Professional Documents
Culture Documents
Cpress Cjenik
Cpress Cjenik
CIJEVI
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-R15 C-PRESS CIJEV 15X1,2mm/6m 1470 M Y1 26,36 3,50
CP-R18 C-PRESS CIJEV 18X1,2mm/6m 1206 M Y1 31,78 4,22
CP-R22 C-PRESS CIJEV 22X1,6mm/6m 792 M Y1 43,23 5,74
CP-R28 C-PRESS CIJEV 28X1,6mm/6m 612 M Y1 56,33 7,48
CP-R35 C-PRESS CIJEV 35X1,6mm/6m 486 M Y1 70,07 9,30
CP-R42 C-PRESS CIJEV 42X1,6mm/6m 402 M Y1 83,35 11,07
CP-R54 C-PRESS CIJEV 54X1,6mm/6m 312 M Y1 107,89 14,32
CP-R76 C-PRESS CIJEV 76X2mm/6m 162 M Y1 231,51 30,73
CP-R88 C-PRESS CIJEV 88,9X2mm/6m 138 M Y1 262,84 34,89
CP-R108 C-PRESS CIJEV 108X2mm/6m 114 M Y1 400,19 53,12
SPOJNI ELEMENTI
SPOJNICA
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-M15 C-PRESS SPOJNICA DN15 20 KOM Y2 17,91 2,38
CP-M18 C-PRESS SPOJNICA DN18 20 KOM Y2 18,61 2,47
CP-M22 C-PRESS SPOJNICA DN22 20 KOM Y2 20,81 2,77
CP-M28 C-PRESS SPOJNICA DN28 20 KOM Y2 26,78 3,56
CP-M35 C-PRESS SPOJNICA DN35 10 KOM Y2 42,41 5,63
CP-M42 C-PRESS SPOJNICA DN42 8 KOM Y2 56,63 7,52
CP-M54 C-PRESS SPOJNICA DN54 6 KOM Y2 67,77 9,00
CP-M76 C-PRESS SPOJNICA DN76 10 KOM Y2 297,10 39,44
CP-M88 C-PRESS SPOJNICA DN88 10 KOM Y2 369,93 49,10
CP-M108 C-PRESS SPOJNICA DN108 10 KOM Y2 492,96 65,43
KOLJENO 90°
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-B15/90 C-PRESS KOLJENO 90° DN15 20 KOM Y2 26,96 3,58
CP-B18/90 C-PRESS KOLJENO 90° DN18 20 KOM Y2 29,88 3,97
CP-B22/90 C-PRESS KOLJENO 90° DN22 20 KOM Y2 34,07 4,53
CP-B28/90 C-PRESS KOLJENO 90° DN28 10 KOM Y2 45,65 6,06
CP-B35/90 C-PRESS KOLJENO 90° DN35 10 KOM Y2 87,96 11,68
CP-B42/90 C-PRESS KOLJENO 90° DN42 6 KOM Y2 146,87 19,50
CP-B54/90 C-PRESS KOLJENO 90° DN54 4 KOM Y2 189,96 25,22
CP-B76/90 C-PRESS KOLJENO 90° DN76 10 KOM Y2 531,93 70,60
CP-B88/90 C-PRESS KOLJENO 90° DN88 10 KOM Y2 732,97 97,29
CP-B108/90 C-PRESS KOLJENO 90° DN108 10 KOM Y2 1037,91 137,76
KOLJENO 90° UV
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-B15/90IA C-PRESS KOLJENO 90° UV DN15 20 KOM Y2 28,01 3,72
CP-B18/90IA C-PRESS KOLJENO 90° UV DN18 20 KOM Y2 30,90 4,11
CP-B22/90IA C-PRESS KOLJENO 90° UV DN22 20 KOM Y2 35,11 4,66
CP-B28/90IA C-PRESS KOLJENO 90° UV DN28 10 KOM Y2 45,57 6,05
CP-B35/90IA C-PRESS KOLJENO 90° UV DN35 10 KOM Y2 91,47 12,15
CP-B42/90IA C-PRESS KOLJENO 90° UV DN42 6 KOM Y2 147,22 19,54
CP-B54/90IA C-PRESS KOLJENO 90° UV DN54 4 KOM Y2 193,22 25,65
CP-B76/90IA C-PRESS KOLJENO 90° UV DN76 10 KOM Y2 540,64 71,76
