06

FHR
200

-2 702 1000 Stair 4

8500
Architect's approval 09 -2
2000
FHR

10
19 18 17 -2D04
Lift 1 Lift 2 3 2 1
Line

8100

8000
-2W16
7800

250 2500 2500 2525 2500 2500 2500 300


2379

150

L[--]11 Lobby 2
of

6870
1237

-2D07

200
-2W08 -2W09 -2W10 -2W11 -2W12
5m s

-2W02 -2W03 -2W04


-2 Services All staircases to detail L[44]series
-2D05

1700 2000 2050 2000 2050 2000 1900 11 Room 513 787 1700 2000 2700 2000 2700 2000 2700 2000 2700 2000 1700

1000
1000
etba

3400

-2D08
-2 -2 -2D09 -2
-2
2463

-2 900 1150 13 14 16
ck

08
Utility -2 WC Utility 18
Stair 3 1500
1443

12
350 100

Store 1 rwp -2W07 -2 Store 2


-2D06 -2W05 -2W06 15 -2W13 -2W14 -2W15
7
200
200

200
1800 5751000 1683 600 3167 2000 6000 2000 6000 2000 14800

-6000 Concrete storm water drain with Ms


L[21]07

200 4500 200 23750 Line of 2m setback 300 3850 200 27750 Line of 2m setback 200 8050 200 3100 200 grating over to detail A[42]series
72500

Plot Boundary
44.3m Plot Boundary
31.9m
Plot Boundary
L[--]12

1000mm high concrete blockwall with coping to


L(--)02 Basement 2 L[--]16
detail A[34] series

1 4850 8000 8000 8000 8000 8000 8000 8000 8000 3450
1 : 150
72300 RC Terrace retaining wall

A B C D E F G H I J K

NOTES Revisions: Client: Project title: Architect: Drawn: Checked:


1. This drawing is copyright. 10. A single layer of 3-ply bituminous felt to be provided between rev date description ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING JULIUS CGO R.R
6. This drawing is to be read in conjunction with specifications and all DDAMULIRA
2. Do not scale off this drawing. other relevant drawings. masonry and r.c. work. REG.NO. 196 Date: Scale:
11. Drain pipes passing under tarmac, driveways, and buildings to be
3. All levels and dimensions to be checked on site before any 7. Walls below 200mm thick to be reinforced with hoop iron at every encased in 150mm thick concrete sorround.
PRAC.NO. 3101 MARCH 2020
alternate course. Location: Drawing title:
building work commences. Published: 9/10/2021 14:43:34 1 : 150 @ A1
12. All reinforced concrete work to Structural Engineer's drawings. PLOT 2A,&2-4,BUTABIKA ROAD
4. Any discrepancies to be reported to the office of the consultant. 8. Depth of foundations to be decided on site.
13. All sanitary works to the entire satisfaction of MoH. BUTABIKA,KAMPALA DISTRICT Basement 2 Job no. Drawing no.
5. All work to be strictly in accordance to with the standard 9. pv denotes permanent air vents over doors and windows as
specifications and notes. 14. All roads, storm water drainage and foul sewerage to L(--)02
shown on drawings. Civil Engineer's drawings.
Tel:+256 701-650587
13.2m
Plot B
ounda
ry
low
d be
e of roa
Lin
e low
ad b
ine of ro
L

Plot Bou
m
k
bac

2.7
m set

3
f5
eo
Lin

ndary
L[--]12
L[--]14
ary
Bound
t
Plo
69150

300 23700 200 8100 200 7750 200

-1W01

swp 1a
-2850

RC Terrace retaining wall


-1 -1

200 3100
Drainage channel to connect to
02 01
ove
outside drainage channel
100 1000100
b

