Work Order

AWCTACILITIES
Mechanical
Work Order No.: PMQ2823001084
Work Trade :
Preventive
Work Status : Work Type:
Open Critical
Compliant Type: Non-compliant
Work Priority:
Gaimsi Bayang Anak Mawar
Assigned to
Received by: SITI NUR AISHAH BINTI MOHD KIAU
Requester:
Received Date / Time: 4 September 2023 09:25
Phone No.:
Required date: External Requester:
10 September 2023
PM Target End Date:
PM Target Start Date: 4 September 2023

Problem Description: Booster Pump


Note To Technician (Location):
Note To Technician (Asset):
Remedy Code:
Failure Code: 2019-M017
Task No.:
PC Code: GFP
Location No.:
Asset No.: Q28-00051 Grd Floor, Pump House
Location Name:
Cold Water Supply, Booster Pump 2
Asset description:
Supplier/Contractor:
Cause description:
Action Taken:
Prevention Taken:
CSR Notes:

Parts Details Qty Returned


Issue Type (D/ 1) UoM Oty Used
Part No. Description

**p=Direct Issue. = Inventory

Labour Details OT2 OT3


Start Date/ Time End Date/Time Normal OT1
Employee Name Employee No.

S.. 202?| S.4. 2023


Date and Time work
Date and Time work started: Ç.4.2021 /6:0am completed: S.4.2023 /4'ou qn
Notes

PM Task
2019-MO17
PM Task No.: Mechanical / Cold Water Supply, Plumbing and Sanitary System - Booster
PM Task Name: pump, Sump Pump
1
Estimated Labour Hours:
Certification of Work Completion
Name and Signature of Requester/Supervisor
Name and Signature of Technician/Engineer
JACKSON DONAVAN ANAK TINSAN
Name Signature Nahe ELISERWANDYBINKEDERIC:
KETUA FASILI: Signature
JURUTEKNIK AMBANGMN WIRA SDN BHO
AMBANG MIRA. SDM. DHD. WP WATU PAA,MATU
Time
Date S..2021 Poor 2. Fair 3. GoodTime e qha Date

Please rate our service :- 1, 4. Very Good 5. Excellent


Form: PMC Rev. 1.0
PPM CHECKLIST
No PPM: MO17

1|BCawangan
ranch 3)/6M
2\Asset Group/
Category/ Description
á2}-ematu
Mechanical /Cold Water Supply,
4PPM Frequency
Frekuensi PPM
s]Work Order No
Kumpulan Aset Kategori Plumbing and Sanitary System -
Booster pump, Sump Pump
No Arahan Kerja PMaz21eoiod4
Keterangan 6Date
Tarikh S.a. 2023
3|Asset Label No
Nolabel Aset 7Estimate Time (Hours)
Anggaran Masa (Jam)
No. Checklist (Senarai Semak) Standard . VJRemarks/ Observation/ Status
Piawaian Catatan' Pemerhatian/ Status

3-Monthly (3-Bulanan)
a. Check pump condition Run on cut in level (Auto) Malfunction /Good condition
Memeriksa kondisi pam |Berfungsi pada tahap cut in |Tidakberfungsi / Keadaan baik
(Auto)

6-Monthly (6-Bulanan)
Service pump:
|Servis pam.
a. Check and lubricate bearing Smooth running Not running smoothly / Good Condition
Memeriksa dan melincirkan bearing Berjalan Lancar Tidak berialan lancar /Keadaan Baik

b. Check alignment and coupling Smooth Alignment Not Smooth / Good Condition
Memeriksa alignment dan coupling Alignment baik Alignment tidak baik /Keadaan Baik

|c. Check motor terminals for tightness No loose connection Loose Connection / Good Condition
Memeriksa terminal motor untuk ketatan Tiada sambungan longgar Sambungan Longgar / Keadaan Baik

Nota / Ulasan

Spare Parts Required/ Used


|Performed By
Dilaksanakan Oleh
Reference (Rujukan ) Schedule 2: Part 3 F -3.3
AW-QP-OPR-01
Page 1of 1