CP-B88/90IA C-PRESS KOLJENO 90° UV DN88 10 KOM Y2 763,70 101,37
CP-B108/90IA C-PRESS KOLJENO 90° UV DN108 10 KOM Y2 1070,52 142,09
KOLJENO 45°
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-B15/45 C-PRESS KOLJENO 45° DN15 20 KOM Y2 30,90 4,11
CP-B18/45 C-PRESS KOLJENO 45° DN18 20 KOM Y2 32,66 4,34
CP-B22/45 C-PRESS KOLJENO 45° DN22 20 KOM Y2 34,86 4,63
CP-B28/45 C-PRESS KOLJENO 45° DN28 10 KOM Y2 46,97 6,24
CP-B35/45 C-PRESS KOLJENO 45° DN35 10 KOM Y2 84,45 11,21
CP-B42/45 C-PRESS KOLJENO 45° DN42 6 KOM Y2 106,43 14,13
CP-B54/45 C-PRESS KOLJENO 45° DN54 4 KOM Y2 148,53 19,72
CP-B76/45 C-PRESS KOLJENO 45° DN76 10 KOM Y2 518,05 68,76
CP-B88/45 C-PRESS KOLJENO 45° DN88 10 KOM Y2 710,63 94,32
CP-B108/45 C-PRESS KOLJENO 45° DN108 10 KOM Y2 968,59 128,56
SPOJNICA UN-V
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-UIG15/1/2 C-PRESS SPOJNICA UN-V 15/1/2 20 KOM Y2 52,24 6,94
CP-UIG15/3/4 C-PRESS SPOJNICA UN-V 15/3/4 20 KOM Y2 62,50 8,30
CP-UIG18/1/2 C-PRESS SPOJNICA UN-V 18/1/2 20 KOM Y2 53,47 7,10
CP-UIG18/3/4 C-PRESS SPOJNICA UN-V 18/3/4 20 KOM Y2 65,41 8,69
CP-UIG22/1/2 C-PRESS SPOJNICA UN-V 22/1/2 20 KOM Y2 67,42 8,95
CP-UIG22/3/4 C-PRESS SPOJNICA UN-V 22/3/4 20 KOM Y2 66,46 8,83
CP-UIG22/1 C-PRESS SPOJNICA UN-V 22/1 20 KOM Y2 102,71 13,64
CP-UIG28/1/2 C-PRESS SPOJNICA UN-V 28/1/2 20 KOM Y2 88,23 11,72
CP-UIG28/3/4 C-PRESS SPOJNICA UN-V 28/3/4 20 KOM Y2 100,60 13,36
CP-UIG28/1 C-PRESS SPOJNICA UN-V 28/1 20 KOM Y2 82,61 10,97
CP-UIG35/1 C-PRESS SPOJNICA UN-V 35/1 10 KOM Y2 110,53 14,67
CP-UIG35/5/4 C-PRESS SPOJNICA UN-V 35/5/4 10 KOM Y2 112,98 15,00
CP-UIG42/6/4 C-PRESS SPOJNICA UN-V 42/6/4 6 KOM Y2 118,95 15,79
CP-UIG54/2 C-PRESS SPOJNICA UN-V 54/2 4 KOM Y2 191,02 25,36
SPOJNICA VN-V
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-UAG15/1/2 C-PRESS SPOJNICA VN-V 15/1/2 20 KOM Y2 55,48 7,37
CP-UAG15/3/4 C-PRESS SPOJNICA VN-V 15/3/4 20 KOM Y2 73,74 9,79
CP-UAG18/1/2 C-PRESS SPOJNICA VN-V 18/1/2 20 KOM Y2 56,80 7,54
CP-UAG18/3/4 C-PRESS SPOJNICA VN-V 18/3/4 20 KOM Y2 60,66 8,06
CP-UAG22/1/2 C-PRESS SPOJNICA VN-V 22/1/2 20 KOM Y2 62,95 8,36
CP-UAG22/3/4 C-PRESS SPOJNICA VN-V 22/3/4 20 KOM Y2 61,54 8,17
CP-UAG22/1 C-PRESS SPOJNICA VN-V 22/1 20 KOM Y2 85,07 11,30
CP-UAG28/3/4 C-PRESS SPOJNICA VN-V 28/3/4 20 KOM Y2 100,78 13,38
CP-UAG28/1 C-PRESS SPOJNICA VN-V 28/1 20 KOM Y2 82,69 10,98
CP-UAG35/5/4 C-PRESS SPOJNICA VN-V 35/5/4 10 KOM Y2 119,48 15,86
CP-UAG35/6/4 C-PRESS SPOJNICA VN-V 35/6/4 10 KOM Y2 124,57 16,54