400 100
ad a
-1D01
o f ro rwp

to SE's details
Stair 1
Line

200
1

200
FHR

6m
RWP(Fulbora outlet)
3600

5.
RWP(Fulbora outlet) Change in level

33.7m
Level transition ramp
-1700 15500
ary 6355 1000 1145
und

RC Terrace retaining wall


o
Plo
t B Sewer Line from Basement 2 slab soffti

6300
6
56
-1

12
03

to SE's details
-1
80 04
bove 00
ad a

80
r o -3000

11100
o f

00
Line set
bac
k
(Slope 1 in 8.
of 5
m 24.1m C.L Legth) Drainage channel with grating

41
e to detail A[93]series and to SE's details
Lin

31

1500

Plot Bou
51 50 49 48 47 46 2

Outline of Building above


-1 2525 2500 2525 450 2525 2500 2525

Line of 2m setback
05

ndary
L[21]01
200

200
200

2a
3m
Stair 2 -1
06

.
-2850

19

8800
4000
4550

Air extraction vent 700 2500 2525 450 2525 2500 2525 450 2525 2500 2500 5002500 2500 2525 450 2525 2500 2525 450 2525 2500 2525 450 2525 2500 2500

-2850 -1
07

FHR
-1D02
200
200

29 30 31 32 33 34 35 36 37 38 39
3
ry

51800
da

800
450 1000
un

Change in level
2525

40 41 42 43 44 45
Bo

Level transition ramp


ot
Pl

28
ac

Outline of Building above


Parking Epoxy & Primer Marking -3000
tb
se

Paint/Thermoplastic Paint to parking slot -3000


5m

-1D02b
-1D02a
marking to Architect's approval
2500
of
ne

-1 -1 -1
Li

03 03 03
L[--]11
27

39750
Plot Boundary
2 hour fire rated steel sliding door to opening schedule

Line of 2m setback
L[--]13

L[--]15
Column protection to be a pplied to all-3.000
exposed columns to detail A[42]series
2525

Slab sloped 2% to drains Slab sloped 2% to drains


26

4
450

70 71 72 73 74 75 76 L[21]02 77 78 79 80 81 82 83 84 85 86 87
Line

2525
2525

2525 2500 500 2475 2500 2500 500 2500 2500 2525 450 2525 2500 2525 450 2525 2500 2525 450 2525 2500 2525

L[21]03
of

L[21]04
PARKING 1000mm high concrete blockwall with
25
5m s

coping to detail A[34] series


Plot B

Bolards to detail A[93]series (87 slots)


etba

24050

2500
ck
ound

1m High Concrete
24

block wall
ary

37200

Outline of Building above Outline of Building above L[21]08


2525

-1 Outline of Building above


03
23

5
450

-3000
2525

33.3m
69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52
Outline of Building above

L[21]05 Column protection to be a pplied to all exposed columns to detail A[42]series


22
32.9

2500

L[--]10 L[--]10

-1D03b
-1D03a
-3000 -3000
21
m

-1
03
2525

Car tyre stop Concrete kerb to detail A[43]series -1 -1 Level transition ramp -1

Plot Boundary
03 Slab sloped 2% to drains03 6331000 Change in level
03 Slab sloped 2% to drains

200
RWP(Fulbora outlet)
20

-1D03

200
6
200

16 15 14 13 Lobby 1 12 11 10 9 8 7 6 5 4
-2850

1900

2200
-1

1000

-1D10
-1D03a

200 200 2450 10


Change in level
2300 300 2450 200

3000
2525 2500 2525 450 2525 2500 2525 450 2525 2500 2525 -1
L[21]06 702 -2850 17

FHR
-1 798

2000 200
1000 Stair 4

7000
09 Lift Lobby
FHR

19 18 17 225 Lift 1 Lift 2 3 2 1


PWD parking slot 2525 2500 2525 4000 1500
Outline of Building above

1000 237

8100
200

-1W18
-1D04
7800

marking to Architect's approval 2500 2500 2525 2500 2500 2525


Line

L[--]11 Lobby 2
307

1000 200
6150 200 2450
-1D07
-1W02 -1W03 -1W04 -1W13 -1W14 -1W15 -1W16 -1W17
200

-1 All staircases to detail L[44]series


of

-1D05

11 Room W10

-1D09
5m s

1700 2000 2700 2000 2700 2000 2700 2000 2700 2000 1700
1000

1700 2000 2050 2000 2050 2000 1900


-1 Services -1D08
-1
2550

-1 513 Utility -1
etba

3350

-1 Utility -1 13 787 200 16


200 9001650 14 -1 18
08 Stair 3 Store 2
1643

Store 1 12 15
ck

-1D06 -1W07 WC -1W11 -1W12


-1W05 -1W06
7
200

200

200
Outline of Building above rwp -1W08 -1W10 Outline of Building above Outline of Building above
3050 2000 6000 2000 4675
PWR 1800 5751000 1645 600
-1W09
3205 2000 6000 2000 6000 2000 3250
-3000
Concrete storm water drain with Ms
L[21]07

