■ IK □ OOK
□ Clarification of Drawing/ Document (Note 1) ■ Provision of missing information
□ Requirement of Meeting □ Incorrect Information
■ Changes to existing drawings/documents ■ Errors or Omissions
□ Development of new drawings/documents □ Unclear information (Note 2)
□ Any Other Scope □ Development of new drawing because of the above reasons
Please explain:
Note 1: Covers all clarifications related to drawing/document other than missing/unclear Note 2: The drawing / document is incomplete and cannot be used for construction for a
information, incorrect information, error and omissions. reason other than missing/incorrect info and errors and omissions.
■ IK ■ OOK
Final Disposition
□ IK ■ OOK
____________________________________ ________________________________________
CONSULTANT’S ENGINEERING MANAGER CONTRACTOR’S ENGINEERING MANAGER
Field Engineering Change Evaluation Form
AREAS/DISCIPLINE
In C202 mobile shelter as per VENDOR drawing VD-V104-NDR-DWG-1402_001, the rail elevation at gridline B(17-
34) is +14.752 metre. But as per site condition the top of rail is +14.777 metre. Also in gridline A(17-34) the top of rail
is +4.150 metre as per drawing. In order to avoid angular difference within the span. the site propose to maintain
+4.175 metre at the top of rail in gridline A(17-34).
AREAS/DISCIPLINE
Please note it is adequate to follow top of rail +4.175 at the ground rail.
Originating Discipline
Interfacing Discipline
Reviewed by (Discipline 7-Sep-2023
Adnan Ahmed Design Manager
Lead Engineer)
Approved by Engineering 20-Sep-2023
Teng PingQiang
(Engineering Manager) Manager
AREAS/DISCIPLINE
□ ARCHITECTURAL □ ELECTRICAL □ MECHANICAL □ PROCUREMENT
Attachment: ■ YES / □ NO
Part 1 - IK Query
In C202 mobile shelter as per VENDOR drawing VD-V104-NDR-DWG-1402_001, the rail elevation at gridline B(17-
34) is +14.752 metre. But as per site condition the top of rail is +14.879 metre. Also in gridline A(17-34) the top of rail is
+4.150 metre as per drawing. In order to avoid angular difference within the span. the site propose to maintain +4.175
metre at the top of rail in gridline A(17-34).
AREAS/DISCIPLINE
□ ARCHITECTURAL □ ELECTRICAL □ MECHANICAL □ PROCUREMENT
Attachment: ■ YES / □ NO
Part II – OOK Response-
Response:
Please note it is adequate to follow top of rail +4.175 at the ground rail.
Originating Discipline
Interfacing Discipline
Reviewed by (Discipline
Adnan Ahmed Design Manager 7-Sep-2023
Lead Engineer)
Approved by
Teng PingQiang Engineering Manager 5-Sep-2023
(Engineering Manager)