CP-UAG42/6/4 C-PRESS SPOJNICA VN-V 42/6/4 6 KOM Y2 126,50 16,79
CP-UAG54/2 C-PRESS SPOJNICA VN-V 54/2 4 KOM Y2 195,41 25,94
CP-UAG76/2/1/2 C-PRESS SPOJNICA VN-V 76/2/1/2 10 KOM Y2 932,00 123,70
CP-UAG88/3 C-PRESS SPOJNICA VN-V 88/3 10 KOM Y2 1421,77 188,71
CP-UAG108/4 C-PRESS SPOJNICA VN-V 108/4 10 KOM Y2 1842,23 244,51
SPOJNICA UN-U
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-UNIG15/1/2 C-PRESS SPOJNICA UN-U 15/1/2 20 KOM Y2 36,67 4,87
CP-UNIG18/1/2 C-PRESS SPOJNICA UN-U 18/1/2 20 KOM Y2 41,05 5,45
CP-UNIG18/3/4 C-PRESS SPOJNICA UN-U 18/3/4 20 KOM Y2 47,99 6,37
CP-UNIG22/1/2 C-PRESS SPOJNICA UN-U22/1/2 20 KOM Y2 51,38 6,82
CP-UNIG22/3/4 C-PRESS SPOJNICA UN-U 22/3/4 10 KOM Y2 60,12 7,98
SPOJNICA VN-U
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-UNAG15/1/2 C-PRESS SPOJNICA VN-U15/1/2 20 KOM Y2 52,85 7,02
CP-UNAG18/1/2 C-PRESS SPOJNICA VN-U 18/1/2 20 KOM Y2 55,48 7,37
CP-UNAG18/3/4 C-PRESS SPOJNICA VN-U 18/3/4 20 KOM Y2 60,84 8,08
CP-UNAG22/1/2 C-PRESS SPOJNICA VN-U 22/1/2 20 KOM Y2 70,05 9,30
CP-UNAG22/3/4 C-PRESS SPOJNICA VN-U 22/3/4 10 KOM Y2 72,69 9,65
PRIRUBNICA PN10/16
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-F76-16 C-PRESS PRIRUBNICA 76-16 10 KOM Y2 1057,67 140,38
CP-F88-16 C-PRESS PRIRUBNICA 88-16 10 KOM Y2 1275,43 169,28
CP-F108-16 C-PRESS PRIRUBNICA 108-16 10 KOM Y2 1788,75 237,41
T-KOMAD
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-T15 C-PRESS T-KOM DN15 20 KOM Y2 49,43 6,57
CP-T18 C-PRESS T-KOM DN18 20 KOM Y2 53,20 7,07
CP-T22 C-PRESS T-KOM DN22 20 KOM Y2 57,68 7,66
CP-T28 C-PRESS T-KOM DN28 10 KOM Y2 74,27 9,86
CP-T35 C-PRESS T-KOM DN35 10 KOM Y2 110,78 14,71
CP-T42 C-PRESS T-KOM DN42 6 KOM Y2 164,33 21,82
CP-T54 C-PRESS T-KOM DN54 4 KOM Y2 197,43 26,21
CP-T76 C-PRESS T-KOM DN76 10 KOM Y2 924,00 122,64
CP-T88 C-PRESS T-KOM DN88 10 KOM Y2 1061,66 140,91
CP-T108 C-PRESS T-KOM DN108 10 KOM Y2 1382,44 183,49
T-KOMAD - UN
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-TI15/1/2/15 C-PRESS T-KOM UN DN15/1/2/15 20 KOM Y2 68,00 9,03
CP-TI18/1/2/18 C-PRESS T-KOM UN DN18/1/2/18 20 KOM Y2 69,35 9,21
CP-TI22/1/2/22 C-PRESS T-KOM UN DN22/1/2/22 20 KOM Y2 73,21 9,72
CP-TI22/3/4/22 C-PRESS T-KOM UN DN22/3/4/22 20 KOM Y2 100,60 13,36
CP-TI28/1/2/28 C-PRESS T-KOM UN DN28/1/2/28 10 KOM Y2 83,57 11,10
CP-TI28/3/4/28 C-PRESS T-KOM UN DN28/3/4/28 10 KOM Y2 102,71 13,64
CP-TI35/1/2/35 C-PRESS T-KOM UN DN35/1/2/35 10 KOM Y2 111,23 14,77
CP-TI35/3/4/35 C-PRESS T-KOM UN DN35/3/4/35 10 KOM Y2 141,86 18,83