200 4500 200 8050 200 13300 Line of 2m setback 200 6150 200 27750 Line of 2m setback 200 8050 200 3100 grating over to detail A[42]series

Plot Boundary
44.3m Plot Boundary
31.9m
Plot Boundary
L[--]12

1000mm high concrete blockwall with coping to


detail A[34] series
L(--)03 Basement 1 L[--]16
4850 8000 8000 8000 8000 8000 8000 8000 8000 3450
1
1 : 150 72300 RC Terrace retaining wall

A B C D E F G H I J K
NOTES Revisions: Client: Project title: Architect: Drawn: Checked:
1. This drawing is copyright. 10. A single layer of 3-ply bituminous felt to be provided between rev date description
2500 ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING JULIUS CGO R.R
6. This drawing is to be read in conjunction with specifications and all DDAMULIRA
2. Do not scale off this drawing. other relevant drawings. masonry and r.c. work. REG.NO. 196 Date: Scale:
11. Drain pipes passing under tarmac, driveways, and buildings to be
3. All levels and dimensions to be checked on site before any 7. Walls below 200mm thick to be reinforced with hoop iron at every encased in 150mm thick concrete sorround.
PRAC.NO. 3101 MARCH 2020
alternate course. Location: Drawing title:
building work commences. Published: 9/10/2021 14:43:39 1 : 150 @ A1
12. All reinforced concrete work to Structural Engineer's drawings. PLOT 2A,&2-4,BUTABIKA ROAD
4. Any discrepancies to be reported to the office of the consultant. 8. Depth of foundations to be decided on site.
13. All sanitary works to the entire satisfaction of MoH. BUTABIKA,KAMPALA DISTRICT Basement 1 Job no. Drawing no.
5. All work to be strictly in accordance to with the standard 9. pv denotes permanent air vents over doors and windows as
specifications and notes. 14. All roads, storm water drainage and foul sewerage to L(--)03
shown on drawings. Civil Engineer's drawings.
Tel:+256 701-650587
Plot B
ounda
ry

. 7m

tback
2

Plot Bou
3 set
bac
k

Line of 2m se
f 5m
eo
Lin

ndary
L[--]12
L[--]14
Concrete storm water drain with Ms ry
grating over to detail A[42]series ounda
tB
Plo

200 8100 200 7800 200

0W01
1a

200
0
02 0
ack

3450
3100
5000 3000 6250 200 01
swp setb
f 5m
rwp
1500 800 2700 800 2200
eo

300
RWP
Lin rwp

200
RWP 0W25 0W24
1

200
FHR

6m
0D01 RWP(Fulbora outlet)

25.
6439 1000 1061
RWP(Fulbora outlet)

ry 15500
ounda
tB

1500
0
Plo

0W23
RC Terrace retaining wall
04

6000
6
80
56
12

00

7800

8000
78

2000
600x700mm concrete planter to detail A[93]series a y 00
a lkw

to SE's details
ed w (Slope 1 in 8.
P av etb
ack Ramp Down to 24.1m C.L Legth)

41

1500
s 0

0W22
31
f 5m 785
Boundary wall to detail L[91]series Lin
eo Basement 1 0 03

Plot Bou
2

200

3000
Air extraction vent

1750
RWP
Retaining wall to SE's details
Handwash

3300
200 1850

ndary
basin ±0.000
L[21]01

1500
0W21
rwp
2a

200
3m
0
36 Stair 2

2000
.