CP-TI42/1/2/42 C-PRESS T-KOM UN DN42/1/2/42 6 KOM Y2 171,10 22,71
CP-TI42/3/4/42 C-PRESS T-KOM UN DN42/3/4/42 6 KOM Y2 198,49 26,35
CP-TI54/1/2/54 C-PRESS T-KOM UN DN54/1/2/54 4 KOM Y2 201,12 26,70
CP-TI54/3/4/54 C-PRESS T-KOM UN DN54/3/4/54 4 KOM Y2 209,10 27,76
CP-TI76/3/4/76 C-PRESS T-KOM UN DN76/3/4/76 10 KOM Y2 806,05 106,99
CP-TI88/3/4/88 C-PRESS T-KOM UN DN88/3/4/88 10 KOM Y2 1088,72 144,50
CP-TI108/3/4/108 C-PRESS T-KOM UN DN108/3/4/10 10 KOM Y2 1292,03 171,49
T-KOMAD - REDUCIRANI
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-T15/18/15 C-PRESS T-KOM RED DN15/18/15 20 KOM Y2 64,88 8,62
CP-T15/22/15 C-PRESS T-KOM RED DN15/22/15 20 KOM Y2 70,75 9,40
CP-T18/22/18 C-PRESS T-KOM RED DN18/22/18 20 KOM Y2 74,01 9,83
CP-T22/28/22 C-PRESS T-KOM RED DN22/28/22 20 KOM Y2 76,55 10,16
HOLENDER
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-AV15/3/4 C-PRESS HOLENDER DN15/3/4 10 KOM Y2 77,87 10,34
CP-AV18/3/4 C-PRESS HOLENDER DN18/3/4 10 KOM Y2 80,50 10,69
CP-AV22/1 C-PRESS HOLENDER DN22/1 10 KOM Y2 88,23 11,72
CP-AV28/5/4 C-PRESS HOLENDER DN28/5/4 10 KOM Y2 114,12 15,15
CP-AV35/6/4 C-PRESS HOLENDER DN35/6/4 8 KOM Y2 188,13 24,97
CP-AV42/1/3/4 C-PRESS HOLENDER DN42/1/3/4 4 KOM Y2 245,27 32,56
CP-AV54/2/3/8 C-PRESS HOLENDER DN54/2/3/8 4 KOM Y2 290,66 38,58
HOLENDER UN
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-HVIG15/1/2 C-PRESS RASTAVLJIVA SPOJNICA UN DN15/1/2 10 KOM Y2 113,69 15,09
CP-HVIG15/3/4 C-PRESS RASTAVLJIVA SPOJNICA UN DN15/3/4 10 KOM Y2 129,57 17,20
CP-HVIG18/1/2 C-PRESS RASTAVLJIVA SPOJNICA UN DN18/1/2 10 KOM Y2 129,57 17,20
CP-HVIG18/3/4 C-PRESS RASTAVLJIVA SPOJNICA UN DN18/3/4 10 KOM Y2 138,79 18,43
CP-HVIG22/3/4 C-PRESS RASTAVLJIVA SPOJNICA UN DN22/3/4 10 KOM Y2 151,96 20,17
CP-HVIG22/1 C-PRESS RASTAVLJIVA SPOJNICA UN DN22/1 10 KOM Y2 178,47 23,69
CP-HVIG28/1 C-PRESS RASTAVLJIVA SPOJNICA UN DN28/1 10 KOM Y2 231,32 30,71
CP-HVIG35/5/4 C-PRESS RASTAVLJIVA SPOJNICA UN DN35/5/4 6 KOM Y2 310,58 41,23
CP-HVIG42/6/4 C-PRESS RASTAVLJIVA SPOJNICA UN DN42/6/4 6 KOM Y2 552,86 73,38
CP-HVIG54/2 C-PRESS RASTAVLJIVA SPOJNICA UN DN54/2 6 KOM Y2 799,36 106,10
HOLENDER VN
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-HVAG15/1/2 C-PRESS RASTAVLJIVA SPOJNICA VN DN15/1/2 10 KOM Y2 121,59 16,14
CP-HVAG15/3/4 C-PRESS RASTAVLJIVA SPOJNICA VN DN15/3/4 10 KOM Y2 138,79 18,43
CP-HVAG18/1/2 C-PRESS RASTAVLJIVA SPOJNICA VN DN18/1/2 10 KOM Y2 129,57 17,20