8800
3263
300

19
0

5000

7350
03

4000
4550

4700
Frameless glass system

1500
paved walkway

0W20
1200 2500 2500 2500 2500 2475 1500 2500 1500 2575

0D45
237 900
±0.000

FHR
2533 2435 5565 2435 2323

200
Parking Epoxy & Primer Marking
Paint/Thermoplastic Paint to parking slot
0W26
7 6 5 4 3 2 1 3

Line of 2m setback
3000
Line of Basement below

8
ry

±0.000

50
marking to Architect's approval

50
da

900 675 900 675 Handwash


0D02 rwp 0D03

100
2550
un

100 300 100 basin


RWP
Bo

2323

43300
5850
ot

500 7500 500 7240 50


Pl

1500
ac

0W19
P av e

9
tb

Line of Basement below


se

Parking
Change in level 0D04
5m

2500

Parking Epoxy & Primer Marking 0

6750
-150

2435

8000
07 Change in level

Frameless glass system


(23)Slots

7240
d wa l

of

2000
Paint/Thermoplastic Paint to PWD 6493 -150
ne

Restaurant
Li

parking slot marking to Architect's L[--]11

Plot Boundary
10
approval
k w ay

Line of 2m setback
-150

1500
2500

Movable Concrete planter to

L[--]13

L[--]15
13500
700

0W18
Matwel to detail A[43]series R=625 ±0.000 0 Landscape Architect's details

500 2533
05
23 22 21 20 19

100 300 100


11

14980

500

3000
600x700mm concrete planter to detail A[93]series L[21]02
2500

18

51450
rwp
Handwash
Line

2522 2,500 2,500 2,500 1500 2507 1500 6500 basin

2533
L[21]03
5600
Plaza
of

900

L[21]04
5000 0
12

Prepainted steel louvres

1500
03
5m s

7350

0W17
to detail A[21]series,sample to 7777
Plot B

2500

2500
etba

0D05
Architect's approval 06
±0.000

7240

2435

8000
2000
ck
ound

Line of Basement below

Bolards to detail A[93]series


13

Frameless glass system

2323
BUTA D

7500
ary

2500

200 8050 200 2550 200 Walkway 7850 200 7500 500 7500 500 7240 50

1500
-100 0 L[21]08

0W16
200
08
ROA

200

200
200 1200 200
100 300 100

0W01a
14

3650 100 4100 200


BIKA

800
Store

800
rwp 0D07 rwp 0D06

50
50

50
Store 0D08

Line of 2m setback
0D11a
5
2750
2500

3000
2533 2435 2533 500 2533 2435 2533 500 2533 2435 2323

200
300 1000 1450 200 900 7800 200 Handwash
basin

3410
±0.000

Line of void above


Boundary wall to detail L[91]series

above
15

voidabove
200 8190 50 16510 200

4100

4100
L[21]05 0
±0.000

1500
12
2500

0W15
Car tyre stop Concrete kerb

ofvoid
5898

Plot Boundary
0
0W01b

to detail A[43]series 01

Lineof
4000
9100
32.9

Stair 5

Line

8510

8000
2100
Lounge

2000
16

200

200
L[--]10 0 4100
0D10
1000 400
Line of void above
0D07a
L[--]10
07
2500

0 200 5300 200 0


m

11 03
200 2500 200 3100 200 Kitchen to detail L[74]series

1000 1500
PC kerb to detail A[93]series

0W14
0D11 0 ±0.000 LOBBY

3000
17

2047 13
2750

4175 2675 775 1200 725


200 10850 200 6000 200 0 200 2150 200
17 RWP(Fulbora outlet)

200
2550

0D12 0D13

200
6

200
0D42
36

200
200

200
1550 200 2450 300 2450 200

500 1200 500

1012 500
50

Line of Basement below 1000 Meeting 100 2417 200 6258 200 0

0D41
Beverages 35

200 1250
Room
1455 1300 1851 1300 494 Lift Lobby 0
Line of Basement below

2500
0
Paved walkway
2200

3340
2200
1750 770 1260 1540 1260 770 22 2500 200 2200 200 1100 200 1100 200 5400 200 1800 200 1700 200 800200 1500 200
18 0D29
1200

0 ±0.000
L[21]06 1200 463

FHR
0D15a
400 15 Washrooms
Office

200

200

200
0D40
Stair 4
4878

200

0D28a
Prepainted steel louvres to detail A[21]series 0D18 0D16 Pwd

900
pwd 0 237 1200 463

FHR
0D17 0D30 Freezer 0D35 0 Dry 31

1800
5280 0D14 Lift 2 0D19 0D28

1700
30

2000

200 2000
Lift 1 Ladies' 0 0

2100
0D34 Store 1000

0D36
0

1000
Duct
0D32 Delivery Access

Duct
20

2700
Rolling Folding gate to detail L[93series 24
Line

713 1000 200 1000 2676 224

1800
2478

8100

8000
14 0D20 0D27

1922
Cleaners

0W13
5000

0 Servery
8955

0
Driveway to walkway transition to detail to detail A[93]series

200
200 19 0 0 0

900
L[--]11 27
4980

200 200

6050
of

200 0 32

6988
2500
0D21 0D26 23 Coldroom 29 0D38
Precast concrete kerb to detail A[93]series 15 100 3317 200 1483 200 3700 100 0D37
5m s

200

200
200

200
200 1300 200 5400 200 7200 200 7900 200 1500 200

2100
6200

All staircases to detail L[44]series

1600
1578
0D22 0 0D25
Drainage channel with grating Lobby 1 0 0 0D39
etba

0 21 0D33
425 16 25
to detail A[93]series and to SE's details 900 Kitchen 674

3360
3900

Gents'

3700
09 0D23

200
0D31
3122

1710 5190 500 226 1000


3122

Catering Office

3100
ck

-100 1500 1890 1010 200 0 0


100 425 Stair 3
100

200 200 200


912

26 28

1900
0D24

1800
200 3000 200
Paved walkway 0W07 0W08 0 34
1200

0W06
7
0D46 Line of Basement below

200
33
750
200

Line of Basement below 0D15


0W02 0W03 0W04 rwp 0W09 0W10 0W11 0W12
200

200

200

0D46 PWR
°
.13

0W27

swp(sewage pipe)

200
74

200
200
Guard House to detail L[--]series 0W05
3201

2850 800 2450 800 4475 800 3150 800 2525 1675 1800 1675 2950 800 2550 800 3250 3950 800 7200 800 7200 800 2336 800614 3300
3495

0
Guard House 2 37

L[21]07
Line of 2m setback Line of 2m setback
Planter to detail L[93]series 4°
10
9.4
5.8
7° 8 200 16450 200 1600 200 5150 200 10150 200 22400 200 1500 200 3100 200
202
P av e

rwp swp
Concrete storm water drain with Ms Plot Boundary
44.3m Plot Boundary
L[--]12

61950
grating over to detail A[42]series
d wa l

Boundary wall to detail L[91]series


4850 8000 8000 8000 8000 L[--]16 8000 8000 8000 8000 3450
k w ay

72300 Washrooms to detail L[74]series

A B C D E F G H I J K
L(--)04 Ground Floor
1
1 : 150

NOTES Revisions: Client: Project title: Architect: Drawn: Checked:


1. This drawing is copyright. 10. A single layer of 3-ply bituminous felt to be provided between rev date description ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING JULIUS CGO R.R
6. This drawing is to be read in conjunction with specifications and all DDAMULIRA
2. Do not scale off this drawing. other relevant drawings. masonry and r.c. work. REG.NO. 196 Date: Scale:
11. Drain pipes passing under tarmac, driveways, and buildings to be
3. All levels and dimensions to be checked on site before any 7. Walls below 200mm thick to be reinforced with hoop iron at every encased in 150mm thick concrete sorround.
PRAC.NO. 3101 MARCH 2020
alternate course. Location: Drawing title:
building work commences. Published: 9/10/2021 14:43:46 1 : 150 @ A1
12. All reinforced concrete work to Structural Engineer's drawings. PLOT 2A,&2-4,BUTABIKA ROAD
4. Any discrepancies to be reported to the office of the consultant. 8. Depth of foundations to be decided on site.
13. All sanitary works to the entire satisfaction of MoH. BUTABIKA,KAMPALA DISTRICT Ground Floor Level Job no. Drawing no.
5. All work to be strictly in accordance to with the standard 9. pv denotes permanent air vents over doors and windows as
specifications and notes. 14. All roads, storm water drainage and foul sewerage to L(--)04
shown on drawings. Civil Engineer's drawings.
Tel:+256 701-650587

You might also like