CP-HVAG18/3/4 C-PRESS RASTAVLJIVA SPOJNICA VN DN18/3/4 10 KOM Y2 142,74 18,95
CP-HVAG22/1/2 C-PRESS RASTAVLJIVA SPOJNICA VN DN22/1/2 10 KOM Y2 138,79 18,43
CP-HVAG22/3/4 C-PRESS RASTAVLJIVA SPOJNICA VN DN22/3/4 10 KOM Y2 148,00 19,65
CP-HVAG22/1 C-PRESS RASTAVLJIVA SPOJNICA VN DN22/1 10 KOM Y2 178,47 23,69
CP-HVAG28/1 C-PRESS RASTAVLJIVA SPOJNICA VN DN28/1 6 KOM Y2 204,89 27,20
CP-HVAG35/5/4 C-PRESS RASTAVLJIVA SPOJNICA VN DN35/5/4 6 KOM Y2 277,57 36,84
CP-HVAG42/6/4 C-PRESS RASTAVLJIVA SPOJNICA VN DN42/6/4 6 KOM Y2 422,94 56,14
CP-HVAG54/2 C-PRESS RASTAVLJIVA SPOJNICA VN DN54/2 6 KOM Y2 898,73 119,29
ZAVRŠNA KAPA
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-K15 C-PRESS ZAVRŠNA KAPA DN15 20 KOM Y2 36,96 4,91
CP-K18 C-PRESS ZAVRŠNA KAPA DN18 10 KOM Y2 39,50 5,25
CP-K22 C-PRESS ZAVRŠNA KAPA DN22 10 KOM Y2 43,28 5,75
CP-K28 C-PRESS ZAVRŠNA KAPA DN28 10 KOM Y2 62,42 8,29
CP-K35 C-PRESS ZAVRŠNA KAPA DN35 10 KOM Y2 73,91 9,81
CP-K42 C-PRESS ZAVRŠNA KAPA DN42 6 KOM Y2 115,88 15,38
CP-K54 C-PRESS ZAVRŠNA KAPA DN54 4 KOM Y2 126,06 16,74
CP-K76 C-PRESS ZAVRŠNA KAPA DN76 10 KOM Y2 282,27 37,47
CP-K88 C-PRESS ZAVRŠNA KAPA DN88 10 KOM Y2 352,06 46,73
CP-K108 C-PRESS ZAVRŠNA KAPA DN108 10 KOM Y2 508,56 67,50
IZMIČNI LUK
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-UB15 C-PRESS IZMIČNI LUK DN15 10 KOM Y2 59,61 7,92
CP-UB18 C-PRESS IZMIČNI LUK DN18 10 KOM Y2 63,51 8,43
CP-UB22 C-PRESS IZMIČNI LUK DN22 10 KOM Y2 67,80 9,00
CP-UB28 C-PRESS IZMIČNI LUK DN28 10 KOM Y2 79,10 10,50
PRESS STROJEVI
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
ROTHENBERGER STROJ ZA PREŠANJE
AKUMULATORSKI
RE-AKPRESS10-108RB (SADRŽI BATERIJSKI STROJ BEZ BATERIJE, 1 KOM YT NA UPIT NA UPIT
PLASTIČNI KOVČEG)
C PRESS D15 D54 RADOPRESS D16 D63
RE-BAT+PUNJAČ BATERIJA+PUNJAČ 1 KOM YT NA UPIT NA UPIT
PRESS STROJEVI
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
KL-KET76REMS ČELJUST APARATA ZA PREŠANJE D76 "M" KONT. REM 1 KOM YT NA UPIT NA UPIT
KL-KET88REMS ČELJUST APARATA ZA PREŠANJE D88 "M" KONT. REM 1 KOM YT NA UPIT NA UPIT
KL-KET108REMS ČELJUST APARATA ZA PREŠANJE D108 "M" KONT. RE 1 KOM YT NA UPIT NA UPIT
KL-KET76 ČELJUST APARATA ZA PREŠANJE D76 "M" KONT. 1 KOM YT NA UPIT NA UPIT
KL-KET88 ČELJUST APARATA ZA PREŠANJE D88 "M" KONT. 1 KOM YT NA UPIT NA UPIT
KL-KET108 ČELJUST APARATA ZA PREŠANJE D108 "M" KONT. 1 KOM YT NA UPIT NA UPIT
ŠABLONA ZA MARKIRANJE
ŠIFRA OPIS J/P JM RAB KN/JM €/JM
CP-ETS ŠABLONA ZA MARKIRANJE 15-54 1 KOM YT 31,11 4,13